ML063040590

From kanterella
Jump to navigation Jump to search
Transmittal of Oconee Unit 1 Rev. 26 to ONEI-0400-50, Core Operating Limits Report, Unit 1 Cycle 24.
ML063040590
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/23/2006
From: Brandi Hamilton
Duke Energy Carolinas, Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONEI-0400-50, Rev 26
Download: ML063040590 (37)


Text

BRUCE H-HAMILTON P6Energy Duke Vice President Oconee Nuclear Station Duke Energy Corporation ONO1VP / 7800 Rochester Highway Seneca, SC 29672 864 885 3487 864 885 4208 fax October 23,2006 bhhamilton@duke-energy.com U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Site Docket No. 50-269 Core Operating Limits Report (COLR)

Gentlemen:

Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 1, Cycle 24, Rev. 26.

Very truly yours, Bruce H. Hamilton Site, Vice President Oconee Nuclear Site Attachment Acoi www. duke-energy. corn

NRC Document Control Desk October 23, 2006 Page 2 xc w/att: Mr. W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commissioft, Region II Mr. L. N. Olshan, Project Manager Office of Nuclear Reactor Regulation Mr. Dan Rich Senior Resident Inspector Oconee Nuclear Site

NRC Document October Control Desk 23, 2006 Page 3 bxc wo/att:

NSRB - EC05P bxc w/att:

ELL ONS Document Management

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO SuperRush THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW Date: 10/13/06 Document Transmittal #: DUK062860007

1) 00620 DOC MGMT MICROFILM EC04T
2) 00813 DOC MGMT EC04T ORIGINAL Duke Energy QA CONDITION *] Yes [] No

-06358ONS-REGUL COMPLIANCE- ON03RC),

4) 06700 -NS MANUAL MASTER FILE ON03DM DOCUMENT TRANSMITTAL FORM OTHER ACKNOWLEDGEMENT REQUIRED D Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
5) 06937 R R ST CLAIR EC08G ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE NUCLEAR GENERAL OFFICE Duke Energy OCONEE NUCLEAR STATION P.O. Box 1006 RESP. GROUP: NE Energy Center EC04T FOR INFORMAUON WORK ITEM: EXEMPTION: M-5 Charlotte, N.C RECORD RETENTION: 003587 OCONEE 1 CYCLE 24 CORE OPERATING LIMITS REPORT Rec'd By Page 1 of 1 Date DOCUMENT NO QACOND REV #/ DATE DISTR CODE 11 2 4 5 6 7 8 9 10 11 12 13 14 15 TOTAL 4 _____ - _________ ~ + 4:: + ~ ~ + 4 ~ + 4 fr ~

  • 4
  • ON EI-0400-050 1 026 10/13/06 NOMD-27 Vi X V1 4 REMARKS: DUKE DOCUMENT RELEASE EXEMPT FROM NUCLEAR MODIFICATION PROGRAM THOMAS C GEER NUCLEAR STATION ENGR MANAGER GS-SVP NUCLEAR SUPPORT BY:

J W SIMMONS JWS/JAK EC08H

ONEI-0400-50 Rev 26 Page 1 of 33 Duke Energy Oconee 1 Cycle 24 Core Operating Limits Report QA Condition 1 Prepared By G. M. Presnell Ijj,. Date: C*c* O(Y0 6

%I Checked By: J. D. Forster Date: I. oCT. o(.*

CDR By: S. L. Parrish Date:

Approved By: R. R. St.Clair

Document No. / Rev. ONEI-0400-50 Rev. 26 Date October 12, 2006 Page No. Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By: Date: ]11Z12C~b (Sponsor)

CATAWBA Inspection Waived MCE (Mechanical & Civil) [] Inspected By/Date:

RES (Electrical Only) Inspected By/Date:

RES (Reactor) [E Inspected By/Date:

MOD [] Inspected By/Date:

Other ( E]) Inspected By/Date:

OCONEE Inspection Waived MCE (Mechanical & Civil) n] Inspected By/Date:

RES (Electrical Only) [] Inspected By/Date:

RES (Reactor) Inspected By/Date:

MOD Inspected By/Date:

Other( ) E_ Inspected By/Date:

MCGUIRE Inspection Waived MCE (Mechanical & Civil) [] Inspected By/Date:

RES (Electrical Only) Inspected By/Date:

RES (Reactor) Inspected By/Date:

MOD El Inspected By/Date:

Other ( ) [] Inspected By/Date:

ONEI-0400-50 Rev 26 Page 3 of 33 Oconee 1 Cycle 24 Core Operating Limits Report Insertion Sheet for Revision 26 This revision is not valid until the end of operation for Oconee 1 Cycle 23.

