P Duke 6Energy BRUCE H-HAMILTON Vice President Oconee Nuclear Station Duke Energy Corporation ONO1VP / 7800 Rochester Highway Seneca, SC 29672 864 885 3487 864 885 4208 fax bhhamilton@duke-energy. com October 23,2006 U.
S.
Nuclear Regulatory Commission Document Control Desk Washington, D.
C.
20555
Subject:
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Site Docket No.
50-269 Core Operating Limits Report (COLR)
Gentlemen:
Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 1, Cycle 24, Rev.
26.
Very truly yours, Bruce H. Hamilton Site, Vice President Oconee Nuclear Site Attachment Ac oi www. duke-energy. corn
NRC Document Control Desk October 23, 2006 Page 2 xc w/att:
Mr.
W. D. Travers, Regional Administrator U.
S. Nuclear Regulatory Commissioft, Region II Mr.
L.
N. Olshan, Project Manager Office of Nuclear Reactor Regulation Mr.
Dan Rich Senior Resident Inspector Oconee Nuclear Site
NRC Document Control Desk October 23, 2006 Page 3 bxc wo/att:
NSRB -
EC05P bxc w/att:
ELL ONS Document Management
DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO SuperRush THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW
- 1) 00620 DOC MGMT MICROFILM EC04T
- 2) 00813 DOC MGMT EC04T ORIGINAL
-06358ONS-REGUL COMPLIANCE-O N03RC),
- 4) 06700 -NS MANUAL MASTER FILE ON03DM
- 5) 06937 R R ST CLAIR EC08G FOR INFORMAUON Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE NUCLEAR GENERAL OFFICE OCONEE NUCLEAR STATION RESP. GROUP: NE WORK ITEM: EXEMPTION: M-5 RECORD RETENTION: 003587 OCONEE 1 CYCLE 24 CORE OPERATING LIMITS REPORT Page 1 of 1 Date:
10/13/06 Document Transmittal #:
DUK062860007 QA CONDITION
- ] Yes [] No OTHER ACKNOWLEDGEMENT REQUIRED D Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
Duke Energy P.O. Box 1006 Energy Center EC04T Charlotte, N.C Rec'd By Date DOCUMENT NO QACOND REV #/ DATE DISTR CODE 11 2
4 5
6 7
8 9
10 11 12 13 14 15 TOTAL 4 _____
~
+
4::
+
~
~
+
4
~
+
4 fr
~
4 ON EI-0400-050 1
026 10/13/06 NOMD-27 Vi X
V1 4
REMARKS: DUKE DOCUMENT RELEASE EXEMPT FROM NUCLEAR MODIFICATION PROGRAM THOMAS C GEER NUCLEAR STATION ENGR MANAGER GS-SVP NUCLEAR SUPPORT BY:
J W SIMMONS JWS/JAK EC08H
ONEI-0400-50 Rev 26 Page 1 of 33 Duke Energy Oconee 1 Cycle 24 Core Operating Limits Report QA Condition 1 6
Ijj,.
%I Prepared By G. M. Presnell Checked By: J. D. Forster Date:
C*c* O(Y0 Date:
I.
oCT. o(.*
Date:
CDR By: S. L. Parrish Approved By: R. R. St.Clair
Document No. / Rev. ONEI-0400-50 Rev. 26 Date October 12, 2006 Page No.
Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By:
Date:
]11Z12C~b (Sponsor)
CATAWBA Inspection Waived MCE (Mechanical & Civil)
[]
Inspected By/Date:
RES (Electrical Only)
Inspected By/Date:
RES (Reactor)
[E Inspected By/Date:
[]
Inspected By/Date:
Other (
E])
Inspected By/Date:
OCONEE Inspection Waived MCE (Mechanical & Civil) n]
Inspected By/Date:
RES (Electrical Only)
[]
Inspected By/Date:
RES (Reactor)
Inspected By/Date:
MOD Inspected By/Date:
Other(
E_
)
Inspected By/Date:
MCGUIRE Inspection Waived MCE (Mechanical & Civil)
[]
Inspected By/Date:
RES (Electrical Only)
Inspected By/Date:
RES (Reactor)
Inspected By/Date:
MOD El Inspected By/Date:
Other (
)
[]
Inspected By/Date:
ONEI-0400-50 Rev 26 Page 3 of 33 Oconee 1 Cycle 24 Core Operating Limits Report Insertion Sheet for Revision 26 This revision is not valid until the end of operation for Oconee 1 Cycle 23.
Remove these Revision 25 pages Insert these Revision 26 pages 1 -33 1-33 Revision Log Effective Pages Pages Pages Total Effective Revision Date Revised Added Deleted Pages 1Oconee 1 Cycle 24 revisions below 26 Oct 2006 1-33 33 lOconee 1 Cycle 23 revisions below 25 Apr2005 1-33 33
'Oconee 1 Cycle 22 revisions below 24 Mar2005 1 -3,5 33 23 Feb 2005 1-4,6 33 22 Dec 2004 1-3,30 33 21 Feb 2004 1-4,6
-33 20 Nov 2003 1-32 33 33 Oconee 1 Cycle 21 revisions below 19 Aug 2003 1,2,3 la 32 18 Apr2002 1,2,4 32 17 Mar 2002 1-31 32 32 Oconee 1 Cycle 20 revisions below 16 May 2001 1-4 31 15 Nov 2000 1-31 31
ONEI-0400-50 Rev 26 Page 4 of 33 Oconee 1 Cycle 24 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for 01 C24 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in references 1 through 11. The RPS protective limits and maximum allowable setpoints are documented in references 12 through 14. These limits are validated for use in 01 C24 by references 15 through 17. The 01C24 analyses assume a design flow of 107.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.714, and axial peaking factor (Fz) of 1.5.
