Duke 9504hergy, T. PRESTON GILLESPIE, JR.
Vice President Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Hwy.
Seneca, SC 29672 864-873-4478 864-873-4208 fax T. Gillespie@duke-energy. com May 22, 2012 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Site Docket Number 50-287 Core Operating Limits Report (COLR)
Attached, pursuant to Oconee Technical Specification 5.6.5.d, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 27, ONEI-0400-70, Revision 32.
If you have any questions, please direct them to Judy Smith at 864-873-4309.
Sincerely, T. reston Gillespie, Jr.
Vice President Oconee Nuclear Station Attachment
,A0o0 www. duke-energy. corn
U.S. Nuclear Regulatory Commission May 22, 2012
.Page 2 xc w/att:
Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 John Boska U.S. Nuclear Regulatory Commission One White Flint North, M/S O-8G9A 11555 Rockville Pike Rockville, MD 20852-2746 Mr. Andrew Sabisch Senior Resident Inspector Oconee Nuclear Site
0 Oz 0
c:
cK..K0 m
0 C
m0 0H 0
M m
0 uoc 003 mCD u -
cn~
M 01 00 X >
Mm;
- a 0'Z M 0 a00 m
z-i z
0
!.3 C>
U.ý -~
A.
0
- 0) cy)
Szo Cý m) 0 0
0 o -40 TKZ 0z,0
~Mr-C Caa
-0) 0 CD 0'
00 0-u m
z
-U 0
0 00zM M
(3' 0
0I-m*
00
- u0 zH 0
-4 w)
-Ph z
000zmm zc 0
Co r-0z zC:
0 zrn 0
0M m
-n 0in a
00 z
zCO)
I-1 0
(D a0 0
0 C-)
- q 0
C).
00 M3 CD 01C zc0 zG) m zG) 0M 0m zi C3
~0 QX3 0 A CD 0
0ý 0o 0) 0 0
-1 M0Z m>
00 z
', Rl 0 a
Cj) Zj M~ >00
<M n
z-0 ci 0
CD (D
0C 3;
(3) 0 0
0 0)-4
ONEI-0400-70 Rev 32 Page 1 of 33 Duke Energy Oconee 3 Cycle 27 Core Operating Limits Report QA Condition 1 Prepared By: T. J. Rogers.j
ý.-
A-j
.T.L L. D. McCla,*
- 'Y it 4
Reviewed By:
CDR By: A.R. Bingham Approved By: R.R. St.Clair Date: ("I/'
Date:09
,/2 Date:
Ix Date:
Document No. / Rev.
ONEI-0400-70 Rev. 32 Date May 2012 Page No.
Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By:
R.R St.Clair 4e__.
Date:
(Sponsor)
CATAWBA Inspection Waived MCE (Mechanical & Civil)
El Inspected By/Date:
RES (Electrical Only)
El Inspected By/Date:
RES (Reactor)
El Inspected By/Date:
MOD El Inspected By/Date:
Other (
)
El Inspected By/Date:
OCONEE Inspection Waived MCE (Mechanical & Civil)
Inspected By/Date:
RES (Electrical Only)
Inspected By/Date:
RES (Reactor)
Inspected By/Date:
MOD Inspected By/Date:
Other (
)
El Inspected By/Date:
MCGUIRE Inspection Waived MCE (Mechanical & Civil)
El Inspected By/Date:
RES (Electrical Only)
El Inspected By/Date:
RES (Reactor)
El Inspected By/Date:
MOD El Inspected By/Date:
Other (
)
El Inspected By/Date:
ONEI-0400-70 Rev 32 Page 3 of 33 Oconee 3 Cycle 27 Core Operating Limits Report Insertion Sheet for Revision 32 I
This revision is not valid until the end of operation for Oconee 3 Cycle 26.
1 Remove these Revision 31 pages Insert these Revision 32 pages 1 - 33 1 - 33 Effective Revision Date Revision Log Pages Revised Pages Added Pages Total Effective Deleted Pages 1Oconee 3 Cycle 27 revisions below 32 May 2012 1-33 33 1Oconee 3 Cycle 26 revisions below 31 Oct2010 1-33 33 Oconee 3 Cycle 25 revisions below 30 May 2009 1-33 33 29 May 2009 1-33 33 28 Apr2009 1-33 33 Oconee 3 Cycle 24 revisions below 27 Mar2009 1-33 33 26 Nov 2007 1-33 33 25 Nov 2007 1-33 33 Oconee 3 Cycle 23 revisions below 24 May 2006 1 -33 33 Oconee 3 Cycle 22 revisions below 23 Mar2006 1 -4,6,15-16,21,27,31 33 22 Mar2005 1-5 33 21 Nov 2004 1-33 33
ONEI-0400-70 Rev 32 Page 4 of 33 Oconee 3 Cycle 27 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for O3C27 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in References 1 through 11. The RPS protective limits and maximum allowable setpoints are documented in References 12 through 14. These limits are validated for use in 03C27 by References 15 through 17. The O3C27'analyses assume a design flow of 108.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.7,14, an axial peaking factor (Fz) of 1.5, and an EOC (< 100 ppmB)
Tavg reduction for up to 1 0°F provided 4 RCPs are in operation and Tavg does not decrease below 569°F.
The error adjusted core operating limits included in Section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 03C27 reload core.
1.1 References
- 1. Oconee Nuclear Design Methodology Using CASMO-4 / SIMULATE-3, DPC-NE-1006-PA, SE dated August 2, 2011.
