T. PRESTON GILLESPIE, Jr.

Dh Duke Vice President wEnergy Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Hwy.

Seneca, SC 29672 864-873-4478 864-873-4208 fax T.Gillespie@duke-energy.com November 1, .2010 U. S. Nuciear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Site Docket Number 50-287 Core Operating Limits Report (COLR)

Attached, pursuant to Oconee Technical Specification 5.6.5.d, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 26, Revision 31.

If you have any questions, please direct them to Judy Smith at 864-873-4309.

Sincerely, T.Preston Gillespie, Jr.

Vice President Oconee Nuclear Station Attachment Ao'Dv www. duke-energy.corm

NRC Document Control Desk November 1, 2010 Page 2 xc w/att: Mr. Luis Reyes Regional Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Ga. 30303-1257 Mr. John Stang Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 8 G9A Washington, DC 20555 Mr. Andrew Sabisch Senior Resident Inspector Oconee Nuclear Site

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY SuperRush THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW Date: 10/28/10

1) 00813 DOC MGMT EC04T ORIGINAL Document Transmittal #: DUK103010029
2) 06358ONS REGUL COMPLIANCE ON03RC
3) 06700 ONS MANUAL MASTER FILE ON03DM Duke Energy QA CONDITION
  • Yes [] No DOCUMENT TRANSMITTAL FORM OTHER ACKNOWLEDGEMENT REQUIRED [] Yes
4) 06937 RR ST CLAIREC08G IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE NUCLEAR GENERAL OFFICE Duke Energy OCONEE NUCLEAR STATION P.O. Box 1006 RECORD RETENTION: 421734 Energy Center EC04T INFORMA ION Charlotte, N.C. 28201-1006 OCONEE 3 CYCLE 26 ONLY CORE OPERATING LIMITS REPORT Ti COPIES ONLY Rec'd By Page 1 of 1 Date DOCUMENT NO QACOND REV #/ DATE DISTR CODE 1 2 3 4 5 6 7 8 9 110 Il 112113 114 15 TOTAL I 4 .4.

ONEI-0400-070 1 031 10/28/10 NOMD-27 X v1 V1 vi 3 I/

SEE REMARKS //

II TI COPIES ONLY II REMARKS: DUKE DAVID A BAXTER CORRECTIONAL TRANSMITTAL TO CORRECT UNIT NUMBER THE DOCUMENT REVISION WILL REMAIN THE SAME. VICE PRESIDENT NUCLEAR ENGINEERING T1 COPIES ONLY BY:

L C JAMES LCJ/JAK EC08G

ONEI-0400-70 Rev 31 Page 1 of 33 Duke Energy Oconee 3 Cycle 26 Core Operating Limits Report QA Condition 1 L00/

Prepared By: L. C. James Keý1-...- 0z"'i Date: D7 0c' 2, Ch ecked By: J. M. SandersQ_ Date :27 6'f O CDR By: A. R. Bingham Date:O*-7 04 A010 R. St.Clair Approved By: ApprvedBy:R. Date: 07bVI-t,;&/0 Dat7fo7tý.I

Document No. / Rev. ONEI-0400-70 Rev. 31 Date October 7, 2010 Page No. Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By: Date: /O/7/2o,"D (Sponsor) -

CATAWBA Inspection Waived MCE (Mechanical & Civil) Inspected By/Date:

RES (Electrical Only) [] Inspected By/Date:

RES (Reactor) [] Inspected By/Date:

MOD [] Inspected By/Date:

Other ( ) [] Inspected By/Date:

OCONEE Inspection Waived MCE (Mechanical & Civil) [] Inspected By/Date:

RES (Electrical Only) [] Inspected By/Date:

RES (Reactor) Inspected By/Date:

MOD [] Inspected By/Date:

Other ( ) [] Inspected By/Date:

MCGUIRE Inspection Waived MCE (Mechanical & Civil) El Inspected By/Date:

RES (Electrical Only) [] Inspected By/Date:

RES (Reactor) [] Inspected By/Date:

MOD [] Inspected By/Date:

Other ( ) [] Inspected By/Date:

ONEI-0400-70 Rev 31 Page 3 of 33 Oconee 3 Cycle 26 Core Operating Limits Report Insertion Sheet for Revision 31 This revision is not valid until the end of operation for Oconee 3 Cycle 25. 1 Remove these Revision 30 pages Insert these Revision 31 pages 1-33 1-33 Revision Log Effective Pages Pages Pages Total Effective Revision Date Revised Added Deleted Pages lOconee 3 Cycle 26 revision below 31 . Oct 2010 1-33 - 33 Oconee 3 Cycle 25 revisions below 30 May 2009 1-33 33 29 May 2009 1-33 33 28 Apr2009 1-33 - 33 Oconee 3 Cycle 24 revisions below 27 Mar2009 1-33 - 33 26 Nov 2007 1 - 33 - - 33 25 Nov 2007 1-33 - 33 IOconee 24 3 Cycle 23 revisions below May 2006 1-33 33 Oconee 3 Cycle 22 revisions below 23 Mar2006 1 - 4, 6,15 - 16, 21, 27, 31 - - 33 22 Mar2005 1-5 - 33 21 Nov 2004 1-33 - 33

ONEI-0400-70 Rev 31 Page 4 of 33 Oconee 3 Cycle 26 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for 03C26 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology reports identified in References 1 through 11. See the discussion below pertaining to References 2 through 8.