The error adjusted core operating limits included in section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 01C24 reload core.
1.1 References
- 1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1 004-A, Revision 0, SER dated November 23, 1992.
- 2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1 002-A, Revision 2, SER dated October 1, 1985.
- 3. Oconee Nuclear Station Reload Design Methodology, NFS-1 001 A, Revision 5, SER dated December 8, 2000.
- 4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003-PA, Revision 1, SER dated June 23, 2000.
- 5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 3, SER dated September 1, 2002.
- 6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008-PA, Revision 0, SER dated April 3, 1995.
- 7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 2, SER dated September 24, 2003.
- 8. Thermal Hydraulic Transient Analysis Methodology, DPC-NE-3000-PA, Rev. 3, SER dated September 24, 2003.
- 9. BAW-1 0192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, Rev. 0, SER dated February 18, 1997.
- 10. BAW-1 01 64P-A, Rev. 4, RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis, SER dated April 9, 2002.
- 11. BAW-1 0227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, Rev. 1, June 2003 (SER to BAW-1 01 86P-A dated June 18, 2003).
- 12. RPS RCS Pressure & Temperature Trip Function Uncertainty Analyses and Variable Low Pressure Safety Limit, OSC-4048, Revision 4, January 2001.
- 13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 2, October 2001.
- 14. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 1, Duke Power Co., June 2002.
- 15. 01 C24 Maneuvering Analysis, OSC-8898, Revision 1, October 2006.
- 16. 01C24 Specific DNB Analysis, OSC-8913, Revision 0, May 2006.
- 17. 01C24 Reload Safety Evaluation, OSC-8975, Revision 0, October 2006.
ONEI-0400-50 Rev 26 Page 5 of 33 Oconee 1 Cycle 24 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.
Referred to by TS 3.5.4.
Spent fuel pool boron concentration shall be greater than 2226 ppm.
Referred to by TS 3.7.12.
The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.
Referred to by TS SLC 16.5.13.
CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in the CFT's shall be less than 4000 ppm.
Referred to by TS 3.5.1.
RCS and Refueling canal boron concentration shall be greater than 2220 ppm.
Referred to by TS 3.9.1.
Shutdown Margin (SDM) shall be greater than 1% Ak/k.
Referred to by TS 3.1.1.
Moderator Temperature Coefficient (MTC) shall be less than:
Linear interpolation is valid within the table provided.
Referred to by TS 3.1.3.
MTC x 10-4 Ap / °F
+0.70
+0.525 0.00 0.00 0.00
% FP 0
20 80 100 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1.
4 RCP:
measured hot leg pressure >2125 psig 3 RCP:
measured hot leg pressure >2125 psig DNB parameter for RCS loop average temperature shall be:
Referred to by TS 3.4.1.
The measured Tavg must be less than COLR limits minus instrument uncertainty. ATc is the setpoint value selected by the operators. Values are expanded by linear interpolation on page 33 of this document without instrument uncertainty.
Max Loop Tavg (Incl 20F unc)
ATc,OF 4RCPOp 3RCPOp 0
581.0 581.0 1
581.4 581.2 2
581.8 581.4 3
582.1 581.7 4
582.5 581.9 5
582.9 582.1
- This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.
DNB parameter for RCS loop total flow shall be:
Referred to by TS 3.4.1.
4 RCP:
Measured _ 108.5 %df 3 RCP:
Measured _74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.
Referred to by TS 312.1.
Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.
Referred to by TS 3.2.1.
Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).
/
ONEI-0400-50 Rev 26 Page 6 of 33 Oconee 1 Cycle 24 Steady State Operating Band Rod Index APSR %WD Min Max Min Max 292 +/- 5 300 30 40 EFPD 0 to EOC Core Power Level, %FP Full Incore Out of Core Backup Incore Quadrant Power Tilt Setpoints Steady State Transient 30-100 0-30 30-100 0-30 3.50 7.61 7.11 9.40 2.35 6.09 5.63 7.72 2.25 3.87 3.63' 4.81 Referred to by TS 3.2.3 Maximum 0-100 16.55 14.22 10.07 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).
