ML12300A419

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report (Colr), Cycle 27
ML12300A419
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/25/2012
From: Gillespie T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONEI-0400-70, Rev 33
Download: ML12300A419 (36)


Text

Duke T. PRESTON GILLESPIE, Jr.

Vice President Energy, Oconee Nuclear Station Duke Energy ONO1 VP / 7800 Rochester Hwy.

Seneca, SC 29672 a.1-U 72 -.1<ý a 864-873-4208 fax T.Gillespie@duke-energy.com October 25, 2012 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Site Docket Number 50-287 Core Operating Limits Report (COLR)

Attached, pursuant to Oconee Technical Specification 5.6.5.d, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 27, ONEI-0400-70, Revision 33.

If you have any questions, please direct them to Judy Smith at 864-873-4309.

Sincerely, T. Preston Gillespie, Jr.

Vice President Oconee Nuclear Station Attachment www. duke-energy.corn

U.S. Nuclear Regulatory Commission October 25, 2012 Page 2 xc w/att: Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 John Boska (By electronic mail only)

U.S. Nuclear Regulatory Commission One White Flint North, M/S O-8G9A 11555 Rockville Pike Rockville, MD 20852-2746 Senior Resident Inspector Oconee Nuclear Site

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO SuperRush THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS Date: 10111112 OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK122850048

1) 00813 DOC MGMT EC04T ORIGINAL
2) 06358 ONS REGUL COMPLIANCE ON03RC Duke Energy QA CONDITION N Yes E] No
3) 06700 ONS MANUAL MASTER FILE ON03DM DOCUMENT TRANSMITTAL FORM OTHER ACKNOWLEDGEMENT REQUIRED [] Yes
4) 06937 R RST CLAIR EC08G IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE NUCLEAR GENERAL OFFICE Duke Energy OCONEE NUCLEAR STATION P.O. Box 1006 UNIT 3 Energy Center EC04T RECORD RETENTION: 421734 Charlotte, N.C. 28201-1006 OCONEE 3 CYCLE 27 CORE OPERATING LIMITS REPORT Rec'd By Page 1 of I Date DOCUMENT NO QACOND REV #1 DATE DISTR CODE I 2 3 4 5 6 7 8 9 10 111 12 113 14 15 TOTAL ONEI-0400-070 I 033 10/11/12 NOMD-27 V1 Vi Vi

_________________________________________________________________ - ____________ .1 £ REMARKS: DUKE DAVID A BAXTER DOCUMENTS CREATED UNDER EDM-501 ARE EXCLUDED FROM THE EDM-601 PROCESS PER NSD-301, SECTION 2.4. THEREFORE, THE EXEMPTION CODE VICE PRESIDENT OR PIP NUMBER REQUIRED BY EDM-601 IS NOT REQUIRED FOR NUCLEAR ENGINEERING THIS DOCUMENT. BY:

T J ROGERS TJR/JAD EC08G

ONEI-0400-70 Rev 33I Page 1 of 33 Duke Energy Oconee 3 Cycle 27 Core Operating Limits Report QA Condition I Prepared By: T. J. Roger.----tZ~cz Date: Om - ( )L2M, SI Reviewed By: W. D. Broome i) 11 ' & ..- Date: Oc- 10 l2 OLz.

CDR By: A.R. Bingham A,,l---- - to Date: C) (-.,+ *oj)

Approved By: R.R. St.Clair 4ýý Date: O"/10, 2 2...

Document No. / Rev. ONEI-0400-70 Rev. 33 Date October 2012 Page No. Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By: R.R St.Clair WVV ,2 Date: JiM/Azo,/2.

(Sponsor)

CATAWBA Inspection Waived MCE (Mechanical & Civil) El Inspected By/Date:

RES (Electrical Only) Inspected By/Date:

RES (Reactor) [] Inspected By/Date:

MOD I] Inspected By/Date:

Other ( ) [] Inspected By/Date:

OCONEE Inspection Waived MCE (Mechanical & Civil) 0 Inspected By/Date:

RES (Electrical Only) E9 Inspected By/Date:

RES (Reactor) Inspected By/Date:

MOD Inspected By/Date:

Other ( ) Inspected By/Date:

MCGUIRE Inspection Waived MCE (Mechanical & Civil) E] Inspected By/Date:

RES (Electrical Only) [E Inspected By/Date:

RES (Reactor) L] Inspected By/Date:

MOD F1 Inspected By/Date:

Other ( ) [] Inspected By/Date:

ONEI-0400-70 Rev 331 Page 3 of 33 Oconee 3 Cycle 27 Core Operating Limits Report Insertion Sheet for Revision 33 I I This revision is not valid until the end of operation for Oconee 3 Cycle 26.

