Duke DAVE BAXTER Ener Vice President Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy. corn April 29, 2009 U.
S.
Nuclear Regulatory Commission Document Control Desk Washington, D.
C.
20555
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Site Docket No.
50-287 Core Operating Limits Report (COLR)
Gentlemen:
Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 25, Rev.
28.
If you have any questions, please direct them to Judy Smith at 864-873-4309.
Sincerely, Dave axter Site Vice President Oconee Nuclear Station Attachment www. duke-energy, com
NRC Document Control Desk April 29, 2009 Page 2 xc w/att:
Mr. Luis Reyes Regional Administrator, Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Ga.
30303-8931 Mr. John Stang Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 8 G9A Washington, DC 20555 Mr.
Andy Hutto Senior Resident Inspector Oconee Nuclear Site
ONEI-0400-70 Rev 28 Page 1 of 33
/
Duke Energy Oconee 3 Cycle 25 Core Operating Limits Report QA Condition 1 Prepared By:
Checked By:
CDR By:
Approved By:
L. CJames 11 L
J. D. Forster
,A
).""O _
M. L. Cameron R. R. St.ClairAM 4.c Date": 13 &k2f*(9 Date:
- M (Z
)9 Date: q/13/Z o0 Date 4: IS/2o4
Document No. / Rev.
ONEI-0400-70 Rev. 28 Date April 13, 2009 Page No.
Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS
/4" Inspection Waived By:
Date:
4" (a I a.,o (Spolfsor)
I 1
CATAWBA Inspection Waived MCE (Mechanical & Civil)
El Inspected By/Date:
RES (Electrical Only)
I]
Inspected By/Date:
RES (Reactor)
E]
Inspected By/Date:
[]
Inspected By/Date:
Other (
)
[]
Inspected By/Date:
OCONEE Inspection Waived MCE (Mechanical & Civil)
Inspected By/Date:
RES (Electrical Only)
[]
Inspected By/Date:
RES (Reactor)
[]
Inspected By/Date:
MOD Inspected By/Date:
Other (
)
[]
Inspected By/Date:
MCGUIRE Inspection Waived MCE (Mechanical & Civil)
El Inspected By/Date:
RES (Electrical Only)
[]
Inspected By/Date:
RES (Reactor)
[]
Inspected By/Date:
[]
Inspected By/Date:
Other (.
)
[]
Inspected By/Date:
ONEI-0400-70 Rev 28 Page 3 of 33 Oconee 3 Cycle 25 Core Operating Limits Report Insertion Sheet for Revision 28 I
This revision is not valid until the end of operation for Oconee 3 Cycle 24.
Remove these Revision 27 pages Insert these Revision 28 pages 1 - 33 1 - 33 Revision Log Effective Date Pages Revised Pages Added Pages Total Effective.
Deleted Pages Revision l0conee 3 Cycle 25 revisions below 28 Apr2009 1-33 33 Oconee 3 Cycle 24 revisions below 27 Mar2009 1-33
-33 26 Nov 2007 1-33
-33 25 Nov 2007 1-33
-33 IOconee 3 Cycle 23 revisions below 24 May 2006 1-33 33 Oconee 3 Cycle 22 revisions below 23 Mar2006 1-4,6,15-16,21,27,31 33 22 Mar2005 1-5 33 21 Nov 2004 1 -33 33 Oconee 3 Cycle 21 revisions below 20 Sep 2004 1-4,6 33 19 Feb 2004 1-4,6 33.
18 Nov 2003 1 -3,5 33 17 Apr2003 1-31 32-33 33 1Oconee 3 Cycle 20 revisions below
ONEI-0400-70 Rev 28 Page 4 of 33 Oconee 3 Cycle 25 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for 03C25 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology reports identified in References 1 through 11. See the discussion below pertaining to References 2 through 8.
03C25 is the second reload of the AREVA Mark-B-HTP fuel design. Revisions to seven NRC-approved Duke methodology reports (References 2 through 8) were submitted to NRC for review and approval to support the transition to the Mark-B-HTP fuel. These revisions were combined into one new methodology report, DPC-NE-2015-P, "Mark-B-HTP Fuel Transition Methodology". The DPC-NE-2015-P methodology report was approved by the NRC in a Safety Evaluation Report (SER) dated October 29, 2008. This SER allows Duke to incorporate the NRC's previously reviewed & approved HTP-related changes into References 2 through 8.
The core operating limits have been developed using the methodologies from revised References 2, 4, 5, and 6 and existing References 3, 7, and 8 with the NRC-approved changes resulting from the NRC approval of the DPC-NE-2015-P report.
The RPS protective limits and maximum allowable setpoints are documented in References 12 through 14. These limits are validated for use in 03C25 by References 15 through 17. The 03C25 analyses assume a design flow of 108.5% of of 88,000 gpm per RCS pump, a radial local peaking (FAh) of 1.714, and an axial peaking factor (Fz) of 1.5, and an EOC
(< 100 ppmB) Tavg reduction of up to 1 0°F provided 4 RCPs are in operation and Tavg does not decrease below 569°F.