Remove these Revision 25 pages Insert these Revision 26 pages 1 -33 1-33 Revision Log Effective Pages Pages Pages Total Effective Revision Date Revised Added Deleted Pages 1Oconee 1 Cycle 24 revisions below 26 Oct 2006 1-33 - - 33 lOconee 1 Cycle 23 revisions below 25 Apr2005 1-33 - - 33

'Oconee 1 Cycle 22 revisions below 24 Mar2005 1 -3,5 - - 33 23 Feb 2005 1-4,6 - - 33 22 Dec 2004 1-3,30 - - 33 21 Feb 2004 1- 4,6 - -33 20 Nov 2003 1-32 33 - 33 Oconee 1 Cycle 21 revisions below 19 Aug 2003 1,2,3 la - 32 18 Apr2002 1,2,4 - - 32 17 Mar 2002 1-31 32 - 32 Oconee 1 Cycle 20 revisions below 16 May 2001 1-4 - 31 15 Nov 2000 1-31 - 31

ONEI-0400-50 Rev 26 Page 4 of 33 Oconee 1 Cycle 24 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for 01 C24 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in references 1 through 11. The RPS protective limits and maximum allowable setpoints are documented in references 12 through 14. These limits are validated for use in 01 C24 by references 15 through 17. The 01C24 analyses assume a design flow of 107.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.714, and axial peaking factor (Fz) of 1.5.

The error adjusted core operating limits included in section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 01C24 reload core.

1.1 References

1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1 004-A, Revision 0, SER dated November 23, 1992.
2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1 002-A, Revision 2, SER dated October 1, 1985.
3. Oconee Nuclear Station Reload Design Methodology, NFS-1 001 A, Revision 5, SER dated December 8, 2000.
4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003-PA, Revision 1, SER dated June 23, 2000.
5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 3, SER dated September 1, 2002.
6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008-PA, Revision 0, SER dated April 3, 1995.
7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 2, SER dated September 24, 2003.
8. Thermal Hydraulic Transient Analysis Methodology, DPC-NE-3000-PA, Rev. 3, SER dated September 24, 2003.
9. BAW-1 0192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, Rev. 0, SER dated February 18, 1997.
10. BAW-1 01 64P-A, Rev. 4, RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis, SER dated April 9, 2002.
11. BAW-1 0227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, Rev. 1, June 2003 (SER to BAW-1 01 86P-A dated June 18, 2003).
12. RPS RCS Pressure & Temperature Trip Function Uncertainty Analyses and Variable Low Pressure Safety Limit, OSC-4048, Revision 4, January 2001.
13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 2, October 2001.
14. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 1, Duke Power Co., June 2002.
15. 01 C24 Maneuvering Analysis, OSC-8898, Revision 1, October 2006.
16. 01C24 Specific DNB Analysis, OSC-8913, Revision 0, May 2006.
17. 01C24 Reload Safety Evaluation, OSC-8975, Revision 0, October 2006.

ONEI-0400-50 Rev 26 Page 5 of 33 Oconee 1 Cycle 24 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.

Referred to by TS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2226 ppm.

Referred to by TS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.

Referred to by TS SLC 16.5.13.

CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in the CFT's shall be less than 4000 ppm. Referred to by TS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1% Ak/k.

Referred to by TS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than: MTC x 10-4 Linear interpolation is valid within the table provided. Ap / °F  % FP Referred to by TS 3.1.3. +0.70 0

+0.525 20 0.00 80 0.00 100 0.00 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1. 4 RCP: measured hot leg pressure >2125 psig 3 RCP: measured hot leg pressure >2125 psig DNB parameter for RCS loop average temperature shall be: Max Loop Tavg (Incl 20F unc)

Referred to by TS 3.4.1. ATc,OF 4RCPOp 3RCPOp 0 581.0 581.0 The measured Tavg must be less than COLR limits minus 1 581.4 581.2 instrument uncertainty. ATc is the setpoint value selected by 2 581.8 581.4 the operators. Values are expanded by linear interpolation on 3 582.1 581.7 page 33 of this document without instrument uncertainty. 4 582.5 581.9 5 582.9 582.1

  • This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be: 4 RCP: Measured _ 108.5 %df Referred to by TS 3.4.1. 3 RCP: Measured _74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.

Referred to by TS 312.1.

Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.

Referred to by TS 3.2.1.

Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).

/

ONEI-0400-50 Rev 26 Page 6 of 33 Oconee 1 Cycle 24 Steady State Operating Band Rod Index APSR %WD EFPD Min Max Min Max 0 to EOC 292 +/- 5 300 30 40 Quadrant Power Tilt Setpoints Steady State Transient Maximum Core Power Level, %FP 30-100 0-30 30-100 0-30 0-100 Full Incore 3.50 7.61 7.11 9.40 16.55 Out of Core 2.35 6.09 5.63 7.72 14.22 Backup Incore 2.25 3.87 3.63' 4.81 10.07 Referred to by TS 3.2.3 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).

