Site, Core Operating Limits Report (COLR)
ML051260284
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/14/2005
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML051260284 (36)


Text

AtDuke RON A. JONES Vice President ErPower. Oconee Nuclear Site A Duke Energy Company Duke Power ON01 VP / 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax April 14, 2005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Oconee Nuclear Site Docket No. 50-269 Core Operating Limits Report (COLR)

Gentlemen:

Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 1, Cycle 23, Rev. 25.

Very truly yours,

  • 7 fI (?c v7 1Jba R. A. Jones Site, Vice President Oconee Nuclear Site Attachment

- Do www. dukepower. corn

NRC Document Control Desk April 14, 2005 Page 2 xc w/att: Mr. W. D. Travers,Regional Administrator U. S. Nuclear Regulatory Commission, Region II Mr. L. N. Olshan,-'-Project Manager Office of Nuclear. Reactor.Regulation Mr. Mel Shannon",

Senior Resident Insp'ector  :

Oconee, Nuclear SiteSe

DISPOSmON OF THE ORIGINAL DOCUMENT WILL BE TO P RTY SuperRush THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS Date: 04107/05 PRIORITY OTHERWISE IDENTIFIED BELOW 1)00620 DOC MGMT MICROFILM EC04T Document Transmittal # DUK050960022 2)00813 DOC MGMT EC04T ORIGINAL Duke Power Company QA CONDITION Ei Yes F No 3)06358 ONS REGUL COMPLANCE ON03RC OTHER ACKNOWLEDGEMENT REQUIRED .

4)06700 ONS MANUAL MASTER FILE ON03DM DOCUMENT TRANSMITTAL FORM Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE 5)06937 RR ST CLAIR EC08G ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE NUCLEAR GENERAL OFFICE Duke Power Company OCONEE NUCLEAR STATION P.O. Box 1006 WORK ITEM: EXEMPTION M-5 Energy Center EC04T RECORD RETENTION: 003587 Charlotte, N.C RESP GROUP: NE OCONEE I CYCLE 23 CORE OPERATING LIMITS REPORTS, Rec'd By Page 1 of 1 Date , I q, . , , I 4.

I. *_.._ i _._ _._ _l DOCUMENT

~ NO QA I

COND REV #1DATE DISTR CODE I .1, 2 3 .4 1,5 6 7 .8 9 10 11 12 113 14 15 lTOTAL I I1 i -

.... ,4-

. I . I I,, .

I I L' -

- . . . . . II I . I I

.. I I I . I I'_I_ _1_i_

_'__I'_I'_

_I ONEI-0400-050 01 ;:i;t 'S:;:. 025 '04/07/05,4 NOMD-27 Vl ." VI1:', VI 4

- i ; ', ] q .- r

, ,,, a ...

I, I;:I:~ ~

,. I .;j i

,: . i Jo., . i:I :I i .. i, ,-....

f- .

. : hi4,. 1 .

FOR INFC RN~AT 10A IotrILY I

REMARKS: DUKE THOMAS C GEER I

DOCUMENT RELEASE EXEMPT FROM NUCLEAR MODIFICATION PROGRAM.

NUCLEAR STATION ENGR MANAGER GS-SVP NUCLEAR SUPPORT BY:

J W SIMMONS JWS/TER EC08H

.ONEI-0400-50 Rev 25 Page 1 of 33 Duke Power Company Oconee 1 -Cycle 23 Core Operating Limits Report QA Condition 1 Prepared By L. D.McClain /2.uc 9-A&'n YI'1 Date: X(Apr Oo5 Checked By: J. D. Forster Date * -&Apr, a I

CDRBy: T.P.-Yadon / n-,tZ.

7 71-~ d Date: /( ,/

/(O o Approved By: R.-R. St.Clair Date: /4 D

6Docu'ment No. / Rev. ONEI-0400-50 Rev. 25

-Date April 6, 2005 Page No. Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By: , IiP (Sponsor) eag Date: i//s CATAWBA Inspection Waived MCE (Mechanical & Civil)  : -Inspected By/Date:

RES (Electrical Only) ' Z] Inspected By/Date: - _-_;

RES (Reactor) El Inspected By/Date:  :

MOD L Inspected By/Date:

Other ' )

'_)_'_:_____ Inspected By/Date:

-CONEE Inspection Waived MCE (Mechanical & Civil) 'Inspected By/Date:

RES (Electrical Only) -Inspected By/Date:::

RES (Reactor) -,InspectedBy/Date: _ _ _ __:

MOD  : I.nspected By/Date: -_:_.

Other ( ) [ Inspected By/Date:  :

-MCGUIRE Inspection Waived MCE (Mechanical & Civil) '  ; Inspected By/Date: '-_-__'.;______________________

RES(Electrical Only) [] InspectedBy/Date:: '-_:

RES (Reactor) [3 Inspected By/Date: _______________-__

MOD [l Inspected By/Date: __ _:

Other ( -E)l______-,_. -, Inspected By/Date: _

1 ONEI-0400-50 Rev 25 Page 3 of 33 Oconee 1 Cycle 23 Core Operating Limits Report Insertion Sheet for Revision 25 This revision is not valid until the end of operation for Oconee 1 Cycle 22.

Remove these Revision 24 pages I te Rev sion 25 pages 1 - 33 1-33 Revision Log Effective Pages Pages., Pages Total Effective Revisionn Date -Revised -.'Added:,- Deleted Pages

-Oconee 1 Cycle 23 revisions below 25 - Apr 2005 = 1 -33 - - 33 Oconee 1 Cycle 22 revisions below .-

-24 Mar2005 3,5 - - 33 23 Feb 2005 1-4,6 - - 33 22 Dec2004 3,30  : .--

, . - 33 21 Feb 2004 14,6 -33 20 Nov2003 1 -32 33 - 33 Oconee 1 Cycle 21 revisions below

-19 ~Aug'2003 1,2,3 -a 1 -32 18 Apr2002 - 1,2,4 - - 17 Mar2002. 1 - 32 Oconee 1 Cycle 20 revisions below - - -

May2001 1 31 15 Nov2000 1 -31 - - 31

ONEI-0400-50 Rev 25 Page 4 of 33 Oconee I Cycle 23 1.0 Error Adjusted Core Operating Limits prepared in accordance with the requirements The Core Operating Limits Report for 01C23 has been have been developed using NRC of TS 5.6.5. The core operatirig limits within this report

11. The RPS protective limits approved methodology identified in references 1 through 12 through 14. These limits are validated for in references and maximum allowable setpoints are documented analyses assume a design flow of 107.5% of use in 01C23 by references 15 through 16.'- The Oi23 of 1.714, and axial peaking factor (Fz) of 1.5, 88,000 gpm per RCS pump, radial local peaking (FAh)0 and Tavg and an EOC (< 100 ppmB) Tavg reduction of up to 10 F provided 4 RCPs are in operation 0

does not decrease below 569 F.