The error adjusted core operating limits included in section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 03C25 reload core.
1.1 References
- 1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1004-A, Revision 1A, January 2009.
- 2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1002-A, Revision 3A, December, 2008.
- 3. Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 5, SER dated December 8, 2000.
- 4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003-PA, Revision 2A, December 2008.
- 5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 4A, December 2008.
- 6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008-PA, Revision 1A, December 2008.
- 7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 2, SER dated September 24, 2003.
- 8. Thermal Hydraulic Transient Analysis Methodology, DPC-NE-3000-PA, Revision 3, SER dated September 24, 2003.
- 9.
BAW-10192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, Revision 0, SER dated February 18, 1997.
- 10. BAW-1 01 64P-A, RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis, Revision 6, report dated June 2007.
- 11. SAW-10227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, Revision 1, June 2003 (SER to BAW-10186P-A dated June 18, 2003).
- 12. RPS RCS Pressure & Temperature Trip Function Uncertainty Analyses and Variable Low Pressure Safety Limit, OSC-4048, Revision 4, January 2001.
- 13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 2, October 2001.
- 14. ATc and EOC Reduced Tavg Operation, OSC-7265, Revision 1, Duke Power Co., June 2002.
S
- 15. O3C25 Maneuvering Analysis, OSC-9548, Revision 2, April 2009.
- 16. 03C25 Specific DNB Analysis, OSC-9556, Revision 0, November 2008.
- 17. 03C25 Reload Safety Evaluation, OSC-9695, Revision 0, April 2009.
ONEI-0400-70 Rev 28 Page 5 of 33 Oconee 3 Cycle 25 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.
Referred to by TS 3.5.4.
Spent fuel pool boron concentration shall be greater than 2220 ppm.
Referred to by TS 3.7.12.
The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.
Referred to by TS SLC 16.5.13.
CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in the CFTs shall be less than 4000 ppm.
Referred to by TS 3.5.1.
RCS and Refueling canal boron concentration shall be greater than 2220 ppm.
Referred to by TS 3.9.1.
Shutdown Margin (SDM) shall be greater than 1% Ak/k:
Referred to by TS 3.1.1.
Moderator Temperature Coefficient (MTC) shall be less than:
Linear interpolation is valid within the table provided.
Referred to by TS 3.1.3.
MTC x 10-4 Ap / 'F
+0.70
+0.525 0.00 0.00 0.00
% FP 0
20 80 100 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1.
4 RCP:
measured hot leg pressure 2125 psig 3 RCP:
measured hot leg pressure >2125 psig DNB parameter for RCS loop average temperature shall be:
Referred to by TS 3.4.1.
The measured Tavg must be less than COLR limits minus instrument uncertainty. ATc is the setpoint value selected by the operators. Values are expanded by linear interpolation on page 33 of this document without instrument uncertainty.
Max Loop Tavg (Inc[ 2°F unc)
ATc,°F 4RCPOp 3RCPOp 0
581.0 581.0 1
581.4 581.2 2
581.8 581.4 3
582.1 581.7 4
582.5 581.9 5
582.9 582.1
- This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2; All other temperature limits apply to the maximum loop Tavg.
DNB parameter for RCS loop total flow shall be:
Referred to by TS 3.4.1.
4 RCP:
Measured _ 108.5 %df 3 RCP:
Measured _ 74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.
Referred to by TS 3.2.1.
Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.
Referred to by TS 3.2.1.
Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).
ONEI-0400-70 Rev 28 Page 6 of 33 Oconee 3 Cycle 25 Steady State Operating Band Rod Index APSR %WD EFPD Min Max Min Max 0 to 458 292 +/- 5 300 30 40 458 to EOC 292 +/- 5 300 100 100 Core Power Level, %FP Full Incore Out of Core Backup Incore Quadrant Power Tilt Setpoints Steady State Transient 30-100 0-30 30-100 0-30 3.50 7.59 7.10 9.39 2.37 6.09 5.63 7.72 2.26 3.87 3.63 4.81 Referred to by TS 3.2.3 Maximum 0- 100 16.54 14.22 10.07 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).