ONEI-0400-50 Rev 26 Page 7 of 33 Oconee 1 Cycle 24 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 2300 2200 C')
C',
0~
0 0
0 ca 2100 2000 1900 1800 17004-540 560 580 600 Reactor Coolant Outlet Temperature, OF 620 640
ONEI-0400-50 Rev 26 Page 8 of 33 Oconee 1 Cycle 24 RPS Power Imbalance Setpoints 4 Pumps
% FP 0.0 88.9 107.9 107.9 90.4 0.0
% Imbalance
-33.0
-33.0
-12.9 14.4 33.0 33.0
-33.0
-33.0
-12.9 14.4 33.0 33.0 3 Pumps 0.0 61.6 80.6 80.6 63.1 0.0 RPS Power Imbalance Limits 4 Pumps
% FP 0.0 88.5 109.4 109.4 90.0 0.0
% Imbalance
-35.0
-35.0
-12.9 14.4 35.0 35.0
-35.0
-35.0
-12.9 14.4 35.0 35.0 3 Pumps 0.0 60.8 81.7 81.7 62.3 0.0 I
ONEI-0400-50 Rev 26 Page 9 of 33 Oconee 1 Cycle 24 Operational Power Imbalance Setpoints 4 Pumps 3 Pumps
%FP 0.0 80.0 90.0 100.0 102.0 102.0 100.0 90.0 80.0 0.0 0.0 61.6 61.6 77.0 77.0 63.1 63.1 0.0 Full Incore
-28.0
-28.0
-26.7
-16.2
-14.1 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-11.7 13.2 28.0 28.0 Backup Incore
-28.0
-28.0
-26.4
-16.2
-14.1 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-11.7 13.2 28.0 28.0 Out of Core
-28.0
-28.0
-26.7
-16.2
-14.1 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-11.7 13.2 28.0 28.0
ONEI-0400-50 Rev 26 Page 10 of 33 Oconee 1 Cycle 24 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC
% FP I
RPS Trip Full Incore Alarm I
Out of Core Alarm 107.9 107.0 106.0 105.0 104.0 103.0 102.0 101.0 100.0 99.0 98.0 97.0 96.0 95.0 94.0 93.0 92.0 91.0 90.4 90.0 89.0 88.9 88.0 87.0 86.0 85.0 84.0 83.0 82.0 81.0 80.0 0.0
-12.9
-13.8
-14.9
-15.9
-17.0
-18.1
-19.1
-20.2
-21.2
-22.3
-23.4
-24.4
-25.5
-26.6
-27.6
-28.7
-29.7
-30.8
-31.5
-31.9
-32.9
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0 14.4 15.4 16.4 17.5 18.5 19.6 20.7 21.7 22.8 23.9 24.9 26.0 27.0 28.1 29.2 30.2 31.3 32.3 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
-14.1
-15.2
-16.2
-17.3
-18.3
-19.4
-20.4
-21.5
-22.5
-23.6
-24.6
-25.7
-26.3
-26.7
-26.8
-26.8
-27.0
-27.1
-27.2
-27.4
-27.5
-27.6
-27.7
-27.9
-28.0
-28.0 15.7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27.0 27.6 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
-14.1
-15.2
-16.2
-1.7.3
-18.3
-19.4
-20.4
-21.5
-22.5
-23.6
-24.6
-25.7
-26.3
-26.7
-26.8
-26.8
-27.0
-27.1
-27.2
-27.4
-27.5
-27.6
-27.7
-27.9
-28.0
-28.0 15.7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27.0 27.6 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
% FP RPS Trip Full Incore Alarm Out of Core Alarm
,2
ONEI-0400-50 Rev 26 Page 11 of 33 Oconee 1 Cycle 24 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC
Full Incore Alarm I
Out of Core Alarm 80.6 80.0 79.0 78.0 77.0 76.0 75.0 74.0 73.0 72.0 71.0 70.0 69.0 68.0 67.0 66.0 65.0 64.0 63.1 63.0 62.0 61.6 61.0 60.0 0.0
-12.9
-13.5
-14.5
-15.6
-16.7
-17.7
-18.8
-19.8
-20.9
-22.0
-23.0
-24.1
-25.2
-26.2
-27.3
-28.3
-29.4
-30.5
-31.5
-31.5
-32.6
-33.0
-33.0
-33.0
-33.0 14.4 15.0 16.1 17.1 18.2 19.3 20.3 21.4 22.4 23.5 24.6 25.6 26.7 27.8 28.8 29.9 30.9 32.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
-11.7
-12.7
-13.8
-14.8
-15.9
-17.0
-18.0
-19.1
-20.2
-21.2
-22.3
-23.3
-24.4
-25.5
-26.5
-26.5
-27.6
-28.0
-28.0
-28.0
-28.0 13.2 14.3 15.3 16.4 17.4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
-11.7
-12.7
-13.8
-14.8
-15.9
-17.0
-18.0
-19.1
-20.2
-21.2
-22.3
-23.3
-24.4
-25.5
-26.5
-26.5
-27.6
-28.0
-28.0
-28.0
-28.0 13.2 14.3 15.3 16.4 17.4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
% FP RPS Trip Full Incore Alarm Out of Core Alarm
.1
ONEI-0400-50 Rev 26 Page 12 of 33 Oconee 1 Cycle 24 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120.0-(-12.9,107.9)
M1 = 0.942
(-33.0,88.9)
(-12.9,80.