Remove these Revision 32 pages Insert these Revision 33 pages I 1 - 33 1 -33 Revision Log Effective Pages Pages Pages Total Effective Revision Date Revised Added Deleted Pages Oconee 3 Cycle 27 revisions below 33 Oct 2012 1-33 - 33 I 32 May 2012 1-33 33 O0conee 3 Cycle 26 revisions below 31 Oct 2010 1-33 - 33 Oconee 3 Cycle 25 revisions below 30 May 2009 1-33 33 29 May 2009 1-33 33 28 Apr2009 1-33 - 33 Oconee 3 Cycle 24 revisions below 27 Mar2009 1-33 - 33 26 Nov 2007 1-33 - 33 25 Nov 2007 1-33 33 Oconee 3 Cycle 23 revisions below 24 May 2006 1-33 - 33 Oconee 3 Cycle 22 revisions below 23 Mar 2006 I - 4, 6, 15 - 16, 21, 27, 31 - 33 22 Mar 2005 1 -5 - 33 21 Nov 2004 1 -33 - 33

ONEI-0400-70 Rev 331 Page 4 of 33 Oconee 3 Cycle 27

  • 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for 03C27 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in References 1 through 11. The RPS protective limits and maximum allowable setpoints are documented in References 12 through 14. These limits are validated for use in 03C27 by References 15 through 17. The 03C27 analyses assume a design flow of 108.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.714, an axial peaking factor (Fz) of 1.5, and an EOC (< 100 ppmB)

Tavg reduction for up to 10°F provided 4 RCPs are in operation and Tavg does not decrease below 569°F.

The error adjusted core operating limits included in Section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 03C27 reload core.

1.1 References

1. Oconee Nuclear Design Methodology Using CASMO-4 / SIMULATE-3, DPC-NE-1006-PA, SE dated August 2, 2011.
2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1 002-A, SE dated July 21, 2011.
3. Oconee Nuclear Station Reload Design Methodology, NFS-1 001-A, SE dated July 21, 2011.
4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003-PA, SE dated July 21, 2011.
5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 4a, December 2008.
6. Fuel Mechanical Reload Analysis Methodology Using TACO3 and GDTACO, DPC-NE-2008-PA, SE dated July 21, 2011.
7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, SE dated July 21, 2011.
8. Thermal Hydraulic Transient Analysis Methodology, DPC-NE-3000-PA, SE dated July 21, 2011.
9. BAW-10192P-A, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, Revision 0, SER dated February 18, 1997.
10. BAW-1 01 64P-A, Rev. 4 and 6, RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis, SERs dated April 9, 2002 and June 25, 2007, respectively.
11. BAW-1 0227P-A, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, Rev. 1, June 2003 (SER to BAW-10186P-A dated June 18, 2003).
12. Digital RPS RCS Pressure &Temperature Trip Function Uncertainties and Variable Low RCS Pressure Safety Limit, OSC-8828, Revision 3, October 2010.
13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 4, April 2011.
14. ATc and EOC Reduced Tavg Operation, OSC-7265, Revision 1, June 2002.
15. 03C27 Maneuvering Analysis, OSC-10517,. Revision 2, October 2012.
16. 03C27 Specific DNB Analysis, OSC-10526, Revision 0, January 2012.
17. 03C27 Reload Safety Evaluation, OSC-10535, Revision 1, May 2012.

ONEI-0400-70 Rev 331 Page 5 of 33 Oconee 3 Cycle 27 Miscellaneous Setpoints BWST boron concentration shall be greater than 2500 ppm and less than 3000 ppm.

Referred to by TS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2500 ppm.

Referred to by TS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.

Referred to byTS SLC 16.5.13.

CFT boron concentration shall be greater than 2300 ppm. The average boron concentration in the CFTs shall be less than 4000 ppm. Referred to by TS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1% Ak/k.

Referred to by TS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than: MTC x 10-4 Linear interpolation is valid within the table provided. Ap / °F  % FP Referred to by TS 3.1.3. +0.70 0

+0.525 20 0.00 80 0.00 100 0.00 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1. 4 RCP: measured hot leg pressure >2125 psig 3 RCP: measured hot leg pressure _ 2125 psig DNB parameter for RCS loop average temperature shall be: Max Loop Tavg (inc 2°F unc)

Referred to by TS 3.4.1. ATc, *F 4 RCP Op 3 RCP Op 0 581.0 581.0 The measured Tavg must be less than COLR limits minus 1 581.4 581.2 instrument uncertainty. ATc is the setpoint value selected by 2 581.8 581.4 the operators. Values are expanded by linear interpolation on 3 582.1 581.7 page 33 of this document without instrument uncertainty. 4 582.5 581.9 5 582.9 582.1

  • This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be: 4 RCP: Measured > 108.5 %df Referred to by TS 3.4.1. 3 RCP: Measured > 74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.

Referred to by TS 3.2.1.

Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.

Referred to by TS 3.2.1.

Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).