1 of the report incorporate all necessary The error adjusted core operating limits included in section 01C23 reload core.

uncertainties and margins required for operation of the 1.1 References DPC-NE-1 004P-A, Revision 0,

1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, SER dated November 23,1992.

II,-DPC-NE-1002A, Revision 1,

2. Oconee Nuclear Station Reload Design Methodology SER dated October 1,1985.

NFS-1001A, Revision 5,

.3. Oconee Nuclear Station Reload Design Methodology, SER dated December 8, 2000.

DPC-NE-2003P-A, Revision 1,

4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, SER dated June 23,2000.

DPC-NE-2005P-A, Revision 2,

5. Thermal Hydraulic Statistical Core Design Methodology, SER dated June 8,1999.

TACO3, DPC-NE-2008P-A,

6. Fuel Mechanical Reload Analysis Methodology Using Revision 0, SER dated April 3,1995. -

DPC-NE-3005-PA, Revision 2,

7. UFSAR Chapter 15 Transient Analysis Methodology, SER dated September 24, 2003.

Methodology, Rev. 3,

8. DPC-NE-3000P-A, Thermal Hydraulic Transient Analysis SER dated September 24, 2003.

Accident Evaluation'Model for

9. BAW-10192-PA, BWNT LOCA BWNT Loss of Coolant 18, 1997.

Once-Through Steam Generator Plants, SER dated February Computer Program'for Ught Water

10. BAW-10164P-A, Rev. 4, RELAP51MOD2-B&W - 'An'AdvancedApril 9, 2002.

dated Reactor LOCA and Non-LOCA Transient Analysis", SER and Structural Material (M5) in PWR Reactor Fuel,

11. BAW10227-PA, Evaluation of Advanced Cladding SER dated February 4, 2000. -

Analyses and Variable Low Pressure

12. RPS RCS Pressure & Temperature Trip Function Uncertainty Safety Limit, OSC-4048, Revision 4, January 2001.-

Using Error Adjusted Flux-Flow Ratio of

13. Power Imbalance Safety Limits and Tech Spec Setpoints 1.094, OSC-5604, Revision 2, October 2001.

Rev. 1, Duke Power Co., June 2002.

14. ATc and EOC Reduced Tavg Operation, OSC-7265, 1, April 2005.
15. 01C23 Maneuvering Analysis, OSC-8658, Revision 0, April 2005.
16. 01 C23 Reload Safety Evaluation, OSC-871 8, Revision

ONEI-0400-50 Rev 25 Page 5 of 33 Oconee 1 Cycle 23 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.

Referred to by TS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.

Referred to by TS SLC 16.5.13.

CFT boron concentration shall be greater than 1874 ppm. The average boron concentration in the CFT's shall be less than 4000 ppmi. Referred to by TS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1% Ak/k.

Referred to by TS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than: MTC x 10-4 Unear interpolation is valid within the table provided. - Ap/ F  % FP Referred to by TS 3.1.3. +0.70 0

+0.525 20 0.00 80 0.00 100 0.00 120 Departure from Nucleate Boiling (DNB) parameter for ROS loop pressure shall be Referred to by TS 3.4.1. 4 RCP:- measured hot leg pressure > 2125 psig 3 R CP:- measured hot leg pressure > 2125 psig 0

DNB parameter for RCS loop average temperature shall be: Max Loop Tavg (Incl 2 F unc)

Referred to by TS 3.4.1. ATc, 'F 4 RCP Op 3 RCP Op 0 581.0 581.0

  • The measured Tavg must be less than COLR limits minus 1 581.4 581.2 instrument uncertainty.- ATc is the setpoint value selected by 2 581.8 581.4 the operators. Values are expanded by linear interpolation on, 3 582.1 581.7 page 33 of this document without instrument uncertainty.4 582.5 581.9 5 582.9 582.1
  • This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be: - 4 RCP: Measured > 108.5 %df Referred to by TS 3.4.1. 3 RCP: Measured > 74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.

Referred to by TS 3.2.1.

Regulating rod group overlap shall be 25% + 5% between two sequential groups.

Referred to by TS 3.2.1.

Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are nmet as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Umits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).

ONEI-0400-50 Rev 25 Page 6 of 33 Oconee 1 Cycle 23 Steady State Operating Band Rod Index APSR %WD EFPD Mi Max Min Max 0 to EOC 292t5 300 30 40 Quandrant Power Tilt Setpoints Steady State Transient Maximum Core Power Level, %FP 30-100 0-30 30-100 0-30 0 - 100 Full Incore 3.50 7.32 6.82 9.10 16.26

-Out of Core 2.33 6.09 5.63 7.72 14.22 Backup Incore 2.25 3.87 3.63 4.81 10.07 Referred to by TS 3.2.3

-Correlation Slope'(CS)

-1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).

ONEI-0400-50 Rev 25 Page 7 of 33 Oconee 1 Cycle 23 Variable Low RCS; PressureRPS Setpoints Referred to by TS 3.3.1 2400 2300 2200 co 05 M

<' 2100 M

cn a) 0n a.

C:

0 0

0 2000 0

1900 1800 1700 _-

540 560 - - 580 600 620 640 Reactor Coolant Outlet Temperature, OF

ONEI-0400-50 Rev 25 Page 8 of 33

- Oconee 1 Cycle 23 RPS Power Imbalance Setpoints

% FP -  % Imbalance 4 Pumps -33.0 90.4 - -33.0

-107.9 - -14.4

-:107.9: 14.4.

190.4 - 33.0.

0. 33.0 3 Pumps - ..- 0 ,:'

^ -33.0

,0 63.1- -33.0

- 80.6- -14.4

,E0 80.6 14.4

- -: 63.1 33.0

.00- 33.0 Maximum Allowable RPS Power Imbalance Limits

% FP-  % Imbalance 4 Pumps -35.0 X;90.0- -35.0 109.4 -14.4 109.4 - 14.4 9.0 35.0

0 35.0 3 Pumps 0' -35.0

-62.3 -35.0 81.7 -14.4 81.7 14.4 62.3 35.0 0 35.0

ONEI-0400-50 Rev 25 Page 9 of 33 eC le 23 Operational Power Imbalance Setpoints Full Backup Out of

%FP mncore. Incore Core 4 Pumps -0 -31.2 -30.8 -31.2

-80 -31.2 -30.8 -31.2 90 -2~7.5`- -27.3 -27.5 100 -1 -18.9 -19.1 102 -7.0 -17.0 -17.0 102 -17.0 -!16.9 17.0 100 19.1; 18.9 19.1 90 28.1 ,27.6 28.1 80 28.1 27.6 28.1 0 28.1 27.6 28.1 3 Pumps 0.0 -31.2 .8 -31.2 63.5-312 -- 31.2 63.96- ~-- 30.8-77.0, -7. -17.0 -17.0 77.0- ~-17.0 16.9 17.0 66.98 27.6 66.51 28.1 28.1 0.0 28.1 27.6' 28.1

ONEI-0400-50 Rev 25 Page 10 of 33 Oconee 1 Cycle 23 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC

% FP RPS Trip . .Full lnoore Alarm I Out of Core Alarm 107.9 -14.40 14.40 107 -15.36 15.36 106 -16.42 16.42 105 -17.48 17.48 104 -18.55 18.55 103 -19.61 19.61 102 -20.67 20.67 -- 17.00 ' 17.00 -17.00 17.00 101 -21.73 -21.73 -18.05 18.05 -18.05 18.05 100 -22.80 22.80 --19.10, 19.10 -19.10 19.10

99 -23.86 23.86 -19.94 20.00 -19.94 20.00 98 -24.92 24.92 -- 20.78 20.90 -20.78 20.90 97 -25.99 -25.99 "-21.62 21.80 -21.62 21.80 96 -27.05 27.05 -22.46- 22.70 -22.46 22.70 95 -28.11 28.11 -23.30: 23.60 -23.30 23.60 94 -29.17 29.17 -24.14 24.50 -24.14 24.50 93 -30.24 30.24 ,;-24.98 25.40 -24.98 25.40 92 -31.30 31.30 3-25.82 2 26.30 -25.82 26.30 91 -32.36 32.36  ;-26.66-- 27.20 -26.66 27.20 90.40 -33.00 33.00 ' -27.16 27.74 -27.16 27.74 90 -33.00 33.00 --27.50 28.1 0 -27.50 28.10 89 -33.00 33.00 -27.87 -28.10 -27.87 28.10 88 -33.00 33.00 -28.24 -28.10 -28.24 28.10 87 -33.00 -33.00 ~-28.61 28.10 -28.61 28.10 86 -33.00 -33.00 -28.98 28.10 -28.98 28.10 85  :-33.00 33.00 -29.35 0 28.10 -29.35 28.10 84 -33.00 -33.00 -29.72 28.1 0 -29.72 28.10 83 -33.00 33.00 -30.09 28.1 0 -30.09 28.10 82 -33.00 33.00 -30.46- 28.10 -30.46 28.10 81 -33.00 33.00 -30.83 28.10 -30.83 28.10 80 -33.00 33.00 --31.20 28.10 -31.20 28.10 0 -33.00 33.00 -31.20 28.10 -31.20 28.10

% FP RPS Trip I :

j ,h Full Incore Alarm J I

Out of Core Alarm ONEI-0400-50 Rev 25 Page 11 of 33 Oconee 1 Cycle 23 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC

% FP I RPS Trip "I Full Incore Alarm Out of Core Alarm 80.6 -14.40 14.40 80' -15.04 15.04 79 -16.10 16.10 78 --17.16 17.16 77.0 -18.23 18.23 - -17.00  : ,17.00 -17.00 17.00 76 -19.29 19.29 -18.06 18.06 -18.06 18.06 75 -20.35 20.35 -19.12 19.12 -19.12 19.12 74 -21.41 21.41 -20.18 20.18 -20.18 20.18 73 -22.48 22.48 ,-21.23 - 21.23 -21.23 21.23 72 -23.54 23.54 -22.29 -22.29 -22.29 22.29 71 -24.60 24.60 -23.35 '23.35 -23.35 23.35 70 -25.67 25.67 -24.41 24.41 -24.41 24.41 69 -26.73 26.73 -25.47:i '25.47 -25.47 25.47 68 -27.79 27.79 ,26.53 26.53 -26.53 26.53 67 w-28.85 28.85 --27.58 '27.58 -27.58 27.58

- 66.5 -29.37 29.37 tr>-28.1 0 28.10 - -28.10 28.10 66 '-29.92 29.92 - X-28.64 28.10 -28.64 28.10 65 -30.98 30.98 -29.70 28.10 -29.70 28.10 64 -32.04 32.040 -'-30.76 :28.10. 0--30.76 28.10 63.58 -32.49 32.49 -31.20 28.10 -31.20 63.1 -33.00 -33.00 -31.20 28.10 -31.20 28.10 63 -33.00 33.00 -31 20 28.1 0 -31.20 28.10 62 -33.00 .33.00 -31.20 28.10 -31.20 28.10 61 -33.00 33.00 -31.20 28.10 -31.20 28.10 60 -33.00 33.00 -- 31.20 '0 28.10 -31.20 28.10 0 -33.00 33.00 '-31.20 28.10 -31.20 28.10

% FP I - RPS Trip [-' Full In*ore Alarm Out of Core Alarm ONEI-0400-50 Rev 25 Page 12 of 33 Oconee 1 Cycle 23 RPS Power Imbalance Setpoihts Referred to byTS 3.3.1 Thermal Power Level, %FP 120 -

(-14.4,107.9) (14.4,107.9) 100 -

M2 = -0.941 M1=0.941 -: ,- . . I, I . - -.

Acceptable 4 mp Operation I - I-, . - ,

(33.0,90.4)

(-33.0,90.4) (-14.4,80.6)  :(14.4,80.6)

-- 0: S--,

= . .

- .4 .

. f

- .... :w.f. -
.... . - f;

. . E

- -060 -  ; .

(33.0,63.1)

(-33.0,63.1)  : . f ',.-

Acceptable 3 or 4 Pui rnp Operation

,0:

L .; .

. o f . .... .... .

, 4 ...

f fC .. .
- .:-: f S

-. V

t --: 20 :-
.. ... .. f l - -: . -: . .; -- .:n

. - , LC

, - .f

- Rn

. * .  ! . . , ov .

-40.0 -30.0 -20.0 -10.0 ,0.0 ' 10.0 20.0 30.0 40.0

Percent Power Imbalance

/ -

I-)*

ONEI-0400-5D9v 25 Page 13 of 33

. Oconee 1 Cycle 23 Imbalance Setpolnts for 4 Pump Operation, BOC to EOC 110 I

RPS Trip Setpoint 100 - - ~ - I _.

mE-- I _ IIncore & Outcore Alarm RPS Trip Setpoint:

90 80 I" 7

70 U1)

BO o :3 60 u-,

a) c ,

5 U)

EL 40 30 20 10

-4 v _ I

- - - : a v a

-40 -35 -30, -25 -20 -15 -10 -5 0 5 10 15 20 ' 25 30 .: 35 40 Percent Axial Imbalance

ONEI-0400-50 A25

.Oconee 1 Cycle 23 Page 14 of 33 Imbalance Setpoints for 3 Pump Operation, BOC to EOC 110 100 90 tRPS Trip Setpoint RPS Trip Setpoint _

1 II I li I t __II_

80 l oI I &

  • It Arm I IOUtcore I :I Alarm
Inco're 70 1_

0 0

CLj . 60 L, ., E a) 050 I .-

Qi, 40 ann 20 10 0

9

  • a 5 - w 35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

ONEI-0400-50 Rev 25 Page 15 of 33 Oconee 0Cycle 23-,

Operational Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Iop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 261.5 283.4 300 100.0 261.5 281.5 300 90.0 261.5 271.9 300 80.0 262.3 300 50.0 233.4 :300 48.0 .195.2 231.5 300 15.0 291.5 21.5- --165.5 300 13.0 -161.5 300 7116.5 5.0 93.5 300 3.0 76.5 300 2.8 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 255.5 '285.2 300 75.0 :251.5 281.5 300 1.5 '