ONEI-0400-50 Rev 26 Page 7 of 33 Oconee 1 Cycle 24 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 2300 2200 C')

2100 C',

0~

0 0

0 2000 ca 1900 1800 17004-540 560 580 600 620 640 Reactor Coolant Outlet Temperature, OF

ONEI-0400-50 Rev 26 Page 8 of 33 Oconee 1 Cycle 24 RPS Power Imbalance Setpoints

% FP  % Imbalance 4 Pumps 0.0 -33.0 88.9 -33.0 107.9 -12.9 107.9 14.4 90.4 33.0 0.0 33.0 3 Pumps 0.0 -33.0 61.6 -33.0 80.6 -12.9 80.6 14.4 63.1 33.0 0.0 33.0 RPS Power Imbalance Limits

% FP  % Imbalance 4 Pumps 0.0 -35.0 88.5 -35.0 109.4 -12.9 109.4 14.4 90.0 35.0 0.0 35.0 3 Pumps 0.0 -35.0 60.8 -35.0 81.7 -12.9 81.7 14.4 62.3 35.0 0.0 35.0 I

ONEI-0400-50 Rev 26 Page 9 of 33 Oconee 1 Cycle 24 Operational Power Imbalance Setpoints Full Backup Out of

%FP Incore Incore Core 4 Pumps 0.0 -28.0 -28.0 -28.0 80.0 -28.0 -28.0 -28.0 90.0 -26.7 -26.4 -26.7 100.0 -16.2 -16.2 -16.2 102.0 -14.1 -14.1 -14.1 102.0 15.7 15.7 15.7 100.0 17.8 17.8 17.8 90.0 28.0 28.0 28.0 80.0 28.0 28.0 28.0 0.0 28.0 28.0 28.0 3 Pumps 0.0 -28.0 -28.0 -28.0 61.6 -28.0 -28.0 61.6 -28.0 77.0 -11.7 -11.7 -11.7 77.0 13.2 13.2 13.2 63.1 28.0 63.1 28.0 28.0 0.0 28.0 28.0 28.0

ONEI-0400-50 Rev 26 Page 10 of 33 Oconee 1 Cycle 24 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC

% FP I RPS Trip Full Incore Alarm I Out of Core Alarm 107.9 -12.9 14.4 107.0 -13.8 15.4 106.0 -14.9 16.4 105.0 -15.9 17.5 104.0 -17.0 18.5 103.0 -18.1 19.6 102.0 -19.1 20.7 -14.1 15.7 -14.1 15.7 101.0 -20.2 21.7 -15.2 16.7 -15.2 16.7 100.0 -21.2 22.8 -16.2 17.8 -16.2 17.8 99.0 -22.3 23.9 -17.3 18.8 -1.7.3 18.8 98.0 -23.4 24.9 -18.3 19.8 -18.3 19.8 97.0 -24.4 26.0 -19.4 20.9 -19.4 20.9 96.0 -25.5 27.0 -20.4 21.9 -20.4 21.9 95.0 -26.6 28.1 -21.5 22.9 -21.5 22.9 94.0 -27.6 29.2 -22.5 23.9 -22.5 23.9 93.0 -28.7 30.2 -23.6 24.9 -23.6 24.9 92.0 -29.7 31.3 -24.6 26.0 -24.6 26.0 91.0 -30.8 32.3 -25.7 27.0 -25.7 27.0 90.4 -31.5 33.0 -26.3 27.6 -26.3 27.6 90.0 -31.9 33.0 -26.7 28.0 -26.7 28.0 89.0 -32.9 33.0 -26.8 28.0 -26.8 28.0 88.9 -33.0 33.0 -26.8 28.0 -26.8 28.0 88.0 -33.0 33.0 -27.0 28.0 -27.0 28.0 87.0 -33.0 33.0 -27.1 28.0 -27.1 28.0 86.0 -33.0 33.0 -27.2 28.0 -27.2 28.0 85.0 -33.0 33.0 -27.4 28.0 -27.4 28.0 84.0 -33.0 33.0 -27.5 28.0 -27.5 28.0 83.0 -33.0 33.0 -27.6 28.0 -27.6 28.0 82.0 -33.0 33.0 -27.7 28.0 -27.7 28.0 81.0 -33.0 33.0 -27.9 28.0 -27.9 28.0 80.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 0.0 -33.0 33.0 -28.0 28.0 -28.0 28.0

% FP RPS Trip Full Incore Alarm Out of Core Alarm

,2

ONEI-0400-50 Rev 26 Page 11 of 33 Oconee 1 Cycle 24 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC

% FP I RPS Trip I Full Incore Alarm I Out of Core Alarm 80.6 -12.9 14.4 80.0 -13.5 15.0 79.0 -14.5 16.1 78.0 -15.6 17.1 77.0 -16.7 18.2 -11.7 13.2 -11.7 13.2 76.0 -17.7 19.3 -12.7 14.3 -12.7 14.3 75.0 -18.8 20.3 -13.8 15.3 -13.8 15.3 74.0 -19.8 21.4 -14.8 16.4 -14.8 16.4 73.0 -20.9 22.4 -15.9 17.4 -15.9 17.4 72.0 -22.0 23.5 -17.0 18.5 -17.0 18.5 71.0 -23.0 24.6 -18.0 19.6 -18.0 19.6 70.0 -24.1 25.6 -19.1 20.6 -19.1 20.6 69.0 -25.2 26.7 -20.2 21.7 -20.2 21.7 68.0 -26.2 27.8 -21.2 22.8 -21.2 22.8 67.0 -27.3 28.8 -22.3 23.8 -22.3 23.8 29.9 -23.3 24.9 -23.3 24.9 66.0 -28.3 65.0 -29.4 30.9 -24.4 25.9 -24.4 25.9 64.0 -30.5 32.0 -25.5 27.0 -25.5 27.0 63.1 -31.5 33.0 -26.5 28.0 -26.5 28.0 63.0 -31.5 33.0 -26.5 28.0 -26.5 28.0 62.0 -32.6 33.0 -27.6 28.0 -27.6 28.0 61.6 -33.0 33.0 -28.0 28.0 -28.0 28.0 61.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 60.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 0.0 -33.0 33.0 -28.0 28.0 -28.0 28.0

% FP RPS Trip Full Incore Alarm Out of Core Alarm

.1

ONEI-0400-50 Rev 26 Page 12 of 33 Oconee 1 Cycle 24 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120.0-(-12.9,107.9) (14.4,107.9) 4-100.0- M2 =-0.942 M1 = 0.942 Operation

(-33.0,88.9) (33.0,90.4)

(-12.9,80. 6) (14.4,80.6)

(-33.0,61.6) 60.0 (33.0,63.1)

Acceptable 3 or 4 Pump Operation 40.0 20.0 II

. I 0.0I I

-40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 Percent Power Imbalance

ONEI-0400-Rev 26 Page 13 of 33 Oconee 1 Cycle 24 Imbalance Setpoints for 4 Pump Operation, BOO to EOC 110.0 100.0 RPS Trip Setpoint I

Incore & Outcore Alarm I RPS Trip Setpoint 90.0 80.0 70.0 0

60.0 LL U-50.0 C) 40.0 30.0 20.0 10.0 0.0 w.V 35 -30 20 -15 -10 -5 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

0 ONEI-0400-50 Rev 26 Oconee 1 Cycle 24 Page 14 of 33 Imbalance Setpoints for 3 Pump Operation, BOC to EOC 110 100 90 80 RPS Trip Setpoint RPS Trip Setpoint.,

Incore & Outcore Alarm 70 0

CL 60 IL 50 CL 40 30 20 10 I 0 U Li 4 35 -30 -25 -20 -15 -10 -5 5 10 15 20 25 30 35 40 Percent Axial Imbalance

ONEI-0400-50 Rev 26 Page 15 of 33 Oconee 1 Cycle 24 (

Operational Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 263.5 283.4 300 100.0 261.5 281.5 300 90.0 251.5 271.9 300 80.0 251.5 262.3 300 50.0 201.5 233.4 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

(

3 Pumps 77.0 246.5 285.2 300 75.0 243.2 281.5 300 50.0 201.5 235.2 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 3O00 0.0 0.0 51.0 300

ONEI-0400-50 Rev 26 Page 16 of 33 Oconee 1 Cycle 24 Shutdown Margin Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 224.6 283.4 300 100.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 227.4 285.2 300 75.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