(-33.0,61.6) 6)
4-100.0-(14.4,107.9)
M2 =-0.942 Operation (33.0,90.4)
(14.4,80.6) 60.0 Acceptable 3 or 4 Pump Operation 40.0 20.0 I
0.0I (33.0,63.1)
II I
-40.0
-30.0
-20.0
-10.0 0.0 10.0 20.0 40.0 30.0 Percent Power Imbalance
ONEI-0400-Rev 26 Page 13 of 33 Oconee 1 Cycle 24 Imbalance Setpoints for 4 Pump Operation, BOO to EOC 0
LL U-C) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 I
RPS Trip Setpoint Incore & Outcore Alarm I
RPS Trip Setpoint 0.0 w.V
-40
-35
-30
-25
-20
-15
-10
-5 0
5 10 15 20 25 30 35 40 Percent Axial Imbalance
0 ONEI-0400-50 Rev 26 Page 14 of 33 Oconee 1 Cycle 24 Imbalance Setpoints for 3 Pump Operation, BOC to EOC 110 100 90 80 RPS Trip Setpoint Incore & Outcore Alarm RPS Trip Setpoint.,
0 CL IL CL 70 60 50 40 30 20 10 I
-40
-35
-30
-25
-20
-15
-10
-5 0
5 10 15 U
Li 20 25 4
30 35 40 Percent Axial Imbalance
ONEI-0400-50 Rev 26 Page 15 of 33 Oconee 1 Cycle 24 (
Operational Rod Index Setpoints RI Insertion Setpoint
%FP No Inop Rod 4 Pumps 3 Pumps 102.0 100.0 90.0 80.0 50.0 48.0 15.0 13.0 5.0 3.0 2.8 0.0 77.0 75.0 50.0 48.0 15.0 13.0 5.0 3.0 2.8 0.0 263.5 261.5 251.5 251.5 201.5 195.2 91.5 76.5 16.5 1.5 0.0 0.0 246.5 243.2 201.5 195.2 91.5 76.5 16.5 1.5 0.0 0.0 1 Inop Rod 283.4 281.5 271.9 262.3 233.4 231.5 165.5 161.5 93.5 76.5 74.8 51.0
(
285.2 281.5 235.2 231.5 165.5 161.5 93.5 76.5 74.8 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 3O00 300
ONEI-0400-50 Rev 26 Page 16 of 33 Oconee 1 Cycle 24 Shutdown Margin Rod Index Setpoints 4 Pumps 3 Pumps
%FP 102.0 100.0 48.0 13.0 3.0 2.8 0.0 77.0 75.0 48.0 13.0 3.0 2.8 0.0 RI Insertion Setpoint No Inop Rod 1 Inop Rod 224.6 283.4 221.5 281.5 141.5 231.5 76.5 161.5 1.5 76.5 0.0 74.8 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 227.4 221.5 141.5 76.5 1.5 0.0 0.0 285.2 281.5 231.5 161.5 76.5 74.8 51.0
Oconee 1 Cycle 24 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-50 Rev 26 Page 17 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 99.8 24.8 100 100 63.5 101 100 99.0 24.0 100 100 62.5 100 100 98.2 23.2 100 100 61.5 99 100 97.5 22.5 100 100 60.5 98 100 96.7 21.7 100 100 59.5 97 100 95.9 20.9 100 100 58.5 96 100 95.2 20.2 100 100 57.5 95 100 94.4 19.4 100 100 56.5 94 100 93.6 18.6 100 100 55.5 93 100 92.9 17.9 100 100 54.5 92 100 92.1 17.1 100 100 53.5 91 100 91.3 16.3 100 100 52.5 90 100 90.6 15.6 100 100 51.5 89 100 89.8 14.8 100 100 51.5 88 100 89.0 14.0 100 100 51.5 87 100 88.2 13.2 100 100 51.5 86 100 87.5 12.5 100 100 51.5 85 100 86.7 11.7 100 100 51.5 84 100 85.9 10.9 100 100 51.5 83 100 85.2 10.2 100 100 51.5 82 100 84.4 9.4 100 100 51.5 81 100 83.6 8.6 100 100 51.5 80 100 82.9 7.9 100 100 51.5 79 100 82.1 7.1 100 100 49.8 78 100 81.3 6.3 100 100 48.2 77 100 80.6 5.6 100 100 46.5 76 100 79.8 4.8 100 100 44.8 75 100 79.0 4.0 100 100 43.2 74 100 78.2 3.2 100 100 41.5 73 100 77.5 2.5 100 100 39.8 72 100 76.7 1.7 100 100 38.2 71 100 75.9 0.9 100 100 36.5 70 100 75.2 0.2 100 100 34.8 69.8 100 75.0 0
100 100 34.5 69 100 73.8 0
100 100 33.2 68 100 72.3 0
100 100 31.5 67 100 70.7 0
100 100 29.8 66 100 69.2 0
100 100 28.2 65 100 67.7 0
100 100 26.5 64.1 100 66.3 0
100 100 25.0 63 100 64.6 0
100 99 24.1 62 100 63.0 0
100 98 23.2 61 100 61.5 0
100 97 22.4 60 100 60.0 0
100 96.6 21.6 59 100 58.4 0
100 95.8 20.8 58 100 56.9 0
100 94.9 19.9 57 100 55.3 0
100 94.1 19.1 56 100 53.8 0
100 93.2 18.2 55 100 52.3
.0 100 92.4 17.4 54 100 50.7 0
100 91.6 16.6 53 100 49.2 0
100 90.8 15.8 52 100 47.7 0
100 89.9 14.9 51 100 46.1 0
100 89.1 14.1 50 100 44.6 0
100 88.2 13.2 49 100 43.0 0