-201.5 - 300 50.0 235.2 48.0 :195.2 231.5 .300 15.0 91.5 165.5 300 13.0 :76.5' 161.5 300 5.0. - 16.5 93.5 300 3.0 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

ONEI-0400-50 Rev 25 Page 16 of 33 Oconee1 Cycle 23 Shtdw-d d...,r St Shutdown Margin-Rod In(dex Se points RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 inop Rod Setpoint 4 Pumps 102.0 224.6- 283.4 300 100.0 221.5:: 281.5 300 48.0 141.5 231.5' 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 '-0.0 51.0 300 3 Pumps 77.0 227.4 285.2 300 75.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0, 74.8 300 0.0 0.0 51.0 300

Oconee 1 Cycle 23 ONEI-0400-50 Rev 25 Rod Index Setpoinrts Page 17 of 33 4 Pump Operation, No Inoperable- Rods, BOC to EOC

- '.- I

-1 Shutdown Margin etPoint - .IOperational Alarm etpoint

,%FP CRGP 5 CRGP 6 ~CRGP7-7 CRGP5 CRGP 6 CRGP 7 102 100 99.8 24.8 100 100' 61.5 101 100 - 99.0 240100 100 61.5 100 100 98.2 23.2-: 100 100 61.5, 99 100 97.5 22.51- 100 I 100 61.5 98 100 96.7 21.7 -100 .100 ~ 61.5 97 10 95.9 20.9 1 00 100 61.5 96 100 -95.2 -20. 2 100 1061.5 95 10 94.4 19.4 100 100 61.5 94100 93.6 18610100 61.5 93- 100 92.9 17.9 100 1061.5 92 100 92.1 -:117.11 100 100 61.5 91 :100 913 16.3 100 100 61.5 90100 90.6 - 15.6 100 100 61.5 89 - 100 89.8 148101061.5 88100 89.0 -14.0 100 100 61.5 87 :100 88.2 13210100 61.5 86 10 87.5 12.5 100 100 61.'5 85 100 86.7 11.7 100 100 61.5 84 100 85.9 110.9 100 100 61.5 83 -::100 85.2 10210 100 61.5 82 .10 84.4 9410100 61.5 81 100 83.6 8.6 -100 100 61.5 80 10 82.9: 7.9 100 100 61.5 79 0082.1 z-7.1 100 100 59.5 78 100 81.3 6.3: 100 100 57.5 77 100 80.6 5.6 100 100 55.5 76 -100 79.8 -- 4.8.f' 100 100 53.5 75 100 79.0 .- 4.0 100 100 51.5 74 100 78.2 ~ 3.2- 10 100' 49.5 73 10 .775 .5 100 100 47.5 72 .100 '76.7 -1.7 100 100 45.5 71 10 75.9 0O.9 100 1043.5 70 :100 75.2 1-1~0.2 ~ 100 100 41.5 69.8 100 75.0 '0 --- 100 100 41.1 69 100 73.8 0: 100 100 39.5 68100 72.3 ~ 0 100 100 .37.5

'67 100 70.7 0100 100 35.5 66r 100 69.2 0 '100 100 33.5 65 100 67.7 0oo 10 0 1.5 64 100 66.11010 0 29.5 63 . 100 64.6 -0 100 100 27.5 62 100 63.0 0 100 1025.5 61.8 -100 6.W 100 100 2.

61 .100 61.5 0' :100 99.2 2.

60 10 60.0 0J10 98.2 23.2 59 10 5.40 0 97.2 2.

58 :100 56.9 0 100 96.2 2.

57 '100 :55.3 0 :100 -95.2 20.2 56 10 5. 010 -94.2 19.2 55 100 -52.3 010011 932' 18.2 54 .100 50.7 0 100 -92.2 17.2 53 10 49.2 -0 100 91.2 16.2 52 100 47.7 - 0100 90.2 15.2 51 100 4610 100 -89.2 14.2 50 100 44.6 0-_~ 100 88.2 13.2

%FP CRGP5 RG s CRP CGP5-CRFGP6.CRP

______ Shutdown Margin Setpoint. Operational Alarm Setpoint RI = 300 is withdrawal limit at 'all power levels. Cotneonexpa.

Continued on next page.

Oconee 1 Cycle 23 ONEI-0400-50 Rev 25 Rod Index;Setpoints Page 18 of 33 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

%FP CRGP5 CRGP6 -CRGP7 CRGP 5 CRGP6 -CRGP7 49 -100 43.0 0 100; -86.7 11.7 48 100 41.5 0 - 100 85.1 10.1 47 100 39.6 0 100 -83.5 8.5 46 100 82.0 7.0 45 100 35.9 0 100 80.4 - 5.4 44 100 34.1 0 100 78.8 3.8 43 100 32.2 -- 0 :' 100 . 77.2 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0-O 100 75.0 0 41 .100 28.5 0 100 73.2 0.

40 100 26.6 0 -100 70.1 0 39.1 -100 25.0 - 0 -100 67.3 0 39 99.9 24.9 0 100 -66.9 0 38 99.0 24.0 -100 0- 63.8 0 37 98.0 -23.0 100 60.6 0 36 97.1 22.1 0 100 57.5 0 35 - 96.2 21.2 0 100 54.3 0 34 -95.2 20.2 0 -100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 .93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 - 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0-- 100 32.4 0 27 88.8 13.8 0 100 29.2 0 26 87.8 12.8 - -0 100 26.1 0 25.7 87.5 12.5 5 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 - 11.0 0 97.4 22.4 0 23 85.0 -10.0 - 0 95.8 20.8 0 22 84.1 9.1 0 :94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 - 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 - O,-0  :;84.8 9.8 0 15 - 77.6 2.6 00= '83.2 ; 8.2- 0 14 76.7 1.7 0 79.5 - 45 0 13 75.8-- 0.8 0 758 0.8 0 12.8 -75.0 0 - 0 ; -75.0 0 0 12 :69.0 0 0 69.0- 0 0 11 61.5 0 0 61.5 0 0

-54.0 0 0 54.0 :0 0 9 . 46.5 0;: 0 46.5 0 0 8 39.0 0 0 .39.0 0 7 31.5 0--?- 0---o 31.5 0 0 6 24.0- 0 0 24.0 0 0 5 -16.5 ,0 0 16.5 0 0 4 9.0 0 0 9.0 0 0 3 1.5 - 0 0- 1.5 0 0 2.8 0 0 0 0 2 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0o 0

%FP CRGP5 CRGP6 --CRGP7 CRGP5 CRGP6 CRGP7

. Shutdown Margin Setpoint Operational Alarm Setpoint RI =300 is withdrawal limit at all power levels.