ONEI-0400-70 Rev 28 Page 7 of 33 Oconee 3 Cycle 25 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 2300 2200 0
2100 D
o 2000 (D
W, 1900 1800 0
1700 540 560 580 600 Reactor Coolant Outlet Temperature, OF 620 640
/
ONEI-0400-70 Rev 28 Page 8 of 33 Oconee 3 Cycle 25 RPS Power Imbalance Setpoints 4 Pumps
% FP 0.0 88.2 107.9 107.9 90.4 0.0
% Imbalance
-33.0
-33.0
-12.1 14.4 33.0 33.0
-33.0
-33.0
-12.1 14.4 33.0 33.0 3 Pumps 0.0 60.9 80.6 80.6 63.1 0.0 0
Maximum Allowable RPS Power Imbalance Limits 4 Pumps
% FP 0.0 87.8 109.4 109.4 90.0 0.0
% Imbalance
-35.0
-35.0
-12.1 14.4 35.0 35.0
-35.0
-35.0
-12.1 14.4 35.0 35.0 3 Pumps 0.0 60.1 81.7 81.7 62.3 0.0
ONEI-0400-70 Rev 28 Page 9 of 33 Oconee 3 Cycle 25 Operational Power Imbalance Setpoints 4 Pumps 3 Pumps
%FP 0.0 80.0 90.0 100.0 102.0 102.0 100.0 90.0 80.0 0.0 0.0 60.9 60.9 77.0 77.0 63.1 63.1 0.0 Full Incore
-28.0
-28.0
-26.1
-15.5
-13.3 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-10.9 13.2 28.0 28.0 Backup Incore
-28.0
-28.0
-26.1
-15.5
-13.3 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-10.9 13.2 28.0 28.0 Out of Core
-28.0
-28.0
-26.1
-15.5
-13.3 15.7 17.8 28.0 28.0 28.0
-28.0
-28.0
-10.9 13.2 28.0 28.0
ONEI-0400-70 Rev 28 Page 10 of 33 Oconee 3 Cycle 25 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC
% FP RPS Trip Full Incore Alarm Out of Core Alarm 107.9 107.0 106.0 105.0 104.0 103.0 102.0 101.0 100.0 99.0 98.0 97.0 96.0 95.0 94.0 93.0 92.0 91.0 90.4 90.0 89.0 88.2 88.0 87.0 86.0 85.0 84.0 83.0 82.0 81.0 80.0 0.0
-12.1
-13.0
-14.1
-151
-16.2
-17.3
-18.3
-19.4
-20.5
-21.5
-22.6
-23.6
-24.7
-25.8
-26.8
-27.9
-29.0
-30.0
-30.7
-31.1
-32.1
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0
-33.0 14.4 15.4 16.4 17.5 18.5 19.6 20.7 21.7 22.8 23.9 24.9 26.0 27.0 28.1 29.2 30.2 31.3 32.3 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
-13.3
-14.4
-15.5
-16.5
-17.6
-18.6
-19.7
-20.8
-21.8
-22.9
-24.0
-25.0
-25.7
-26.1
-26.3
-26.4
-26.5
-26.7
-26.8
-27.0
-27.2
-27.4
-27.6
-27.8
-28.0
-28.0 15.7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27.0 27.6 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
-13.3
-14.4
-15.5
-16.5
-17.6
-18.6
-19.7
-20.8
-21.8
-22.9
-24.0
-25.0
-25.7
-26.1
-26.3
-26.4
-26.5
-26.7
-26.8
-27.0
-27.2
-27.4
-27.6
-27.8
-28.0
-28.0 15.7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27.0 27.6 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
% FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 28 Page 11 of 33 Oconee 3 Cycle 25 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC
% FP RPS Trip Fullý Incore Alarm Out of Core Alarm 80.6 80.0 79.0 78.0 77.0 76.0 75.0 74.0 73.0 72.0 71.0 70.0 69.0 68.0 67.0 66.0 65.0 64.0 63.1 63.0 62.0 61.0 60.9 60.0 0.0
-12.1
-12.7
-13.7
-14.8
-15.9
-16.9
-18.0
-19.1
-20.1
-21.2
-22.2
-23.3
-24.4
-25.4
-26.5
-27.6
-28.6
-29.7
-30.7
-30.7
-31.8
-32.9
-33.0
-33.0
-33.0 14.4 15.0 16.1 17.1 18.2 19.3 20.3 21.4 22.4 23.5 24.6 25.6 26.7 27.8 28.8 29.9 30.9 32.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
-10.9
-11.9
-13.0
-14.1
-15.1
-16.2
-17.2
-18.3
-19.4
-20.4
-21.5
-22.6
-23.6
-24.7
-25.7
-25.7
-26.8
-27.9
-28.0
-28.0
-28.0 13.2 14.3 15.3 16.4 17.4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
-10.9
-11.9
-13.0
-14.1
-15.1
-16.2
-17.2
-18.3
-19.4
-20.4
-21.5
-22.6
-23.6
-24.7
-25.7
-25.7
-26.8
-27.9
-28.0 13.2 14.3 15.3 16.4 17.4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
-28.0
-28.0
% FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 28 Page 12 of 33 Oconee 3 Cycle 25 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120.0
(-12.1,107.9)
(14.4,107.9)
M1 = 0.942
(
(-33.0,88.2)
(-12.1,80.6) 100.0 Acceptable 4 Operation M2 = -0.942 (33.0,90.4)
(14.4,80.6) 0 60.0
(-33.0,60.9)
(33.0,63.1)
Acceptable 3 or 4 Pump Operation 40.0 20.0
, I 0.0
.1.