ONEI-0400-70 Rev 331 Page 6 of 33 Oconee 3 Cycle 27 Steady State Operating Band Rod Index APSR %WD EFPD Min Max Min Max 0 to 595 292 +/- 5 300 30 40 595 to EOC 292 +/- 5 300 100 100 Quadrant Power Tilt Setpoints Steady State Transient Maximum Core Power Level, %FP 30-100 0-30 30-100 0-30 0-100 Full Incore 3.50 7.61 7.11 9.40 16.55 Out of Core 2.35 6.09 5.63 7.72 14.22 Backup Incore 2.25 3.87 3.63 4.81 10.07 Referred to by TS 3.2.3 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).

ONEI-0400-70 Rev 331 Page 7 of 33 Oconee 3 Cycle 27 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 P = 2355 psig T=618 F 2300 2200

_o 210 S2100 Acceptable U/)

Operation 0L

~P = 11.14 *Tout -470 CU 0

0

~.2000 Unacceptable 1900 Operation P = 1800 psig 1800 T=584 F 1700 I I i 540 560 580 600 620 640 Reactor Coolant Outlet Temperature, OF

ONEI-0400-70 Rev 331 Page 8 of 33 Oconee 3 Cycle 27 RPS Power Imbalance Setpoints

% FP  % Imbalance 4 Pumps 0.0 -33.0 90.4 -33.0 107.9 -14.4 107.9 14.4 90.4 33.0 0.0 33.0 3 Pumps 0.0 -33.0 63.1 -33.0 80.6 -14.4 80.6 14.4 63.1 33.0 0.0 33.0 Maximum Allowable RPS Power Imbalance Limits

% FP  % Imbalance 4 Pumps 0.0 -35.0 90.0 -35.0 Pmax => 109.4 -14.4 Pmax => 109.4 14.4 90.0 35.0 0.0 35.0 3 Pumps 0.0 -35.0 62.3 -35.0 Pmax=> 81.7 -14.4 Pmax => 81.7 14.4 62.3 35.0 0.0 35.0

ONEI-0400-70 Rev 331 Page 9 of 33 Oconee 3 Cycle 27 Operational Power Imbalance Setpoints Full Backup Out of

%FP Incore Incore Core 4 Pumps 0.0 -28.0 -27.3 -28.0 80.0 -28.0 -27.3 -28.0 90.0 -28.0 -27.3 -28.0 100.0 -17.8 -17.8 -17.8 102.0 -15.7 -15.7 -15.7 102.0 15.7 15.7 15.7 100.0 17.8 17.8 17.8 90.0 28.0 28.0 28.0 80.0 28.0 28.0 28.0 0.0 28.0 28.0 28.0 3 Pumps 0.0 -28.0 -27.3 -28.0 63.1 -28.0 -28.0 63.7 -27.3 77.0 -13.2 -13.2 -13.2 77.0 13.2 13.2 13.2 63.1 28.0 63.1 28.0 28.0 0.0 28.0 28.0 28.0

ONEI-0400-70 Rev 331 Page 10 of 33 Oconee 3 Cycle 27 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC

% FP I RPS Trip Full Incore Alarm I Out of Core Alarm 107.9 -14.4 14.4 107.0 -15.4 15.4 106.0 -16.4 16.4 105.0 -17.5 17.5 104.0 -18.5 18.5 103.0 -19.6 19.6 102.0 -20.7 20.7 -15.7 15.7 -15.7 15.7 "14 -7 101.0 -21.7 -16.7 16.7 -16.7 16.7 100.0 -22.8 22.8 -17.8 17.8 -17.8 17.8 99.0 -23.9 23.9 -18.8 18.8 -18.8 18.8 98.0 -24.9 24.9 -19.8 19.8 -19.8 19.8 97.0 -26.0 26.0 -20.9 20.9 -20.9 20.9 96.0 -27.0 27.0 -21.9 21.9 -21.9 21.9 95.0 -28.1 28.1 -22.9 22.9 -22.9 22.9 94.0 -29.2 29.2 -23.9 23.9 -23.9 23.9 93.0 -30.2 30.2 -24.9 24.9 -24.9 24.9 92.0 -31.3 31.3 -26.0 26.0 -26.0 26.0 91.0 -32.3 32.3 -27.0 27.0 -27.0 27.0 90.4 -33.0 33.0 -27.6 27.6 -27.6 27.6 90.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 89.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 88.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 87.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 86.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 85.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 84.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 83.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 82.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 81.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 80.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 0.0 -33.0 33.0 -28.0 28.0 -28.0 28.0

% FP I RPS Trip Full Incore Alarm I Out of Core Alarm ONEI-0400-70 Rev 331 Page 11 of 33 Oconee 3 Cycle 27 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC

% FP I RPS Trip I Full Incore Alarm I Out of Core Alarm 80.6 -14.4 14.4 80.0 -15.0 15.0 79.0 -16.1 16.1 78.0 -17.1 17.1 77.0 -18.2 18.2 -13.2 13.2 -13.2 13.2 76.0 -19.3 19.3 -14.3 14.3 -14.3 14.3 75.0 -20.3 20.3 -15.3 15.3 -15.3 15.3 74.0 -21.4 21.4 -16.4 16.4 -16.4 16.4 73.0 -22.4 22.4 -17.4 17.4 -17.4 17.4 72.0 -23.5 23.5 -18.5 18.5 -18.5 18.5 71.0 -24.6 24.6 -19.6 19.6 -19.6 19.6 70.0 -25.6 25.6 -20.6 20.6 -20.6 20.6 69.0 -26.7 26.7 -21.7 21.7 -21.7 21.7 68.0 -27.8 27.8 -22.8 22.8 -22.8 22.8 67.0 -28.8 28.8 -23.8 23.8 -23.8 23.8 66.0 -29.9 29.9 -24.9 24.9 -24.9 24.9 65.0 -30.9 30.9 -25.9 25.9 -25.9 25.9 64.0 -32.0 32.0 -27.0 27.0 -27.0 27.0 63.1 -33.0 33.0 -28.0 28.0 -28.0 28.0 63.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 62.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 61.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 60.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 0.0 -33.0 33.0 -28.0 28.0 -28.0 28.0

% FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 33 I Page 12 of 33 Oconee 3 Cycle 27 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120.0

(-33.0,90.4)

(-33.0,63.1)

-40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 Percent Power Imbalance

Oconee 3 Cycle 27 ONEI-0400-70 Rev 33 Imbalance Setpoints for 4 Pump Operation, BOC to EOC Page 13 of 33 110.0 100.0 I RPS Trip Setpoint nce & eetpoint _.

90.0 Incore & Outcore Alarm 80.0 70.0 0

C- 60.0 LiL "E 50.0 C.)

0,.

40.0 30.0 20.0 10.0 0.0 &a- -M4M

-40 -35 -30 20 -15 -10 -5 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

0 S0 Oconee 3 Cycle 27 ONEI-0400-70 Rev 33 Imbalance Setpoints for 3 Pump Operation, BOC to EOC Page 14 of 33 110 --

100 I

90 80 RPS Trip Setpoint RPS Trip Setpoint 70 Incore & Outcore Alarm 0

C_ 60 50 0

E 50 13.

40 30 30 20 10 0 bia

-40 -35 -30 -20 -15 -10 -5 5 15

-25 0 10 20 25 30 35 40 Percent Axial Imbalance

ONEI-0400-70 Rev 331 Page 15 of 33 Oconee 3 Cycle 27 Operational Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No nop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 263.5 283.4 300 100.0 261.5 281.5 300 90.0 251.5 271.9 300 80.0 241.5 262.3 300 50.0 201.5 233.4 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 237.5 285.2 300 75.0 234.8 281.5 300 50.0 201.5 235.2 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

ONEI-0400-70 Rev 331 Page 16 of 33 Oconee 3 Cycle 27 Shutdown Margin Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No nop Rod 1 (nop Rod Setpoint 4 Pumps 102.0 224.6 283.4 300 100.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 227.4 285.2 300 75.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

Oconee 3 Cycle 27 ONEI-0400-70 Rev 331 Rod Index Setpoints Page 17 of 33 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 99.8 24.8 100 100 63.5 101 100 99.0 24.0 100 100 62.5 100 100 98.2 23.2 100 100 61.5 99 100 97.5 22.5 100 100 60.5 98 100 96.7 21.7 100 100 59.5 97 100 95.9 20.9 100 100 58.5 96 100 95.2 20.2 100 100 57.5 95 100 94.4 19.4 100 100 56.5 94 100 93.6 18.6 100 100 55.5 93 100 92.9 17.9 100 100 54.5 92 100 92.1 17.1 100 100 53.5 91 100 91.3 16.3 100 100 52.5 90 100 90.6 15.6 100 100 51.5 89 100 89.8 14.8 100 100 50.5 88 100 89.0 14.0 100 100 49.5 87 100 88.2 13.2 100 - 100 48.5 86 100 87.5 12.5 100 100 47.5 85 100 86.7 11.7 100 100 46.5 84 100 85.9 10.9 100 100 45.5 83 100 85.2 10.2 100 100 44.5 82 100 84.4 9.4 100 100 43.5 81 100 83.6 8.6 100 100 42.5 80 100 82.9 7.9 100 100 41.5 79 100 82.1 7.1 100 100 40.2 78 100 81.3 6.3 100 100 38.8 77 100 80.6 5.6 100 100 37.5 76 100 79.8 4.8 100 100 36.2 75 100 79.0 4.0 100 100 34.8 74 100 78.2 3.2 100 100 33.5 73 100 77.5 2.5 100 100 32.2 72 100 76.7 1.7 100 100 30.8 71 100 75.9 0.9 100 100 29.5 70 100 75.2 0.2 100 100 28.2 69.8 100 75.0 0 100 100 27.9 69 100 73.8 0 100 100 26.8 68 100 72.3 0 100 100 25.5 67.6 100 71.7 0 100 100 25.0 67 100 70.7 0 100 99.6 24.6 66 100 69.2 0 100 98.9 23.9 65 100 67.7 0 100 98.2 23.2 64 100 66.1 0 100 97.6 22.6 63 100 64.6 0 100 96.9 21.9 62 100 63.0 0 100 96.2 21.2 61 100 61.5 0 100 95.6 20.6 60 100 60.0 0 100 94.9 19.9 59 100 58.4 0 100 94.2 19.2 58 100 56.9 0 100 93.6 18.6 57 100 55.3 0 100 92.9 17.9 56 100 53.8 0 100 92.2 17.2 55 100 52.3 0 100 91.6 16.6 54 100 50.7 0 100 90.9 15.9 53 100 49.2 0 100 90.2 15.2 52 100 47.7 0 100 89.6 14.6 51 100 46.1 0 100 88.9 13.9 50 100 44.6 0 100 88.2 13.2