100 86.7 11.7
%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 1 Cycle 24 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-50 Rev 26 Page 18 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 48 100 41.5 0
100 85.1 10.1 47 100 39.6 0
100 83.5 8.5 46 100 37.8 0
100 82.0 7.0 45 100 35.9 0
100 80.4 5.4 44 100 34.1 0
100 78.8 3.8 43 100 32.2 0
100 77.2 2.2 42 100 30.4 0
100 75.7 0.7 41.6 100 29.6 0
100 75.0 0
41 100 28.5 0
100 73.2 0
40 100 26.6 0
100 70.1 0
39.1 100 25.0 0
100 67.3 0
39 99.9 24.9 0
100 66.9 0
38 99.0 24.0 0
100 63.8 0
37 98.0 23.0 0
100 60.6 0
36 97.1 22.1 0
100 57.5 0
35 96.2 21.2 0
100 54.3 0
34 95.2 20.2 0
100 51.2 0
33 94.3 19.3 0
100 48.1 0
32 93.4 18.4 0
100 44.9 0
31 92.5 17.5 0
100 41.8 0
30 91.5 16.5 0
100 38.6 0
29 90.6 15.6 0
100 35.5 0
28 89.7 14.7 0
100 32.4 0
27 88.8 13.8 0
100 29.2 0
26 87.8 12.8 0
100 26.1 0
25.7 87.5 12.5 0
100 25.0 0
25 86.9 11.9 0
99.0 24.0 0
24 86.0 11.0 0
97.4 22.4 0
23 85.0 10.0 0
95.8 20.8 0
22 84.1 9.1 0
94.2 19.2 0
21 83.2 8.2 0
92.7 17.7 0
20 82.2 7.2 0
91.1 16.1 0
19 81.3 6.3 0
89.5 14.5 0
18 80.4 5.4 0
88.0 13.0 0
17 79.5 4.5 0
86.4 11.4 0
16 78.5 3.5 0
84.8 9.8 0
15 77.6 2.6 0
83.2 8.2 0
14 76.7 1.7 0
79.5 4.5 0
13 75.8 0.8 0
75.8 0.8 0
12.8 75.0 0
0 75.0 0
0 12 69.0 0
0 69.0 0
0 11 61.5 0
0 61.5 0
0 10 54.0 0
0 54.0 0
0 9
46.5 0
0 46.5 0
0 8
39.0 0
0 39.0 0
0 7
31.5 0
0 31.5 0
0 6
24.0 0
0 24.0 0
0 5
16.5 0
0 16.5 0
0 4
9.0 0
0 9.0 0
0 3
1.5 0
0 1.5 0
0 2.8 0
0 0
0 0
0 2
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Oconee 1 Cycle 24 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-50 Rev 26 Page 19 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 27.4 100 100 46.5 76.2 100 100 25.0 100 100 45.2 76 100 99.7 24.7 100 100 44.9 75 100 98.2 23.2 100 100 43.2 74 100 96.8 21.8 100 100 41.5 73 100 95.3 20.3 100 100 39.9 72 100 93.8 18.8 100 100 38.2 71 100 92.3 17.3 100 100 36.5 70 100 90.8 15.8 100 100 34.9 69 100 89.4 14.4 100 100 33.2 68 100 87.9 12.9 100 100 31.5 67 100' 86.4 11.4 100 100 29.9 66 100 84.9 9.9 100 100 28.2 65 100 83.4 8.4 100 100 26.5 64.1 100 82.1 7.1 100 100 25.0 63 100 80.5 5.5 100 99 24.1 62 100 79.0 4.0 100 98 23.3 61 100 77.5 2.5 100 97 22.4 60 100 76.0 1.0 100 96.6 21.6 59.3 100 75.0 0.0 100 96.0 21.0 59 100 74.1 0
100 95.8 20.8 58 100 71.1 0
100 94.9 19.9 57 100 68.2 0
100 94.1 19.1 56 100 65.2 0
100 93.3 18.3 55 100 62.2 0
100 92.4 17.4 54 100 59.3 0
100 91.6 16.6 53 100 56.3 0
100 90.8 15.8 52 100 53.4 0
100 89.9 14.9 51 100 50.4 0
100 89.1 14.1 50 100 47.4 0
100 88.2 13.2 49 100 44.5 0
100 86.7 11.7 48 100 41.5 0
100 85.1 10.1 47 100 39.6 0
100 83.5 8.5 46 100 37.8 0
100 82.0 7.0 45 100 35.9 0
100 80.4 5.4 44 100 34.1 0
100 78.8 3.8 43 100 32.2 0
100 77.2 2.2 42 100 30.4 0
100 75.7 0.7 41.6 100 29.6 0
100 75.0 0.0 41 100 28.5 0
100 73.2 0
40 100 26.6 0
100 70.1 0
39.1 100 25.0 0
100 67.3 0
39 99.9 24.9 0
100 66.9 0
38 99 24.0 0
100 63.8 0
37 98 23.0 0
100 60.6 0
36 97.1 22.1 0
100 57.5 0
35 96.2 21.2 0
100 54.3 0
34 95.2 20.2 0
100 51.2 0
33 94.3 19.3 0
100 48.1 0
32 93.4 18.4 0
100 44.9 0
31 92.5 17.5 0
100 41.8 0
30 91.5 16.5 0
100 38.6 0
29 90.6 15.6 0
100 35.5 0
28 89.7 14.7 0
100 32.4 0
27 88.8 13.8 0
100 29.2 0
% FP CRGP 5 CRGP 6 CRGP 7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
/
Oconee 1 Cycle 24 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-50 Rev 26 Page 20 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 26 87.8 12.8 0
100 26.1 0
25.7 87.5 12.5 0
100 25.0 0
25 86.9 11.9 0
99.0 24.0 0
24 86.0 11.0 0
97.4.
