Duke DA VE BAXTER Vice President
- Energy.
Oconee Nuclear Station Duke Energy ONO0 VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy. com May 21, 2009 U.
S.
Nuclear Regulatory Commission Document Control Desk Washington, D.
C. 20555
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Site Docket Number 50-287 Core Operating Limits Report (COLR)
Gentlemen:
Attached, pursuant to Oconee Technical Specification 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 25, Rev. 30.
If you have any questions, please direct them to Judy Smith at 864-873-4309.
Sincerely, Dave axter Vice President Oconee Nuclear Station Attachment Aoof www. duke-energy. com
NRC Document Control Desk May 21, 2009 Page 2 xc w/att:
Mr. Luis Reyes Regional Administrator, Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85
- Atlanta, Ga.
30303-8931 Mr. John Stang Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 8 G9A Washington, DC 20555 Mr. Andy Hutto Senior Resident Inspector Oconee Nuclear Site
DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY SuperRush THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW
- 1) 00813 DOC MGMT EC04T ORIGINAL SR 0'@b7F Ef0K Q03RC
- 3) 06700 ONS MANUAL MASTER FILE ON03DM
- 4) 06937 R R ST CLAIR EC08G OR NFORNATION ONLY Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE NUCLEAR GENERAL OFFICE OCONEE NUCLEAR STATION RESP GROUP: NE WORK ITEM: EXEMPTION M-5 RECORD RETENTION: 003587 OCONEE 3 CYCLE 25 CORE OPERATING LIMITS REPORTS Page 1 of I Date:
05/14109 Document Transmittal #:
DUK091340002 QA CONDITION
- Yes
[
No OTHER ACKNOWLEDGEMENT REQUIRED D Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:,
Duke Energy P.O. Box 1006 Energy Center ECO4T Charlotte, N.C.
28201-1006 Rec'd By Date DOCUMENT NO QACOND REV #/ DATE DISTR CODE 1
3 4
5 6
17 8
9 10 11 12 13 14 15 TOTAL
______________________________________________________________ L ____________ 4 4
4
-~------I--4-+
~-~-~-4 I-
+--~-~-
i-c-ONEI-0400-070 1
030 05/14/09 NOMD-27 X
'f',
vi V1 3
L I
' ____.1.,..4
~
____ ~
____ A ____ -
~
REMARKS:
DUKE DOCUMENT RELEASE EXEMPT FROM NUCLEAR MODIFICATION PROGRAM THOMAS C GEER NUCLEAR STATION ENGR MANAGER GS-SVP NUCLEAR SUPPORT BY:
J W SIMMONS JWSITER EC08H
ONEI-0400-70 Rev 30 Page 1 of 33 Duke Energy Oconee 3 Cycle 25 Core Operating Limits Report QA Condition I
<A Prepared By: J. M. Sanders Checked By:
L. C James il Date:
Date :
Date:
5/A !
q CDR By:
M. L. Cameron
- Ale, Approved By: R. R. St.Clair
[)coicnie No.
Kev CA 10- 1 c
)
P~ue No.
Palyct 2 ol 33 INSm~criox OF ENGINEERING INSTRUACTIONS Inspection WVaived By:
('I T)01 ' ý4 )T Date:
CATAWBA MCE (Mechanical &Civilh RES (Electrical Only)
RIES (Reactor)
MOD Other Inspection Waived El D
Inpcto Inspected By/Date:
n.npected By/'Date:
Inspected By/Date:
Inspccted By/Date:
inspected By/Date:
OCONEEl NICE (Mechanical & Civil)
RES (Electricail Only)
RES (Reactor)
MOD Other (
)
Inspection Waived rx-L nx n]
Inspected By/Date:
inspected By/Date:
Inspected ByiDate:
'Inspected By/Date:
Inispected By/Date;
~1 MCGUIRE
'MCE (Mechanical & Civil)
RES (Electrical.Only)
RES (Reactor)
MOD Other(
)
Inspection Waived LII Li Li Li Li Inspected By'Tate:
Inspected,By/Date:
Inspected By/Date:
inspected By/Date:
Inspected By/Date:
ONEI-0400-70 Rev 30 Page 3 of 33 Oconee 3 Cycle 25 Core Operating Limits Report Insertion Sheet for Revision 30 I
This revision is not valid until the end of operation for Oconee 3 Cycle 24.
Remove these Revision 29 pages Insert these Revision 30 pages 1 -33 1 - 33.
Revision Log Effective Revision Date Pages Revised Pages Added Pages Total Effective Deleted Pages Oconee3 Cycle 25 revisions below.
30 May 2009 1 -33
.33 29 May2009 1 -33 33 28 Apr2009 1
33 Oconee 3 Cycle 24 revisions below 27 Mar2009 1-33 33 26 Nov 2007 1-33 33 25 Nov2007 1-33 33i jOconee 3 Cycle 23 revisions below 24 May2006 1-33 33 1Qconee 3 Cycle 22 revisions below 23 Mar2006 1 -4,6,15-16,21,27,31 33 22 Mar2005 1-5 33 21 Nov 2004 1-33 33 Oconee,3 Cycle 21 revisions below 20 Sep2004 1 -4,6 33 19 Feb'2004 1-4,6 33 18 Nov2003 1-3,5 33 17 Apr2003 1-31 32-33 33
ONEI-0400-70 Rev 30 Page 4 of 33 Oconee 3 Cycle 25 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for O3C25 has been prepared in accordance with the requirements of TS 5.6.5. The core operaiing limits within this report have been developed using NRC approved methodology reports identified in References 1 through 11. See the discussion beiow pertaining to References 2 through 8.
03025 is the second reload of the AREVA Mark-B-HTP fuel design. Revisions to seven NRC-approved Duke methodology reports (References 2 through 8) were submitted to NRC for review and approval to support the transition to the Mark-B-FtTP fuel. These revisions were combined into one new methodology report, DPC-NE-2015-P. "Mark-B-HTP Fuel Transition Methodology". The DPC-.E-201 5-P methodology report was approved by the NRC in a Safety Evaluation Report (SER) dated October 29. 2008. This SER allows Duke to incorporate the NRC's previously reviewed & approved HTP-related changes into References 2 through 8.