The RPS protective limits and maximum allowable setpoints are documented in References 12 through 14. These limits are validated for use in O3C26 by References 15 through 17. The 03C26 analyses assume a design flow of 108.5% of of 88,000 gpm per RCS pump, a radial local peaking (FAh) of 1.714, an axial peaking factor (Fz) of 1.5, and an EOC

(< 100 ppmB) Tavg reduction for up to 10°F provided 4 RCPs are in operation and Tavg does not decrease below 569 *F.

The error adjusted core operating limits included in section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 03C26 reload core.

1.1 References

1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1004-A, Revision 1A, January 2009.
2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1002-A, Revision 3b, June 2009.
3. Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 6a, June 2009.
4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003-PA, Revision 2a, December 2008.
5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 4a, December 2008.
6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008-PA, Revision la, December 2008.
7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 3b, July 2009.
8. Thermal Hydraulic Transient Analysis Methodology, DPC-NE-3000-PA, Rev. 4a, July 2009.
9. BAW-10192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, Rev. 0, SER dated February 18, 1997.
10. BAW-10164P-A, Rev. 4 and 6, RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis, SERs dated April 9, 2002 and June 25, 2007, respectively.
11. BAW-1 0227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, Rev. 1, June 2003 (SER to BAW-1 01 86P-A dated June 18, 2003).
12. RPS RCS Pressure & Temperature Trip Function Uncertainty Analyses and Variable Low Pressure Safety Limit, OSC-4048, Revision 6, September 2010.
13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 3, July 2009.
14. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 1, Duke Power Co., June 2002.
15. 03C26 Maneuvering Analysis, OSC-9958, Revision 1, October 2010.
16. 03C26 Specific DNB Analysis, OSC-9969, Revision 0, May 2010.
17. 03C26 Reload Safety Evaluation, OSC-9999, Revision 0, October 2010.

ONEI-0400-70 Rev 31 Page 5 of 33 Oconee 3 Cycle 26 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.

Referred to by TS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.

Referred to by TS SLC 16.5.13.

CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in the CFT's shall be less than 4000 ppm. Referred to by TS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1% Ak/k.

Referred to by TS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than: MTC x 10-4 Linear interpolation is valid within the table provided. Ap /I F  % FP Referred to by TS 3.1.3. +0.70 0

+0.525 20 0.00 80 0.00 100 0.00 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1. 4 RCP: measured hot leg pressure _ 2125 psig 3 RCP: measured hot leg pressure 2!2125 psig DNB parameter for RCS loop average temperature shall be: Max Loop Tavg (Incl 2*F unc)

Referred to by TS 3.4.1. ATc,'F 4RCPOp 3RCPOp 0 581.0 581.0 The measured Tavg must be less than COLR limits minus 1 581.4 581.2 instrument uncertainty. ATc is the setpoint value selected by 2 581.8 581.4 the operators. Values are expanded by linear interpolation on 3 582.1 581.7 page 33 of this document without instrument uncertainty. 4 582.5 581.9 5 582.9 582.1

  • This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be: 4 RCP: Measured >_108.5 %df Referred to by TS 3.4.1. 3 RCP: Measured >_74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.

Referred to by TS 3.2.1.

Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.

Referred to by TS 3.2.1.

0 Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by IS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).

ONEI-0400-70 Rev 31 Page 6 of 33 Oconee 3 Cycle 26 Steady State Operating Band Rod Index APSR %WD EFPD Min Max Min Max 0 to 439 292 + 5 300 30 40 439 to EOC 292 +/- 5 300 100 100 Quadrant Power Tilt Setpoints Steady State Transient Maximum Core Power Level, %FP 30-100 0-30 30-100 0-30 0 - 100 Full Incore 3.50 7.56 7.07 9.36 16.51 Out of Core 2.39 6.09 5.63 7.72 14.22 Backup Incore 2.27 3.87 3.63 4.81 10.07 Referred to by TS 3.2.3 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).

ONEI-0400-70 Rev 31 Page 7 of 33 Oconee 3 Cycle 26 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 P 2355 psig T =618 OF 2300 2200 Co 0-S2100 Acceptable

,Operation P= 11.14 *Tout - 4706 0

0 2000 a.)

