ML091100285

From kanterella
Jump to navigation Jump to search
Site - Revision 27 to Core Operating Limits Report (COLR)
ML091100285
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/13/2009
From: Baxter D
Duke Energy Carolinas, Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML091100285 (36)


Text

DAVE BAXTER Duke Vice President Energy Oconee Nuclear Station Duke Energy ON0I VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy.com April 13, 2009 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Site Docket No. 50-287 Core Operating Limits Report (COLR)

Gentlemen:

Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 24, Rev. 27.

If you have any questions, please direct them to Judy Smith at 864-873-4309.

Sincerely, Dave axter Site Vice President Oconee Nuclear Station Attachment 4Ado (

www. duke-energy.com

NRC Document Control Desk April 13, 2009 Page 2 xc w/att: Mr. Luis Reyes Regional Administrator, Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Ga. 30303-8931 Mr. John Stang Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 8 G9A Washington, DC 20555 Mr. Andy Hutto Senior Resident Inspector Oconee Nuclear Site

NRC Document April 13, Control 2009 Desk Page 3 bxc wo/att:

NSRB - EC05P bxc w/att:

ELL ONS Document Management

ONEI-0400-70 Rev 27 Page 1 of 33 Duke Energy Oconee 3 Cycle 24 Core Operating Limits Report QA Condition 1 0

Prepared By: D.S. Orr L 7 Date:

Checked By: W.D. Broome Date: 3 03 CDR By: A.W. Strange ,444 Date:

Approved By: R.R. St.Clair &.::,. Date Dat e_ : 3-3c) -Oq

Document No. / Rev. ONEI-0400-70 Rev. 27 Date March 16, 2009 Page No. Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By: Date: 3/3c) f)

(Sponsor) - I CATAWBA Inspection Waived MCE (Mechanical & Civil) R Inspected By/Date:

RES (Electrical Only) [] Inspected By/Date:

RES (Reactor) 0I Inspected By/Date:

MOD El Inspected By/Date:

Other ( 0)

[ Inspected By/Date:

OCONEE Inspection Waived MCE (Mechanical & Civil) Inspected By/Date:

RES (Electrical Only) [] Inspected By/Date:

[I]

0 RES (Reactor)

MOD Other (

Mx M)

Inspected By/Date:

Inspected By/Date:

Inspected By/Date:

MCGUIRE Inspection Waived MCE (Mechanical & Civil) Inspected By/Date:

RES (Electrical Only) LI Inspected By/Date:

RES (Reactor) Inspected By/Date:

MOD Inspected By/Date:

Other ( ) LI Inspected By/Date:

ONEI-0400-70 Rev 27 Page 3 of 33 Oconee 3 Cycle 24 Core Operating Limits Report Insertion Sheet for Revision 27 Remove these Revision 26 pages Insert these Revision 27 pages 1 - 33 1 - 33 Revision Log Effective Pages Pages Pages Total Effective Revision Date Revised Added Deleted Pages Oconee 3 Cycle 24 revisions below 27 Mar2009 1 -33 - - 33 26 Nov 2007 1-33 - - 33 25 Nov 2007 1-33 - - 33 1Oconee 3 Cycle 23 revisions below I 24 May 2006 1 -33 - - 33 Oconee 3 Cycle 22 revisions below 23 Mar2006 1 -4,6,15-16,21,27,31 - - 33 22 Mar2005 1-5 - - 33 21 Nov 2004 1 -33 - - 33

ONEI-0400-70 Rev 27 Page 4 of 33 Oconee 3 Cycle 24 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for 03C24 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in references 1 through 11. The RPS protective limits and maximum allowable setpoints are documented in references 12 through 14. These limits are validated for use in 03C24 by references 15 through 17. The 03C24 analyses assume a design flow of 107.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.714, an axial peaking factor (Fz) of 1.5, and an EOC (<100 ppmB) Tavg reduction of up to 10' F provided 4 RCPs are in operation and Tavg does not decrease below 569" F.

The error adjusted core operating limits included in section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 03C24 reload core.

1.1 References

1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1004-A, Revision 0, SER dated November 23, 1992.
2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1002-A, Revision 2, SER dated October 1, 1985.
3. Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 5, SER dated December 8, 2000.
4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003-PA, Revision 1, SER dated June 23, 2000.
5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 3, SER dated September 1, 2002.
6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008-PA, Revision 0, SER dated April 3, 1995.
7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 2, SER dated September 24, 2003.
8. Thermal Hydraulic Transient Analysis Methodology, DPC-NE-3000-PA, Rev. 3, SER dated September 24, 2003.
9. BAW-10192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, Rev. 0, SER dated February 18, 1997.
10. BAW-10164P-A, Rev. 4, RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis, SER dated April 9, 2002.
11. BAW-10227-PA, Evaluation of Advanced.Cladding and Structural Material (M5) in PWR Reactor Fuel, Rev. 1, June 2003 (SER to BAW-10186P-A dated June 18, 2003).
12. RPS RCS Pressure & Temperature Trip Function Uncertainty Analyses and Variable Low Pressure Safety Limit, OSC-4048, Revision 4, January 2001.
13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 2, October 2001.
14. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 1, Duke Power Co., June 2002.
15. 03C24 Maneuvering Analysis, OSC-9099, Revision 3, March 2009.
16. 03C24 Specific DNB Analysis, OSC-9171, Revision 1, November 2007.
17. 03C24 Reload Safety Evaluation, OSC-9222, Revision 2, March 2009.