I I
-40.0 I
I
-30.0
-20.0
-10.0 0.0 10.0 Percent Power Imbalance 20.0 30.0 40.0
Oconee 3 Cycle 25 Imbalance Setpoints for 4 Pump Operation, BOC to EOC ONEI-
- 0 Rev 28 Page 13 of 33 0
0 ai) 2 110.0
-==:RSTrip Setpoint 100.0 100.0or
& Outcore Alarm-=
90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0
-40
-35
-30
-25
-20
-15
-10
-5 0
5 Percent Axial Imbalance 10 15 20 25 30 35 40
Oconee 3 Cycle 25 Imbalance.Setpoints for 3 Pump Operation, BOC to EOC ONEI-040*Rev 28 Page 14 of 33 0
LL 4--
0 2) 0
")
0p 110 100 90
__RPS Trip SetpoinF_
80 ncore & Outcore Alarm---
70 60 50 40 30 20 10 0
-40
-35
-30
-25
-20
-15
-10
-5 0
5 Percent Axial Imbalance 10 15 20 25 30 35 40
ONEI-0400-70 Rev 28 Page 15 of 33 Oconee 3 Cycle 25 4 Pumps 3 Pumps Operational Rod Index Setpoints RI Insertion Setpoint
%FP No Inop Rod 1 Inop Rod 102.0 263.5 283.4 100.0 261.5 281.5 90.0 251.5 271.9 80.0 251.5 262.3 50.0 201.5 233.4 48.0 195.2 231.5 15.0 91.5 165.5 13.0 76.5 161.5 5.0 16.5 93.5 3.0 1.5 76.5 2.8 0.0 74.8 0.0 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 77.0 75.0 50.0 48.0 15.0 13.0 5.0 3.0 2.8 0.0 246.5 243.2 201.5 195.2 91.5 76.5 16.5 1.5 0.0 0.0 285.2 281.5 235.2 231.5 165.5 161.5 93.5 76.5 74.8 51.0
ONEI-0400-70 Rev 28 Page 16 of 33 Oconee 3 Cycle 25 Shutdown Margin Rod Index Setpoints 4 Pumps 3 Pumps
%FP 102.0 100.0 48.0 13.0 3.0 2.8 0.0 77.0 75.0 48.0 13.0 3.0 2.8 0.0 RI Insertion Setpoint No Inop Rod 1 Inop Rod 224.6 283.4 221.5 281.5 141.5 231.5 76.5 161.5 1.5 76.5 0.0 74.8 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 227.4 221.5 141.5 76.5 1.5 0.0 0.0 285.2 281.5 231.5 161.5 76.5 74.8 51.0
Oconee 3 Cycle 25 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 28 Page 17 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP7 102 100 99.8 24.8 100 100 63.5 101 100 99.0 24.0 100 100 62.5 100 100 98.2 23.2 100 100 61.5 99 100 97.5 22.5 100 100 60.5 98 100 96.7 21.7 100 100 59.5 97 100 95.9 20.9 100 100 58.5 96 100 95.2 20.2 100 100 57.5 95 100 94.4 19.4 100 100 56.5 94 100 93.6 18.6 100 100 55.5 93 100 92.9 17.9 100 100 54.5 92 100 92.1 17.1 100 100 53.5 91 100 91.3 16.3 100 100 52.5 90 100 90.6 15.6 100 100 51.5 89 100 89.8 14.8 100 100 51.5 88 100 89.0 14.0 100 100 51.5 87 100 88.2 13.2 100 100 51.5 86 100 87.5 12.5 100 100 51.5 85 100 86.7 11.7 100 100 51.5 84 100 85.9 10.9 100 100 51.5 83 100 85.2 10.2 100 100 51.5 82 100 84.4 9.4 100 100 51.5 81 100 83.6 8.6 100 100 51.5 80 100 82.9 7.9 100 100 51.5 79 100 82.1 7.1 100 100 49.8 78 100 81.3 6.3 100 100 48.2 77 100 80.6 5.6 100 100 46.5 76 100 79.8 4.8 100 100 44.8 75 100 79.0 4.0 100 100 43.2 74 100 78.2 3.2 100 100 41.5 73 100 77.5 2.5 100 100 39.8 72 100 76.7 1.7 100 100 38.2 71 100 75.9 0.9 100 100 36.5 70 100 75.2 0.2 100 100 34.8 69.8 100 75.0 0
100 100 34.5 69 100 73.8 0
100 100 33.2 68 100 72.3 0
100 100 31.5 67 100 70.7 0
100 100 29.8 66 100 69.2 0
100 100 28.2 65 100 67.7 0
100 100 26.5 64.1 100 66.3 0
100 100 25.0 63 100 64.6 0
100 99.1 24.1 62 100 63.0 0
100 98.2 23.2 61 100 61.5 0
100 97.4 22.4 60 100 60.0 0
100 96.6 21.6 59 100 58.4 0
100 95.8 20.8 58 100 56.9 0
100 94.9 19.9 57 100 55.3 0
100 94.1 19.1 56 100 53.8 0
100 93.2 18.2 55 100 52.3 0
100 92.4 17.4 54 100 50.7 0
100 91.6 16.6 53 100 49.2 0
100 90.8 15.8 52 100 47.7 0
100 89.9 14.9 51 100 46.1 0
100 89.1 14.1 50 100 44.6 0
100 88.2 13.2