Unacceptable 1900 Operation P = 1800 psig 1800 T = 584 OF 1700 I I I 540 560 580 600 620 640 Reactor Coolant Outlet Temperature, OF

ONEI-0400-70 Rev 31 Page 8 of 33 0 Oconee 3 Cycle 26 RPS Power Imbalance Setpoints

% FP  % Imbalance 4 Pumps 0.0 -33.0 90.4 -33.0 107.9 -14.4 107.9 14.4 90.4 33.0 0.0 33.0 3 Pumps 0.0 -33.0 63.1 -33.0 80.6 -14.4 80.6 14.4 63.1 33.0 0.0 33.0 Maximum Allowable RPS Power Imbalance Limits

% FP  % Imbalance 4 Pumps 0.0 -35.0 90.0 -35.0 109.4 -14.4 109.4 14.4 90.0 35.0 0.0 35.0 3 Pumps 0.0 -35.0 62.3 -35.0 81.7 -14.4 81.7 14.4 62.3 35.0 0.0 35.0

ONEI-0400-70 Rev 31 Page 9 of 33 Oconee 3 Cycle 26 Operational Power Imbalance Setpoints Full Backup Out of

%FP Incore Incore Core 4 Pumps 0.0 -28.0 -28.0 -28.0 80.0 -28.0 -28.0 -28.0 90.0 -28.0 -28.0 -28.0 100.0 -17.8 -17.8 -17.8 102.0 -15.7 -15.7 -15.7 102.0 15.7 15.7 15.7 100.0 17.8 17.8 17.8 90.0 28.0 28.0 28.0 0 80.0 28.0 28.0 28.0 0.0 28.0 28.0 28.0 3 Pumps 0.0 -28.0 -28.0 -28.0 63.1 -28.0 -28.0 63.1 -28.0 77.0 -13.2 -13.2 -13.2 77.0 13.2 13.2 13.2 63.1 28.0 63.1 28.0 28.0 0.0 28.0 28.0 28.0

ONEI-0400-70 Rev 31 Page 10 of 33 Oconee 3 Cycle 26 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC

% FP RPS Trip Full Incore Alarm Out of Core Alarm 107.9 -14.4 14.4 107.0 -15.4 15.4 106.0 -16.4 16.4 105.0 -17.5 17.5 104.0 -18.5 18.5 103.0 -19.6 19.6 102.0 -20.7 20.7 -15.7 15.7 -15.7 15.7 101.0 -21.7 21.7 -16.7 16.7 -16.7 16.7 100.0 -22.8 22.8 -17.8 17.8 -17.8 17.8 99.0 -23.9 23.9 -18.8 18.8 -18.8 18.8 98.0 -24.9 24.9 -19.8 19.8 -19.8 19.8 97.0 -26.0 26.0 -20.9 20.9 -20.9 20.9 96.0 -27.0 27.0 -21.9 21.9 -21.9 21.9 95.0 -28.1 28.1 -22.9 22.9 -22.9 22.9 94.0 -29.2 29.2 -23.9 23.9 -23.9 23.9 93.0 -30.2 30.2 -24.9 24.9 -24.9 24.9 92.0 -31.3 31.3 -26.0 26.0 -26.0 26.0 91.0 -32.3 32.3 -27.0 27.0 -27.0 27.0 90.4 -33.0 33.0 -27.6 27.6 -27.6 27.6 90.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 89.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 88.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 87.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 86.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 85.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 84.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 83.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 82.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 81.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 80.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 0.0 -33.0 33.0 -28.0 28.0 -28.0 28.0

% FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 31 Page 11 of 33 Oconee 3 Cycle 26 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC

%FP RPS Trip Full Incore Alarm Out of Core Alarm 80.6 -14.4 14.4 80.0 -15.0 15.0 79.0 -16.1 16.1 78.0 -17.1 17.1 77.0 -18.2 18.2 -13.2 13.2 -13.2 13.2 76.0 -19.3 19.3 -14.3 14.3 -14.3 14.3 75.0 -20.3 20.3 -15.3 15.3 -15.3 15.3 74.0 -21.4 21.4 -16.4 16.4 -16.4 16.4 73.0 -22.4 22.4 -17.4 17.4 -17.4 17.4 72.0 -23.5 23.5 -18.5 18.5 -18.5 18.5 71.0 -24.6 24.6 -19.6 19.6 -19.6 19.6 70.0 -25.6 25.6 -20.6 20.6 -20.6 20.6 69.0 -26.7 26.7 -21.7 21.7 -21.7 21.7 68.0 -27.8 27.8 -22.8 22.8 -22.8 22.8 67.0 -28.8 28.8 -23.8 23.8 -23.8 23.8 66.0 -29.9 29.9 -24.9 24.9 -24.9 24.9 65.0 -30.9 30.9 -25.9 25.9 -25.9 25.9 64.0 -32.0 32.0 -27.0 27.0 -27.0 27.0 63.1 -33.0 33.0 -28.0 28.0 -28.0 28.0 63.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 62.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 61.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 60.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 0.0 -33.0 33.0 -28.0 28.0 -28.0 28.0