- 2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1002-A, SE dated July 21, 2011.
- 3. Oconee Nuclear Station Reload Design Methodology, NFS-1001-A, SE dated July 21, 2011.
- 5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 4a, December 2008.
- 6. Fuel Mechanical Reload Analysis Methodology Using TACO3 and GDTACO, DPC-NE-2008-PA, SE dated July 21, 2011.
- 9. BAW-10192P-A, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, Revision 0, SER dated February 18, 1997.
- 10. BAW-10164P-A, Rev. 4 and 6, RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis, SERs dated April 9, 2002 and June 25, 2007, respectively.
- 11. BAW-10227P-A, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, Rev. 1, June 2003 (SER to BAW-10186P-A dated June 18, 2003).
- 12. Digital RPS RCS Pressure & Temperature Trip Function Uncertainties and Variable Low RCS Pressure Safety Limit, OSC-8828, Revision 3, October 2010.
- 13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 4, April 2011.
- 14. ATc and EOC Reduced Tavg Operation, OSC-7265, Revision 1, June 2002.
- 15. 03C27 Maneuvering Analysis, OSC-10517, Revision 1, May 2012.
- 16. 03C27 Specific DNB Analysis, OSC-1 0526, Revision 0, January 2012.
- 17. 03C27 Reload Safety Evaluation, OSC-1 0535, Revision 1, May2012.
ONEI-0400-70 Rev 32 Page 5 of 33 Oconee 3 Cycle 27 Miscellaneous Setpoints BWST boron concentration shall be greater than 2500 ppm and less than 3000 ppm.
Referred to by TS 3.5.4.
Spent fuel pool boron concentration shall be greater than 2500 ppm.
Referred to by TS 3.7.12.
The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.
Referred to by TS SLC 16.5.13.
CFT boron concentration shall be greater than 2300 ppm. The average boron concentration in the CFTs shall be less than 4000 ppm.
Referred to by TS 3.5.1.
RCS and Refueling canal boron concentration shall be greater than 2220 ppm.
Referred to by TS 3.9.1.
Shutdown Margin (SDM) shall be greater than 1% Ak/k.
Referred to by TS 3.1.1.
Moderator Temperature Coefficient (MTC) shall be less than:
MTC x 10-4 Linear interpolation is valid within the table provided.
Ap / °F
+0.70 0
+0.525 20 0.00 80 0.00 100 0.00 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1.
4 RCP:
measured hot leg pressure Ž2125 psig 3 RCP:
measured hot leg pressure > 2125 psig DNB parameter for RCS loop average temperature shall be:
Referred to by TS 3.4.1.
The measured Tavg must be less than COLR limits minus instrument uncertainty. ATc is the setpoint value selected by the operators. Values are expanded by linear interpolation on page 33 of this document without instrument uncertainty.
Max Loop Tavg (Incl 2°F unc)
581.0 581.0 1
581.4 581.2 2
581.8 581.4 3
582.1 581.7 4
582.5 581.9 5
582.9 582.1
- This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.
DNB parameter for RCS loop total flow shall be:
Referred to by TS 3.4.1.
4 RCP:
Measured > 108.5 %df 3 RCP:
Measured > 74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.
Referred to by TS 3.2.1.
Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.
Referred to by TS 3.2.1.
Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).
ONEI-0400-70 Rev 32 Page'6 of 33 Oconee 3 Cycle 27 EFPD 0 to 612 612 to EOC Core Power Level, %FP Full Incore Out of Core Backup Incore Steady State Operating Band Rod Index APSR %WD Min Max Min Max 292 +/- 5 300 30 40 292 +/- 5 300 100 100 Quadrant Power Tilt Setpoints Steady State Transient 30-100 0-30 30-100 0-30 3.50 7.61 7.11 9.40 2.35 6.09 5.63 7.72 2.25 3.87 3.63 4.81 Referred to by TS 3.2.3 Maximum 0- 100 16.55 14.22 10.07 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).
ONEI-0400-70 Rev 32 Page 7 of 33 Oconee 3 Cycle 27 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 P = 2355 psig T=618 F 2300 2200 (D
6 2100 Acceptable UOperation 0)
AP=
11.14*Tout-4706 0
00 2000
.2 r,"
Unacceptable 1900 Operation P = 1800 psig 1800 T=584 F 1700 I
540 560 580 600 620 640 Reactor Coolant Outlet Temperature, TF
ONEI-0400-70qRev 32 Page 8 of 33 Oconee 3 Cycle 27 RPS Power Imbalance Setpoints 4 Pumps
% FP 0.0 90.4 107.9 107.9 90.4 0.0
% Imbalance
-33.0
-33.0
-14.4 14.4 33.0 33.0
-33.0
-33.0
-14.4.