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 3 Cycle 27 ONEI-0400-70 Rev 331 Rod Index Setpoints Page 18 of 33 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 49 100 43.0 0 100 86.7 11.7 48 100 41.5 0 100 85.1 10.1 47 100 39.6 0 100 83.5 8.5 46 100 37.8 0 100 82.0 7.0 45 100 35.9 0 100 80.4 5.4 44 100 34.1 0 100 78.8 3.8 43 100 32.2 0 100 77.2 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0 100 75.0 0 41 100 28.5 0 100 73.2 0 40 100 26.6 0 100 70.1 0 39.1 100 25.0 0 100 67.3 0 39 99.9 24.9 0 100 66.9 0 38 99.0 24.0 0 100 63.8 0 37 98.0 23.0 0 100 60.6 0 36 97.1 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0 100 32.4 0 27 88.8 13.8 0 100 29.2 0 26 87.8 12.8 0 100 26.1 0 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 15 77.6 2.6 0 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 0 13 75.8 0.8 0 75.8 0.8 0 12.8 75.0 0 0 75.0 0 0 12 69.0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 7 31.5 0 0 31.5 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5 0 0 4 9.0 0 0 9.0 0 0 3 1.5 0 0 1.5 0 0 2.8 0 0 0 0 0 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

% FP CRGP5 CRGP6 CRGP7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 27 ONEI-0400-70 Rev 331 Rod Index Setpoints Page 19 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Marqin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 27.4 100 100 37.5 76.2 100 100 25.0 100 100 36.4 76 100 99.7 24.7 100 100 36.1 75 100 98.2 23.2 100 100 34.8 74 100 96.8 21.8 100 100 33.5 73 100 95.3 20.3 100 100 32.1 72 100 93.8 18.8 100 100 30.8 71 100 92.3 17.3 100 100 29.5 70 100 90.8 15.8 100 100 28.1 69 100 89.4 14.4 100 100 26.8 68 100 87.9 12.9 100 100 25.5 67.6 100 87.4 12.4 100 100 25.0 67 100 86.4 11.4 100 99.6 24.6 66 100 84.9 9.9 100 98.9 23.9 65 100 83.4 8.4 100 98.2 23.2 64 100 82.0 7.0 100 97.6 22.6 63 100 80.5 5.5 100 96.9 21.9 62 100 79.0 4.0 100 96.2 21.2 61 100 77.5 2.5 100 95.6 20.6 60 100 76.0 1.0 100 94.9 19.9 59.3 100 75.0 0 100 94.4 19.4 59 100 74.1 0 100 94.2 19.2 58 100 71.1 0 100 93.6 18.6 57 100 68.2 0 100 92.9 17.9 56 100 65.2 0 100 92.2 17.2 55 100 62.2 0 100 91.6 16.6 54 100 59.3 0 100 90.9 15.9 53 100 56.3 0 100 90.2 15.2 52 100 53.4 0 100 89.6 14.6 51 100 50.4 0 100 88.9 13.9 50 100 47.4 0 100 88.2 13.2 49 100 44.5 0 100 86.7 11.7 48 100 41.5 0 100 85.1 10.1 47 100 39.6 0 100 83.5 8.5 46 100 37.8 0 100 82.0 7.0 45 100 35.9 0 100 80.4 5.4 44 100 34.1 0 100 78.8 3.8 43 100 32.2 0 100 77.2 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0 100 75.0 0 41 100 28.5 0 100 73.2 0 40 100 26.6 0 100 70.1 0 39.1 100 25.0 0 100 67.3 0 39 99.9 24.9 0 100 66.9 0 38 99 24.0 0 100 63.8 0 37 98 23.0 0 100 60.6 0 36 97.1 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0 100 32.4 0