% FP RPS Trip Full Incore Alarm Out of Core Alarm 0

ONEI-0400-70 Rev 31 Page 12 of 33 Oconee 3 Cycle 26 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120.0 -

(-14.4,107.9) (14.4,107.9)

  • 10.0M2 =-0.942 M1 =0.942
  • ~Acceptable 4 Pump Operation (33.0,90.4)

(-14.4,80.6) (14.4,80.6)

-40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 Percent Power Imbalance

ONEI-.0*70 Rev 31 Page 13 of 33 Oconee 3 Cycle 26 Imbalance Setpoints for 4 Pump Operation, BOC to EOC 110.0 100.0 1 'RPS Tr'rip Setpoint' Incore & Outcore Alarm -RPS Trip Setpoint ý 90.0 80.0 70.0 0.. 60.0 LL 46

  • " 50.0 30.

40.0 10.0 0.0

-40 -35 -30 20 -15 -10 -5 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

0 ONEI-0400-70 Rev,31 Oconee 3 Cycle 26 Page 14 of 33 Imbalance Setpoints for 3 Pump Operation, BOC to EOC 110 100 90 80 70 0) 0 0~ 60 U-0 50 a,

C.)

I-a) 0~

40 30 20 10 0

35 25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

ONEI-0400-70 Rev.31 Page 15 of 33 Oconee 3 Cycle 26 Operational Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 263.5 283.4 300 100.0 261.5 281.5 300 90.0 251.5 271.9 300 80.0 241.5 262.3 300 50.0 201.5 233.4 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 0 5.0 3.0 16.5 1.5 93.5 76.5 300 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 237.5 285.2 300 75.0 234.8 281.5 300 50.0 201.5 235.2 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 0 2.8 0.0 0.0 0.0 74.8 51.0 300 300

ONEI-0400-70 Rev 31 Page 16 of 33 Oconee 3 Cycle 26 Shutdown Margin Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 224.6 283.4 300 100.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 227.4 285.2 300 75.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

Oconee 3 Cycle 26 ONEI-0400-70 Rev 31 Rod Index Setpoints Page 17 of 33 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Sepoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGF 7 CRGP 5 CRGP 6 CRGP7 102 100 99.8 24.8 100 100 63.5 101 100 99.0 24.0 100 100 62.5 100 100 98.2 23.2 100 100 61.5 99 100 97.5 22.5 100 100 60.5 98 100 96.7 21.7 100 100 59.5 97 100 95.9 20.9 100 100 58.5 96 100 95.2 20.2 100 100 57.5 95 100 94.4 19.4 100 100 56.5 94 100 93.6 18.6 100 100 55.5 93 100 92.9 17.9 100 100 54.5 92 100 92.1 17.1 100 100 53.5 91 100 91.3 16.3 100 100 52.5 90 .... 100 90.6 15.6 100 100 51.5 89 100 89.8 14.8 100 100 50.5 88 100 89.0 14.0 100 100 49.5 87 100 88.2 13.2 100 100 48.5 86 100 87.5 12.5 100 100 47.5 85 100 86.7 11.7 100 100 46.5 84 100 85.9 10.9 100 100 45.5 83 100 85.2 10.2 100 100 44.5 82 100 84.4 9.4 100 100 43.5 81 100 83.6 8.6 100 100 42.5 80 100 82.9 7.9 100 100 41.5 79 100 82.1 7.1 100 100 40.2 78 100 81.3 6.3 100 100 38.8 77 100 80.6 5.6 100 100 37.5 76 100 79.8 4.8 100 100 36.2 75 100 79.0 4.0 100 100 34.8 74 100 78.2 3.2 100 100 33.5 73 100 77.5 2.5 100 100 32.2 72 100 76.7 1.7 100 100 30.8 71 100 75.9 0.9 100 100 29.5 70 100 75.2 0.2 100 100 28.2 69.8 100 75.0 0 100 100 27.9 69 100 73.8 0 100 100 26.8 68 100 72.3 0 100 100 25.5 67.6 100 71.7 0 100 100 25.0 67 100 70.7 0 100 99.6 24.6 66 100 69.2 0 100 98.9 23.9 65 100 67.7 0 100 98.2 23.2 64 100 66.1 0 100 97.6 22.6 63 100 64.6 0 100 96.9 21.9 62 100 -630 0 100 96.2 21.2 61 100 61.5 0 100 95.6 20.6 60 100 60.0 0 100 94.9 19.9 59 100 58.4 0 100 94.2 19.2 58 100 56.9 0 100 93.6 18.6 57 100 55.3 0 100 92.9 17.9 56 100 53.8 0 100 92.2 17.2 55 100 52.3 0 100 91.6 16.6 54 100 50.7 0 100 90.9 15.9 53 100 49.2 0 100 90.2 15.2 52 100 47.7 0 100 89.6 14.6 51 100 46.1 0 100 88.9 13.9 50 100 44.6 0 100 88.2 13.2

