May 2004 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3
ML041690123
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/02/2004
From: Grimes J
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML041690123 (6)


Text

Exekanm Exelon Nuclear Peach Bottom Atomic Power Station Telephone 717.456.7014 www.exeloncorp.com Nuclear 1848 Lay Road Delta, PA 17314-9032 June 2, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278

Subject:

Monthly Operating Report for May 2004 In accordance with Technical Specifications, Section 5.6.4, "Monthly Operating Reports,"

we are submitting this Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3.

Should you have any questions concerning this letter, please contact Mr. Chester Lewis at (717) 456-3245.

Respectfully, Joseph P. Grimes Plant Manager Peach Bottom Atomic Power Station JPG/PJD AIpCSL:cmg VP 'm Cs L Enclosures cc:

H. J. Miller, Administrator, Region I, USNRC C. Smith, USNRC, Senior Resident Inspector, PBAPS G. F. Wunder, Project Manager, USNRC, PBAPS CwS gA-\4og U-~ o-Om) ,/eA

I. INTRODUCTION Peach Bottom Atomic Power Station is composed of two Boiling Water Reactors and Steam Turbine/Generators located in Delta, Pennsylvania. Unit Two and Unit Three both have a Maximum Dependable Capacity of 1112 MWe Net. The Station is jointly owned by Exelon Nuclear and Public Service Electric and Gas. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect/Engineer and Primary Construction Contractor was Bechtel Corporation. The Susquehanna River is the condenser cooling water source. The plant is subject to license numbers DPR-44 and DPR-56, issued October 25, 1973, and July 2, 1974, for Unit Two and Unit Three respectively, pursuant to Docket Numbers 50-277 and 50-278. The dates of initial Reactor criticality for Units Two and Three were September 16, 1973, and August 7, 1974, respectively. Commercial generation of power began on February 18, 1974, for Unit Two, and September 1, 1974, for Unit Three.

II.

SUMMARY

OF OPERATING EXPERIENCE A. Unit TWO Unit 2 began the month of May at 100% of maximum allowable power (3496 MWth).

At 2300 on May 2 3 rd, Unit 2 reduced power to 92%, for planned turbine stop valve and intercept valve testing. The Unit returned to maximum allowable power by 0228 on May 24'h.

Unit 2 ended the month of May at 100% of maximum allowable power (3496 MWth).

B. Unit THREE Unit 3 began the month of May at 100% of maximum allowable power (3514 MWth).

At 2207 on May 14th, Unit 3 reduced power to 52%, for a planned summer readiness load drop, in which condenser waterboxes were cleaned, among other miscellaneous activities. The Unit returned to maximum allowable power by 0838 on May 16th*

At 0233 on May 17 th, Unit 3 reduced power to 89%, for a planned follow-up rod pattern adjustment. The Unit returned to maximum allowable power by 0511 on May 17 th.

At 0427 on May 18 th, Unit 3 reduced power to 96%, due to a control rod hydraulic control unit air leak. Control rod 14-47 was inserted, and other rods were adjusted to get the Unit back to maximum allowable power by 0804 on May 18th*

At 0023 on May 2 0 th, Unit 3 reduced power to 86% in order to repair and test the air leak on the control rod hydraulic control unit. Rod 14-47 was withdrawn to its previous position, and following the adjustment of other rods, the Unit returned to maximum allowable power by 0443 on May 2 0 th.

Unit 3 ended the month of May at 100% of maximum allowable power (3514 MWth).

III. OPERATING DATA STATISTICS A. Peach Bottom Unit TWO Operating Data Report for May 2004 DOCKET NO.: 50-277 DATE: June 2, 2004 COMPLETED BY: Chip Lewis TELEPHONE: (717) 456-3245 OPERATING STATUS REPORTING PERIOD: May 2004 GROSS HOURS IN REPORTING PERIOD: 744 CURRENTLY AUTHORIZED POWER LEVEL (MWth): 3496

1. DESIGN ELECTRICAL RATING (MWe-Net): 1138
2. MAX. DEPENDABLE CAPACITY (MWe-Net): 1112 UNIT 2 OPERATING STATUS PARAMETER THIS MONTH YTD CUMULATIVE
3. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 3590.1 193,356.5
4. HOURS GENERATOR ON-LINE 744.0 3569.8 188,884.9
5. UNIT RESERVE SHUTDOWN HOURS 0 0 0
6. NET ELECTRICAL ENERGY GENERATED 841,738.1 4,035,329.7 187,186,867.8

III. OPERATING DATA STATISTICS B. Peach Bottom Unit THREE Operating Data Report for May 2004 DOCKET NO.: 50-278 DATE: June 2, 2004 COMPLETED BY: Chip Lewis TELEPHONE: (717) 456-3245 OPERATING STATUS REPORTING PERIOD: May 2004 GROSS HOURS IN REPORTING PERIOD: 744 CURRENTLY AUTHORIZED POWER LEVEL (MWth): 3514

1. DESIGN ELECTRICAL RATING (MWe-Net): 1138
2. MAX. DEPENDABLE CAPACITY (MWe-Net): 1112 UNIT 3 OPERATING STATUS PARAMETER THIS MONTH YTD CUMULATIVE
3. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 3647.0 191,917.4
4. HOURS GENERATOR ON-LINE 744.0 3647.0 187,972.0
5. UNIT RESERVE SHUTDOWN HOURS 0 0 0
6. NET ELECTRICAL ENERGY GENERATED 834,229.1 4,152,560.7 185,206,325.8

IV. OPERATING DATA STATISTICS A. Unit TWO Shutdowns for May 2004 Method of No. for Type Duration Reason Shutting Year Date (1) (Hours) (2) Down (3) Corrective Actions/Comments No Unit TWO shutdownsfor May 2004 B. Unit THREE Shutdowns for May 2004 Method of No. for Type Duration Reason Shutting Year Date (1) (Hours) (2! Down (3) Corrective Actions/Comments No Unit THREE shutdownsfor May 2004 Legend (1) Type: F - Forced S - Scheduled (2) Reason: A. - Equipment Failure (Explain)

B. - Maintenance or Test C. - Refueling D. - Regulatory Restriction E. - Operator Training/License Examination F. - Administrative G. - Operational Error (Explain)

H. - Other (Explain)

(3) Method of Shutting Down: 1. - Manual

2. - Manual Trip/Scram
3. - Automatic Trip/Scram
4. - Continuation
5. - Other (Explain)