Oconee 1 Cycle 23 ONEI-0400-50 Rev 25

.Rod Index Setpoints Page 19 of 33 3 Pump Operation ,No Inoperable Rods, BOC to EQO Shutdown Marqin Sepoint'- Oper tonal Alarm Setpoint

%P CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP67 CRGP 7 77 100 100 '27.4- 100 100 55.5 76.2 100 100 -25.0-' 100 100 53.9 76- 100 .99.7 24.7 10100 53.5 75 10 - 9.232100 100 51.5 74 100 96.8 218 0 100 49.5 73 100 95.3 -~20.3 100 1047.5 72 100 .93.8 18.8 10100 45.5 71 100 92.3 17.3 100 100 43.5 70 100 90.8 -15.8 100 10 4.

69 1089.4 -14.4 -100 100 39.5 68 100 87.9 129100 100 - 37.5 67 10 64 11.4 100 1100 35.5 66 100 84.9 9.9' 100 100 33.5 65 100 83.4 .- 8.4 100 100 31.5 64 100 -82.0 70100 100 29.5

.63 :100 -80.5 5.5 10100 27.5 62100 79.0 '40100 7 100 2.

61.8 -100 78.6 3.6 100 100.- 25.0 61 .100 77.5 - 2.5 ~ 100:- 99.2 24.2 60 100 76.0 -101009823.

59.3 100 75.0 0 100 97.6 22.6

59. 100 74.1 0100 97.2 22.2 58 -100' 71.1 0 -100 96221.2 57 100 68.2 :0 100 95.2 20.2 56 -100 65.2 0100 94.2 19.2 55 100 62.2 0- 100 93.2 18.2 54 100 59.3 0100 92.2 17.2 53 -100 56.3 0 100 91.2 16.2 52 '100 53.4 0O 100 90.2 15.2 51 .100 50.4 0 10 9214.2 50 ~~-100 47.4 '-0 100 -88.2 13.2 49 10 450- 100 86.7 11.7 48 100' 41.5 0 100 85.1 10.1 47 100' *39.6 0 100 83.5 - 8.5 46 100 37.8 0 100 82.0 -7.0 45 .100 35.9 -0100 80.4 5.4
44. -100 :34.1 0 100 7883.8

- 3100 32.2 . 0 722.2:

42 ~ -100 30.4 0- 100 75.7 0.7 41.6 100 29.6' 0 .100 75.0 0 41 100 :28.5 0 10 73.2 0 40 -100 26.6, 0~- 1100 70.10 39.1 -100 25.0 0 - 100 6730 39 99.9 24.9 0 1j00 66.9 0 38 ~ 99 24.0 01063.8 0 37 9823.0 0100 60.6 0 36 97.1 - 210 100 57.5 0 35 96.2 21.2:- 0 100 54.3 0 34 95.2 20.2 0 - 100 51.2 0 33 94.3 19.3 0.- 100 48.1 0 32 93.4 -18.4 0 100 44.9' 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 2990.6 15.6 0 100 35.5. 0 28 89.7 14.7 0 100: 32.4 0

% FP- CRGP 5 CRGP 6 7CRGP 7 CRGP 5 CRGP 6 CRGP 7

_____ Shutdown Margin Setpoint - Operational Alarm Sepon RI = 300 is withdrawal limit at all power levels. Cotneonexpa.

Continued on next page.

IOconee 1,Cycle 23 ONEI-0400-50 Rev 25 I.Rod Index Setpoints Page 20 of 33 3 Pump Operation, No Inoperable Rods, BOC to EQO Shutdown Marqin Sepofint Operational Alarm Sepoint

%FP CG5 CRGP 6 ~CRGP. -CRGP5 CRGP 6. CRGP 7 27 88.8 13.8 0. 100 29.2 0

26. 87.8 12.8 0 00 26.1 0 25.7 87.5 12.5 -0 100 25.0 0 25 86.9 -11.9, ~0 99.0 24.0 0 248. 100 -97.4 22.4 0 23 85.0 10.0' ~0 95.8 20.8 0 22 84.1 9.1 _0 94.2 19.2 0O 21 83.2 8.2 0 927 17.7 0 20 82.2 -7.2 091.1 16.1 0 19 813 6.3 0 8Z9.5 14.50 18 80.4 -5.4 0 88.0 13.0. 0 17 79.5 4.5 .0 86.4 11.4 0 16 78.5 3.5 0 8489.8 0 15 77.6 26 83.2 8.2 0 14 76.7 1.7 0 954.5 0 13 75.8 0.8 0-~ 75.8 0.8 0 12.8 75.0 0 7. 0 12 69.0 0 0~- 69.0 0 0 11 61.50 0 61.5 0 0 10 54.0 0 -0 54.0 .0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 039.0 0 0 7 31.5 00 31.5 0 0 6 24.0 0 024.0 0 0 516.5 0 01 6.500 4 9.0 0 0 9.0 0 0 3 1.5 0 0 .5 0 0 2.8 0 0 0 0 0 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

% FP CRGP 5 CRGP 6 -CRGP7 CRGPS 'CRGP6 CRGP 7

_____ Shutdown Margin Setpoint i--- Operational Alarm Setpoint RI =- 300 is withdrawal limit at all power levels.

Ocornee 1 Cy~cle 23 ONEI-0400-50 Rev 25 Rod Index' Setpoints Page 21 of 33 4 Pump Operation, 1 Inoperable Rod, BOC to EQO Shutdown Marmin Sepoint -Operational Alarm Setpoint

% FP :CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 102 :100 100 -83.4 '100 100 83.4 101 1100 00825100 100 82.5 10 .100 100 81.5 100 100 81.5

-99 ~ 100 ~ 100 80.5 100 100 80.5 98100 100 ~ 79.6 -100 100 79.6 97 .100 l100-. 778.6 '100 100 -78.6 96 100 100 ,--77.7 100 100 77.7 95 100 100 76.7 100 100 76.7 94100 100 75.7 100 107.

93 .100100 74.8 100 100 74.8 92 -100 100 73.8 :100 100 73.8 91 :100 100. 72.8 .1001 100 72.9 90 100 100 10107. 71.9 89 ~ 100 100 709100, 100 70.9 88 100 100 70.0: 100 100 - 70.0

~87 100 100 -__69.0 10 1069.0 86 100 100  :,,68.0 100 100 68.1 85 100, 100O ',67.1 100 100 67.1

.84 100 100 --66.1- 100 ~ 100 66.1 83 -100 '100 '6 5.2 100 100 65.2 -

82 .100 100 _;~64.2 100 100 64.2 81 100 :100 63~".2 100 :100 63.3 80 100, 100 62.3 100 100 62.3 79 100 :100 613100 100 61.3 78 10100 ~ 60.3 100 100 60.4 77 100 100 ':;59.4 10100 59.4 76 -100 7101057. 100 58.4 100058.4 100 100 5.

74 100 100 56.5 100100 56.5 73 :100 .100 55.5 100. 100 565.

72 100 100 54.6 100 100 54.6 71 :100 100 53.6 100 100 53.6 70 100 10 00 527 100 52.7 69 100 100 ~ 51.7 100 100 5.