% FP CRGP 5 CRGP 6 CRGP 7 CRGP5 CRGP6 CRGP'7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Uconee 3 Cycle 2b ONEI-0400-70 Rev 31 Rod Index Setpoints Page 18 of 33 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 49 100 43.0 0 100 86.7 11.7 48 100 41.5 0 100 85.1 10.1 47 100 39.6 0 100 83.5 8.5 46 100 37.8 0 100 82.0 7.0 45 100 35.9 0 100 80.4 5.4 44 100 34.1 0 100 78.8 3.8 43 100 32.2 0 100 77.2 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0 100 75.0 0 41 100 28.5 0 100 73.2 0 40 100 26.6 0 100 70.1 0 39.1 100 25.0 0 100 67.3 0 39 99.9 24.9 0 100 66.9 0 38 99.0 24.0 0 100 63.8 0 37 98.0 23.0 0 100 60.6 0 36 97.1 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 '14.7 0 100 32.4 0 27 88.8 13.8 0 100 29.2 0 26 87.8 12.8 0 100 26.1 0 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 15 77.6 2.6 0 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 0 13 75.8 0.8 0 75.8 0.8 0 12.8 75.0 0 0 75.0 0 0 12 69.0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 7 31.5 0 0 31.5 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5 0 0 4 9.0 0 0 9.0 0 0 3 1.5 0 0 1.5 0 0 2.8 0 0 0 0 0 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 11_ Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 26 ONEI-0400-70 Rev 31 Rod Index Setpoints Page 19 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm.Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 27.4 100 100 37.5 76.2 100 100 25.0 100 100 36.4 76 100 99.7 24.7 100 100 36.1 75 100 98.2 23.2 100 100 34.8 74 100 96.8 21.8 100 100 33.5 73 100 95.3 20.3 100 100 32.1 72 100 93.8 18.8 100 100 30.8 71 100 92.3 17.3 100 100 29.5 70 100 90.8 15.8 100 100 28.1 69 100 89.4 14.4 100 100 26.8 68 100 87.9 12.9 100 100 25.5 67.6 100 87.4 12.4 100 100 25.0 67 100 86.4 11.4 100 99.6 24.6 66 100 84.9 9.9 100 98.9 23.9 65 100 83.4 8.4 100 98.2 23.2 64 100 82.0 7.0 100 97.6 22.6 63 100 80.5 5.5 100 96.9 21.9 62 100 79.0 4.0 100 96.2 21.2 61 100 77.5 2.5 100 95.6 20.6 60 100 76.0 1.0 100 94.9 19.9 59.3 100 75.0 0 100 94.4 19.4 59 100 74.1 0 100 94.2 19.2 58 100 71.1 0 100 93.6 18.6 57 100 68.2 0 100 92.9 17.9 56 100 65.2 0 100 92.2 17.2 55 100 62.2 0 100 91.6 16.6 54 100 59.3 0 100 90.9 15.9 53 100 56.3 0 100 90.2 15.2 52 100 53.4 0 100 89.6 14.6 51 100 50.4 0 100 88.9 13.9 50 100 47.4 0 100 88.2 13.2 49 100 44.5 0 100 86.7 11.7 48 100 41.5 0 100 85.1 10.1 47 100 39.6 0 100 83.5 8.5 46 100 37.8 0 100 82.0 7.0 45 100 35.9 0 100 80.4 5.4 44 100 34.1 0 100 78.8 3.8 43 100 32.2 0 100 77.2 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0 100 75.0 0 41 100 28.5 0 100 73.2 0 40 100 26.6 0 100 70.1 0 39.1 100 25.0 0 100 67.3 0 39 99.9 24.9 0 100 66.9 0 38 99 24.0 0 100 63.8 0 37 98 23.0 0 100 60.6 0 36 97.1 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0 100 32.4 0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint

.RI = 300 is withdrawal limit at all power levels. Continued on next page.

uconee ;j uycie zb UNtI-U4UU-tU Kev ;i Rod Index Setpoints Page 20 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Marclin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 27 88.8 13.8 0 100 29.2 0 26 87.8 12.8 0 100 26.1 0 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 15 77.6 2.6 0 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 0 13 75.8 0.8 0 75.8 0.8 0 12.8 75.0 0 0 75.0 0 0 12 69.0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 7 31.5 0 0 31.5 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5 0 0 4 9.0 0 0 9.0 0 0 3 1.5 0 0 1.5 0 0 2.8 0 0 0 0 0 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