14.4 33.0 33.0 3 Pumps 0.0 63.1 80.6 80.6 63.1 0.0 Maximum Allowable RPS Power Imbalance Limits 4 Pumps
% FP 0.0 90.0 Pmax =>
109.4 Pmax =>
109.4 90.0 0.0 0.0 62.3 Pmax =>
81.7 Pmax =>
81.7 62.3 0.0
% Imbalance
-35.0
-35.0
-14.4 14.4 35.0 35.0 3 Pumps
-35.0
-35.0
-14.4 14.4 35.0 35.0
ONEI-0400-70 Rev 32 Page 9 of 33 Oconee 3 Cycle 27 Operational Power Imbalance Setpoints 4 Pumps 3 Pumps
%FP 0.0 80.0 90.0 100.0 102.0 102.0 100.0 90.0 80.0 0.0 0.0 63.1 63.7 77.0 77.0 63.1 63.1 0.0 Full Incore
-28.0
-28.0
-28.0
-17.8
-15.7 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-13.2 13.2 28.0 28.0 Backup Incore
-27.3
-27.3
-27.3
-17.8
-15.7 15.7 17.8 28.0 28.0 28.0
-27.3
-27.3
-13.2 13.2 28.0 Out of Core
-28.0
-28.0
-28.0
-17.8
-15.7 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-13.2 13.2 28.0 28.0 28.0
ONEI-0400-70 Rev 32 Page 10 of 33 Oconee 3 Cycle 27 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC
Full Incore Alarm
[
Out of Core Alarm 107.9 107.0 106.0 105.0 104.0 103.0 102.0 101.0 100.0 99.0 98.0 97.0 96.0 95.0 94.0 93.0 92.0 91.0 90.4 90.0 89.0 88.0 87.0 86.0 85.0 84.0 83.0 82.0 81.0 80.0 0.0
-14.4
-15.4
-16.4
-17.5
-18.5
-19.6
-20.7
-21.7
-22.8
-23.9
-24.9
-26.0
-27.0
-28.1
-29.2
-30.2
-31.3
-32.3
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0 14.4 15.4 16.4 17.5 18.5 19.6 20.7 21.7 22.8 23.9 24.9 26.0 27.0 28.1 29.2 30.2 31.3 32.3 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
-15.7
-16.7
-17.8
-18.8
-19.8
-20.9
-21.9
-22.9
-23.9
-24.9
-26.0
-27.0
-27.6
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0 15.7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27.0 27.6 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
-15.7
-16.7
-17.8
-18.8
-19.8
-20.9
-21.9
-22.9
-23.9
-24.9
-26.0
-27.0
-27.6
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0 15.7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27.0 27.6 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
.28.0 28.0 28.0
% FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 32 Page 1.1 of 33 Oconee 3 Cycle 27 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOG to EOC
Full Incore Alarm I
Out of Core Alarm 80.6 80.0 79.0 78.0 77.0 76.0 75.0 74:0 73.0 72.0 71.0 70.0 69.0 68.0 67.0 66.0 65.0 64.0 63.1 63.0 62.0 61.0 60.0 0.0
-14.4
-15.0
-16.1
-17.1
-18.2
-19.3
-20.3
-21.4
-22.4
-23.5
-24.6
-25.6
-26.7
-27.8
-28.8
-29.9
-30.9
-32.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0 14.4 15.0 16.1 17.1 18.2 19.3 20.3 21.4 22.4 23.5 24.6 25.6 26.7 27.8 28.8 29.9 30.9 32.0 33.0 33.0 33.0 33.0 33.0 33.0
-13.2
-14.3
-15.3
-16.4
-17.4
-18.5
-19.6
-20.6
-21.7
-22.8
-23.8
-24.9
-25.9
-27.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0 13.2 14.3 15.3 16.4 17.4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0
-13.2
-14.3
-15.3
-16.4
-17.4
-18.5
-19.6
-20.6
-21.7
-22.8
-23.8
-24.9
-25.9
-27.0
-28.0
-28.0
-28.0
-28.0
-28.0
-28.0 13.2 14.3 15.3 16.4 17.4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0 0
% FP RPS Trip Full Incore Alarm Out of Core Alarm ONE-0400-70'Rev 32 Page 1-2 of 33 Oconee 3 Cycle 27 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120.0 -1
(-14.4,107.9)
(1A A In7 O\\
k I"
(-33.0,90.4)
(-33.0,63.1)
-40.00
-30.00
-20.00
-10.00 0.00 10.00 20.00 30.00 Percent Power Imbalance 40.00
0 Oconee 3 Cycle 27 ONEI-0400-70 Rev 32 Imbalance Setpoints for 4 Pump Operation, BOC to EOC Page 13 of 33 110.0 100.0 90.0 80.0 70.0 7) 0.-
60.0 U-0 "E
50.0 a.)
a.-
13..
40.0 30.0 20.0 I
lI l I I
I I
I I
l I
RP S Trip Setpoint I
. e.