68 100, 100 -__50.7 - 100 100 50.7

~67 100 100 49.8.- 100 100 49.8 66100 :100 48.8 100 :100 48.8 65100 10 .47.8 - :1 00 100 47.8 64 -100 -- 100 :_~46.9 100 -100 46.9 63 100 100' 45.9 .100 100 4.

62 100 10 50100 100 - 45.0 61 :100 100 ~ 44.0 -100 100 44.0 60 100 -100 43.0: 100 100 43.0 59 100 04. - 100 100 4.

,58 -100 :100 .'41.1' 100 100 41.1 57 100 -1 00 40.2: '100: 100 . 40.2 56 1010 39.2 1000- 39.2 55 100 100 38.2 10Q 100 38.2 54 _100 ~ 100 37.3 10-100 3.

53100 100 36.3 :100 -100 36.3 52 10100 35.3 100 100 35.3 51 100 100 34.4 - 100 100 34.4 50 ~ 100 100 ~ 33.4 100 100 33.4 49 100 100 ~ .32.5 100 '1032.5 48 100 10 .31.5,: 100 100 31.5

%P CRGP 5 CRISP6 CRGP 7 CRGP 5 -CRGP6 CRGP 7 Shutdown Margin Setpon . Operational Alarm Setpoint RI = 300 iswithdrawal limit at all power levels. Cotneonexpa.

Continued on next page.

Oconee 1 Cycle 23 ONEI-0400-50 Rev 25

,~II.Rod Index Setpoints Page 22 of 33 4 Pump Operation, ~1In'operable Rod, BOC to EOC Shutdown Margin SepitOperatonal Alarm Sepoint

% FP CRGP.5 CRGP 6:CGP CRGP 5 CRGP 6 CRGP 7 47- 100 100 29.5 ~ 100 100 29.5 46 100 100 -27.5 100 100 27.5 45 100 100 25.5 100 1025.5 44.8 100 100 250 100 100 25.0 44 100 99.2 -24.2 100 99.2 24.2 43 100 98.2 -23.2, 100 98.2 23.2 -

42 100 '97.2 222 10 97.2 22.2, 41 100 -96.2 -21.2 -100 96.2 21.2 40100 `95.2 20.2 100 9520.

39100 ~~94.2 192 10 94.2 19.2 38 100 ~ ~93.2 -18.2 100: 93.2 18.2 37 .10 922 1.00 92.2 17.2 36 100 912 16.2 1100 91.2 16.2 35 100 90.2 -15.2-:- 100 90.2 15.2 34 ~ 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 10 88.2 13.2 32 100' 87.2 -12.2 :100 87.2 12.2 31100 86.2 ~ -11.2, 100 86.2 11.2 30 :100 -85.2 10.2 100 85.2 1.

29 '100 8429. 0 84.2 .2 28 -100 83.2 8.2100 83.2 8.2 27 10 822 72 10 82. 7.

26 100 81.2 7.2 100 81.2 6.2 25, 100 80.2 52100 80.2 5.2 24 100 79.2 ,4.2 10 79.2 4.2 23 100 78.2 -3.2 100 78.2 3.2 22 100 77.2 2.2 -100 .77.2 2.2 21 100 -76.2 -1.2 :100 76.2 1.2 20 100 -75.2 -'-0.2 100 75.2 0.2 19.8 100 75.0 -0100 75.0 0 19 100 73.5 0 .100 73.5 0 18 100 71. - :100 71.'5 0 17 100 69.5 0 100 6950 16100 67.5 0 10 67.5 0 15 100 65.5 0 100 65.5 0 14100 63.5 0100 63.5 :0 13 100 61.5 106. 0 12 100 53.0 0 - 0 300 11100 4450 - 100 44.50 10 100 36.0-~ 0 100 36.0 0 9 100 27.5 0100 27.5 0 8.7 100 25.0 010 25.0 -0

.8 97.0 22.0 0 97.0 22.0 0 7 92.8 117.8: 0 28 17.8 0 6 88.5 13.5 088.5, 13.5 0 584.2 9.2 0 842920 4 8. 5.0 0~ 80.0 .5.0 0 3 75.8 0.8O 75.8: 0.8 0 2.8 - 75 0 0750 0 2 68 0 :0 68 0 0 1 59.5 0 0 59.5 ~ 0 0 0 51 -0 0 ~ 51 0 0

%FP CRGP 5 -CRGP 6 CRGP 7 CRGP 5 -CRGP 6 CRGP 7

________ Shutdown Margin Setpoint --. Operational Alarm Setpoint RI --300 is withdrawal limit at all power levels.

Oconee 1 Cycle 23 ONEI-0400-50 Rev 25 Rod Inde-x Setpoints Page 23 of 33

.3 Pump Operation, 1 Inoperable Rod,' BOC to EOC Magin SepointOperational Alarm Setpin

-Shutdwn

%FP CRGP 5 ~-CRGP 6 CRGP 7 CRGP5~ CRGP6 CRGP7 77 100 100 85.2 100 1085.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 10100 81.5 74 100 100 .-79.6 100 100 79.6

.73 100 100 77.8 :1 00 100 77.8 72 100 100 --:,75.9 -100 100 75.9 71 ~ 100 100 - .74.1 100 100 74.1

~70 100 . 100 72.2 -100 100 72.2,

-69 100 .1070.4 100 100 70.4 68 100 100 685100 100 68.5 67, -100 100 - 67100 100 66.7 66 ~ 100 100 -'64.8 10100 64.8 65 -100 100 63~.0 . 100 100 63.0 64100 100 ,61.1 100106.

63 100 1059.3 10100 59.3 62 100 1 100 57.4 100 :100 57.4 61 100 100 .55.6 100 ~ 100 55.6 60 .100 100 53.7., T 100 100 53.7 59 -`100 100 51.9 100 100 -51.9 58 100 100 - 0010100 50.0 57 10100 -48.2 100 100 48.2 56 100 100 ~ ~46.3 100 .100 46.3 55 100 100 -44.5 100 100 44.5 54 100 -100 --- 42.6 100 100 42.6 53 100 100 1 4~0. 8 , -100 100 40.8 52 100 100 38.9 100 1038.9 51 100 .100 -~37.1 10100 37.1 50 100 100 35.2 100 100 35.2 49 100 -- 100 33.4 100 100 33.4 48 100 100 31.5 100 100 31.5 47 100 100 295100 100 29.5 46 100 100 -27.5 100027.5 45 100 100 25.5 100 100 25.5 44.8 100 .100 25.0 100 100 25.0

~44 :100 99.2 ~ 24.2 100 99.2 :24.2 43 1098.2 23.2' ~100 98.2 2.