The core operating limits have been developed using the methodologies from revised References 2, 4, 5, and 6 and existing References 3, 7, and 8 wih the NRC-approved changes resulting from the NRC approval of the DPC-NE-2015-P report.
The RPS protective limits and maximum allowable setpoints are documented in References 12 through 14. These limits are validated for use.in 03025 by References 15 through 17. The 03C25 analyses assume a design.flow of 108.5% of of 88,000 gpm per RCS pump.a radial local peaking (FAh) of 1.714, and an axial peaking factbr(Fz) of 1.5, and an EOC
< 1,00ppmB) Tavg reductoneof up to 10'F provided 4 ROPs are in operationand Tavg does not decrease below 569'F.
The error adjusted core operating.limits included.in section 1 of the report incorporate all necessary uncertainties and marlgins required for operation of the 03C25 reload core, 1.1 References
- 1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1004-A, Revision 1A, January 2009.
- 2. Oconee NuciearStation Reload Design Methodology tl, DPC-NE-1002-A, Revision 3A, December, 2008.
3, Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 5, SER dated December.8,2000.
- 4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003-PA, Revision 2A, December 2008.
- 5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 4A, December 2008,
- 6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008-PA, Revision 1A, December 2008.
- 7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 2, SER dated September 24, 2003.
- 8. Thermal Hydraulic Transient Analysis Methodology, DPC-NE-3000-PA, Revision 3, SER dated September 24, 2003.
- 9. BAW-10192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants.. Revision 0, SER.dated February 18, 1997.
- 10. BAW-10164P-A, RELAP51MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis, Revision 6. report.dated June 2007.
- 11. BAW-10227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, Revision 1, June 2003 (SER to BAW-10186P-A.datedJune 18; 2003).
- 12. RPS RCS Pr essure & Temperature Trip Function Uncertainty Analyses and Variable Low Pressure Safety Limit" OSC-4048, Revision 4, January 2001,
- 13. Power Imbalance Safety Limitsand Tech Spec Setpoints.Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 2, October 2001.
- 14. ATc and EOC Reduced Tavg Operation, OSC-7265, Revision 1, Duke Power Co., June 2002.
- 15. 03025 Maneuvering Analysis, OSC-9548, Revision 4, May 2009.
- 16. 03025 Specific DNB Analysis, OSC-9556, Revision 1, May 2009.
- 17. 03025 Reload Safety Evaluation, OSC-9695, Revision 2, May 2009.
ONEI-0400-70 Rev 30 Page 5 of 33 Oconee 3 Cycle 25 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.
Referred to by TS 315A4.
Spent fuel pool boron concentration shall be greater than 2220 ppm.
Referred to by TS 3.7.12.
The equivalent ofat least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.
Referred to by TS SLC 16.5.13.
CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in the CFTs shall be less than 4000 ppm.
Referred to by TS 3.5.1.
RCS and Refueling canal boron concentration shall be greater than 2220 ppm.
Referred to by TS 3.9.1.
Shutdown Margin (SDM) shall be greater than I% A.,k/k.
Referred to by TS 3.1.1.
Moderator Temperature Coefficient (MTC) shall be less than:
Linear interpolation is valid within the table provided.
Referred to by TS'3.1I3.
MTC x, 10-4 Ap I ?F
+0.70
+0.525 0.00 0.00 0.00
%FP 0
20 80 100 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1.
4 RCP:
measured hot leg pressure >'2125 psig 3 RCP:
measured hot leg pressureŽ. 2125 psig DNB parameter for RCS loop average temperature shall be:
Referred to by TS 3.4.1.
The measured Tavg must be less than COLR"limits minus instrument uncertainty. ATc is the setpoint value selected by the operators. Values are;expanded by linear interpolation on page 33 of this document without instrument uncertainty.
Max Loop Tavg (Incl 2*F unc)
581.0
, 581.0 1
581.4 581.2
'2 58'1.8 581.4 3
582.1 581.7 4
582.5 581.9 5
582.9 582.1 This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.
DNB parameter for RCS loop total flow shall be:
Referred to by TS'3.4.1.
4 RCP:
Measured> 108.5 %df 3 RCPO Measured > 74.7 % of 4 ROP minflow Regulating rod groups.shall be withdrawn.in sequence starting with group 5, group 6, and finally group 7.
Referred to by TS 3.2.1.
Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.
Referred to'by TS 3.2.1.
Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1 5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power*Tilt).
ONEI-0400-70 Rev 30 Page 6 of 33 Oconee 3 Cycle 25 Steady State Operating Band EFPD 0 to 454 454 to EOC Rod Index Min Max 292 +/- 5 300 292 +/- 5 300 APSR %WD Min Max 30 40 100 100 Core Power Level, %FP Full Incore Out of Core Backup Ircore Quadrant Power Tilt Setpoints Steady State Transient 30-100 0-30 30-100 0-30 3.50 7.59 7.10 9.39 2.37 6.09 5.63 772 2.26 3.87 3.63 4,81 Referred to by TS 3.2.3 Maximum 0- 100 16,54 14.22 10.07 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).