Oconee 1 Cycle 24 ONEI-0400-50 Rev 26 Rod Index Setpoints Page 17 of 33 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 99.8 24.8 100 100 63.5 101 100 99.0 24.0 100 100 62.5 100 100 98.2 23.2 100 100 61.5 99 100 97.5 22.5 100 100 60.5 98 100 96.7 21.7 100 100 59.5 97 100 95.9 20.9 100 100 58.5 96 100 95.2 20.2 100 100 57.5 95 100 94.4 19.4 100 100 56.5 94 100 93.6 18.6 100 100 55.5 93 100 92.9 17.9 100 100 54.5 92 100 92.1 17.1 100 100 53.5 91 100 91.3 16.3 100 100 52.5 90 100 90.6 15.6 100 100 51.5 89 100 89.8 14.8 100 100 51.5 88 100 89.0 14.0 100 100 51.5 87 100 88.2 13.2 100 100 51.5 86 100 87.5 12.5 100 100 51.5 85 100 86.7 11.7 100 100 51.5 84 100 85.9 10.9 100 100 51.5 83 100 85.2 10.2 100 100 51.5 82 100 84.4 9.4 100 100 51.5 81 100 83.6 8.6 100 100 51.5 80 100 82.9 7.9 100 100 51.5 79 100 82.1 7.1 100 100 49.8 78 100 81.3 6.3 100 100 48.2 77 100 80.6 5.6 100 100 46.5 76 100 79.8 4.8 100 100 44.8 75 100 79.0 4.0 100 100 43.2 74 100 78.2 3.2 100 100 41.5 73 100 77.5 2.5 100 100 39.8 72 100 76.7 1.7 100 100 38.2 71 100 75.9 0.9 100 100 36.5 70 100 75.2 0.2 100 100 34.8 69.8 100 75.0 0 100 100 34.5 69 100 73.8 0 100 100 33.2 68 100 72.3 0 100 100 31.5 67 100 70.7 0 100 100 29.8 66 100 69.2 0 100 100 28.2 65 100 67.7 0 100 100 26.5 64.1 100 66.3 0 100 100 25.0 63 100 64.6 0 100 99 24.1 62 100 63.0 0 100 98 23.2 61 100 61.5 0 100 97 22.4 60 100 60.0 0 100 96.6 21.6 59 100 58.4 0 100 95.8 20.8 58 100 56.9 0 100 94.9 19.9 57 100 55.3 0 100 94.1 19.1 56 100 53.8 0 100 93.2 18.2 55 100 52.3 .0 100 92.4 17.4 54 100 50.7 0 100 91.6 16.6 53 100 49.2 0 100 90.8 15.8 52 100 47.7 0 100 89.9 14.9 51 100 46.1 0 100 89.1 14.1 50 100 44.6 0 100 88.2 13.2 49 100 43.0 0 100 86.7 11.7

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 1 Cycle 24 ONEI-0400-50 Rev 26 Rod Index Setpoints Page 18 of 33 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 48 100 41.5 0 100 85.1 10.1 47 100 39.6 0 100 83.5 8.5 46 100 37.8 0 100 82.0 7.0 45 100 35.9 0 100 80.4 5.4 44 100 34.1 0 100 78.8 3.8 43 100 32.2 0 100 77.2 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0 100 75.0 0 41 100 28.5 0 100 73.2 0 40 100 26.6 0 100 70.1 0 39.1 100 25.0 0 100 67.3 0 39 99.9 24.9 0 100 66.9 0 38 99.0 24.0 0 100 63.8 0 37 98.0 23.0 0 100 60.6 0 36 97.1 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0 100 32.4 0 27 88.8 13.8 0 100 29.2 0 26 87.8 12.8 0 100 26.1 0 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 15 77.6 2.6 0 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 0 13 75.8 0.8 0 75.8 0.8 0 12.8 75.0 0 0 75.0 0 0 12 69.0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 7 31.5 0 0 31.5 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5 0 0 4 9.0 0 0 9.0 0 0 3 1.5 0 0 1.5 0 0 2.8 0 0 0 0 0 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 1 Cycle 24 ONEI-0400-50 Rev 26 Rod Index Setpoints Page 19 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 27.4 100 100 46.5 76.2 100 100 25.0 100 100 45.2 76 100 99.7 24.7 100 100 44.9 75 100 98.2 23.2 100 100 43.2 74 100 96.8 21.8 100 100 41.5 73 100 95.3 20.3 100 100 39.9 72 100 93.8 18.8 100 100 38.2 71 100 92.3 17.3 100 100 36.5 70 100 90.8 15.8 100 100 34.9 69 100 89.4 14.4 100 100 33.2 68 100 87.9 12.9 100 100 31.5 67 100' 86.4 11.4 100 100 29.9 66 100 84.9 9.9 100 100 28.2 65 100 83.4 8.4 100 100 26.5 64.1 100 82.1 7.1 100 100 25.0 63 100 80.5 5.5 100 99 24.1 62 100 79.0 4.0 100 98 23.3 61 100 77.5 2.5 100 97 22.4 60 100 76.0 1.0 100 96.6 21.6 59.3 100 75.0 0.0 100 96.0 21.0 59 100 74.1 0 100 95.8 20.8 58 100 71.1 0 100 94.9 19.9 57 100 68.2 0 100 94.1 19.1 56 100 65.2 0 100 93.3 18.3 55 100 62.2 0 100 92.4 17.4 54 100 59.3 0 100 91.6 16.6 53 100 56.3 0 100 90.8 15.8 52 100 53.4 0 100 89.9 14.9 51 100 50.4 0 100 89.1 14.1 50 100 47.4 0 100 88.2 13.2 49 100 44.5 0 100 86.7 11.7 48 100 41.5 0 100 85.1 10.1 47 100 39.6 0 100 83.5 8.5 46 100 37.8 0 100 82.0 7.0 45 100 35.9 0 100 80.4 5.4 44 100 34.1 0 100 78.8 3.8 43 100 32.2 0 100 77.2 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0 100 75.0 0.0 41 100 28.5 0 100 73.2 0 40 100 26.6 0 100 70.1 0 39.1 100 25.0 0 100 67.3 0 39 99.9 24.9 0 100 66.9 0 38 99 24.0 0 100 63.8 0 37 98 23.0 0 100 60.6 0 36 97.1 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0 100 32.4 0 27 88.8 13.8 0 100 29.2 0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