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 3 Cycle 27 ONEI-0400-70 Rev 331 Rod Index Setpoints Page 20 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 27 8.8 13.8 0 - 00 __. 29.2 0 26 87.8 12.8 0 100 26.1 0 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 _0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 15 77.6 2.6 0 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 0 13 75.8 0.8 0 75.8 0.8 0 12.8 75.0 0 0 75.0 0 0 12 69.0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 7 31.5 0 0 31.5 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5 0 0 4 9.0 0 0 9.0 0 0 3 1.5 0 0 1.5 0 0 2.8 0 0 0 0 0 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 27 ONEI-0400-70 Rev 331 Rod Index Setpoints Page 21 of 33 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 100 83.4 100 100 83.4 101 100 100 82.5 100 100 82.5 100 100 100 81.5 100 100 81.5 99 100 100 80.5 100 100 80.5 98 100 100 79.6 100 100 79.6 97 100 100 78.6 100 100 78.6 96 100 100 77.7 100 100 77.7 95 100 100 76.7 100 100 76.7 94 100 100 75.7 100 100 75.7 93 100 100 74.8 100 100 74.8 92 100 100 73.8 100 100 73.8 91 100 100 72.8 100 100 72.9 90 100 100 71.9 100 100 71.9 89 100 100 70.9 100 100 70.9 88 100 100 70.0 100 100 70.0 87 100 100 69.0 100 100 69.0 86 100 100 68.0 100 100 68.1 85 100 100 67.1 100 100 67.1 84 100 100 66.1 100 100 66.1 83 100 100 65.2 100 100 65.2 82 100 100 64.2 100 100 64.2 81 100 100 63.2 100 100 63.3 80 100 100 62.3 100 100 62.3 79 100 100 61.3 100 100 61.3 78 100 100 60.3 100 100 60.4 77 100 100 59.4 100 100 59.4 76 100 100 58.4 100 100 58.4 75 100 100 57.5 100 100 57.5 74 100 100 56.5 100 100 56.5 73 100 100 55.5 100 100 55.6 72 100 100 54.6 100 100 54.6 71 100 100 53.6 100 100 53.6 70 100 100 52.7 100 100 52.7 69 100 100 51.7 100 100 51.7 68 100 100 50.7 100 100 50.7 67 100 100 49.8 100 100 49.8 66 100 100 48.8 100 100 48.8 65 100 100 47.8 100 100 47.8 64 100 100 46.9 100 100 46.9 63 100 100 45.9 100 100 45.9 62 100 100 45.0 100 100 45.0 61 100 100 44.0 100 100 44.0 60 100 100 43.0 100 100 43.0 59 100 100 42.1 100 100 42.1 58 100 100 41.1 100 100 41.1 57 100 100 40.2 100 100 40.2 56 100 100 39.2 100 100 39.2 55 100 100 38.2 100 100 38.2 54 .100 100 37.3 100 100 37.3 53 100 100 36.3 100 100 36.3 52 100 100 35.3 100 100 35.3 51 100 100 34.4 100 100 34.4 50 100 100 33.4 100 100 33.4 49 100 100 32.5 100 100 32.5 48 100 100 31.5 100 100 31.5

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on nextpage.

Oconee 3 Cycle 27 ONEI-0400-70 Rev 331 Rod Index Setpoints Page 22 of 33 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 _ 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 63.5 0 13 100 61.5 0 100 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 10 100 36.0 0 100 36.0 0 9 100 27.5 0 100 27.5 0 8.7 100 25.0 0 100 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 88.5 13.5 0 5 84.2 9.2 0 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75 0 0 75 0 0 2 68 0 0 68 0 0 1 59.5 0 0 59.5 0 0 0 51 0 0 51 0 0

%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7

_ Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 27 ONEI-0400-70 Rev 331 Rod Index Setpoints Page 23 of 33 3 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 100 100 81.5 74 100 100 79.6 100 100 79.6 73 100 100 77.8 100 100 77.8 72 100 100 75.9 100 100 75.9 71 100 100 74.1 100 100 74.1 70 100 100 72.2 100 100 72.2 69 100 100 70.4 100 100 70.4 68 100 100 68.5 100 100 68.5 67 100 100 66.7 100 100 66.7 66 100 100 64.8 100 100 64.8 65 100 100 63.0 100 100 63.0 64 100 100 61.1 100 100 61.1 63 100 100 59.3 100 100 59.3 62 100 100 57.4 100 100 57.4 61 100 100 55.6 100 100 55.6 60 100 100 53.7 100 100 53.7 59 100 100 51.9 100 100 51.9 58 100 100 50.0 100 100 50.0 57 100 100 48.2 100 100 48.2 56 100 100 46.3 100 100 46.3 55 100 100 44.5 100 100 44.5 54 100 100 42.6 100 100 42.6 53 100 100 40.8 100 100 40.8 52 100 100 38.9 100 100 38.9 51 100 100 37.1 100 100 37.1 50 100 100 35.2 100 100 35.2 49 100 100 33.4 100 100 33.4 48 100 100 31.5 100 100 31.5 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. .Continued on next page.