ONEI-0400-70 Rev 30 Page 7 of 33 Oconee 3 Cycle 25 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 2300 2200 0
(I) w LI)
U) 0~
C (U
0 00 0
0 (Ua) 2100 2000 1900 1800 1700 540 560 580 600 Reactor Coolant Outlet Temperature, OF 620 640
ONEI-0400-7 0 Rev 30 Page 8 of 33 Oconee 3 Cycle 25 RPS Power Imbalance Setpoints 4 Pumbjs 3 Pumps
% FP 0,0 88.2 107.9 107.9 90.4
.0.0 0,0 60.9 80.6 80.6 63.1 0.0
% Imbalance
-33.0
-33.0
-12.1 14.4 33.0 33.0
-33.0
-33.0
-12.1 14.4 33.0 33,0 4
Maximum Allowable RPS Power Imbalance Limits
% FP
%Imbalance Pumps 0.0
-35.0 87.8
-35.0 109.4
-12.1 109.4 14.4 90.0 35.0 0.0 35.0 Dumps 0.0
-35.0 60.1
-35.0 81.7; "12.1 81.7 14.4 62.3 35.0 0.0 35.0 3 F
ONEI-0400-70 Rev 30 1Pag'e 9of 33 Oconee 3 Cycle 25 Operational Power Imbalance Setpoints 4 Pumps 3 Pumps
%FP 0'0 80.0 90.0 100.0 102.0 102.0 100.0 90.0 80.0 0.0 0.0 60.9 60.9 77.0 77.0 63.1 63.1 0.0 Full Incore
-28.0
-28.0
-26.1
-15.5
-13.3 15.7 17:8 28.0 28.0 28:0
-28.0
-28.0
-10.9 13.2 28.0 28.0 Backup Incore
-28.0
-28.0
-26.1
-15.5
-13.3 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-10.9 13.2 28.0 Out of Core
-28.0
-28.0
-26.1
-15.5
-13.3 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-10.9 13.2 28.0 28.0 28.0
ONEI-0400-70 Rev 30 Page 10 of 33 Oconee 3 Cycle 25 Operational Power Imnbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC
% FP
.RPS Trip Full Incore Alarm Out of Core Alarm 107.9 107.0 106.0 105.0 104.0 103.0 102.O 101.0 100.0 99.0 98.0 97.*0 96.0' 95.0 94.0 93.0 92.0 91.0
.90.4 90.0 89.0 88.2 88.0 87.0 86.0 85.0 84.0 83.0 82:0 81 0.
80.0 0.0
-12.1
-13.0
-14.1
-15.1
-16.2
-17.3
-18.3
-19.4
-20.5
-21.5
-22.6
-23:6
-24.7
-25.8
-26.8
-27:9
-29.0
-30.0
-30:7
-31.1
-32.1
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0.
-33:0
-33:.0
-33:0
-33.0
-330 14.4 15.4 16.4 17.5 18,5 19.6 20.7 2,1.7 22.8 23.9 24:9 26.0 27:0 28.1 29.2
- 30.2 31.3 32.3 33.0
.33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
-13.3
-14.4
-15.5
-16.5
-17.6
-18.6
-19.7
-20.8
-21.8
-22.9
-24.0
-25.0
-25.7
-26.1
-26.3
-26.4
-26.5
-26.7
-26.8
-27.0
-27.2
.-27.4
-27.6
-27.8
-28,0
-28.0 15,7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27.0 27.6 28.0 28.0 28.0 28.0 28.0 28.0 28.0 2&0 28.0 28.0 28.0 28.0
.28.0
-13.3
-14.4
-15.5
-16.5
-17.6
-18.6
-19.7
-20.8
-21.8
-22.9
-24.0
-25.0
-25.7
-26.1
-26.3
-26.4
-26.5
-26.7
-26.8
-27.0
-27.2
-27.4
-27.6
-27.8
-28,0
-28.0 15.7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27:0 27:6 28:0 28.0 28.0 28.0 28.0 28,0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
% FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 30 Page 11 of 33 Oconee 3 Cycle 25 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps. BOC to EOC
%FP RPS Trip Full Incore Alarm [ Out of Gore Alarm 80.6 80.0 79.0 78:0 77.0 76.0 75:0 74.0 73.0 72.0 71.0 70.0 69.0 68.0 67.0, 66.0 65.0 64.0 63.1 63.0 62.0 61.0.
60.9' 60.0 0.0
-12.1
-1.2.7
-1.3.7
-14.8
-15.9
-16.9
-18.0
-19.1
-20.1
-21.2
-22.2
-233
-24.4
-25.4
-26.5
-27%6
-28.6
-29.7
-30.7
-30.7
-31.8
-32.9
-33.0
-33.0
-33.0 14.4 15.0 16.1 17.1 1'8.2 19.3 20.3 21.4 22:4 23.5 24.6 25;6 26.7 27.8 28.8 29,9 30.9 32.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 N' "
T
-10.9
-11.9
-13.0
-14.1
-15.1
-16.2
-17:2
.183
-19.4
-20.4
-21.5
-22.6
-23.6
-24.7
-25.7
-25.7
-26.8
.-27.9
-28.0
-28.0
-28.0 13.2 14.3 15,3 16.4 17A4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
-10.9
-11.9
-13.0
-14.1
-15.1
-16.2
-17.2
-18.3
-19.4
-20.4
-21.5
-22.6
-23.6
-24.7
-25.7
-25.7
-26.8
-27.9
-28.0
-28.0
-28.0 13.2 14.3 15.3 16.4 17.4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 30 Page 12 of 33 Oconee 3 Cycle 25 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120.0
(-12.1.,107.9)
( 14,4,107.9) 100.0 M1 = 0.942 M2 = -0.942 Acceptable 4 Pump Operation
(-33.0,88.2)
(33.0,90.4)
(14.4,80.6)
(-33.0,60.9) 60.0 Acceptable 3or 4 Pump Operation 40.0 20.0 (33.0,63.1)
I I
-40.0
-30.0
-20.0
-10.0 0.0 10.0 Percent Power Imbalance 20.0 30.0 40.0
ONEI-0400-70 Rev 30 Page 13 of 33 Oconee 3 Cycle 25 Imbalance Setpoints for 4 Pump Operation, BOC to EOC 110.0 100.0 90.0 80.0 ZPS-Trip, Setpoirit I
I I
4 i
Il' ii
-4
- -j- - - - -
- I.-.
J::core & Otitcore Alanr Z :::: Y
....;...*...........*...*... *...I...
I-RPIS Trip Setpoint' 4
I
-~
5! ~ I;
/ ~
4-44 J-11 i
1
+-+
70.0
-O
- a.
60.0 0
t 50,0 a) a)
0L 40.0 30.0 20.0 10.0 0,0
.~~~...
l..'
i7-
-i 17...
P=--
- ::*, i '* d,* ** :* : :::,,: **i
.:,* * * :*:i::.. **::,.::...-==================::.*..
- :' *:,:**,.*:-,:'.:}* : *,* -i:]:.*::,:,::
I i
- :.::.i* :: ::, : *::i::
- . :* : ;* I-::I -I- -K........
- .:ii: -T
'T * * *
- i : : ---.