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 11 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 3 Cycle 25 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 28 Page 18 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 49 100 43.0 0
100 86.7 11.7 48 100 41.5 0
100 85.1 10.1 47 100 39.6 0
100 83.5 8.5 46 100 37.8 0
100 82.0 7.0 45 100 35.9 0
100 80.4 5.4 44 100 34.1 0
100 78.8 3.8 43 100 32.2 0
100 77.2 2.2 42 100 30.4 0
100 75.7 0.7 41.6 100 29.6 0
100 75.0 0
41 100 28.5 0
100 73.2 0 '
40 100 26.6 0
100 70.1 0
39.1 100 25.0 0
100 67.3 0
39 99.9 24.9 0
100 66.9 0
38 99.0 24.0 0
100 63.8 0
37 98.0 23.0 0
100 60.6 0
36 97.1 22.1 0
100 57.5 0
35 96.2 21.2 0
100 54.3 0
34 95.2 20.2 0
100 51.2 0
33 94.3 19.3 0
100 48.1 0
32 93.4 18.4 0
100 44.9 0
31 92.5 17.5 0
100 41.8 0
30 91.5 16.5 0
100 38.6 0
29 90.6 15.6 0
100 35.5 0
28 89.7 14.7 0
100 32.4 0
27 88.8 13.8 0
100 29.2 0
26 87.8 12.8 0
100 26.1 0
25.7 87.5 12.5 0
100 25.0 0
25 86.9 11.9 0
99.0 24.0 0
24 86.0 11.0 0
97.4 22.4 0
23 85.0 10.0 0
95.8 20.8 0
22 84.1 9.1 0
94.2 19.2 0
21 83.2 8.2 0
92.7 17.7 0
20 82.2 7.2 0
91.1 16.1 0
19 81.3 6.3 0
89.5 14.5 0
18 80.4 5.4 0
88.0 13.0 0
17 79.5 4.5 0
86.4 11.4 0
16 78.5 3.5 0
84.8 9.8 0
15 77.6 2.6 0
83.2 8.2 0
14 76.7 1.7 0
79.5 4.5 0
13 75.8 0.8 0
75.8 0.8 0
12.8 75.0 0
0 75.0 0
0 12 69.0 0
0 69.0 0
0,
.11 61.5 0
0 61.5 0
0 10 54.0 0
0 54.0 0
0 9
46.5 0
0 46.5 0
0 8
39.0 0
0 39.0 0
0 7
31.5 0
0 31.5 0
0 6
24.0 0
0 24.0 0
0 5
16.5 0
0 16.5 0
0 4
9.0 0
0 9.0 0
0 3
1.5 0
0 1.5 0
0 2.8 0
0 0
0 0
0 2
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
% FP CRGP 5 CRGP 6 CRGP 7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Oconee 3 Cycle 25 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 28 Page 19 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 27.4 100 100 46.5 76.2 100 100 25.0 100 100 45.2 76 100 99.7 24.7 100 100 44.9 75 100 98.2 23.2 100 100 43.2 74 100 96.8 21.8 100 100 41.5 73
_100 95.3 20.3 100 100 39.9 72 100 93.8 18.8 100 100 38.2 71 100 92.3 17.3 100 100 36.5 70 100 90.8 15.8 100 100 34.9 69 100 89.4 14.4 100 100 33.2 68 100 87.9 12.9 100 100 31.5 67 100 86.4 11.4 100 100 29.9 66 100 84.9 9.9 100 100 28.2 65 100 83.4 8.4 100 100 26.5 64.1 100 82.1 7.1 100 100 25.0 63 100 80.5 5.5 100 99.1 24.1 62 100 79.0 4.0 100 98.3 23.3 61 100 77.5 2.5 100 97.4 22.4 60 100 76.0 1.0 100 96.6 21.6 59.3 100 75.0 0
100 96.0 21.0 59 100 74.1 0
100 95.8 20.8 58 100 71.1 0
100 94.9 19.9 57 100 68.2 0
100 94.1
.19.1 56 100 65.2 0
100 93.3 18.3 55 100 62.2 0
100 92.4 17.4 54 100 59.3 0
100 91.6 16.6 53 100 56.3 0
100 90.8 15.8 52 100 53.4 0
100 89.9 14.9 51 100 50.4 0
100 89.1 14.1 50 100 47.4 0
100 88.2 13.2 49 100 44.5 0
100 86.7 11.7 48 100 41.5 0
100 85.1 10.1 47 100 39.6 0
100 83.5 8.5 46 100 37.8 0
100 82.0 7.0 45 100 35.9 0
100 80.4 5.4 44 100 34.1 0
100 78.8 3.8 43 100 32.2 0
100 77.2 2.2 42 100 30.4 0
100 75.7 0.7 41.6 100 29.6 0
100 75.0 0
41 100 28.5 0
100 73.2 0
40 100 26.6 0
100 70.1 0
39.1 100 25.0 0
100 67.3 0
39 99.9 24.9 0
100 66.9 0
38 99 24.0 0
100 63.8 0
37 98 23.0 0
100 60.6 0
36 97.1 22.1 0
100 57.5 0
35 96.2 21.2 0
100 54.3 0
34 95.2 20.2 0
100 51.2 0
33 94.3 19.3 0
100 48.1 0
32 93.4 18.4 0
100 44.9 0
31 92.5 17.5 0
100 41.8 0
30 91.5 16.5 0
100 38.6 0
29 90.6 15.6 0
100 35.5 0
28 89.7 14.7 0
100 32.4 0
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
Oconee 3 Cycle 25 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 28 Page 20 of 33 RI = 300 is withdrawal limit at all power levels.