Oconee 3 Cycle 27 ONEI-0400-70 Rev 331 Rod Index Setpoints Page 24 of 33 3 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 63.5 0 13 100 61.5 0 100 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 10 100 36.0 0 100 36.0 0 9 100 27.5 0 100 27.5 0 8.7 100 25.0 0 100 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 88.5 13.5 0 5 84.2 9.2 0 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75.0 0 0 75.0 0 0 2 68 0 0 68 0 0 1 59.5 0 0 59.5 0 0 0 51 0 0 51 0 0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

0 I Oconee 3 Cycle 27 I 0 ONEI-0400-70 Rev 33 Page 25 of 33 105 105 100 ~100 95 95 90 Restricted -0 .. 9...0I 90 85 peration .. 85 80 80 75 75 70 70 65 65 O_

" 60 60 55 55 50 Acceptable 50

..... ... Operation C 45 45 40 40 35 35 30 30 25 25 20 20 15 15 10 10 5 5 75 85 95 0 0 10 10 20 30 40 50 60 70 80 90 100 1 0 10 20 30 40 50 60 70 80 90 100 IGroup 51 Cor [Group 7 itrol Rod Position, % WD

_ I I I II ONEI-0400-70 Rev 331 105 I Oconee 3 Cycle 27 I Page 26 of 33 100 Control Rod Position Setpoints 100

. No Inoerable Rods, 3 Pum Flow 95 90 90 85 85 80 80 75 75 70 70 LI 65 Unacceptable 65 0- Operation LL 60 I 60 "111 H 55 55 0) 50 50 C.,

45 45 40 40 1i -HP Operation 35 35 30 04 Acceptable 30 Operation 25 25 H-H 20 20 mrH 15 15 I'll 10 a rt- 10 I U U I I

15 a

5 25 35 45 6 55Group 75..5.95 5 15 15 25 35 45 55 65 75 85 95 0 Jo0 i1 20 30 40 50 60 70 80 90 1000 j 0 10 20 30 40 50 60 70 80 90 100 1 1 Group 5 1 ]Group 7 Cont rol Rod Position, % WD

ONEI-0400-70 Rev 331 105 I Oconee 3 Cycle 27 1 Page 27 of 33 100 100" Control Rod Position Setpoints 95 . Ioperable Rod, 4 Pum Flow 95 90 90 m-n qqTq 85 85 1-1 80 80 75 75 70 65

÷ 70 65 CL Unacceptable LL 60 Operation 60 55 ... 55 0) 0 MI 50 ...

.4 0* :H Acceptable 45 Operation 50 45 40 35 I IP 40 35 30 25 20 15 1 1 ll-IP 30 25 20 15 10 II H* 10 5

0.

I

-H 10 20 30 40 G

I50 60 pConi 70 5

80 U

.....15..-...1 90 25 100 1..

35 11 Group 6 45 .....

55 ... 65 75

[0 85 10 95 20 30 1 1 JJJLU 40 50 60 70 80 90 100 5

0 trol Rod Position, % WD Group 7

105 1LIL

___________________oNE,-040o-70 0 Oconee 3 Cycle 27 ,-0 Rev 33, Page 2o3 Page 28 of 33 0 105 100 Control Rod Position Setpoints 100 95 1 Incperable Rod, 3 Pum Flow 95 90 90 85 85 80 80 75 75 70 Uncetbe70 45 WS L It 65 65 (3u_60 60 0)55 55 o1. 50 50 Eiji 45 n-40 Operation 40 35 35 30 30 25 25 20 20 15 15 10 10 5 I5 0 - 1 25 5 65 75 I 85 0.

0 10 20 30 40 50 60 70 80 90 100 0 10 20 30 40 50 60 70 80 90 100 Group Control Rod Position, % W Group 7 I

ONEI-0400-70 Rev 331 Page 29 of 33 Oconee 3 Cycle 27 2.0 Core Operating Limits - Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.

References provided in section 1 of this COLR identify the sources for the data which follows.

l~i ~ ~ *nar *e h&l i-"T1.4 Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State Transient Maximum Core Power Level, %FP 3()-100 0-30 30-10 0 0-30 0-100 Quadrant Power Tilt, % 5.40 10.00 9.44 12.00 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 Core Out.let Pressure Reactor Coolant Outlet Temperature, OF sia 3 RCS Pumps 4 RCS Pumps 1

800 581.0 578.3

  • 1 900 590.0 587.3 2000 598.9 596.3 2 100 607.9 605.2 2 200 616.9 614.2 2 300 625.9 623.2

ONEI-0400-70 Rev 331 Page 30 of 33 Oconee 3 Cycle 27 Axial Power Imbalance Protective Limits Referred to by TS 2.1.1 Not for lanUs

%FP RPS Operational 4 Pumps 0.0 -35.0 -39.5 80.0 -39.5 90.0 -35.0 -39.5 100.0 -28.4 109.4 -14.4 109.4 14.4 100.0 28.4 90.0 35.0 39.5 80.0 39.5 0.0 35.0 39.5 3 Pumps 0.0 -35.0 -39.5 62.3 -35.0 77.0 -39.5 81.7 -14.4 81.7 14.4 77.0 39.5 62.3 35.0 0.0 35.0 39.5

ONEI-0400-70 Rev 331 Page 31 of 33 Oconee 3 Cycle 27 Rod Index Limits Referred to by TS 3.2.1 I*'>:,

Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal

%FP Insertion Limit No Inop Rod 1 Inop Rod Limit 4 Pumps 102 262 220 280 300 100 260 300 90 250 300 80 240 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300 3 Pumps 77 236 220 280 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300

ONEI-0400-70 Rev 331 Page 32 of 33 Oconee 3 Cycle 27 LOCA Limits I Not for Plant Use Core Elevation LOCA LHR kw/ft Limit Versus Burnup Feet Mk-B-HTP w10% Gad rods 0 GWd/mtU 34 GWd/mtU 62 GWd/mtU 0 16.9 16.9 12.3 2.506 17.8 17.8 12.3 4.264 17.8 17.8 12.3 6.021 17.8 17.8 12.3 7.779 17.8 17.8 12.3 9.536 17.3 17.3 12.3 12 16.4 16.4 12.3 Core Elevation LOCA LHR kw/ft Limit Versus Burnup Feet Mk-B-HTP w/2% Gad rods 0 GWd/mtU 34 GWd/mtU 62 GWd/mtU 0 16.0 16.0 11.6 2.506 16.9 16.9 11.6 4.264 16.9 16.9 11.6 6.021 16.9 16.9 11.6 7.779 16.9 16.9 11.6 9.536 16.4 16.4 11.6 12 15.5 15.5 11.6 Core Elevation LOCA LHR kw/ft Limit Versus Burnup Feet Mk-B-HTP w/4% Gad rods 0 GWd/mtU 34 GWd/mtU 62 GWd/mtU 0 15.2 15.2 11.1 2.506 16.1 16.1 11.1 4.264 16.1 16.1 11.1 6.021 16.1 16.1 11.1 7.779 16.1 16.1 11.1 9.536 15.7 15.7 11.1 12 14.9 14.9 11.1 Core Elevation LOCA LHR kwlft Limit Versus Burnup Feet Mk-B-HTP w/6% Gad rods 0 GWd/mtU 34 GWd/mtU 62 GWd/mtU 0 14.8 14.8 10.8 2.506 15.6 15.6 10.8 4.264 15.6 15.6 10.8 6.021 15.6 15.6 10.8 7.779 15.6 15.6 10.8 9.536 15.2 15.2 10.8 12 14.4 14.4 10.8 Core Elbvation LOCA LHR kw/ft Limit Versus Burnup Feet Mk-B-HTP w/8% Gad rods 0 GWd/mtU 34 GWd/mtU 62 GWd/mtU 0 14.3 14.3 10.4 2.506 15.1 15.1 10.4 4.264 15.1 15.1 10.4 6.021 15.1 15.1 10.4 7.779 15.1 15.1 10.4 9.536 14.7 14.7 10.4 12 13.9 13.9 10.4

ONEI-0400-70 Rev 331 Page 33 of 33 Oconee 3 Cycle 27

. ~Not foi- Plant Use~

mentjjppu~~ptwfe ar' t'n ddnf th values~h1~i f 4 RCP Operation - Loop Average Temp., *F 3 RCP Operation - Loop Average Temp., TF ATcold, 0 F Tavg (Analytical) Tavg (Analytical) 0.0 <581.0 <581.0 0.1 <581.0 <581.0 0.2 <581.1 <581.0 0.3 <581.1 <581.1 0.4 <581.2 <581.1 0.5 <581.2 <581.I 0.6 <581.2 <581.1 0.7 <581.3 <581.2 0.8 <581.3 <581.2 0.9 <581.3 <581.2 1.0 <581.4 <581.2 1.1 <581.4 <581.2 1.2 <581.5 "<581.3 1.3 <581.5 <581.3 1.4 <581.5 <581.3 1.5 <581.6 <581.3 1.6 <581.6 <581.4 1.7 <581.6 <581.4 1.8 <581.7 <581.4 1.9 <581.7 <581.4 2.0 <581.8 <581.4 2.1 <581.8 <581.5 2.2 <581.8 <581.5 2.3 <581.9 <581.5 2.4 <581.9 <581.5 2.5 <582.0 <581.6 2.6 <582.0 <581.6 2.7 <582.0 <581.6 2.8 <582.A <581.6 2.9 <582A1 <581.6 3.0 <582.1 <581.7 3.1 <582.2 <581.7 3.2 <582.2 <581.7 3.3 <582.3 <581.7 3.4 <582.3 <581.7 3.5 <582.3 <581.8 3.6 <582.4 <581.8 3.7 <582.4 <581.8 3.8 <582.4 <581.8 3.9 <582.5 <581.9 4.0 <582.5 <581.9 4.1 <582.6 <581.9 4.2 <582.6 <581.9 4.3 <582.6 <581.9 4.4 <582.7 <582.0 4.5 <582.7 <582.0 4.6 <582.7 <582.0 4.7 <582.8 <582.0 4.8 <582.8 <582.1 4.9 <582.9 <582.1 5.0 <582.9 <582.1