-:i e
I
- I : : :::::::::: ::::: :::::::::::: :::::::::::::: E !!,*i !* [i :!!i!!i:i!!i*!: :!:!! !!i::!!!! {* ! ': !i:!i:! l~! :: !i::!!Y !: !!:: i ii:!i!!====================
llI:~ ::ii! ::::: ::::::::::: :: : ::::: ::: :
- ....-......i.: - :::- - -*
- I=
..-:4 :.:::}*
....:__-_..*[:-'. aa::i:::: = = z:*........ : _:=*=*=b.::
- : =
- = = : :::::~ : : :: :::: :: : :*: ::: :: :: ::: :
-40
-35
-30
-25
-20
-15
-10
-5 0
5 10 15 20 25 30 35 40 Percent Axial Imbalance
ONEI-0400-70 Rev 30 Page 14 of 33 Oconee. 3 Cycle 25 Imbalance Setpoints for 3 Pump Operation, BOC to EOC 110 100 90 80 70 60 LL 0
15 50 30 a) 20 40 30 20 10 0
RPS T ip '
etpmipt PP rip Setpo itt mcore &Outcore Alarm 7
1 E
q 7::ii::;fc S
u c r l r.-:i*:ii:
4.-.:..
4 --...-....
-40
-35
-30
-25
-20
-15
-10
-5 0
5 10 15 20 25 30 35 40 Percent Axial Imbalance
ONEI-0400-70 Rev 30 Page 15of33 Oconee 3 Cycle 25 4 Pumps 3 Pumps Operational Rod Index Setpoints RI Insertion Setpoint
%FP No tnop Rod 1 Inop Rod 102.0 263.5 283.4 100.0 261.5 281.5 90.0 251.5 271,9 80,0 251.5 262.3 50.0 201,5 233.4 48.0 195.2 231.5 15.0 91.5 165.5 13.0 76.5 161.5 5.0 16.5 93.5 3.0 1.5 76.5 2.8 0.0 74.8 0.0 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 77.0 75.0 50.0 48.0 15.0 13.0 5.0 3.0 2.8 01.0 246.5 243.2 201.5 195.2 91.5 76.5 16.5-1.5 0.0 0.0 285.2 281.5 235.2 231.5 165.5 161.5 93.5 76.5 74.8 51.0
ONEI-0400-70 Rev 30 Page 16of33 Oconee 3 Cycle 25 Shutdown Margin Rod Index Setpoints 4 Pumps 3 Pumps
%FP 102.0 100.0 48.0 13.0 3.0 2.8 0.0 77.0 75.0 48.0 13.0 3.0 2-8 0.0 RI Insertion Setpoint No lnop Rod 1 InopRod 224.6 283.4 221.5 281.5 141.5 231.5 76.5 161.5 1.5 76.5 0.0 74.8 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 30O 300 300 300 300 300 300 300 300 227.4 221.5 141.5 76.5
-1.5 0.0 0.0 285.2 281.5 231.5 161.5 76.5 74.8 51.0
Oconee 3 Cycle 25 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEi-0400-70 Rev 30 Page 17 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP CRGP5 CRGP2 I CRGP7 102 101 100 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77' 76 75 74 73 72 71 70 69.8 69 68 67 66 65 64.1 63 6ý2 61 60 5958 57 56 54 53 52 51 50 100 100 100 100 100 100 100 10o 100 100 100 100
.100 100 100 1 00 100 100 100 100 100 100 100 100 1o00 066 100 100 100 100.
o 100 100 1..
00 100 100 100 100 100 106 100 100 100 160 166 100 100 100:
99.8 99.0 98.2 97.5 96.7 95.9 95.2 94.4 93.6 92.9 92.1 91.3 89`.8 89,0 8&2 87.5 86.7 85.9 85,2 84.4 831.6 82.9 82.1 81.3 80.6 79.8 79.0 78.2 77.5 76.7
" 75.9 7592 75.0 72.3 70.7 69.2 67.7 66.3 64.6 61.5 60.0 58.4 56.9 55.3 53.8 52.3 50.7 49,2 46.1 44,6 24.8 24.0 23.2 22.5 21.7 20-9 20.2 19.4 18.6 17.9 17.1 16.3 15.
14.8 14.0 13.2 12.5 11.7 10.9 10.2 9.4 7.9 7.1 6.3 5.6 4.8 4.0 3.2 2.5 1.7 0.9 0.
0 0
0 0
0 0
0
~0
~0 0
0 0
0 0
0 0
0
- 0 0
100 100 100 100 100 100 100 100 100 100 100 1.00 100 10 0 1ioo 100 100 100 100 100 100 100 1~00 100 160 100 10.0 100 100 100 1 do i0o 100 100 1 o0 100 1010 100 100
.1.00..
100 100 100 100 10b 100 100 100.
100
- 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 106 100 100 100 100 100 100 1ob 100 100 100 100 l ob 100 100 100 100 100 100 100 100 100 100 99.1 98.2 97.4 96.6 95.8 94.9 94.1 93.2 92.4 91.6 90.8 89.9 89.1 88.2 63.5 62.5 61.5 60.5 59.5 58.5 57.5 56.5 55,5 54.5 5315 52.5 51.5 51.5 51.5 51.5 51.5 51.5 51.5
.51.5 51.5 51,5 "51.5 49.8 48,2 46.5 44.8 43.2 41.5 39.8 38.2 36.5 34.8 34.5 33.2 31.5 29 8 28.2 26.5 25.0 24.1 23.2 22.4 21.6 20.8 19.9 19.1 18.2 17.4 16.6 15.8 14.1 132
%FP CRGP5 CRGP 6 CRG 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin. Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 3 Cycle 25 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400- 70 Rev 30 Page 18 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 51 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 49 48 47 46 45 44 43 42 41.6 41 40 39.1 38.
386 37 36 35 34 33, 32 3.......
31 29 27 26.
25.7 25 24 23 22 21 20 19 18 16 15 14 13 12.8 9
,8 6
2 0
100 100 100 100 100 100 100 100 100 100 10o 10O 99.9 99.0 98.0 97.1 96.2 95.2 94.3 93.4 92.5 91.5 90.6 89."7" 88.8 87.8 87.ý5 86.9 86.0 85.0 84.1 82.2 81.3 80.4 79.5 78.5 77.6 76.7 75.8 75.0 69.0 61.5 46.5
- ....1.....