%FP CRGP5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 26 ONEI-0400-70 Rev 31 Rod Index Setpoints Page 21 of 33 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

%FP CRGP 5 CRGP 6 CRGP7 CRGP 5 CRGP 6 CRGP 7 102 100 100 83.4 100 100 83.4 101 100 100 82.5 100 100 82.5 100 100 100 81.5 100 100 81.5 99 100 100 80.5 100 100 80.5 98 100 100 79.6 100 100 79.6 97 100 100 78.6 100 100 78.6 96 100 100 77.7 100 100 77.7 95 100 100 76.7 100 100 76.7 94 100 100 75.7 100 100 75.7 93 100 100 74.8 100 100 74.8 92 100 100 73.8 100 100 73.8 91 100 100 72.8 100 100 72.9 90 100 100 71.9 100 100 71.9 89 100 100 70.9 100 100 70.9 88 100 100 70.0 100 100 70.0 87 100 100 69.0 100 100 69.0 86 100 100 68.0 100 100 68.1 85 100 100 67.1 100 100 67.1 84 100 100 66.1 100 100 66.1 83 100 100 65.2 100 100 65.2 82 100 100 64.2 100 100 64.2 81 100 100 63.2 100 100 63.3 80 100 100 62.3 100 100 62.3 79 100 100 61.3 100 100 61.3 78 100 100 60.3 100 100 60.4 77 100 100 59.4 100 100 59.4 76 100 100 58.4 100 100 58.4 75 100 100 57.5 100 100 57.5 74 100 100 56.5 100 100 56.5 73 100 100 55.5 100 100 55.6 72 100 100 54.6 100 100 54.6 71 100 100 53.6 100 100 53.6 70 100 100 52.7 100 100 52.7 69 100 100 51.7 100 100 51.7 68 100 100 50.7 100 100 50.7 67 100 100 49.8 100 100 49.8 66 100 100 48.8 100 100 48.8 65 100 100 47.8 100 100 47.8 64 100 100 46.9 100 100 46.9 63 100 100 45.9 100 100 45.9 62 100 100 45.0 100 100 45.0 61 100 100 44.0 100 100 44.0 60 100 100 43.0 100 100 43.0 59 100 100 42.1 100 100 42.1 58 100 100 41.1 100 100 41.1 57 100 100 40.2 100 100 40.2 56 100 100 39.2 100 100 39.2 55 100 100 38.2 100 100 38.2 54 100 100 37.3 100 100 37.3 53 100 100 36.3 100 100 36.3 52 100 100 35.3 100 100 35.3 51 100 100 34.4 100 100 34.4 50 100 100 33.4 100 100 33.4 49 100 100 32.5 100 100 32.5 48 100 100 31.5 100 100 31.5

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Confinued on nextpage.

uconee ; L;ycie zto UNt1-U4UU-fU Kev 3i Rod Index Setpoints Page 22 of 33 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP7 CRGP 5 CRGP 6 CRGP 7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 63.5 0 13 100 61.5 0 100 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 10 100 36.0 0 100 36.0 0 9 100 27.5 0 100 27.5 0 8.7 100 25.0 0 100 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 88.5 13.5 0 5 84.2 9.2 0 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75 0 0- 75 0 0 2 68 0 0 68 0 0 1 59.5 0 0 59.5 0 0 0 51 0 0 51 0 0

%FP CRGP5 CRGP6 CRGP7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 26 ONEI-0400-70 Rev 31 Rod Index Setpoints Page 23 of 33 3 Pump Operation, I Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 100 100 81.5 74 100 100 79.6 100 100 79.6 73 100 100 77.8 100 100 77.8 72 100 100 75.9 100 100 75.9 71 100 100 74.1 100 100 74.1 70 100 100 72.2 100 100 72.2 69 100 100 70.4 100 100 70.4 68 100 100 68.5 100 100 68.5 67 100 100 66.7 100 100 66.7 66 100 100 64.8 100 100 64.8 65 100 100 63.0 100 100 63.0 64 100 100 61.1 100 100 61.1 63 100 100 59.3 100 100 59.3 62 100 100 57.4 100 100 57.4 61 100 100 55.6 100 100 55.6 60 100 100 53.7 100 100 53.7 59 100 100 51.9 100 100 51.9 58 100 100 50.0 100 100 50.0 57 100 100 48.2 100 100 48.2 56 100 100 46.3 100 100 46.3 55 100 100 44.5 100 100 44.5 54 100 100 42.6 100 100 42.6 53 100 100 40.8 100 100 40.8 52 100 100 38.9 100 100 38.9 0 51 50 49 100 100 100 100 100 100 37.1 35.2 33.4 100 100 100 100 100 100 37.1 35.2 33.4 48 100 100 31.5 100 100 31.5 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 972 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 1.4.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2( 12.2 31 100 86.2. 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2

%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP 7

_ _Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on nextpage.