22.4 0
23 85.0 10.0 0
95.8 20.8 0
22 84.1 9.1 0
94.2 19.2 0
21 83.2 8.2 0
92.7 17.7 0
20 82.2 7.2 0
91.1 16.1 0
19 81.3 6.3 0
89.5 14.5 0
18 80.4 5.4 0
88.0 13.0 0
17 79.5 4.5 0
86.4 11.4 0
16 78.5 3.5 0
84.8 9.8 0
15 77.6 2.6 0
83.2 8.2 0
14 76.7 1.7 0
79.5 4.5 0
13 75.8 0.8 0
75.8 0.8 0
12.8 75.0 0
0 75.0 0
0 12 69:0 0
0 69.0 0
0 11 61.5 0
0 61.5 0
0 10 54.0 0
0 54.0 0
0 9
46.5 0
0 46.5 0
0 8
39.0 0
0 39.0 0
0 7
31.5 0
0 31.5 0
0 6
24.0 0
0 24.0 0
0 5
16.5 0
0 16.5 0
0 4
9.0 0
0 9.0 0
0 3
1.5 0
0 1.5 0
0 2.8 0
0 0
0 0
0 2
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
.11 1
1 II.
I I
I
-II
-t
-I
-It-I I
II
-1
-1
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Oconee 1 Cycle 24 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-50 Rev 26 Page 21 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 100 83.4 100 100 83.4 101 100 100 82.5 100 100 82.5 100 100 100 81.5 100 100 81.5 99 100 100 80.5 100 100 80.5 98 100 100 79.6 100 100 79.6 97 100 100 78.6 100 100 78.6 96 100 100 77.7 100 100 77.7 95 100 100 76.7 100 100 76.7 94 100 100 75.7 100 100 75.7 93 100 100 74.8 100 100 74.8 92 100 100 73.8 100 100 73.8 91 100 100 72.8 100 100 72.9 90 100 100 71.9 100 100 71.9 89 100 100 70.9 100 100 70.9 88 100 100 70.0 100 100 70.0 87 100 100 69.0 100 100 69.0 86 100 100 68.0 100 100 68.1 85 100 100 67.1 100 100 67.1 84 100 100 66.1 100 100 66.1 83 100 100 65.2 100 100 65.2 82 100 100 64.2 100 100 64.2 81 100 100 63.2 100 100 63.3 80 100 100 62.3 100 100 62.3 79 100 100 61.3 100 100 61.3 78 100 100 60.3 100 100 60.4 77 100 100 59.4 100 100 59.4 76 100 100 58.4 100 100 58.4 75 100 100 57.5 100 100 57.5 74 100 100 56.5 100 100 56.5 73 100 100 55.5 100 100 55.6 72 100 100 54.6 100 100 54.6 71 100 100 53.6 100 100 53.6 70 100 100 52.7 100 100 52.7 69 100 100 51.7 100 100 51.7 68 100 100 50.7 100 100 50.7 67 100 100 49.8 100 100 49.8 66 100 100 48.8 100 100 48.8 65 100 100 47.8 100 100 47.8 64 100 100 46.9 100 100 46.9 63 100 100 45.9 100 100 45.9 62 100 100 45.0 100 100 45.0 61 100 100 44.0 100 100 44.0 60 100 100 43.0 100 100 43.0 59 100 100 42.1 100 100 42.1 58 100 100 41.1 100 100 41.1 57 100 100 40.2 100 100 40.2 56 100 100 39.2 100 100 39.2 55 100 100 38.2 100 100 38.2 54 100 100 37.3 100 100 37.3 53 100 100 36.3 100 100 36.3 52 100 100 35.3 100 100 35.3 51 100 100 34.4 100 100 34.4 50 100 100 33.4 100 100 33.4 49 100 100 32.5 100 100 32.5 48 100 100 31.5 100 100 31.5
%FP CRGP5 CRGP6 CRGP7 CRGP I CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 1 Cycle 24 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-50 Rev 26 Page 22 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2
.37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 1,00 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0
100 75.0 0
19 100 73.5 0
100 73.5 0
18 100 71.5 0
100 71.5 0
17 100 69.5 0
100 69.5 0
16 100 67.5 0
100 67.5 0
15 100 65.5 0
100 65.5 0
14 100 63.5 0
100 63.5 0
13 100 61.5 0
100 61.5 0
12 100 53.0 0
100 53.0 0
11 100 44.5 0
100 44.5 0
10 100 36.0 0
100 36.0 0
9 100 27.5 0
100 27.5 0
8.7 100 25.0 0
100 25.0 0
8 97.0 22.0 0
97.0 22.0 0
7 92.8 17.8 0
92.8 17.8 0
6 88.5 13.5 0
88.5 13.5 0
5 84.2 9.2 0
84.2 9.2 0
4 80.0 5.0 0
80.0 5.0 0
3 75.8 0.8 0
75.8 0.8 0
2.8 75 0
0 75 0
0 2
68 0
0 68 0
0 1
59.5 0
0 59.5 0
0 0
51 0
0 51 0
0