39.0
- 31.5 24.0 16,5 9.0 1.5 0
0"0 43.0 41.5 39,6 37.8 35.9 34.1 32.2 30.4 29.6 28.5 26.6 25.0 24.9 24.0 23.0 22.1 21.2 20.2 19.3 18.4 17.5 16.5 15.6 14.7 13.8 12.8 12.5 11.9 11.0 10.0 9.1 8.2 7.2 6.3 5.4 4.5 3.5 2.6 1.7 0.8 0
0 0
0 0
0 0
0 0
0 0
01 0
0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 iob 100 100 100 100 100 100 100 100 100 100 10 99.0 97.4 95.8 94.2 92.7 91.1 89.5 88.0 86.4 84.8 83,2 79.5 75.8 75.0 69.0 61.5 54.0 46.5 39-0 31.5 24.0 16.5 9.0 1,5 0.
0 0
0 86.7 85.1 83.5 82.0 80.4 78.8 77.2 75.7 75.0 73.2 70.1 67.3 66.9 63.8 60.6 57.5 54.3 51.2 48.1 44.9 41.8 38.6 35.5 32.4 29.2 26.1i 25.0 24.0 22.4 20.8 19.2 17.7 16.1 14.5 13.0 11.4 9.8 8.2 4.5 0.8 0
6 0
0 0
0 0
0 0
0 0
0 0
0 0
11.7 10.1 8.5 7.0 5.4 3.8 2.2 0.7 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0.
0 0
0 0
0 0
0 0
%FP
.ICRGP 5
CRGP6 CRGP7 CRGP5 jCRGP6 I CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Oconee 3 Cycle 25 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 30 Page 19 of 33 Shutdown Margin Setpoint i1 Operational Alarm Setooint
%FP iCRRGPG5 1 CR026 CRGP 7f CRGP 5 CRGP 6 CRGP 7 f-77 76.2 76 75 74 73 72 71 70 69 68
.67 66 65 64.1 63 62 61 60 59.3 59 58 57 56 55 54 53
- 52 51
...50 49 48 47 46 45 44 43 42 41.6 41 4b 39.1 39 38 37 36 35 34 33 31 30 29
.28.
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 1.00 100 160 100 100 100o 100 100 10o it.O...
100 100 100 100 100 100*
100 100 100 100 i ob 100 I ido.
99.9 99 98 97.1 96.2 95.2 94.3 93A4
- 92.5 90.6
.89.-7.
100 100 99.7 98.2 96.8 95.3 93.8 92.3 90.8 89.4 87.9 86.4 84.9 83.4 82.1 80.5 79.0 77.5 76.0 75.0 74-1 71.1 68.2 65.2.
62.2 59.3 56.3 53.4 50.4 47.4 44.5 41.5 39.6 37.8 35.9 34.1 32.2 30.4 28.5 26.6 25.0 24.9 24.0 23.0 22.1 21.2 20.2 19.3 18.4 17.5 16.5 15.6 14.7 27.4 25.0 24.7 23.2 21.8 20.3 18.8 17.3 15.8 14.4 12.9 11.4 9.9 8.4 7.1 5.5 4.0 2.5 1.0 0
0 0
0 0
0 0
0 0
.0 0
0 0
0 00
.0 0
0 0
0
- 0 0
0 0
0 0
0 0
0~
100 100 100 100 100 100 100 100 100 100 100 100 100 100 1o0 100 100 100 100 100 100 1 ob 100 100 100 100
.160 100 100 100....
o.
100 100 100 100 100 100 100 100 1O00
'100 100 100 100 100 100 100 100 100 10.0 1 0 0....
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 99.1 98.3 97.4 96.6 96.0 95.8 94.9 94,1 93.3 92.4 91.6 90.8 89.9 89.1
....88.2
- 86.7 851 83,5 82.0 80,4 78.8 77,2 75.7 75.0 73.2 70.1 67T3 66,9 63.8 60.6 57.5 54.3 51.2~
48 1 44.9 41.8 38.6 35.5 32.4 46.5 45.2 44.9 43.2 41.5 39.9 38.2 36.5 34,9 33.2 31.5 29.9 28.2 26:5 25.0 24.1 23.3 22.4 21.6 2.1..0 20.8 19.9 19.1 18.;3 17.4 16.6 15.8 14:9 14.1 13.2 11,7
- II 4
- 10.1 8:.5 7,0 5.4 3.8 2.2 0.7 0
0 0
0 0
0 0-0 00 0
0' 0
0
%FP CRGP5 CRGP6 [ CRGP7 CRGP5 1 CRGP6 [ CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 3 Cycle 25 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 30 Page 20 of 33 Shutdown Ma(gin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 6
CRGP7 27 26 25,7 25 24 23 22 21 20 19 18 17 16 1.5 14 13 12.8 11 10 9
8 7
6 5
4 3
2.8 2
1 0
88.8 87.8 87.5 86.9 86.0 85.0 84.1 83.2 82.2 81.3 80.4 79.5 78.5 77.6 76.7 75.8 75.0 69.0 61.5 54.0 46.5 39.0 315 24.0 16.5 9.0 1.5
.0 0
0 0
13,8 12,8 12.5 11.9 11,0 10.0 9.1 8.2 7.2 6.3 5.4 4.5 3.5 2.6 1,7 0.8 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
100 100 100 99,0 97.4 95.8 94.2 92.7 91.1 89.5 88.0 84.8 83.2 79.5*
75.8 75.0 69.0 61.5 54.0 46.5, 39.0 31.5 24.0 16.5 9.0 1.5 0.
0 0
0 29.2 26.1 25.0 24.0 22.4 20.8 19.2 17.7 16.1 14.5 13.0 11.4 8.2 4,5 0.8 0
0 0
0 0
0 0
0 00 0
0 0
- 0
%FP CRGP5 1 CRGP 6.
CRGP 7
.CRGP 5 CRGP 6 CRGP7 7771_
~
Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal.limit;at all power levels.