/

Oconee 1 Cycle 24 ONEI-0400-50 Rev 26 Rod Index Setpoints Page 20 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 26 87.8 12.8 0 100 26.1 0 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4. 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 15 77.6 2.6 0 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 0 13 75.8 0.8 0 75.8 0.8 0 12.8 75.0 0 0 75.0 0 0 12 69:0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 7 31.5 0 0 31.5 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5 0 0 4 9.0 0 0 9.0 0 0 3 1.5 0 0 1.5 0 0 2.8 0 0 0 0 0 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

.11 1 1 II. I I

  • I * -II -t -I

-It- I I II -1 -1

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 1 Cycle 24 ONEI-0400-50 Rev 26 Rod Index Setpoints Page 21 of 33 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 100 83.4 100 100 83.4 101 100 100 82.5 100 100 82.5 100 100 100 81.5 100 100 81.5 99 100 100 80.5 100 100 80.5 98 100 100 79.6 100 100 79.6 97 100 100 78.6 100 100 78.6 96 100 100 77.7 100 100 77.7 95 100 100 76.7 100 100 76.7 94 100 100 75.7 100 100 75.7 93 100 100 74.8 100 100 74.8 92 100 100 73.8 100 100 73.8 91 100 100 72.8 100 100 72.9 90 100 100 71.9 100 100 71.9 89 100 100 70.9 100 100 70.9 88 100 100 70.0 100 100 70.0 87 100 100 69.0 100 100 69.0 86 100 100 68.0 100 100 68.1 85 100 100 67.1 100 100 67.1 84 100 100 66.1 100 100 66.1 83 100 100 65.2 100 100 65.2 82 100 100 64.2 100 100 64.2 81 100 100 63.2 100 100 63.3 80 100 100 62.3 100 100 62.3 79 100 100 61.3 100 100 61.3 78 100 100 60.3 100 100 60.4 77 100 100 59.4 100 100 59.4 76 100 100 58.4 100 100 58.4 75 100 100 57.5 100 100 57.5 74 100 100 56.5 100 100 56.5 73 100 100 55.5 100 100 55.6 72 100 100 54.6 100 100 54.6 71 100 100 53.6 100 100 53.6 70 100 100 52.7 100 100 52.7 69 100 100 51.7 100 100 51.7 68 100 100 50.7 100 100 50.7 67 100 100 49.8 100 100 49.8 66 100 100 48.8 100 100 48.8 65 100 100 47.8 100 100 47.8 64 100 100 46.9 100 100 46.9 63 100 100 45.9 100 100 45.9 62 100 100 45.0 100 100 45.0 61 100 100 44.0 100 100 44.0 60 100 100 43.0 100 100 43.0 59 100 100 42.1 100 100 42.1 58 100 100 41.1 100 100 41.1 57 100 100 40.2 100 100 40.2 56 100 100 39.2 100 100 39.2 55 100 100 38.2 100 100 38.2 54 100 100 37.3 100 100 37.3 53 100 100 36.3 100 100 36.3 52 100 100 35.3 100 100 35.3 51 100 100 34.4 100 100 34.4 50 100 100 33.4 100 100 33.4 49 100 100 32.5 100 100 32.5 48 100 100 31.5 100 100 31.5

%FP CRGP5 CRGP6 CRGP7 CRGP I CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 1 Cycle 24 ONEI-0400-50 Rev 26 Rod Index Setpoints Page 22 of 33 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2

.37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 1,00 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 63.5 0 13 100 61.5 0 100 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 10 100 36.0 0 100 36.0 0 9 100 27.5 0 100 27.5 0 8.7 100 25.0 0 100 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 88.5 13.5 0 5 84.2 9.2 0 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75 0 0 75 0 0 2 68 0 0 68 0 0 1 59.5 0 0 59.5 0 0 0 51 0 0 51 0 0

