November 2004 Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 & 3
ML050040242
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/02/2004
From: Grimes J
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML050040242 (8)


Text

l Exekanm Exelon Nuclear Peach Bottom Atomic Power Station Telephone 717.456.7014 www.exeloncorp.com Nuclear 1848 Lay Road Delta, PA 17314-9032 December 2, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278

Subject:

Monthly Operating Report for November 2004 In accordance with Technical Specifications, Section 5.6.4, "Monthly Operating Reports,"

we are submitting this Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3.

Should you have any duestions concerning this letter, please contact Mr. Chester Lewis at (717) 456-3245. I Respectfully, Joseph P. Grimes Plant Manager Peach Bottom Atomic Power Station JPG/PJD/NPA/CSL:cmg Enclosures cc:

S. Collins, Administrator, Region I, USNRC G. F. Wunder, Project Manager, USNRC U. S. NRC Senior Resident, PBAPS Aq I

Ctc,, aq- ltIC)27

I. INTRODUCTION Peach Bottom Atomic PoWer Station is composed of two Boiling Water Reactors and Steam Turbine/Generators located in Delta, Pennsylvania. Unit Two and Unit Three both have a Maximum Dependable Capacity of 1112 MWe Net. The Station is jointly owned by Exelon Nuclear and Public Service Electric and Gas. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect/Engineer and Primary Construction Contractor was Bechtel Corporation. The Susquehanna River is the condenser cooling water source. The plant is subject to license'numbers DPR-44 and DPR-56, issued October 25, 1973, and July 2, 1974, for Unit Two and Unit Three respectively, pursuant to Docket Numbers 50-277 and 50-278. The dates of initial Reactor criticality for Units Two and Three were September 16, 1973, and August 7, 1974, respectively. Commercial generation of power began on February 18, 1974, for Unit Two, and September 1, 1974, for Unit Three.

/ e II.

SUMMARY

OF OPERATING EXPERIENCE A. Unit TWO Unit 2 began the monti of November at 100% of maximum allowable power (3514 MWth).

At 0801 on November 7th, Unit 2 reduced power to 71%, due to a blown fuse in the outboard MSIV solenoid valve. Following repairs, the Unit returned to full power by 1455 on November 7th.

Unit 2 ended the month of November at 100% of maximum allowable power (3514 MWth).

B. Unit THREE Unit 3 began the month of November at 100% of maximum allowable power (3514 MWth).

At 2314 on November 12'h, Unit 3 reduced power to 94%, for planned turbine stop valve testing. Following completion of the tests, the Unit returned to full power by 0332 on November 13th.

Unit 3 ended the month of November at 100% of maximum allowable power (3514 MWth).

i 111. OPERATING DATA STATISTICS A. Peach Bottom Unit TWO Operating Data Report for November 2004 DOCKET NO.: 50-277 DATE: December 1, 2004 COMPLETED BY: Chip Lewis TELEPHONE: (717) 456-3245 OPERATING STATUS REPORTING PERIOD: November 2004 GROSS HOURS IN REPORTING PERIOD: 720 CURRENTLY AUTHORIZED POWER LEVEL (MWth): 3514

2. DESIGN ELECTRICAL RATING (MWe-Net): 1138
2. MAX. DEPENDABLE CAPACITY (MWe-Net): 1112 UNIT 2 OPERATING STATUS PARAMETER THIS MONTH YTD CUMULATIVE
3. NUMBER OF HOURS THE REACTOR WAS CRITICAL 720.0 7,439.8 197,206.3
4. HOURS GENERATOR ON-LINE 720.0 7,380.9 192,694.8
5. UNIT RESERVE SHUTDOWN HOURS 0 0 0
6. NET ELECTRICAL ENERGY GENERATED 827,075.9 8,168,116.9 191,319,655.0

/

Ill. OPERATING DATA STATISTICS B. Peach Bottom Unit THREE Operating Data Report for Novemiber 2004 DOCKET NO.: 50-278 DATE: December 1, 2004 COMPLETED BY: Chip Lewis TELEPHONE: (717) 456-3245 OPERATING STATUS REPORTING PERIOD: November 2004 GROSS HOURS IN REPORTING PERIOD: 720 CURRENTLY AUTHORIZED POWER LEVEL (MWth): 3514 .