Oconee 3 Cycle 25 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 28 Page 21 of 33 0
0 Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 102 100 100 83.4 100 100 83.4 101
-- 100 100 82.5 100 100 82.5 100 100 100 81.5 100 100 81.5 99 100 100 80.5 100 100 80.5 98 100 100 79.6 100 100 79.6 97 100 100 78.6 100 100 78.6 96 100 100 77.7 100 100 77.7 95 100 100 76.7 100 100 76.7 94 100 100 75.7 100 100 75.7 93 100 100 74.8 100 100 74.8 92 100 100 73.8 100 100 73.8 91 100 100 72.8 100 100 72.9 90 100 100 71.9 100 100 71.9 89 100 100 70.9 100 100 70.9 88 100 100 70.0 100 100 70.0 87 100 100 69.0 100 100 69.0 86 100 100 68.0 100 100 68.1 85 100 100 67.1 100 100 67.1 84 100 100 66.1 100 100 66.1 83 100 100 65.2 100 100 65.2 82 100 100 64.2 100 100 64.2 81 100 100 63.2 100 100 63.3 80 100 100 62.3 100 100 62.3 79 100 100 61.3 100 100 61.3 78 100 100 60.3 100 100 60.4 77 100 100 59.4 100 100 59.4 76 100 100 58.4 100 100 58.4 75 100 100 57.5 100 100 57.5 74 100 100 56.5 100 100 56.5 73 100 100 55.5 100 100 55.6 72 100 100 54.6 100 100 54.6 71 100 100 53.6 100 100 53.6 70 100 100 52.7 100 100 52.7 69 100 100 51.7 100 100 51.7 68 100 100 50.7 100 100 50.7 67 100 100 49.8 100 100 49.8 66 100 100 48.8 100 100 48.8 65 100 100 47.8 100 100 47.8 64 100 100 46.9 100 100 46.9 63 100 100 45.9 100 100 45.9 62 100 100 45.0 100 100 45.0 61 100 100 44.0 100 100 44.0 60 100 100 43.0 100 100 43.0 59 100 100 42.1 100 100 42.1 58 100 100 41.1 100 100 41.1 57 100 100 40.2 100 100 40.2 56 100 100 39.2 100 100 39.2 55 100 100 38.2 100 100 38.2 54 100 100 37.3 100 100 37.3 53 100 100 36.3 100 100 36.3 52 100 100 35.3 100 100 35.3 51 100 100 34.4 100 100 34.4 50 100 100 33.4 100 100 33.4 49 100 100 32.5 100 100 32.5 48 100 100 31.5 100 100 31.5
%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Continued on next page.
/
Oconee 3 Cycle 25 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 28 Page 22 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint
%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100.
87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100.
81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0
100 75.0 0
19 100 73.5 0
100 73.5 0
18 100 71.5
.0 100 71.5 0
17 100 69.5 0
100
.69.5 0
16 100 67.5 0
100 67.5 0
15 100 65.5 0
100 65.5 0
14 100 63.5 0
100 63.5 0
13 100 61.5 0
100 61.5 0
12 100 53.0 0
100 53.0 0
11 100 44.5 0
100 44.5 0
10 100 36.0 0
100 36.0 0
9 100 27.5 0
100 27.5 0
8.7 100 25.0 0
100 25.0 0
8 97.0 22.0 0
97.0 22.0 0
7 92.8 17.8 0
92.8 17.8 0
6 88.5 13.5 0
88.5 13.5 0
5 84.2 9.2 0
84.2 9.2 0
4 80.0 5.0 0
80.0 5.0 0
3 75.8 0.8 0
75.8 0.8 0
2.8 75.0 0
0 75.0 0
0 2
68.0 0
0 68.0 0
0 1
59.5 0
0 59.5 0
0 0
51.0 0
0 51.0 0
0
% FP
.CRGP 5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.
Oconee 3 Cycle 25 Rod Index Setpoints 3 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 28 Page 23 of 33 0
Shutdown Margin Setpoint Operational Alarm Setpoint
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 100 100 81.5 74 100 100 79.6 100 100 79.6 73 100 100 77.8 100 100 77.8 72 100 100 75.9 100 100 75.9 71 100 100 74.1 100 100 74.1 70 100 100 72.2 -
100 100 72.2 69 100 100 70.4 100 100 70.4 68 100 100 68.5 100 100 68.5 67 100 100 66.7 100 100 66.7 66 100 100 64.8 100 100 64.8 65 100 100 63.0 100 100 63.0 64 100 100 61.1 100 100 61.1 63 100 100 59.3 100 100 59.3 62 100 100 57.4 100 100 57.4 61 100 100 55.6 100 100 55.6 60 100 100 53.7 100 100 53.7 59 100 100 51.9 100 100 51.9 58 100 100 50.0 100 100 50.0 57 100 100 48.2 100 100 48.2 56 100 100 46.3 100 100 46.3 55 100 100 44.5 100 100 44.5 54 100 100 42.6 100 100 42.6 53 100 100 40.8 100 100 40.8 52 100 100 38.9 100 100 38.9 51 100 100 37.1 100 100 37.1 50 100 100 35.2 100 100 35.2 49 100 100 33.4 100 100 33.4 48 100 100 31.5 100 100 31.5 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2
% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint 0
RI = 300 is withdrawal limit at all power levels.