4109722100 097222.2 41 100 96.2 ~ 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95220.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 189.2 -100- 93.2 18.2 37- 100 92.2: 17. 1 00 ~ 92.2 -17.2 36 :100 91.2 ~ 16.2 100 91.2 16.2 35 -100. 9. 15.2 ~ 100 90.2 15.2 34 .100 89.2 14.2- 100 89.2 14.2 33 100 -88.2 -13.2 100 -88.2 13.2 32 100 87.2 12.2 100 87.2 12.2:

31 100 . 86.2 -11.2 100 86.2 11.2 30 -100 85.2 ~ 10.2 - 100 85.2 10.2 29- '100 84.2 92100 -8.9.2 28 :100 83.2 ~ 8.2 100 83.2 8.2 27 100 82.2 7.2 100 ~ 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 ~ :5.2 100 80.2 5.2 24 100 79.2 42100 79.2 4.2

%FP CRGP5 CRP R P- CRGP5 CRGP6 CRGP7

_____ Shutdown Margin Setpoint - Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Cotneonexpa.

Continued on next page.

Oconee 1 Cycle 23 ONEI-0400-50 Rev 25 Rod Index Setpoints Page 24 of 33 3 Pump Operation, 1 Inoperable Rod, BOC to EQO Shutdown Margqin Sepoint Operational Alarm Sepoint

%FP CRGP 5 CRGP 6 -- CRGP7L1 CRGP5 CRGP 6 CRGP 7.

23 '100 *7.23.2 -100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100. 76.2 1.2 100 76.2 1.2 20 .100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0100 7500 19 1073.5 0l~- 100 73.5 0 18 100 71.5 0-: ~ 100, 71.5 0 17100 69.5 0 1069.5 0 1670 6. 100 6.

15 100 65.5 0 100 65.5 0 14 100 63.5 0v~!- 100 63.5 0 13, 100 61.5 0100 61.5 0

-12 100 53.0 o ~ 100 53.0 0 11 100 44.5 0 -100 44.5 0 10100 -36.0 ~ 01036.0 0 9 100 27.5 0 - 100 27.5 0 8.7 1025.0': 0 -~ 100 25.0 0 8 .97.0 22.0: 0 97.0 22.0 0 7 92.8 '17.8 -- 0  :~92.8 17.8 0 6 88.5 1350 88.5 1350 5 84.2 9.2 0; ~~84.2 9.2 0 4 80.0 5.0 0 8005.0 0 3 75.8 0.8 -%0-: 75.8 0.8 0 2.8 75.0 -0 0~ 75.0 0 0 2 68 0 0o 68 0 0 1 59.5 0-0 59.5 0 0 0 51 0 0 51 0 0

%.F P 7CRGP 5 CRGP 6 CRGP:7 CRGP 5 CRGP 6 CRGP 7

_____ Shutdown Margin Setpoint - Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

N U ONEI-0400*50 kj5

1. Page 25 of33 105 Control, Rod Po6sition Setpolints I100 100 No inoperable'Rods):4Pump Flov%

95 .95:

90 90 85 85 SO 80 75 J5 70 .70 65 a-LL 1111 Ail II IIIII60 C.

a) '55 55, 0

a- "50 A ptbl 3/450

0. 7, peratlan" a) 45 **1, cc 40 ..... . . .. -40 35--

30 -III T l1 25 20- 35 10 4 10 20 0 3' '50 60 0 80 90 300 15 GroupI7 10 0- 1 20 30 40 50 60 -70:: 80 90 100 TG-roup 5I Control Rod Position, % WI

U1 ONEI-0400-50 J25

-lI  :, Page 26 of 33

.... .. I., I_ Oconee1 Cycle 23 l-2.

1' 105 fill Control Rod Position Setpolnts I I iLLLLtL4 100 1'

95- 95 90i l[ 1 .. II Ut I i l I H H1 ll i t e 1 1l l i i t eI i l 790 85IaL L 85 80m ..

75 75 70 680 70 65 Unacceptable 65 60 ILL 60 355 0

Operatio a-, 350 45 a) 25[l l i:

20.. .. 40 15 l i . .. . . . . . . . .. I si l. . .i 35 101 .L fI Il L 5i - f I i t e Ml 1I I it I i l I l L 1I LI -m 30 II I i 25 20 15

'10 5

I 0 10 20 3 40 5 6 70. ,0 .90 . .100 i [ T T I  : I . I T I s F .

90i
. 1u00

.I I ° 10 , 20 . 30: -40 . 50 :60 70 ~~80 90 100 j~I' 1:0- 10 20

: 30 40 , 50 60 70 .80 I Group 5 1  : Group7Tl Control Rod Position, %WD

'7..-

ONEI.0400-50J 25 I .

Page 27 of 33

_ -: , Oconeed1 Cycle 23. ' I_ . .:::': ... .uo 105

g ControllRod Position Setpolnts. H11 I 100 95 90 qw E I 2 It SIiiiiiiiiiiiiiiiiiiiilllllllllllllllllll EI lilillllllliiiiii HIM H II[I HH I -H80 80 85 80 .l EIIHIII I IE ilt IIIII II[lim it illi I 1I lilil illI ll IIIlIlI uiiii~illlilt Unacceptable LLL I EEi 2 -7 75 70 H lIl [il 1E1 =H IL 65l

.,I 11 11111111lt1111 I Il II11111l11 11111111

[tl 1' 1111111111 -11i11111111111111111111111X11111 MI'IllE's 65 60 ,.u11'11Ile. ' lllllllllHIMl. I. l . lill. . lllu t . lllll

- lt H. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIE I IIIIIIIIIIgI Ilt lllllllllllilllkllIlil 45 55 855 50 g g 1i!1llllllll~illl1lllllilt Illl1I IlIII~tE~IIIaII~ai!I~il!lII!!l11lll!

. TE t 11111 1 111 1I 11111111111111 111 1 l11111111111 1 111111 24q>8Acceptable- bw>

45 40 1 llilt LI. .. 11111111111 1 9 IAli iiiTT~ILII~llsLllfi~IITI~ilIIIIIIImtIiiiiiiiii

..1

... . . 0 35 i XALIml ll!! 111L!!1 ! !!!

lil!!l!t!!W4!!!!!

l !!ll It11!!!il!ll ......

5tU ALup a d'oa l~'.

2 55I5 55 65 5 85 9 30 25 20 15 10

-115 5

0 IE1. I , II I I I I t I . I I I ,1 I-.

0 10' 20 ^ 30 '-"40 -- 50 -"' 60 70 80 90 100 I 0 10 : 20 30 40 : 50: 60 70 80 90 100 I l1 Group 5 lI ... I Group7 Ii:.-

Control Rod Position, % WD

I - ONEI-0400-502 25 Oconee .1 Cycle 23 Page 28 of 33

. - ; 0 .: ~105 105 Control Rod Position Setp(

100 100

'1 Inoperable.Rod, 3 Pump

.1 ImLL r LIlslliiirooirmrlTil . . . .. I l.-. mii 95 IgLI lm~llIII II r l l l . .. . . , 915 90 isiai~ii TTTT illlli~l Illlilll I ~Jil IIIllS, 1,,, H IIII llII lT , ,,

85 a~~ LLmmmwmlmmt ~I i II 1Hll] 80 H I i I i l l l lI iiii i t-u 80 HI~

lilt HIM IL i 80II 75 75 f Unacceptable. lllllllllmlIiiiiilla S 7 70 4 Hl l peOpertlon

=._ U.1111111 65 60 65 60 II I ILL L"L.,llt~I Ir 0- Tlil~liilililiilililiilil4T~I ~lilmilzliii LI IFI 5 0--1 . uIH 3 05 Im 01 -I LLI+ 45-Imlr 0 .50.