- Oconee 3 Cycle 25 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 30 Page 21 of 33 Shutdown Margin Setpoint I-Operational Alarm Setpoini
%FP CRGP5 I CRGP6 CRGP7 CRGP5 CRGP6 CRGP 7 102 101 100 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 6 9 68 67 66 65 64 63 62 61 60 59 58
. 57 56 55 54 53 52 S50 49 48 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 10o 100 100 100 100 100 100 lob) loo lob 100 100 100 100 100 100 100 100 100 109 t100 100 100 l00 100 100 10o 100 100 100 100 10o 100 100 10*0 100
... i00 100 100 100 100 100 100 100 100 100 100 100 100 100 l00 100 100 100 100 106 100 100 l00 lo0 1O00 100 100 10.0 100 100 100 100 100 100 100 100 100 100 1o00 100 100 l166 100 100 1001 100 100 100 100 100 100 1o0 100 100 100 100 lob
.100
')66 83.4 82.5 81.5 80.5 79.6 78.6 77.7 76.7 75.7 74.8 73.8 72.8 71.9 70.9 70.0 69.0 68.0 67.1 66.1 65.2 64.2 63.2 62.3 61.3 60.3 59.4 58.4 57.5 56.5 55.5 54.6 516 52.7 51.7 50.7 49.8 48.8 47.8 46.9 45.9 45.0 44.0 4310 421 411.
40.2 39.2 38.2 T37.
36.3 35.3 34.4 33-4 32.5 3i.5 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 160 100 100 100 3oo*
100 100 100 100 100 100 10.0
-1009 100 100 loo 100 100 100 100 100
{6'6
...100...
100 100 100 100 100 100 100 100 1:00.
100 1 00 100 100 100 100 100 100 100 100 100 100 100 100 1 o6 100 100 100 100 100 100 100 100 100 ido 100 100 100 1oo 100 1o0 100 109 100 100 100 100 100 100
-1i "doI 100 100 0oo i.66 100 1 100 1-60 100 100 100 100 100 100 100 83.4 82.5 81.5 80.5 79.6 78.6 77.7 76.7 75.7 74.8 73.8 72.9 71.9 70.9 70.0 69.0 68.1 67,1 66.1 65.2 64.2 63.3 62.3 61.3 60.4 59.4 58.4 57.5 55.6 54.6 52.7 51.7 50.7 49.8 48.8 47.8 46.9
- 45. ' 9 45.0 44.0 43.0
.4121:...
40.2 38.2 37.3 36.3 35.3 34.4 33.4 32.5
% FP 5 CRGP_5 C
CRGP6 7CRGP CRGP 5 ! CRGP6 CRGP.7 Shutdown Margin Setpoint operational Alarm Setpoint.
RI = 300 is withdrawal limit at all power levels.
Continued, on next page.
Oconee 3 Cycle 25 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 30O Page 22 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 1 CRGP 7 1 CRGPS I CRGP 6 [ CRGP 7 47 46 45 44,8 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19.8 19 18 17
.5 1312 10 9
8.7 8
6 4
3 2
0.
100 100 100 100 100 100 100 100 100 100 100
.100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 97,0 92.8 88.5 84.2 80.0 75.81 75.0 68.0 5i.0 100 100 100 100 99.2 98,2 97T2 96.2 95.2 94.2 93.2 92.2 91.2 90.2 89.2 88.2 87.2 86.2 85.2 84*2 83-2 82.2 81.2 80.2 79.2 78.2 77.2 76.2 75.2 75,0 73.5 71.5 69.5 67.5 65.5 63.5 53.0
-441.5-36,0 27.5 25.0 22.0.
17.8 13.5 9.2 5.0 0.8 0
0 0
29.5 27.5 25.5 25.0 24.2 23.2 22.2 21.2 20.2 19.2 18.2 17.2 16.2 15.2 14.2 13.2 12ý.2 11.2 10.2 9.2 8.2 7.2 6.2 5.2 4.2 3.2 2.T2 1.2 02 0
0 0
0 0
0 0
0 0
0 00 0
0 0......
0 0
o...
0 0
100 100 100 100 100 100 100 100 100 100 100 100
- 100, 100 100 100 100 100 100 100 100 100 100 100 100 100o 100 10-0 100 100 100 100 100 100 100 100 100 100 1.!00 100 97.0 88,5 84.2 80.0, 75,8.
75.0 68.0 51.0 100 100 100 100 99.2 98.2 97.2 96.2 95.2 94.2 93.2 92.2 91.2 90.2 89.2 88.2 86.2 85.2 84.2 832 82.2
- :81i.2 80.2 79.2 78.2 77.2 76.2 75.2 75.0
-73.51 71.5 69.5 67.5 65.5 63.5 61.5 53.0 44.5 360 27.5 25.0 22.0 13.5 5.0 0.8 0
0 0
0 29,5 27,5 25.5 25.0 24.2 23.2 22.2 21.2 20.2 19.2 18.2 17.2 16.2 15.2 14.2 13.2 12.2 11.2 10.2 9.2 8.2 7.2 6.2 5.2 4.2 3.2 2.2 1.2 0.'2 0
0 0
0 0
0 0
0 0.0 0
0 0
0 0
0 0
0 0
0
- 0 0
%FP CRGP5
. CRGP6 CRGP7 CRGP,5 CRGP6.CRGP 7
Shutdown Margin Setpoint, Operational Alarm Setpoint RI= 300 is withdrawal limit at all power levels.
Oconee 3 Cycle 25 Rod Index Setpoints 3 Pump Operation, 1 Inoperable Rod. BOC to EOC ONEI-0400-70 Rev 30 Page 23 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
%FP CRGP5I CR3P6 CRGP7 CRGP5 CRGP6 CRGP7 77 76 75 74 73 72 71 70 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 45 44.8 44 43 42 41 40.
39 37 36 35 34 33
,32 31 30 29 27 26 25 24 100 100 100 100 100 100 100 100 100 100 100 100 10o0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 lO1 100 1ido 100 160 100 1 do 100 100
.100 100 100 100 100 160 100 1.00 100 100 100 1 00 100 100 100 100 100 100 100 100 100 lob 100 100 100 100
.100 1600 100 100 100 lob 100 lob 100 100 1 bo 100 100 100 100 1 0o 100 100 100 99.2 98.2 97.2 96.2 95.2 94.2 93.-2 92.2 91.2 89.2 88.2 87:2 86.2'-
84.2 83.2 82.2 81.2 00.2 79.2 85.2 83.4 81.5 79.6 77.8 75.9 74.1 72.2 70.4 68.5 66.7 64.8 63.0 59.3 57.4 55.6 53.7 51.9 50.0 48.2 46.3 44.5 42.6 38.9 37.1 S35.2 33.4.