Oconee 3 Cycle 2b ONEI-0400-70 Rev 31 Rod Index Setpoints Page 24 of 33 3 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP7 CRGP 5 CRGP 6 CRGP 7 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 63.5 0 13 100 61.5 0 100 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 10 100 36.0 0 100 36.0 0 9 100 27.5 0 100 27.5 0 8.7 100 25.0 0 100 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 88.5 13.5 0 5 84.2 9.2 0 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75.0 0 0 75.0 0 0 2 68 0 0 68 0 0 1 59.5 0 0 59.5 0 0 0 51 0 0 51 0 0 II + + U I -t U 4 4- 4* 4 -1 II 4 4- U 4 +

U 4 4- 4* 4 -1 II -I- 4- 1* 4 +

II -I- I II 4 4 II 4- I *1

  • 4 II 4- I *1 4 4 II 4- I ii 4 4 4*- I- I II 4 4

-II- I I II 4 4 4*- I 4 II 4 +

4*- I 4 II 4 4

%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

ONEI-040#6ev 31 I Oconee 3 Cycle 26 I Page 25 of 33 105 .105 100 100 Control Rod Position Setpoints

.95 No Inooerable Rods. 4 Pumo Flov Restrcted95 90 Opertion90 85 85 80 75 75 70 70 65 65

(.

LL 60 60 i, 55 55 05 Ill " .. .... .... .....

I ..... .....

Acceptable 50 c 45 45 a) 40 40 35 35 30 30 25 25 20 20 15 15 10 5 10 0 0 0 20 30 40 50 60 70 80 90 o100 Group77 L 1 Control Rod Position, % WD

S I Oconee 3 Cycle 26  ; ONEI-O4*Rev 31 Page 26 of 33 105 p

105 100 Control Rod Position Setpoints 100 95 Inoperable Rods, 3 Pum Flo 95 90 90 85 85 80 80 75- 75 70 70 II 65 Unacceptable 65

(-

0.

Operation L-60 60 L.

a) 55 55 50 50 I

Restricted ICU 45 45 Operation 40 40 35 35 30 Acceptable 30 Operation 25 25 20 20 11111 15 ÷ 15 10 10 5 3 Group 6 5 15 2b 35 45 55 65 75 85 95 0 ~0 10 10 20 30 40 50 60 70 80 90 100 0 10 20 30 40 50 60 70 80 90 100 I Group 51 I Group77 Control Rod Position, % WD

Oconee 3 Cycle 26 I. ONEI-040Rev 31 105 100 95 -

.. IControl Rod Position Setpoints I Inoperable Rod, 4 Pump Flow I  ! 111 i pI Page 27 of 33 100 i 1I I 95 "11" 90 90

-H+H H 85 80 75 H 85 80 75 70 70

  • ULU 65 65

-Til Unacceptable IL

+HU HI' Operation 60 60 55 55 0 HtH Q-Uj 50 Acceptable 50 0o L..

0Y Operation 45 45 40 35

-k-I-H H4+ II 1 40 35 30 30

-- H ~Th @

25 25 4WI~

20 H 15 10 5 Lu PH 0

F0 10 HI~

20 I

30 40 H4 50 S

5 15 1.

25 35

! l i Grou p 6 45 55 65 F0 75 85 10 95.

.. . .T. .. . .. . . .T. .. . .. . ..* .. . . I 20 30 40 50 60 70 80 90 5

0 60 70 80 90 100 100 IGroup 5J [Group 7J Control Rod Position, % WD

Oconee 3 Cycle 26 1 @ ONEl@040#ev 31 Page 28 of 33 105 100 95 I Control Rod Position Setpoints l g JJ-105 100 951Ioeal Rod, 3 PupFo 90 85 1

Im I

1 1 90 85 80 75 70 65

~

--- TI

! Unacceptable Operation 80 75 70 65 10.

LL 60 60 I-U) 55 .... 55 03 50 50 n-45 Aceptable 40 Operation 35 35 30 30 25 25 20 20 IF11 15 10 5 G u 5

[ 1 0025 35 45 55 65 75 85 95 LU Um UH 10 10 20 30' 40 50 60 70 80 90 100 1 f0 10 20 30 40 50 60- 70 80 90 100 I Group5 I [-Group 7 Control Rod Position, % WD

ONEI-0400-70 Rev 31 Page 29 of 33 Oconee 3 Cycle 26 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.

References provided in section 1 of this COLR identify the sources for the data which follows.

Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State 1'ransient Maximum 0 Core Power Level, %FP 3(0-100 0-30 30-10 0 0-30 0 - 100 Quadrant Power TiIt, % 5.45 10.00 9.44 12.00 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 Core Out,et Pressure Reactor Coolant Outlet Temperature, *F psia 3RCS Pumps 4 RCS Pumps 11800 581.0 578.3 900 590.0 587.3 600 598.9 596.3 21100 607.9 605.2 22200 616.9 614.2 2'

300 625.9 623.2

ONEI-0400-70 Rev 31 Page 30 of 33 0 Oconee 3 Cycle 26 Axial Power Imbalance Protective Limits Referred to by TS 2.1.1

%FP RPS Operational 4 Pumps 0.0 -35.0 -39.5 80.0 -39.5 90.0 -35.0 90.0 -39.5 100.0 -14.4 -28.4 109.4 109.4 14.4 100.0 28.4 90.0 35.0 39.5 80.0 39.5 0.0 35.0 39.5 3 Pumps 0.0 -35.0 -39.5 62.3 -35.0 77.0 -39.5 81.7 -14.4 81.7 14.4 77.0 39.5 62.3 35.0 0.0 35.0 39.5

ONEI-0400-70 Rev 31 Page 31 of 33 0 Oconee 3 Cycle 26 Rod Index Limits Referred to by TS 3.2.1 Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal

%FP Insertion Limit No Inop Rod 1 Inop Rod Limit 4 Pumps 102 262 220 280 300 100 260 300 90 250 300 80 240 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300 3 Pumps 77 236 220 280 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300

ONEI-0400-70 Rev 31 Page 32 of 33 Oconee 3 Cycle 26 LOCA Limits Core Elevation Feet LOCA LHR kw/ft Limit Versus Burnup Mk-B11 Fuel 0 GWd/mtU 23 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 16.6 16.6 16.6 12.2 2.506 17.5 17.5 17.5 12.2.

4.264 17.6 17.6 17.6 12.2 6.021 17.7 17.7 17.7 12.2 7.779 17.6 17.6 17.6 12.2 9.536 17.5 17.5 17.5 12.2 12.00 16.6 16.6 16.6 12.2 Mk-B-HTP 0 GWd/mtU 23 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 16.7 16.7 16.7 12.5 2.506 17.6 17.6 17.6 13.2 4.264 17.8 17.8 17.8 13.2 6.021 17.8 17.8 17.8 13.2 7.779 17.8 17.8 17.8 13.2 9.536 17.3 17.3 17.0 13.2 12.00 16.4 16.4 16.1 12.5 WH-177 0 GWd/mtU 23 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 14.9 .14.9 14.9 11.0 2.506 15.7 15.7 15.7 11.0 4.264 15.8 15.8 .15.8 11.0 6.021 15.9 15.9 15.9 11.0 7.779 15.8 15.8 15.8 11.0 9.536 15.7 15.7 15.7 11.0 12.00 14.9 14.9 14.9 11.0

ONEI-0400-70 Rev 31 Page 33 of 33 Oconee 3 Cycle 26 44RCP Operation - Loop Average Temp., oF 3 RCP Operation - Loop Average Temp., -F ATcold, TF Tavg (Analytical) Tavg (Analytical) 0.0 <581.0 <581.0 0.1 <581.0 <581.0 0.2 <581.1 <581.0 0.3 <581.1 <581.1 0.4 <581.2 <581.1 0.5 <581.2 <581.1 0.6 <581.2 <581.1 0.7 <581.3 <581.2 0.8 <581.3 <581.2 0.9 <581.3 <581.2 1.0 <581.4 <581.2 1.1 <581.4 <581.2 1.2 <581.5 <581.3 1.3 <581.5 <581.3 1.4 <581.5 <581.3 1.5 <581.6 <581.3 1.6 <581.6 <581.4 1.7 <581.6 <581.4 1.8 <581.7 <581.4 1.9 <581.7 <581.4 2.0 <581.8 <581.4 2.1 <581.8 <581.5 2.2 <581.8 <581.5 2.3 <581.9 <581.5 2.4 <581.9 <581.5 2.5 <582.0 <581.6 2.6 <582.0 <581.6 2.7 <582.0 <581.6 2.8 <582.1 <581.6 2.9 <582.1 <581.6 3.0 <582.1 <581.7 3.1 <582.2 <581.7 3.2 <582.2 <581.7 3.3 <582.3 <581.7 3.4 <582.3 <581.7 3.5 <582.3 <581.8 3.6 <582.4 <581.8 3.7 <582.4 <581.8 3.8 <582.4 <581.8 3.9 <582.5 <581.9 4.0 <582.5 <581.9 4.1 <582.6 <581.9 4.2 <582.6 <581.9 4.3 <582.6 <581.9 4.4 <582.7 <582.0 4.5 <582.7 <582.0 4.6 <582.7 <582.0 4.7 <582.8 <582.0 4.8 <582.8 <582.1 4.9 <582.9 <582.1 5.0 <582.9 <582.1