1. DESIGN ELECTRICAL RATING (MWe-Net): 1138
2. MAX. DEPENDABLE CAPACITY (MWe-Net): 1112
i. UNIT 3 OPERATING STATUS

, PARAMETER THIS MONTH YTD CUMULATIVE

3. 'NUMBER OF HOURS THE REACTOR WAS CRITICAL 720.0 8,040.0 196,310.4
4. HOURS GENERATOR ON-LINE 720.0 8,040.0 192,364.5
5. UNIT RESERVE SHUTDOWN HOURS 0 0 1 0
6. NET ELECTRICAL ENERGY GENERATED 823,608.9 9,136,615.9 190,190,381.0

/ IV. OPERATING DATA STATISTICS A. Unit TWO Shutdowns for November 2004 Method of No. for Type Duration Reason Shutting Year Date (1) (Hours) (2) Down (3) Corrective Actions/Comments No Unit TWYO shutdownsfor November 2004 B. Unit THREE Shutdowns for November 2004 Method of No. for Type Duration Reason Shutting Year Date (I! '(Hours) (2) Down (3) Corrective Actions/Comments No Unit THREE shutdownsfor November 2004 Legend (1) Type: F - Forced S - Scheduled (2) Reason: A. - Equipment Failure (Explain)

B. - Maintenance or Test C. - Refueling D. - Regulatory Restriction E. - Operator Training/License Examination F. - Administrative G. - Operational Error (Explain)

H. - Other (Explain)

(3) Method of Shutting Down: 1. - Manual

2. - Manual Trip/Scram
3. - Automatic Trip/Scram
4. - Continuation
5. - Other (Explain)

/ ExekmSn..

Exelon Nuclear Telephone 717.456.7014 Nuclear Peach Bottom Atomic Power Station www.exeloncorp.com 1848 Lay Road Delta. PA 17314-9032 10 CFR 50.74 December 7, 2004 Mr. Samuel J. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region I 475 Allendale Rd.

King of Prussia, PA 19406 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

Subject:

Notification of Change in Status of a Licensed Operator Pursuant to 10 CFR 50.74, this letter is submitted to inform you that the following licensed individual no longer requires his license due to a permanent reassignment:

Phillip J. Habbershon (OP-10894-2, Docket No. 55-61315)

We request that this individual be removed from the list of license holders. If you have any questions, feel free to contact Mr. Richard Edens at 717-456-3578.

If you have any questions, please feel free to contact us.

Robert C. Braun Site Vice President Peach Bottom Atomic Power Station cc: Senior Resident Inspector, USNRC, PBAPS (w/o attachment)

R. R. Janati, Commonwealth of Pennsylvania (w/o attachment)

Document Control Desk, USNRC, Washington DC (w/o attachment)

CCN: 04-14098

/ /- /Exek'n:

-xe oeen sM Exelon Nuclear Telephone 717.456.7014 Nuclear Peach Bottom Atomic Power Station www.exeloncorp.com 1848 Lay Road Delta, PA 17314-9032 November 19, 2004 U.S. NRC Region I Administrator 475 Allendale Road King of Prussia, PA 19406

Subject:

Submittal of Integrated Initial License Training Examination Materials Peach Bottom Atomic Power Station, Units 2 and 3 NRC Docket Nos. 50-277 and 50-278 In accordance with NUREG 1021, Revision 9, "Operating Licensing Examination Standards for Power Reactors", Peach Bottom Atomic Power Station is submitting the integrated initial license training examination materials. This submittal supports the initial license examination scheduled for the weeks of February 7 and 14, 2005.

In accordance with NUREG 1021, Revision 9, Section ES-201, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Should you have any questions concerning this letter or the examination materials, please contact Philip E. Nielsen (717) 456-4122.

Respectfully, Richard S. Llewellyn Facility Representative Peach Bottom Atomic Power Station

Enclosures:

(Delivered to Todd Fish, Chief Examiner, NRC Region I)

Control Room Systems and Facility Walkthrough Job Performance Measures Administrative Topic Job Performance Measures Integrated Plant Operation Scenario Guides RO/SRO Written Examinations and keys ES-301-3, Operating Test Quality Checklist ES-301-4, Simulator Scenario Quality Checklist ES-301-5, Transient and Event Checklist ES-301-6, Competencies Checklist ES-401-6, Written Exam Quality Checklist cc: (without attachments)

PSE&G, Financial Controls and Co-owner Affairs R. R. Janati, Commonwealth of Pennsylvania INPO Records Center S. Collins, US-NRC, Administrator, Region I R. I. McLean, State of Maryland C. W. Smith, US NRC, Senior Resident Inspector PBT-File ccn 04-14091