i
,Iore & Outcore Alarm I
10.0
.0 5
10 15 20 25 0.0 &
-40
-35
-30
-25
-20
-15
-10
-5 30 35 40 Percent Axial Imbalance
Oconee 3 Cycle 27 ONEI-0400-70 Rev 32 Imbalance Setpoints for 3 Pump Operation, BOC to EOC Page 14 of 33 110 100 90 80 RPS Trip Setpoint ::
RPS Trip Setpoint 70 0
D_
60
-5 40 40 Incore & Outcore Alarm I
30 20 10 0
i 7 4--
h-.W.i
-40
-35
-30
-25
-20
-15
-10
-5 0
5 10 15 20 25 30 35 40 Percent Axial Imbalance
ONEI-0400-70 Rev 32 Page 15 of 33 Oconee 3 Cycle 27 Operational Rod Index Setpoints RI Insertion Setpoint
%FP No Inop Rod 4 Pumps 3 Pumps 102.0 100.0 90.0 80.0 50.0 48.0 15.0 13.0 5.0 3.0 2.8 0.0 77.0 75.0 50.0 48.0 15.0 13.0 5.0 3.0 2.8 0.0 263.5 261.5 251.5 241.5 201.5 195.2 91.5 76.5 16.5 1.5 0.0 0.0 237.5 234.8 201.5 195.2 91.5 76.5 16.5 1.5 0.0 0.0 1 Inop Rod 283.4 281.5 271.9 262.3 233.4 231.5 165.5 161.5 93.5 76.5 74.8 51.0 285.2 281.5 235.2 231.5 165.5 161.5 93.5 76.5 74.8 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300
ONE4-0400-70"Rev 32 Page 16 of 33 Oconee 3 Cycle 27 Shutdown Margin Rod Index Setpoints 4 Pumps 3 Pumps
%FP 102.0 100.0 48.0 13.0 3.0 2.8 0.0 77.0 75.0 48.0 13.0 3.0 2.8 0.0 RI Insertion Setpoint No Inop Rod 1 Inop Rod 224.6 283.4 221.5 281.5 141.5 231.5 76.5 161.5 1.5 76.5 0.0 74.8 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 227.4 221.5 141.5 76.5 1.5 0.0 0.0 285.2 281.5 231.5 161.5 76.5 74.8 51.0
Oconee 3 Cycle 27 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 32 Page 17 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 102 100 99.8 24.8 100 100 63.5 101 100 99.0 24.0 100 100 62.5 100 100 98.2 23.2 100 100 61.5 99 100 97.5 22.5 100 100 60.5 98 100 96.7 21.7 100 100 59.5 97 100 95.9 20.9 100 100 58.5 96 100 95.2 20.2 100 100 57.5 95 100 94.4 19.4 100 100 56.5 94 100 93.6 18.6 100 100 55.5 93 100 92.9 17.9 100 100 54.5 92 100 92.1 17.1 100 100 53.5 91 100 91.3 16.3 100 100 52.5 90 100 90.6 15.6 100 100 51.5 89 100 89.8 14.8 100 100 50.5 88 100 89.0 14.0 100 100 49.5 87 100 88.2 13.2 100 100 48.5 86 100 87.5 12.5 100 100 47.5 85 100 86.7 11.7 100 100 46.5 84 100 85.9 10.9 100 100 45.5 83 100 85.2 10.2 100 100 44.5 82 100 84.4 9.4 100 100 43.5 81 100 83.6 8.6 100 100 42.5 80 100 82.9 7.9 100 100 41.5 79 100 82.1 7.1 100 100 40.2 78 100 81.3 6.3 100 100 38.8 77 100 80.6 5.6 100 100 37.5 76 100 79.8 4.8 100 100 36.2 75 100 79.0 4.0 100 100 34.8 74 100 78.2 3.2 100 100 33.5 73 100 77.5 2.5 100 100 32.2 72 100 76.7 1.7 100 100 30.8 71 100 75.9 0.9 100 100 29.5 70 100 75.2 0.2 100 100 28.2 69.8 100 75.0 0
100 100 27.9 69 100 73.8 0
100 100 26.8 68 100 72.3 0
100 100 25.5 67.6 100
.71.7 0
100 100 25.0 67 100 70.7 0
100 99.6 24.6 66 100 69.2 0
100 98.9 23.9 65 100 67.7 0
100 98.2 23.2 64 100 66.1 0
100 97.6 22.6 63 100 64.6 0
100 96.9 21.9 62 100 63.0 0
100 96.2 21.2 61 100 61.5 0
100 95.6 20.6 60 100 60.0 0
100 94.9 19.9 59 100 58.4 0
100 94.2 19.2 58 100 56.9 0
100 93.6 18.6 57 100 55.3 0
100 92.9 17.9 56 100 53.8 0
100 92.2 17.2 55 100 52.3 0
100 91.6 16.6 54 100 50.7 0
100 90.9 15.9 53 100 49.2 0
100 90.2 15.2 52 100 47.7 0
100 89.6 14.6 51 100 46.1 0
100 88.9 13.9 50 100 44.6 0
100 88.2 13.2
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 3 Cycle 27 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 32 Page 18 of 33 Shutdown Marqin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 49 100 43.0 0
100 86.7 11.7 48 100 41.5 0
100 85.1 10.1 47 100 39.6 0
100 83.5 8.5 46 100 37.8 0
100 82.0 7.0 45 100 35.9 0
100 80.4 5.4 44 100 34.1 0
100 78.8 3.8 43 100 32.2 0
100 77.2 2.2 42 100 30.4 0
100 75.7 0.7 41.6 100 29.6 0
100 75.0 0
41 100 28.5 0
100 73.2 0
40 100 26.6 0
100 70.1 0
39.1 100 25.0 0
100 67.3 0
39 99.9 24.9 0
100 66.9 0
38 99.0 24.0 0
100 63.8 0
37 98.0 23.0 0
100 60.6 0
36 97.1 22.1 0
100 57.5 0
35 96.2 21.2 0
100 54.3 0
34 95.2 20.2 0
100 51.2 0
33 94.3 19.3 0
100 48.1 0
32 93.4 18.4 0
100 44.9 0
31 92.5 17.5 0
100 41.8 0
30 91.5 16.5 0
100 38.6 0
29 90.6 15.6 0
100 35.5 0
28 89.7 14.7 0
100 32.4 0
27 88.8 13.8 0
100 29.2 0
26 87.8 12.8 0
100 26.1 0
25.7 87.5 12.5 0
100 25.0 0
25 86.9 11.9 0
99.0 24.0 0
24 86.0 11.0 0
97.4 22.4 0
23 85.0 10.0 0
95.8 20.8 0
22 84.1 9.1 0
94.2 19.2 0
21 83.2 8.2 0
92.7 17.7 0
20 82.2 7.2 0
91.1 16.1 0
19 81.3 6.3 0
89.5 14.5 0
18 80.4 5.4 0
88.0 13.0 0
17 79.5 4.5 0
86.4 11.4 0
16 78.5 3.5 0
84.8 9.8 0
15 77.6 2.6 0
83.2 8.2 0
14 76.7 1.7 0
79.5 4.5 0
13 75.8 0.8 0
75.8 0.8 0
12.8 75.0 0
0 75.0 0
0 12 69.0 0
0 69.0 0
0 11 61.5 0
0 61.5 0
0 10 54.0 0
0 54.0 0
0 9
46.5 0
0 46.5 0
0 8
39.0 0
0 39.0 0
0 7
31.5 0
0 31.5 0
0 6
24.0 0
0 24.0 0
0 5
16.5 0
0 16.5 0
0 4
9.0 0
0 9.0 0
0 3
1.5 0
0 1.5 0
0 2.8 0
0 0
0 0
0 2
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint 0
RI = 300 is withdrawal limit at all power levels.