45 3~'0 ai) Iliillilliiliil~liillilliiliillilli > . Acceptble - +mT 40  !!!'Ol"!ill32!llli- perat n: C 40 35 TT IIIIIItit~~lll lllllllelllll TllllI[T [T IlllllH m llllll 30 llllll-llllll Illlllllll~llllilllllL~lllll ':5o 25 ~5 20 TT ~ Illl lrI mIm m m ILI ILI ILTTIl..

lniml 11 I m T lI 1 ..... I ILI ]II u IMll I ll ll^wSZL m IItm T ~

....2 r 15 0 1L03 t I llJ4 LILIII 7 80 9LLLL0' li 10030 Illlllllllllllllmllllllllllllm fIIII rHl ol

.. llii Illllll iiiilllllllll 1 10 5  ; ~~~~~.. . . ILL/........

0 l~0 10 20 30: 40L 50. 60 70:7, 80 :90 100l lGroup`7 l Control Rod Position, % WD

ONEI-0400-50 Rev 25 Page 29 of 33 Oconee 1 CycIe 23 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.

References provided in section 1of this COLR identify the sources for the data which follows.

Quadrant'Power'Tilt Limits Referred to by TS 3.2.3 Steady'State' T.ransient Maximum Core Power Level, %FP 3C0-100 0 -30 30 - 10D 0 - 30 0- 100 Quadrant Power Tilt, %! 5.38. 10.00 9.44 12.00 20.00 Variable Low RCS'Pressu're-Protective Limits Referred to byTS 2.1.1 Core Out let Pressure -Reactor Coolant Outlet Temperature, °F F)sia 3 RCS Pumps 4 RCS Pumps 1800 '581.0 578.3 1900 ' -_590.0 587.3 2000 598.9 596.3 2100 607.9 605.2 2200 616.9 614.2 2300 " 625.9 623.2

ONEI-0400-50 Rev 25 Page 30 of 33 Oconee 1 Cycle 23 Axial Power Imbalance Protective Limits Referred to by TS 2.1.1 irn00MVUwMIMNMI I 0 W-0MR-9-MIMI0 W-Cft'%n--M-M I I-

%FP . RPS I .,',Operational 4 Pumps 0O

  • 5.0 -43.4 80 -43.4 90 -35.0 -39.6 100 -30.0 109.4 109.4 100 30.0 90 35.0 40.3 80 39.6 0 35.0 39.6 3 Pumps 0 -43.4

.-35.0, 62.3 77.0 35.0 -43.4 81.7 -14.4 81.7 14.4 77.0 39.6 62.3 35.0 0 39.6

ONEI-0400-50 Rev 25 Page 31 of 33 Oconee 1'Cycle 23 Rod In'dex Limits Referred to by TS 3.2.1

- of~ anR Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal

%FP Insertion Limit -No iop Rod 1 Inop Rod Limit 4 Pumps 102 260 220 280 300 100 260 300 90 260 300 80

  • 260 300 50 200 140 230 300 15 90 75 -160 300 5 0 0 e75 300 3 Pumps 77 254 220 280 300 50 200 140- 230 300 15 90 -;75: 160 300 5 0 .=0 75 300

ONEI-0400-50 Rev 25 Page 32 of 33 OconeelI Cycle 23 LOCA Limits

. . - . .: ItISU~I MINIMUM la 1

NotflnrARMfIitft-lt r .

Ufl01

. - . -a - ..

I RA-Core Elevation Feet '=LOCA LHR kw/ft Limit Versus Burnup Mk-B11 Fuel 0 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 0 16.6'- 16.6 12.2 2.506 17.5 17.5 12.2 4.264 17.6' 17.6 12.2 6.021 17.7 17.7 12.2 7.779 17.6 0 17.6 - 12.2 9.536 ,17.5 17.5 12.2 12.00 16.6 16.6 12.2 Mk-B1 0 Fuel 0 GWd/mtU  : 30 GWd/mtU 62 GWd/mtU 0.000 15.6 - 15.6 11.6 2.506 16.5 16.5 11.6 4.264 16.8 16.8 11.6 6.021 17.0'- 17.0 11.6 7.779 17.0 17.0 11.6

-9.536 16.7 16.7 11.6 12:00 15.8 15.8 11.6

!,44t ,-1,- i, I . , - 1  : 3 ONEI-0400-.50 Rev 25, Page 33 of 33 Oconee I Cycle 23

..~ l 4RCPOperation -Loop Average Temp.,T J 3 RCP Operation - Loop Average Temp., TF Aod~FjTavg (An~aytical) ~ -- -- I:~Tavg (Analytical)

Z_____<8. <58K1.0 0.1 <581.0 -<581.0 0.2 <581.1 <581.0

.0.3 <581.1 <581.1 0.4 <581.2 ~<581.1 0.5 .<581.2- - <581.1 0.6 <581.2 -<581.1 0.7 -<581.3 .<581.2 0.8 <581.3 '<581.2,

-0.9 <581.3 -<581.2 1.0 -<581.4 <581.2 1.1 <581.4 <581.2 1.2 <581.5 <581.3 13 <581.5 <581.3 1.4 - -6<81.5 -. <581.3 1.5 <581.<513 1.6 <581.6 <581.4

-1.7 -<581.6 <581.4 1.8 .- 517<5 81.4.

-1.9 <581.7 <581.4

'2.0 <581.8 <581.4 2.1 <581.8 .<581.5 2.2 <581.8 -<581.5 2.3 <5681.9 <581.5 24<581.9 <581.5 2.5 -<582.0 <581.6 2.6 <582.0 <581.6

  • 2.7 <582.0 -<581.6 2.8 <582.1 - <81.6 2.9 <52. - <81.6

-3.0 - <82.1 -81.7

<5 3.1 -.<82.2 -d-<81.7 32 <.582.2 -<581.7 3.3 - .<82.3 *- <81.7 3.4 <582.3 -<581.7 3.5 <523 .- <581.8 3.6 <582.4 <581.8 3.7 -<582.4 d.<81.8

~3.8 -<582.4 81 -

-3.9 <8. -- -<8.

4.0 - 52. - -<81.9 4.1 <5 82.6 <581.9 -

4.2 <526- ~.<81.9 4.3 <526-<581.9 4.4 <582.7 -. <582.0 4.5 - <82.7 - <5 82.0

-4.6 -<87 *-<582.0 4.7 <5.82.8 * <82.0 48.-<582.8 *-- -<582.1

4. *<82.9 - *<582.1 50<582.9 . <82.1