%FP CRGP5 CRGP6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Oconee 1 Cycle 24 Rod Index Setpoints 3 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-50 Rev 26 Page 23 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 100 100 81.5 74 100 100 79.6 100 100 79.6 73 100 100 77.8 100 100 77.8 72 100 100 75.9 100 100 75.9 71 100 100 74.1 100 100 74.1 70 100 100 72.2 100 100 72.2 69 100 100 70.4 100 100 70.4 68 100 100 68.5 100 100 68.5 67 100 100 66.7 100 100 66.7 66 100 100 64.8 100 100 64.8 65 100 100 63.0 100 100 63.0 64 100 100 61.1 100 100 61.1 63 100 100 59.3 100 100 59.3 62 100 100 57.4 100 100 57.4 61 100 100 55.6 100 100 55.6 60 100 100 53.7 100 100 53.7 59 100 100 51.9 100 100 51.9 58 100 100 50.0 100 100 50.0 57 100 100 48.2 100 100 48.2 56 100 100 46.3 100 100 46.3 55 100 100 44.5 100 100 44.5 54 100 100 42.6 100 100 42.6 53 100 100 40.8 100 100 40.8 52 100 100 38.9 100 100 38.9 51 100 100 37.1 100 100 37.1 50 100 100 35.2 100 100 35.2 49 100 100 33.4 100 100 33.4 48 100 100 31.5 100 100 31.5 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2, 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 I
Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 1 Cycle 24 Rod Index Setpoints 3 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-50 Rev 26 Page 24 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0
100 75.0 0
19 100 73.5 0
100 73.5 0
18 100 71.5 0
100 71.5 0
17 100 69.5 0
100 69.5 0
16 100 67.5 0
100 67.5 0
15 100 65.5 0
100 65.5 0
14 100 63.5 0
100 63.5 0
13 100 61.5 0
100 61.5 0
12 100 53.0 0
100 53.0 0
11 100 44.5 0
100 44.5 0
10 100 36.0 0
100 36.0 0
9 100 27.5 0
100 27.5 0
8.7 100 25.0 0
100 25.0 0
8 97.0 22.0 0
97.0 22.0 0
7 92.8 17.8 0
92.8 17.8 0
6 88.5 13.5 0
88.5 13.5 0
5 84.2 9.2 0
84.2 9.2 0
4 80.0 5.0 0
80.0 5.0 0
3 75.8 0.8 0
75.8 0.8 0
2.8 75.0 0
0 75.0 0
0 2
68 0
0 68 0
0 1
59.5 0
0 59.5 0
0 0
51 0
0 51 0
0
% FP CRGP 5 CRGP 6 CRGP 7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
0 ONEI-0400-5 9
0iv 26 Page 25 of 33 Oconee 1 Cycle 24 105 100 95 90 85 80 -
75 70 65 1
Control Rod Position Setpoints No Inoperable Rods, 4 Pump Flow Unacceptable Operation Hý 76.
Restricted Operation "TITT1 H I I Al FI+/-H I 105 100 95 90 85 80 75 70 65 60 55 50 45 40 I
IL U-0 CE, 60 55 50 45 40 35 30 25 20 15 10 5
i I
- 2 m
Acceptable Operation
-H+
I 1
AH 1
Hfh 1
TM 35 30 25 20 15 10 5
i4 I
.,i Group 6 5
15 25 35 45 55 65 75 85 95 H
0 0
]
I l
I l
I I
010 20 30 40 50 60 70 80 90 100o Group 5 I 0 10 20 30 40 50 60 70 80 90 100 I 1 Group 7 Control Rod Position, % WD
ONEI-0400-5q0ev 26 Page 26 of 33 I
Oconee 1 Cycle 24 I
105 100 95-90 -
85 -
80 -
Control Rod Position Setpoints No Inoperable Rods, 3 Pump FlowI i!
I E
-u U
H H
-H i I
H I UU H4-H HU rU If
Il-I H+H I
-H+/-H 4ýH IIq a-80 0) 0)
0-a:
75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
0 I
UI 105 100 95 90 85 80 75 70 65 60 55 50 I
i H
ii Unacceptable Operation 44ý
- 11 It F-H IT m1I q3 1ii
-HH l
Restricted Oprton 45 40 35 i
H Uq!
Acceptable30 Operation-
~ 25 n
-I i
1 I
Elq IqlII i Group 6 I
20 15 10
-5 0
LL LU U-q U
5 15 25 35 45 55 65 75 85 95 F0 10 20 30 40 50 60 70 80 90 100 Group5I j0 10 20 30 40 50 60 70 80 90 1001 1 Group7 Control Rod Position, % WD
0 ONEI-0400-50ev 26 Page 27 of 33 I
Oconee 1 Cycle 24 I
U-0-
0~
Ca a)_
ML1051009590 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 L
LlL11111HIHI fffi Control Rod Position Setpoints 1 Inoperable Rod, 4 Pump Flow I
týý IIA Unacceptable Operation iia 105 100 Acceptable Operation H
[II I I 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
0 5
SGroup 6
45 55 I
1'5 15 25 35 65 75 85 95 0 4:-d I
I F
I I
4 10 10 20 30 40 50 60 70 80 90 1
1 0 10 20 30 40 50 60 70 80 90 100 1 IGroup 5 I Group 71 Control Rod Position, % WD
77 Ui fffff*
1 ý2 2 II I 1
E I II 11tir "Iit T.