Oconee 3 Cycle 27 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 32 Page 19'of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 27.4 100 100 37.5 76.2 100 100 25.0 100 100 36.4 76 100 99.7 24.7 100 100 36.1 75 100 98.2 23.2 100 100 34.8 74 100 96.8 21.8 100 100 33.5 73 100 95.3 20.3 100 100 32.1 72 100 93.8 18.8 100 100 30.8 71 100 92.3 17.3 100 100 29.5 70 100 90.8 15.8 100 100 28.1 69 100 89.4 14.4 100 100 26.8 68 100 87.9 12.9 100 100 25.5 67.6 100 87.4 12.4 100 100 25.0 67 100 86.4 11.4 100 99.6 24.6 66 100 84.9 9.9 100 98.9 23.9 65 100 83.4 8.4 100 98.2 23.2 64 100 82.0 7.0 100 97.6 22.6 63 100 80.5 5.5 100 96.9 21.9 62 100 79.0 4.0 100 96.2 21.2 61 100 77.5 2.5 100 95.6 20.6 60 100 76.0 1.0 100 94.9 19.9 59.3 100 75.0 0
100 94.4 19.4 59 100 74.1 0
100 94.2 19.2 58 100 71.1 0
100 93.6 18.6 57 100 68.2 0
100 92.9 17.9 56 100 65.2 0
100 92.2 17.2 55 100 62.2 0
100 91.6 16.6 54 100 59.3 0
100 90.9 15.9 53 100 56.3 0
100 90.2 15.2 52 100 53.4 0
100 89.6 14.6 51 100 50.4 0
100 88.9 13.9 50 100 47.4 0
100 88.2 13.2 49 100 44.5 0
100 86.7 11.7 48 100 41.5 0
100 85.1 10.1 47 100 39.6 0
100 83.5 8.5 46 100 37.8 0
100 82.0 7.0 45 100 35.9 0
100 80.4 5.4 44 100 34.1 0
100 78.8 3.8 43 100 32.2 0
100 77.2 2.2 42 100 30.4 0
100 75.7 0.7 41.6 100 29.6 0
. 100 75.0 0
41 100 28.5 0
100 73.2 0
40 100
.26.6 0
100 70.1 0
39.1 100 25.0 0
100 67.3 0
39 99.9 24.9 0
100 66.9 0
38 99 24.0 0
100 63.8 0
37 98 23.0 0
100 60.6 0
36 97.1 22.1 0
100 57.5 0
35 96.2 21.2 0
100 54!3 0
34 95.2 20.2 0
100 51.2 0
33 94.3 19.3 0
100 48.1 0
32 93.4 18.4 0
100 44.9 0
31 92.5 17.5 0
100 41.8 0
30 91.5 16.5 0
100 38.6 0
29 90.6 15.6 0
100 35.5 0
28 89.7 14.7 0
100 32.4 0
% FP CRGP 5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint 0
RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 3 Cycle 27 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 32 Page 20 of 33 0
Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 27 88.8 13.8 0
100 29.2 0
26 87.8 12.8 0
100 26.1 0
25.7 87.5 12.5 0
100 25.0 0
25 86.9 11.9 0
99.0 24.0 0
24 86.0 11.0 0
97.4 22.4 0
23 85.0 10.0 0
95.8 20.8 0
22 84.1 9.1 0
94.2 19.2 0
21 83.2 8.2 0
92.7 17.7 0
20 82.2 7.2 0
91.1 16.1 0
19 81.3 6.3 0
89.5 14.5 0
18 80.4 5.4 0
88.0 13.0 0
17 79.5 4.5 0
86.4 11.4 0
16 78.5 3.5 0
84.8 9.8 0
15 77.6 2.6 0
83.2 8.2 0
14 76.7 1.7 0
79.5 4.5 0
13 75.8 0.8 0
75.8 0.8 0
12.8 75.0 0
0 75.0 0
0 12 69.0 0
0 69.0 0
0 11 61.5 0
0 61.5 0
0 10 54.0 0
0 54.0 0
0 9
46.5 0
0 46.5 0
0 8
39.0 0
0 39.0 0
0 7
31.5 0
0 31.5 0
0 6
24.0 0
0 24.0 0
0 5
16.5 0
0 16.5 0
0 4
9.0 0
0 9.0 0
0 3
1.5 0
0 1.5 0
0 2.8 0
0 0
0 0
0 2
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Oconee 3-Cycle 27 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 32 Page 21 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5.