31.5 29.5 27.5 25.0 24 2 23.2' 22.2 21,2 20.2 19.2 18.2 17.2
.... -.1 ---l -
16.2 14.2 13:2 12:2 11.2
,9.2 8.2 7.2 6.2 5.2 4.2 100 100 10o 100 100 100 100 100 100 100 160 100 100 100 100 100 100 100 100
'100 100 100 100 100 1 00 100 1d0o 100 1o0 100 100 100 100 100 100 100 100 100 i100 100 100 100
.100.
100 1O00 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 10o 100 100 100 100 100 100 100 100 100 100 100 0oo 100 ldoo 100
- 1. o 100 100 100 99.2 98.2 97.2 96.2 95.2 94.2 93.2 92.2 89.2 88.2 87.2 86.2 85.2 84.2 83.2 82.2 81.2 80.2 79.2 85.2 83.4 81.5 79.6 77.8 75.9 74.1 72.2 70.4 68.5 66.7 64.8 63.0 81.1 59.3 57.4 55.6 53.7 51.9 50.0 48.2 46.3 44.5 42.6 40.8 38.9 37.1
'35.2 33.4 31.5 29:5 27.5 25.5 25.0
.241.2 23.2 22.2 21.2 20.2 19.2 18.2 17.2 16.2 15.2 14.2 12.2 11.2 10.2
..."P.
ý.:2 8.2 6.2 5.2 4.2
%FP CRGP5 C CR CG6 1
.CRGP7 CRGP5 C
CRGP6 j CRGP7 Shutdown Margin.Setpoint.
Operational Alarm Setpoint RI = 300 is withdrawal limit at all power leve!s.
Continued on next page.
Oconee 3 Cycle 25 Rod Index. Setpoints 3 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 30 Page 24 of 33 I
Shutdown Margin Setpoint Operational Alarm Setpoint
%FPP CRGPS CRGP6 CRGP I CRGPS [
fRGP6f CRGP7 23 22 21 20 19.8 19 18 17 16 15 14 13 12 11 10 9
8.7 8
7 6
5 4
3 2.8 2
1 0
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 97.0 92.8 88.5 84.2 80.0 75.8 75.0 68.0 59.5 51.0 78.2 77.2 76-2 75:2 75.0 73.5 71.5 69.5 67.5 65.5 63.5 61Z5 53.0 44.5 36.0 27.5 25.0 22.0
- 17.8 13.5 9.2 5.0 0.8 0
0 0
0 3.2 2.2 1.2 0.2 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 97.0 92.8 88.5 84.2 80.0 75.8 75.0 68.0 59.5 51.0 78.2 77.2 76.2 75.2 75.0 73,5 71,5 69.5 67.5 65.5 63.5 61.5 53.0 44.5 36.0 27.5 25.0 22.0 17.8 13.5 9.2 5.0 0.8 0
0 0
0 3.2 2.2 1.2 0.2 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0
% FP CRGP 5 CRGP.6 CRGP 7 CRGP 5 CRGP6 '
CRGP 7
'Shutdown Margin.Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels,
I
, Oconee 3 Cycle 25 1
ONEI-0400-70 Rev 30 Page 25 of 33 105 100 95 90 85 80 75.
70 65 3..
U_.
0:
O 0) 60 55 50 45 40 35.
30 25 20 15 10 5
0 ontrol Rod Position Setpoints noerable Rods, 4 Pump Flow Restricted
'5rc-J Ope ratoperation 2-1
- peration
[r;"i'.........
pe ra.ti on
- .:1:!..
i i:71
~~~7 r:7,:[U:
i+-
-i ILI r-nacpabe 1
Ti"i
---ii
-+'--
![
i]
tit!............per..tion" KL...
i G-r--
-p
'I 4;++ +
'+IIl 5
15 25 35 45 55 65 7 5 8595 95 9 5i1
'i i1
-105 100 95 90 85 75 70 65 60 55 50 45 40 35 30 25 1 5 1 0 5
0 10 10
- 20.
30 40 50 60 70 80 90 100 I
[Group 5 1 0.
10 20 30 40 50 60 70 80 90 100 1
Group 7 Control Rod Position, % WD
Oconee 3 Cycle 25 OONEI-0400-70 Rev 30 Page 26 of 33 a-LL
,C)
Q)
M-105 100 95 90 85 80 75 7O 65 60 55 50
.45 40 35 30 25 20 15 10 5
0 Control Rod Position Setpoints 4-
- No Inoperable Rods,,3 Pump Flow
-7 :: ::
j, I
"Unacceptable
... -Operation
-!ii i.
T i y
- '=**
- ,*-.r.,Restricted 71 Operation
. :Acceptable
'1 r z 4 4':
- j O p e r a t i o n
'~5 15 25
- 35.
45 55 65 7 5ý 85 1 9ýj'Tnt 7
__i.!:!%::;;
"L *
"105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 0
- 0.
10 20 30 40 50 60 70 80 90 100 IG roup 5 1 0
10 20 30 40 50 60 70 80 90 100 I Group7 7 Control Rod Position, % WD
Oconee 3 Cycle 25 ONEI-0400-70 Rev 30 Page 27 of 33 U-CL oL 10, 1-0 9S 9C
- 8 80 75 70 65 6(
551 45c 4(
35 30 25 20
- 0)
-7 Control Rod Position Setpoints I
r... 1 Inoperable Rod, 4 Pump Flow l7 Unacceptable Operation 7 Acceptable Operation 7T.7 TT7 174 II4 i 4 n
15
.25 35 45 55 65 75 85 95 4j~F~l~1
~
"105 100 95 90 85 80 70 65 60 55 50 45 40 35 30 25 20 15 10
- 5 0
10 5
0 o
10 20 30 40 50 60 0
80 90 100:]
I Group 5 1 10 10 20 30 40 50 60 70 80 90 100 1
I Group 7t Control Rod Position, % WD
.Oconee 3 Cycle 25 ONEI-0400-70 Rev 30 Page 28 of 33 Q-LL CL 0J a-105 1 00 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
0 Control Rod Position Selpoints H
-1 I n p e ab c
-t
.A 11 ii1!L -"-
mi..-
- 'j Unacceptable Operation Acce table Operation
....~....