%FP CRGP5 CRGP6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 1 Cycle 24 ONEI-0400-50 Rev 26 Rod Index Setpoints Page 23 of 33 3 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 100 100 81.5 74 100 100 79.6 100 100 79.6 73 100 100 77.8 100 100 77.8 72 100 100 75.9 100 100 75.9 71 100 100 74.1 100 100 74.1 70 100 100 72.2 100 100 72.2 69 100 100 70.4 100 100 70.4 68 100 100 68.5 100 100 68.5 67 100 100 66.7 100 100 66.7 66 100 100 64.8 100 100 64.8 65 100 100 63.0 100 100 63.0 64 100 100 61.1 100 100 61.1 63 100 100 59.3 100 100 59.3 62 100 100 57.4 100 100 57.4 61 100 100 55.6 100 100 55.6 60 100 100 53.7 100 100 53.7 59 100 100 51.9 100 100 51.9 58 100 100 50.0 100 100 50.0 57 100 100 48.2 100 100 48.2 56 100 100 46.3 100 100 46.3 55 100 100 44.5 100 100 44.5 54 100 100 42.6 100 100 42.6 53 100 100 40.8 100 100 40.8 52 100 100 38.9 100 100 38.9 51 100 100 37.1 100 100 37.1 50 100 100 35.2 100 100 35.2 49 100 100 33.4 100 100 33.4 48 100 100 31.5 100 100 31.5 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2, 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 I Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 1 Cycle 24 ONEI-0400-50 Rev 26 Rod Index Setpoints Page 24 of 33 3 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 63.5 0 13 100 61.5 0 100 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 10 100 36.0 0 100 36.0 0 9 100 27.5 0 100 27.5 0 8.7 100 25.0 0 100 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 88.5 13.5 0 5 84.2 9.2 0 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75.0 0 0 75.0 0 0 2 68 0 0 68 0 0 1 59.5 0 0 59.5 0 0 0 51 0 0 51 0 0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

0 ONEI-0400-5 0iv 9 26 105 100 95 Oconee 1 Cycle 24 Control Rod Position Setpoints No Inoperable Rods, 4 Pump Flow Hý

76. Restricted Page 25 of 33 105 100 95 "TITT1 Operation IAl 90 .. 90 85 80 -

1 FI+/-H H I 85 80 75 Unacceptable I 75 70 65 I . ..... Operation 70 65 IL U-0 60 55 50 i I m

2 Acceptable Operation 60 55 50 CE, 45 45 40 35 30 1

-H+

Hfh AH I 40 35 30 25 20 15 I

! TM 1 1 25 20 15 10 10 i4 5

5 15 25 35

.,i Group 6 45 55 65 75 85 95 H 5 0 ] - I l I l I I 0 010 20 30 40 50 60 70 80 90 100o I0 10 20 30 40 50 60 70 80 90 100 I Group 5 1 Group 7 Control Rod Position, % WD

ONEI-0400-5q0ev 26 Page 26 of 33 105 I Oconee 1 Cycle 24 I 105 i  ! E -u U H

100 Control Rod Position Setpoints No Inoperable Rods, 3 Pump FlowI I H 100 I

-H I UU 95 95-90 -

i H If Il-I  ! H4-H HU rU 90 85 - 85 H+H I

IIq

-H+/-H 4ýH 80 - 80 UI 75 70 II :11 75 70 65 i ii Unacceptable Operation H

44ý 65 a-80 60

-- It F-H IT 60 1ii 55 55

0) m1I q3 50 50 a: -HH
0) Restricted 45 45 l

0- Oprton 40 40 H

35 -

Uq Acceptable30 i 35 30 25 n  ! Operation-

~ 25 i

20 - 20 I  !

15 10 5 LL LU I Group 6 U-q U Elq IqlII iI -5 15 10 1 5 15 25 35 45 55 65 75 85 95 0 0 F0 10 20 30 40 50 60 70 80 90 100 j0 10 20 30 40 50 60 70 80 90 1001 Group5I 1 Group7 Control Rod Position, % WD

0 ONEI-0400-50ev 26 105 I Oconee 1 Cycle 24 I Page 27 of 33 105 100 LLlL11111HIHI fffi Control Rod Position Setpoints 1 Inoperable Rod, 4 Pump Flow I 100 95 95 90 90 85 85 80 80 75 týý 75 70 70 IIA 65 65 Unacceptable U- Operation 60 60 iia 0- 55 a)_ 55 ML 0~

50 50 Acceptable Ca 45 Operation 45 H

[II I I 40 40 35 35 30 30 25 25 20 20 15 15 10 10 5

0 4:-d 10 10 20 30 40 50 IGroup 5 60 70 1'5 I

80 15 90 25 1

35 45 I

55 6

F 65 I

75 10 85 10 95 I

20 30 SGroup 40 50 60 I Group 71 70 80 I490 5

0 100 1 Control Rod Position, % WD

77 .  ! II£ Ui "I II I II

J T. ........