CRGP 6 CRGP 7 102 100 100 83.4 100 100 83.4 101 100 100 82.5 100 100 82.5 100 100 100 81.5 100 100 81.5 99 100 100 80.5 100 100 80.5 98 100 100 79.6 100 100 79.6 97 100 100 78.6 100 100 78.6 96 100 100 77.7 100 100 77.7 95 100 100 76.7 100 100 76.7 94 100 100 75.7 100 100 75.7 93 100 100 74.8 100 100 74.8 92 100 100 73.8 100 100 73.8 91 100 100 72.8 100 100 72.9 90 100 100 71.9 100 100 71.9 89 100 100 70.9 100 100 70.9 88 100 100 70.0 100 100 70.0 87 100 100 69.0 100 100 69.0 86 100 100 68.0 100 100 68.1 85 100 100 67.1 100 100 67.1 84 100 100 66.1 100 100 66.1 83 100 100 65.2 100 100 65.2 82 100 100 64.2 100 100 64.2 81 100 100 63.2 100 100 63.3 80 100 100 62.3 100 100 62.3 79 100 100 61.3 100 100 61.3 78 100 100 60.3 100 100 60.4 77 100 100 59.4 100 100 59.4 76 100 100 58.4 100 100 58.4 75 100 100 57.5 100 100 57.5 74 100 100 56.5 100 100 56.5 73 100 100 55.5 100 100 55.6 72 100 100 54.6 100 100 54.6 71 100 100 53.6 100 100 53.6 70 100 100 52.7 100 100 52.7 69 100 100 51.7 100 100 51.7 68 100 100 50.7 100 100 50.7 67 100 100 49.8 100 100 49.8 66 100 100 48.8 100 100 48.8 65 100 100 47.8 100 100 47.8 64 100 100 46.9 100 100 46.9 63 100 100 45.9 100 100 45.9 62 100 100 45.0 100 100 45.0 61 100 100 44.0 100 100 44.0 60 100 100 43.0 100 100 43.0 59 100 100 42.1 100 100 42.1 58 100 100 41.1 100 100 41.1 57 100 100 40.2 100 100 40.2 56 100 100 39.2 100 100 39.2 55 100 100 38.2 100 100 38.2 54 100 100 37.3 100 100 37.3 53 100 100 36.3 100 100 36.3 52 100 100 35.3 100 100 35.3 51 100 100 34.4 100 100 34.4 50 100 100 33.4 100 100 33.4 49 100 100 32.5 100 100 32.5 48 100 100 31.5 100 100 31.5
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 3 Cycle 27 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC toEOC ONEI-0400-70,Rev 32 Page 22 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82,2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80,2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0
100 75.0 0
19 100 73.5 0
100 73.5 0
18 100 71.5 0
100 71.5 0
17 100 69.5 0
100 69.5 0
16 100 67.5 0
100 67.5 0
15 100 65.5 0
100 65.5 0
14 100 63.5 0
100 63.5 0
.13 100 61.5 0
'100 61.5 0
12 100 53.0 0
100 53.0 0
11 100 44.5 0
100 44.5 0
10 100 36.0 0
100 36.0 0
9 100 27.5 0
100 27.5 0
8.7 100 25.0 0
100 25.0 0
8 97.0 22.0 0
97.0 22.0 0
7 92.8 17.8 0
92.8 17.8 0
6 88.5 13.5 0
88.5 13.5 0
5 84.2 9.2 0
84.2 9.2 0
4 80.0 5.0 0
80.0 5.0 0
3 75.8 0.8 0
75.8 0.8 0.
2.8 75 0
0 75 0
0 2
68 0
0 68 0
0 1
59.5 0
0 59.5 0
0 0
51 0
0 51 0
0
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint 0
RI = 300 is withdrawal limit at all power levels.