Continued on next page.
I/
Oconee 3 Cycle 25 Rod Index Setpoints 3 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 28 Page 24 of 33 0
0 RI = 300 is withdrawal limit at all power levels.
I,
0 10 II ONEI-040Oev 28 Page 25 of 33 Oconee 3 Cycle 25 l
105 100 95 90 85 80 75 70 65 CL 6 0 55 0a 50 C.)
ot 45 40 35 30 25 20 15 10 5
Rod Position Setpoints rable Rods, 4 Pump Flov 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
10 10 20 30 40 50 60 70 80 90 100 rGroup 71 Control Rod Position, % WD
I Oconee 3 Cycle 25 I1@
ONEI-040 ev 28 Page 26 of 33 L105 105 Fll 100 Control Rod Position Setpoints 9No Inoperable Rods, 3 Pump Flow'1 9 5..
- 4 Q-LL (D
13_
0
],)
90 85 80 75 70 65 60 55 50 45 40 35 30 25 20
-ff !
I.
1]
1l1 N 1 44 4
II It Ii 11 N
JJlt' Unacceptable Operation 11 100 95 90 85 ft~ n4~
Restricted Operation T-T --
H N
1 H
80 75 70 65 60 55 50 45 40 35 HIMI 1
Hillq
[II
-HE 1 H H-h1 H41 0
-H HU Acceptable 30 Operation 125 II A I I IL IL j if fifi
-20
-HEtI II 15-10 5
0-N N
Mi fl2 H+Hft I
Group 6
15 25 35 45 55 65
- 4 N 1I 15 10 5
0 5
75 85 951 f*
0 10 20 30 40 50 60 70 80 90 100 I
j0 10 20 30 40 50 60 70 80 90 100 1 Group 7 Group 5 Control Rod Position, % WD
Oconee 3 Cycle 25 i; I Fiiiiif 1
A....
I ILL
]Jill 11 HtHtt E
I 1 fill m
i Jill to I I if I
I titith F
H+
HUf i I I if E
I I
17 L -1 ILI EB]
i
-r t
F J
-4 I
II L
105 100 Oconee 3 Cycle 25 Control Rod Position Setpoints FInoprablod, 3 Pump Flow I 1 95 #..........
IIliII I!am ONEI-04@* Rev 28 Page 28 of 33 105 100 95 90 85 80 CL a) 0 IL 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 tl Ii Unacceptable Operation I I II Hit!
Acceptable Operation 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
5 35 45 55 65 75 85 95 III 5
15 25 f
0 H
I I
I I
I I I I + I I I 0
10 20 30 40 50 60 70 80 90 100
........T.........T.........7..... I i
IIII Ill i
I I I
I I
t I j I I I
II II I
I
[II II I II I
iii*
I+
+
0 I0 10 20 30 40 50 60 70 80 90 100 I Group 7i I Group5 5 Control Rod Position, % WD
ONEI-0400-70 Rev 28 Page 29 of 33 Oconee 3 Cycle 25 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.
References provided in section 1 of this COLR identify the sources for the data which follows.