I i

  • 4 I

it iU 111 ------------

fffff* E 11tir r-m rrr 1 ý2 2 1

~III .12 5

UL I II I i I I I Z*

I TI 22 U Ii 1~'

44' H]

rrr +

I..I LL

- +

I i I IIii II ...... ... IIII i 50 45 40 35


T 30 25 20 15

-t 10 7 I

  • 1~ 7 7 *I> -- I 0

-- -- -- -- --- -- I I - I

ONEI-0400-50 Rev 26 Page 29 of 33 Oconee 1 Cycle 24 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.

References provided in section 1 of this COLR identify the sources for the data which follows.

Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State T ransient Maximum Core Power Level, %FP 3'0-100 0-30 30-1040 0-30 0 - 100 Quadrant Power Ti ilt, % 5.40 10.00 9.44 12.00 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 Core Outlet Pressure Reactor Coolant Outlet Temperature, OF psia 3 RCS Pumps 4 RCS Pumps 800 581.0 578.3 900 590.0 587.3 2C000 598.9 596.3 21 607.9 605.2 24100 616.9 614.2 2 200 300 625.9 623.2

ONEI-0400-50 Rev 26 Page 30 of 33 Oconee 1 Cycle 24 Axial Power Imbalance Protective Limits Referred to by TS 2.1.1

%FP RPS Operational 4 Pumps 0.0 -35.0 -39.5 80.0 -39.5 88.5 -35.0 90.0 -38.6 100.0 -26.5

-12.9 109.4 109.4 14.4 100.0 28.4 90.0 35.0 39.5 80.0 39.5 0.0 35.0 39.5 3 Pumps 0.0 -35.0 -39.5 60.8 -35.0 77.0 -39.5 81.7 -12.9 81.7 14.4 77.0 39.5 62.3 35.0 0.0 35.0 39.5

ONEI-0400-50 Rev 26 Page 31 of 33 Oconee 1 Cycle 24 Rod Index Limits Referred to by TS 3.2.1 Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal

%FP Insertion Limit No Inop Rod 1 Inop Rod Limit 4 Pumps 102 262 220 280 300 100 260 300 90 250 300 80 250 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300 3 Pumps 77 245 220 280 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300

ONEI-0400-50 Rev 26 Page 32 of 33 Oconee 1 Cycle 24 LOCA Limits Core Elevation Feet LOCA LHR kw/ft Limit Versus Burnup Mk-B11 Fuel 0 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 16.6 16.6 12.2 2.506 17.5 17.5 12.2 4.264 17.6 17.6 12.2 6.021 17.7 17.7 12.2 7.779 17.6 17.6 12.2 9.536 17.5 17.5 12.2 12.00 16.6 16.6 12.2

ONEI-0400-50 Rev 26 Page 33 of 33 Oconee 1 Cycle 24 4 RCP Operation - Loop Average Temp., F 3 RCP Operation - Loop Average Temp., TF ATcold, 0F Tavg (Analytical) Tavg (Analytical) 0.0 <581.0 <581.0 0.1 <581.0 <581.0 0.2 <581.1 <581.0 0.3 <581.1 <581.1 0.4 <581.2 <581.1 0.5 <581.2 <581.1 0.6 <581.2 <581.1 0.7 <581.3 <581.2 0.8 <581.3 <581.2 0.9 <581.3 <581.2 1.0 <581.4 <581.2 1.1 <581.4 <581.2 1.2 <581.5 <581.3 1.3 <581.5 <581.3 1.4 <581.5 <581.3 1.5 <581.6 <581.3 1.6 <581.6 <581.4 1.7 <581.6 <581.4 1.8 <581.7 <581.4 1.9 <581.7 <581.4 2.0 <581.8 <581.4 2.1 <581.8 <581.5 2.2 <581.8 <581.5 2.3 <581.9 <581.5 2.4 <581.9 <581.5 2.5 <582.0 <581.6 2.6 <582.0 <581.6 2.7 <582.0 <581.6 2.8 <582.1 <581.6 2.9 <582.1 <581.6 3.0 <582.1 <581.7 3.1 <582.2 <581.7 3.2 <582.2 <581.7 3.3 <582.3 <581.7 3.4 <582.3 <581.7 3.5 <582.3 <581.8 3.6 <582.4 <581.8 3.7 <582.4 <581.8 3.8 <582.4 <581.8 3.9 <582.5 <581.9 4.0 <582.5 <581.9 4.1 <582.6 <581.9 4.2 <582.6 <581.9 4.3 <582.6 <581.9 4.4 <582.7 <582.0 4.5 <582.7 <582.0 4.6 <582.7 <582.0 4.7 <582.8 <582.0 4.8 <582.8 <582.1 4.9 <582.9 <582.1 5.0 <582.9 <582.1

/