Oconee 3 Cycle 27 Rod Index Setpoints 3 Pump Operation, 1 Inoperable Rod, BOC toEOC ONEI-0400-70 Rey 32 Page 23 of 33 0
Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 100 100 81.5 74 100 100 79.6 100 100 79.6 73 100 100 77.8 100 100 77.8 72 100 100 75.9 100 100 75.9 71 100 100 74.1 100 100 74.1 70 100 100 72.2 100 100 72.2 69 100 100 70.4 100 100 70.4 68 100 100 68.5 100 100 68.5 67 100 100 66.7 100 100 66.7 66 100 100 64.8 100 100 64.8 65 100 100 63.0 100 100 63.0 64 100 100 61.1 100 100 61.1 63 100 100 59.3 100 100 59.3 62 100 100 57.4 100 100 57.4 61 100 100 55.6 100 100 55.6 60 100 100 53.7 100 100 53.7 59 100 100 51.9 100 100 51.9 58 100 100 50.0 100 100 50.0 57 100 100 48.2 100 100 48.2 56 100 100 46.3 100 100 46.3 55 100 100 44.5 100 100 44.5 54 100 100 42.6 100 100 42.6 53 100 100 40.8 100 100 40.8 52 100 100 38.9 100 100 38.9 51 100 100 37.1 100 100 37.1 50 100 100 35.2 100 100 35.2 49 100 100 33.4 100 100 33.4 48 100 100 31.5 100 100 31.5 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2
%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 3 Cycle 27 Rod IndexSetpoints 3 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 32 Page 24 of33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0
100 75.0 0
19 100 73.5 0
100 73.5 0
18 100 71.5 0
100 71.5 0
17 100 69.5 0
100 69.5 0
16 100 67.5 0
100 67.5 0
15 100 65.5 0
100 65.5 0
14 100 63.5 0
100 63.5 0
13 100 61.5 0
100 61.5 0
12 100 53.0 0
100 53.0 0
11 100 44.5 0
100 44.5 0
10 100 36.0 0
100 36.0 0
9 100 27.5 0
100 27.5 0
8.7 100 25.0 0
100 25.0 0
8 97.0 22.0 0
97.0 22.0 0
7 92.8 17.8 0
92.8 17.8 0
6 88.5 13.5 0
88.5 13.5 0
5 84.2 9.2 0
84.2 9.2 0
4 80.0 5.0 0
80.0 5.0 0
3 75.8 0.8 0
75.8 0.8 0
2.8 75.0 0
0 75.0 0
0 2
68 0
0 68 0
0 1
59.5 0
0 59.5 0
0 0
51 0
0 51 0
0
%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
S
'I 0
I Oconee 3 Cycle 27 I
105 100
.95 90 85 80 75 70 H
I I
Control Rod Position Setpoints No Inoperable Rods, 4 Pump Flow ONEI-0400-70 Rev 32 Page 25 of 33 Restricted Operation R
d H*
I D..
LL a,
a 0~
0 Uw a,
65 60 55 50 45.
40 35 30 25 20 15 10 5
Unacceptable Operation I
4444
[FH Acceptable Operation 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
.1 I
I
=.=Group 6 i
S5
-15 25 35 45 55 65 75 85 95 0
....I
I..
....I 0
10 20 30 40 50 60 70 80 90 100 0
10 20 30 40 50 60 70 80 90 100 WD Group 7 I Group 5 Control Rod Position, %
105 I
Oconee 3 Cycle 27 ONEI-0400-70 Rev 32 Page 26 of 33
ffp
100 Control Rod Position Setpoints 95 No Ioperable Rods, 3 Pum Flow 90 85 80 75 I
i i
105 100 95 444414 U3-a, 0r 70 65 60 55 50 45 40 Unacceptable Operation OP.-
44 tth l
85 80 75 70 65 60 55 50 45 40 I
35 30 25 20 15 10 5
0 _
Restricted Operation Acceptable Operation H
I35 30 H
Z 25 20
- 1 Group 6 5
15 25 35 45 55 65 75 85 95 5
114111 1 KIIII jim"'..1 Ill Ill ii I I I I list 11 FO-10 20 30 40 50 60 7080 90 100 Contr 0
10 20 30 40 50 60 70 80 90 100 VD, G roup" 7 ol Rod Position, % VWD
0 I
Oconee 3 Cycle 27 I
ONEI-0400-70 Rev 32 Page 27 of 33 105 100 I
CL 0~
95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 Control Rod Position Setpoints 1 Inoperable Rod, 4 Pump Flow I
75 70 65 60 55 Unacceptable Operation 100 95 90 85 80 Acceptable Operation 50 45 I
40 35 30 25 20 15 10 i-5 0
25 35 45 55 65 5
15 75 85 95 5
0 IL I0 10 20 30 40 50 60 70 80 90 100 1 0 10 20 30 40 50 60 70 80 90 100 1 I Group 5 Control Rod Position, % WD I Group 7 1
0 I
Oconee 3 Cycle 27 I
ONEI-0400-70 Rev 32 Page 28 of 33 105 Ir 1°00 Control Rod Position Setpoii I Inoperable Rod, 3 Pump FI 105 100 95 I
0-LL
-)
0-0~
90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 "hi 85 80 Unacceptable Operation Acceptable Operation 90 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
4#4 Group LH4& 45 55 65 5
15 - 25 75 85 95 0
10 20 0
80 90 100 30 40 50 60 1 Group 5 70 80 90 100 I
1.0 10 20 30 40 50 60 70 1 Group 7 I
Control Rod Position, % WD
ONEI-0400-70 Rev 32 Page 29 of 33 Oconee 3 Cycle '27 2.0 Core Operating Limits -
Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.
References provided in section 1 of this COLR identify the sources for the data which follows.
Information provided in thiis s~ection shouild not<be u~sed> in, plant procedures
- Core Power Level, Quadrant Power Ti Core OutI p
2 2
2.