- J I
111 i
r-m rrr
- 4
~III I
i I£ I
II I..
II 44' T
I Ii I LL-II H]TIi Z*
rrr i
III UI
.12 UL
+
I iI II 22 I
U
+ 5 1~' Ii i
50 45 40 35 30 25 20 15 10 0
-t 7
- 1~
7 7
- I>
I I
I I
I
ONEI-0400-50 Rev 26 Page 29 of 33 Oconee 1 Cycle 24 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.
References provided in section 1 of this COLR identify the sources for the data which follows.
Core Power Level, Quadrant Power Ti Core Outl p
2C 21 24 2
%FP 3'
ilt, %
Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State T
0-100 0-30 30-104 5.40 10.00 9.44 ransient 0
0-30 12.00 Maximum 0 - 100 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 et Pressure Reactor Coolant Outlet Temperature, OF sia 3 RCS Pumps 4 RCS Pumps 800 581.0 578.3 900 590.0 587.3 000 598.9 596.3 100 607.9 605.2 200 616.9 614.2 300 625.9 623.2
ONEI-0400-50 Rev 26 Page 30 of 33 Oconee 1 Cycle 24 Axial Power Imbalance Protective Limits Referred to by TS 2.1.1 4 Pumps 3 Pumps
%FP 0.0 80.0 88.5 90.0 100.0 109.4 109.4 100.0 90.0 80.0 0.0 0.0 60.8 77.0 81.7 81.7 77.0 62.3 0.0 RPS Operational
-35.0
-35.0
-12.9 14.4 35.0 35.0
-35.0
-35.0
-12.9 14.4 35.0 35.0
-39.5
-39.5
-38.6
-26.5 28.4 39.5 39.5 39.5
-39.5
-39.5 39.5 39.5
ONEI-0400-50 Rev 26 Page 31 of 33 Oconee 1 Cycle 24 Rod Index Limits Referred to by TS 3.2.1 Operational RI
%FP Insertion Limit Shutdown Margin RI Insertion Limit No Inop Rod 1 Inop Rod 4 Pumps 3 Pumps 102 100 90 80 50 15 5
77 50 15 5
262 260 250 250 200 90 0
245 200 90 0
220 140 75 0
220 140 75 0
280 230 160 75 280 230 160 75 RI Withdrawal Limit 300 300 300 300 300 300 300 300 300 300 300
ONEI-0400-50 Rev 26 Page 32 of 33 Oconee 1 Cycle 24 LOCA Limits Core Elevation Feet LOCA LHR kw/ft Limit Versus Burnup Mk-B11 Fuel 0.000 2.506 4.264 6.021 7.779 9.536 12.00 0 GWd/mtU 16.6 17.5 17.6 17.7 17.6 17.5 16.6 40 GWd/mtU 16.6 17.5 17.6 17.7 17.6 17.5 16.6 62 GWd/mtU 12.2 12.2 12.2 12.2 12.2 12.2 12.2
ONEI-0400-50 Rev 26 Page 33 of 33 Oconee 1 Cycle 24 4 RCP Operation - Loop Average Temp., F 3 RCP Operation - Loop Average Temp., TF ATcold, 0F Tavg (Analytical)
Tavg (Analytical) 0.0
<581.0
<581.0 0.1
<581.0
<581.0 0.2
<581.1
<581.0 0.3
<581.1
<581.1 0.4
<581.2
<581.1 0.5
<581.2
<581.1 0.6
<581.2
<581.1 0.7
<581.3
<581.2 0.8
<581.3
<581.2 0.9
<581.3
<581.2 1.0
<581.4
<581.2 1.1
<581.4
<581.2 1.2
<581.5
<581.3 1.3
<581.5
<581.3 1.4
<581.5
<581.3 1.5
<581.6
<581.3 1.6
<581.6
<581.4 1.7
<581.6
<581.4 1.8
<581.7
<581.4 1.9
<581.7
<581.4 2.0
<581.8
<581.4 2.1
<581.8
<581.5 2.2
<581.8
<581.5 2.3
<581.9
<581.5 2.4
<581.9
<581.5 2.5
<582.0
<581.6 2.6
<582.0
<581.6 2.7
<582.0
<581.6 2.8
<582.1
<581.6 2.9
<582.1
<581.6 3.0
<582.1
<581.7 3.1
<582.2
<581.7 3.2
<582.2
<581.7 3.3
<582.3
<581.7 3.4
<582.3
<581.7 3.5
<582.3
<581.8 3.6
<582.4
<581.8 3.7
<582.4
<581.8 3.8
<582.4
<581.8 3.9
<582.5
<581.9 4.0
<582.5
<581.9 4.1
<582.6
<581.9 4.2
<582.6
<581.9 4.3
<582.6
<581.9 4.4
<582.7
<582.0 4.5
<582.7
<582.0 4.6
<582.7
<582.0 4.7
<582.8
<582.0 4.8
<582.8
<582.1 4.9
<582.9
<582.1 5.0
<582.9
<582.1
/