5
'1 5
2 5.: 3 5 4 5 5 5 1 6 5 7
ý 8 5 9 5 [ ::
- [ ] ] J: ; i ; ; 1 E-
'105 10.0 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
0 10 10 20 30 40 50:
60 70 80 90 100 I Group 5 1
[0 10 20 30 40 50 60 70 80 90 1001 I Group7 Control Rod Position, % WD
ONEI-0400-70 Rev 30 Page 29 of 33 Oconee 3 Cycle 25 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.
References provided in section 1 of this COLR identify the sources forthe data which follows.
!nforfmation provided in this section should not be used in plant procedures.
Core Power Level, Quadrant Power Ti Core Outl p
21 2
23
%FP 31 it, %
Quadrant Power Tilt Limits, Referred to by TS 3.2.3 Steady State T
0-100 0-30 30-10 5.42 1 0.00' 9.44 ransient 0
0-30 12.00 Maximum 0- 100 20.00 Variable Low RCS Pressure Protective Limits Referredto by TS 2.1.1 et Pressure Reactor Coolant OutletTemperature, 'F sia 3 RCS Pumnps 4 RCS Pumps 800 581.0 578.3 900 590.0 587.3 000 598.9 596.3 100 607.9 605.2 200 616.9 614.2:
300 625.9 623.2.
ONEI-0400-70 Rev 30 Page 30 of 33 Oconee 3 Cycle 25 Axial Power Imbalance Protective Limits Referred,to by TS 2.1.1 Not fo~r Plant Use 4 Pumps 3 Pumps
%FP 0.0 80.0 87.8 90.0 100:0 109.4 109,4 100.0 90.0 80.0 0.0 0.0 60.1 77.0 81.7 81.7 77.0 62.3 0.0 RPS Operational
-35.0
-35.0
-12.1 14.4 35.0 35.0
-35,0
-35.0
-12,1 14.4 35;0 35.0
-;39.5
-39:5
-37.8
-25.6 28.4 39.5 39:5 39.5
-39.5
-39.5 39.5 39.5
ONEI-0400-70 Rev 30 Page 31 of 33 Oconee 3 Cycle 25 Rod Index Limits Referred to by TS 3,2.1 INot for Plant-,
Uzse Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal
%FP Insertion Limit No Inop Rod I Inop Rod Limit 4 Pumps 102 100 90 80 50 15 5
77 50 15 5
262 260 250 250 200 90 0
245 200
.90 0
220 140 75 0
220 140 75 0
280 230 160 75 280 230 160 75 300 300 300 300 300 300 300 300 300 300 300 3 Pumps
ONEI-0400-70 Rev 30 Page 32 of :33 Oconee 3 Cycle 25 LOCA Limits Not.or ýPlant, Use Core Elevation Feet LOCA LHR kw/ft Limit Versus Burnup Mk-B11 Fuel 0.000 2.506, 4.264 6.021 7.779 9.536 12.00 0 GWd/mtU 16.2 17.1 17.2 17.3 17.2 17,1 16.2 0 GWdtmtU 16.7 17.6 17.8 17.8 1'7.8 17.3 16.4 40 GWdimtU 16.2 17.1 17.2 17.3 17.2 17.1 16.2 40 GWd!mtU 16.7 17.6 17.8 17.8 17.8 17.3 16.4 62 GWd/mtU 11.8 11.8 11.8 11.8 11.8 11.8 11.8 Mk-B-HTP 0.000 2.506 4.264 6.021 7.779 9.536 12.00
ONEfll0400-70 Rev 30 Paae 33 of 33 Oconec 3 Cycle 25
-Not'fjor',VI thit Usc I
!ru t u i
I in the values shown.
4 R01 Operation - Loop Avcragemiip.. TF 3 R1t' Operation - Loop Average Temp.. 'F
\\Tcold, "F
[avg (Analytical)
Tai (Analyticdl)
<58 1._0
<_5s 1 0.
0.2
' 581 0
<581.0 0.2
-'5.I
-58
.0.
043
<581. 1
<581.1 0.34.
().5
- 45.
58 1.
.<58 I. I 0.86
<S8125 0,7
'5 1-***
S* '2' Os
-<.581.3
<58t12 0,.9
-,'SS1.3
<581.2 1.0
<581-4
<581.2 1.1
<581,4
<581.2 1.2 58 5
<5,81.3 1.3
<5 }5
<58t1.3.
1.4
<58
'1.3 1.5
<58I.6
<581.3 1.6
.<591.6"
<581A4 1.7
<58 1,6
<5 1.4 1.8
<581.7
<5 81 A L.9
<581,7
<5,914 2,0
<58 1t
<581.4 211
<581.8
<581.5 2.2
<581:1
<581.5 2_3
<58 1 9
<581.5 2.4
<581,9
<58 1.5 2.5
<582.0
<581.6 2.6
<582 0
<581.6 2.7
<582,0
<581.6 2.8
<592.1 "5'.6 2.9
<582,1.
<58i.6 3.0
<582.1
<581.7 3.1
<582.2
<581.7 3.2
<582.2
<581.7 3.3
<582.3
<581.7 3.4
"<582.3
<581.7 3.5
<582.3
<581.8 3:6
<582.4
<581.8 3.7
<582.,4.
<5818 3:8
<582,4
<581.8 3.9
<582.5
<581.9 4:0
<582,5"
<581.9
.4.1
<582.6
<581.9 4.2
<582.6
<581.9 4.3
<582.6
<581.9 4.4 i582.7
<582.0 A45
<582.7
<582,0 466
<582.7
<582.0 4.7
.<582.8
<582.0 4.8
"<582.8
<582,1 4.9
<582.9
<582.1 5.0
<582.9
<582:1