Information provided in in plant procedUresj Core Power Level, Quadrant Power T Core Outl p
11 2C 21 2
2:
%FP 3(
ilt, %
Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State T
)-100 0-30 30-10' 5.42 10.00 9.44 ransient 0
0-30 12.00 Maximum 0 - 100 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 et Pressure Reactor Coolant Outlet Temperature, *F sia 3 RCS Pumps 4 RCS Pumps 800 581.0 578.3 900 590.0 587.3 000 598.9 596.3 100 607.9 605.2 200 616.9 614.2 300 625.9 623.2 0
/
ONEI-0400-70 Rev 28 Page 30 of 33 Oconee 3 Cycle 25 Axial Power Imbalance Protective Limits Referred to by TS 2.1.1 fo*
f** ***
Use I
4 Pumps
%FP 0.0 80.0 87.8 90.0 100.0 109.4 109.4 100.0 90.0 80.0 0.0 0.0 60.1 77.0 81.7 81.7 77.0 62.3 0.0 RPS Operational
-35.0
-35.0
-12.1 14.4 35.0 35.0
-35.0
-35.0
-12.1 14.4 35.0 35.0
-39.5
-39.5
-37.8
-25.6 28.4 39.5 39.5 39.5
-39.5
-39.5 39.5 39.5 3 Pumps
ONEI-0400-70 Rev 28 Page 31 of 33 Oconee 3 Cycle 25 Rod Index Limits Referred to by TS 3.2.1 Operational RI Shutdown Margin RI Insertion Limit
%FP Insertion Limit No Inop Rod 1 Inop Rod 4 Pumps 3 Pumps 102 100 90 80 50 15 5
77 50 15 5
262 260 250 250 200 90 0
245 200 90 0
220 140 75 0
220 140 75 0
280 230 160 75 280 230 160 75 RI Withdrawal Limit 300 300 300 300 300 300 300 300 300 300 300
ONEI-0400-70 Rev 28 Page 32 of 33 Oconee 3 Cycle 25 LOCA Limits
~Not for Plant ~Use I
Core Elevation Feet LOCA LHR kw/ft Limit Versus Burnup Mk-B11 Fuel 0.000 2.506 4.264 6.021 7.779 9.536 12.00 0 GWd/mtU 16.2 17.1 17.2 17.3 17.2 17.1 16.2 0 GWd/mtU 16.7 17.6 17.8 17.8 17.8 17.3 16.4 40 GWd/mtU 16.2 17.1 17.2 17.3 17.2 17.1 16.2 40 GWd/mtU 16.7 17.6 17.8 17.8 17.8 17.3 16.4 62 GWd/mtU 11.8 11.8 11.8 11.8 11.8 11.8 11.8 Mk-B-HTP 0.000 2.506 4.264 6.021 7.779 9.536 12.00
ONEI-0400-70 Rev 28 Page 33 of 33 Oconee 3 Cycle 25 D
4 RCP Operation -Loop Average Temp., TF 3 RCP Operation -Loop Average Temp., 'F Alcold, T F Tavg (Analytical)
]Tavg (Analytical) 0.0___
<8.
<5~81.0 0.1
<581.0
<581.0 0.2
<58 1.1
<581.0 0.3
<581.1
<58 1.1 0.4
<581.2
<581.1 0.5
<581.2
<581.1 0.6
<581.2
<581.1 0.7
<581.3
<581.2 0.8
<581.3
<581.2 0.9
<581.3
<581.2 1.0
<581.4
<581.2 1.1
<581.4
<581.2 1.2
<581.5
<581.3 1.3
<581.5
<581.3 1.4
<581.5
<581.3 1.5
<581.6
<581.3 1.6
<581.6
<581.4 1.7
.<581.6
<581.4 1.8
<581.7
<581.4 1.9
<581.7
<581.4 2.0
<581.8
<581.4 2.1
<581.8
<581.5 2.2
<581.8
<581.5 2.3
<581.9
<581.5 2.4
<581.9
<581.5 2.5
<582.0
<581.6 2.6
<582.0
<581.6 2.7
<582.0
.<581.6 2.8
<582A
<581.6 2.9
<582.1
<581.6 3.0
<582.1
<581.7 3.1
<582.2
<581.7 3.2
<582.2
<581.7 3.3
<582.3
<581.7 3.4
<582.3
<581.7 3.5
<582.3
<581.8 3.6
<582.4
<581.8 3.7
.<582.4
<581.8 3.8
<582.4
<581.8 3.9
<582.5
<581.9 4.0
<582.5
<581.9 4.1
<582.6
<581.9 4.2
<582.6
<581.9 4.3
<582.6
<581.9 4.4
<5 82.7
<582.0 4.5
<582.7
<582.0 4.6
<582.7
<582.0 4.7
<582.8
<582.0 4.8<582.8
<582.1 4.9
<582.9
<582.1 5.0 11<582.9
<582.1 0*
/
DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIURITY SuperRush THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW
- 1) 00813 DOC MGMT EC04T ORIGINAL
- 3) 06700 ONS MANUAL MASTER FILE ON03DM
- 4) 06937 R R ST CLAIR EC08G FOR INFORMATION ONLY Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE NUCLEAR GENERAL OFFICE OCONEE NUCLEAR STATION RESP GROUP: NE WORK ITEM: EXEMPTION M-5 RECORD RETENTION: 003587 OCONEE 3 CYCLE 25 CORE OPERATING LIMITS REPORT Page 1 of 1 Date:
04/16/09 Document Transmittal #:
DUK091060021 QA CONDITION E Yes [
OTHER ACKNOWLEDGEMENT REQUIRED
--] Yes IF OA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
Duke Energy P.O. Box 1006 Energy Center EC04T Charlotte, N.C.
28201-1006 Rec'd By Date DOCUMENT NO ONEI-0400-070 SEE REMARKS QA COND REV #/DATE DISTR CODE 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 TOTi 1
028 04/16/09 NOMD-27 X
1i Vi VI 3
I1
//
/I
/I REMARKS:
DUKE DOCUMENT RELEASE EXEMPT FROM NUCLEAR MODIFICATION PRO RAM REFERENCE PAGE 3 FOR FILING INSTRUCTIONS THOMAS C GEER NUCLEAR STATION ENGR MANAGER GS-SVP NUCLEAR SUPPORT BY:
L C JAMES LCJ/TER EC08G