2
%FP 3(
it, %
Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State T
-100
.0-30 30-10 5.40 10.00 9.44 ransient 0
0-30 12.00 Maximum 0- 100 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 let Pressure Reactor Coolant Outlet Temperature, 'F sia 3 RCS Pumps 4 RCS Pumps 800 581.0 578.3 900 590.0 587.3 000 598.9 596.3 100 607.9 605.2 200 616.9 614.2 300 625.9 623.2
ONEI-0400-70 Rev 32 Page 30 of 33 Oconee 3 Cycle 27 Axial Power Imbalance Protective Limits Referred to by TS 2.1.1 4 Pumps 3 Pumps
%FP 0.0 80.0 90.0 100.0 109.4 109.4 100.0 90.0 80.0 0.0 0.0 62.3 77.0 81.7 81.7 77.0 62.3 0.0 RPS Operational
-35.0
-35.0
-14.4 14.4 35.0 35.0
-35.0
-35.0
-14.4 14.4 35.0 35.0
-39.5
-39.5
-39.5
-28.4 28.4 39.5 39.5 39.5
-39.5
-39.5 39.5 39.5
ONEI-0400-70 Rev 32 Page 31 of 33 Oconee 3 Cycle 27 Rod Index Limits Referred to by TS 3.2.1 Operational RI Shutdown Margin RI Insertion Limit
%FP Insertion Limit No Inop Rod 1 Inop Rod 4 Pumps 0
102 100 90 80 50 15 5
77 50 15 5
262 260 250 240 200 90 0
236 200 90 0
220 140 75 0
220 140 75 0
280 230 160 75 280 230 160 75 RI Withdrawal Limit 300 300 300 300 300 300 300 300 300 300 300 3 Pumps
ONEI-0400-70 Rev 32 Page 32 of 33 Oconee 3 Cycle 27 LOCA Linits I
Not for Plant Use Core Elevation Feet 0
2.506 4.264 6.021 7.779 9.536 12 LOCA LHR kw/ft Limit Versus Burnup Mk-B-HTP w/0% Gad rods 0 GWd/mtU 34 GWd/mtU 62 GWd/mtU 16.9 16.9 12.3 17.8 17.8 12.3 17.8 17.8 12.3 17.8 17.8 12.3 17.8 17.8 12.3 17.3 17.3 12.3 16.4 16.4 12.3 Core Elevation Feet 0
2.506 4.264 6.021 7.779 9.536 12 LOCA LHR kw/ft Limit Versus Burnup Mk-B-HTP w/2% Gad rods 0 GWd/mtU 34 GWd/mtU 62 GWd/mtU 16.0 16.0 11.6 16.9 16.9 11.6 16.9 16.9 11.6 16.9 16.9 11.6 16.9 16.9 11.6 16.4 16.4 11.6 15.5 15.5 11.6 Core Elevation Feet 0
2.506 4:264 6.021 7.779 9.536 12 LOCA LHR kw/ft Limit Versus Bumup Mk-B-HTP w/4% Gad rods 0 GWd/mtU 34 GWd/mtU 62 GWd/mtU 15.2 15.2 I1.I 16.1 16.1 1I.1 16.1 16.1 11.1 16.1 16.1 11.1 16.1 16.1 l~
15.7 15.7 11.1 14.9 14.9 11.1 Core Elevation LOCA LHR kw/ft Limit Versus Burnup Feet Mk-B-HTP w/6% Gad rods 0 GWd/mtU 34 GWd/mtU 62 GWd/mtU 0
14.8-14.8 10.8 2.506 15.6 15.6 10.8 4.264 15.6 15.6 10.8 6.021 15.6 15.6 10.8 7.779 15.6 15.6 10.8 9.536 15.2 15.2 10.8 12 14.4 14.4 10.8 Core Elevation LOCA LHR kw/ft Limit Versus Burnup Feet Mk-B-HTP w/8% Gad rods 0
2.506 4.264 6.021 7.779 9.536 12 0 GWdlmtU 34 GWd/mtU 62 GWd/mtU 14.3 14.3 10.4 15.1 15.1 10.4 15.1 15.1 10.4 15.1 15.1 10.4 15.1 15.1 10.4 14.7 14.7 10.4 13.9 13.9 10.4
ONEI-0400-70 Rev 32 Page 33 of 33 Oconee 3 Cycle 27 4 RCP Operation - Loop Average Temp., 'F 3 RCP Operation - Loop Average Temp., TF ATcold, TF Tavg (Analytical)
Tavg (Analytical) 0.0
<581.0
<5817.
0.1
<581.0
<581.0 0.2
<581.1
<581.0 0.3
<581.1
<581.1 0.4
<581.2
<581.1 0.5
<581.2
<581.1 0.6
<581.2
<581.1 0.7
<581.3
<581.2 0.8
<581.3
<581.2 0.9
<581.3
<581.2 1.0
<581.4
<581.2 1.1
<581.4
<581.2 1.2
<581.5
<581.3 1.3
<581.5
<581.3 1.4
<581.5
<581.3 1.5
<581.6
<581.3 1.6
<581.6
<581.4 1.7
<581.6
<581.4 1.8
<581.7
<581 A 1.9
<581.7
<581.4 2.0
<581.8
<581.4 2.1
<581.8
<581.5 2.2
<581.8
<581.5 2.3
<581.9
<581.5 2.4
<581.9
<581.5 2.5
<582.0
<581.6 2.6
<582.0
<581.6 2.7
<582.0
<581.6 2.8
<582.1
<581.6 2.9
<582.1
<581.6 3.0
<582.1
<581.7 3.1
<582.2
<581.7 3.2
<582.2
<581.7 3.3
<582.3
<581.7 3.4
<582.3
<581.7 3.5
<582.3
<581.8 3.6
<582.4
<581.8 3.7
<582.4
<581.8 3.8
<582.4
<581.8 3.9
<582.5
<581.9 4.0
<582.5
<581.9 4.1
<582.6
<581.9 4.2
<582.6
<581.9 4.3
<582.6
<581.9 4.4
<582.7
<582.0 4.5
<582.7
<582.0 4.6
<582.7
<582.0 4.7
<582.8
<582.0 4.8
<582.8
<582.1 4.9
<582.9
<582.1 5.0
<582.9
<582.1