ONEI-0400-70 Rev 27 Page 5 of 33 Oconee 3 Cycle 24 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.

Referred to by TS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.

Referred to by TS SLC 16.5.13.

CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in the CFT's shall be less than 4000 ppm. Referred to by TS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1% Ak/k.

Referred to by TS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than: MTC x 10-4 Linear interpolation is valid within the table provided. Ap/ 0 F  % FP Referred to by TS 3.1.3. +0.70 0

+0.525 20 0.00 80 0.00 100 0.00 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1. 4 RCP: measured hot leg pressure > 2125 psig 3 RCP: measured hot leg pressure > 2125 psig DNB parameter for RCS loop average temperature shall be: Max Loop Tavg (Incl 2'F unc)

Referred to by TS 3.4.1. ATc, 'F 4 RCP Op 3 RCP Op 0 581.0 581.0 The measured Tavg must be less than COLR limits minus 1 581.4 581.2 instrument uncertainty. ATc is the setpoint value selected by 2 581.8 581.4 the operators. Values are expanded by linear interpolation on 3 582.1 581.7 page 33 of this document without instrument uncertainty. 4 582.5 581.9 5 582.9 582.1

  • This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be: 4 RCP: Measured > 107.5 %df Referred to by TS 3.4.1. 3 RCP: Measured > 74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.

Referred to by TS 3.2.1.

Regulating rod group overlap shall be 25% + 5% between two sequential groups.

Referred to by TS 3.2.1.

Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).

ONEI-0400-70 Rev 27 Page 6 of 33 Oconee 3 Cycle 24 Steady State Operating Band Rod Index APSR %WD EFPD Min Max Min Max 0 to 446 292+/- 5 300 30 40 446 to EOC 292 +/- 5 300 100 100 Quadrant Power Tilt Setpoints Steady State Transient Maximum Core Power Level, %FP 30-100 0-30 30-100 0-30 0- 100 Full Incore 3.50 7.61 7.11 9.40 16.55 Out of Core 2.35 6.09 5.63 7.72 14.22 Backup Incore 2.25 3.87 3.63 4.81 10.07 Referred to by TS 3.2.3 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).

ONEI-0400-70 Rev 27 Page 7 of 33 Oconee 3 Cycle 24 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 P = 2355 psig T=618 F 2300 2200

(_

0) c 2100 Acceptable U) Operation 0o

_* P = 11.14 *Tout -470 0

0

? 2000 U

Unacceptable 1900 Operation P =1800 psig 1800 T=584 F 1700 I I 540 560 580 600 620 640 Reactor Coolant Outlet Temperature, OF

ONEI-0400-70 Rev 27 Page 8 of 33 Oconee 3 Cycle 24 RPS Power Imbalance Setpoints

% FP  % Imbalance 4 Pumps 0.0 -33.0 87.5 -33.0 107.9 -11.4 107.9 14.4 90.4 33.0 0.0 33.0 3 Pumps 0.0 -33.0 60.2 -33.0 80.6 -11.4 80.6 14.4 63.1 33.0 0.0 33.0 Maximum Allowable RPS Power Imbalance Limits

% FP  % Imbalance 4 Pumps 0.0 -35.0 87.1 -35.0 109.4 -11.4 109.4 14.4 90.0 35.0 0.0 35.0 3 Pumps 0.0 -35.0 59.4 -35.0 81.7 -11.4 81.7 14.4 62.3 35.0 0.0 35.0

ONEI-0400-70 Rev 27 Page 9 of 33 0 Oconee 3 Cycle 24 Operational Power Imbalance Setpoints Full Backup Out of

%FP Incore Incore Core 4 Pumps 0.0 -28.0 -28.0 -28.0 80.0 -28.0 -28.0 -28.0 90.0 -25.4 -25.4 -25.4 100.0 -14.7 -14.7 -14.7 102.0 -12.6 -12.6 -12.6 102.0 15.7 15.7 15.7 100.0 17.8 17.8 17.8 90.0 28.0 28.0 28.0 80.0 28.0 28.0 28.0 0.0 28.0 28.0 28.0 3 Pumps 0.0 -28.0 -28.0 -28.0 60.2 -28.0 - -28.0 60.2 - -28.0 -

77.0 -10.2 -10.2 -10.2 77.0 13.2 13.2 13.2 63.1 - 28.0 -

63.1 28.0 - 28.0 0.0 28.0 28.0 28.0

ONEI-0400-70 Rev 27 Page 10 of 33 Oconee 3 Cycle 24 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC

% FP I RPS Trip [ Full Incore Alarm I Out of Core Alarm 107.9 -11.4 14.4 107.0 -12.3 15.4 106.0 -13.4 16.4 105.0 -14.4 17.5 104.0 -15.5 18.5 103.0 -16.6 19.6 102.0 -17.6 20.7 -12.6 15.7 -12.6 15.7 101.0 -18.7 21.7 -13.7 16.7 -13.7 16.7 100.0 -19.7 22.8 -14.7 17.8 -14.7 17.8 99.0 -20.8 23.9 -15.8 18.8 -15.8 18.8 98.0 -21.9 24.9 -16.9 19.8 -16.9 19.8 97.0 -22.9 26.0 -17.9 20.9 -17.9 20.9 96.0 -24.0 27.0 -19.0 21.9 -19.0 21.9 95.0 -25.1 28.1 -20.1 22.9 -20.1 22.9 94.0 -26.1 29.2 -21.1 23.9 -21.1 23.9 93.0 -27.2 30.2 -22.2 24.9 -22.2 24.9 92.0 -28.2 31.3 -23.2 26.0 -23.2 26.0 91.0 -29.3 32.3 -24.3 27.0 -24.3 27.0 90.4 -30.0 33.0 -25.0 27.6 -25.0 27.6 90.0 -30.4 33.0 -25.4 28.0 -25.4 28.0 89.0 -31.4 33.0 -25.6 28.0 -25.6 28.0 88.0 -32.5 33.0 -25.9 28.0 -25.9 28.0 87.5 -33.0 33.0 -26.0 28.0 -26.0 28.0 87.0 -33.0 33.0 -26.2 28.0 -26.2 28.0 86.0 -33.0 33.0 -26.4 28.0 -26.4 28.0 85.0 -33.0 33.0 -26.7 28.0 -26.7 28.0 84.0 -33.0 33.0 -26.9 28.0 -26.9 28.0 83.0 -33.0 33.0 -27.2 28.0 -27.2 28.0 82.0 -33.0 33.0 -27.5 28.0 -27.5 28.0 81.0 -33.0 33.0 -27.7 28.0 -27.7 28.0 80.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 0.0 -33.0 33.0 -28.0 28.0 -28.0 28.0

% FP RPS Trip Full Incore Alarm j Out of Core Alarm ONEI-0400-70 Rev 27 Page 11 of 33 Oconee 3 Cycle 24 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC

% FP RPS Trip Full Incore Alarm Out of Core Alarm 80.6 -11.4 14.4 80.0 -12.0 15.0 79.0 -13.0 16.1 78.0 -14.1 17.1

-10.2 -10.2 13.2 77.0 -15.2 18.2 13.2

-16.2 19.3 -11.2 14.3 -11.2 14.3 76.0 75.0 -17.3 20.3 -12.3 15.3 -12.3 15.3 74.0 -18.3 21.4 -13.3 16.4 -13.3 16.4 73.0 -19.4 22.4 -14.4 17.4 -14.4 17.4 72.0 -20.5 23.5 -15.5 18.5 -15.5 18.5 71.0 -21.5 24.6 -16.5 19.6 -16.5 19.6 70.0 -22.6 25.6 -17.6 20.6 -17.6 20.6 69.0 -23.7 26.7 -18.7 21.7 -18.7 21.7 68.0 -24.7 27.8 -19.7 22.8 -19.7 22.8 67.0 -25.8 28.8 -20.8 23.8 -20.8 23.8 66.0 -26.8 29.9 -21.8 24.9 -21.8 24.9 65.0 -27.9 30.9 -22.9 25.9 -22.9 25.9 64.0 -29.0 32.0 -24.0 27.0 -24.0 27.0 63.1 -30.0 33M0 -25.0 28.0 -25.0 28.0 63.0 -30.0 33.0 -25.0 28.0 -25.0 28.0 62.0 -31.1 33.0 -26.1 28.0 -26.1 28.0 61.0 -32.2 33.0 -27.2 28.0 -27.2 28.0 60.2 -33.0 33.0 -28.0 28.0 -28.0 28.0 60.0 -33.0 33.0 -28.0 28.0 -28.0 28.0 0.0 -33.0 33.0 -28.0 28.0 -28.0 28.0

% FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 27 Page 12 of 33 Oconee 3 Cycle 24 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120.0

(-11.4,107.9) (14.4,107.9) 100.0 M1 = 0.942 M2 = -0.942 Acceptable 4 Pump Operation

(-33.0,87.5) (33.0,90.4)

(-11.4,80.6) (14.4,80.6)

I ~ ~U.

(-33.0,60.2) 60.0 (33.0,63.1)

Acceptable 3 or 4 Pump Operation:

40.0 20.0 I l 0.0 I 'II ,

-40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 Percent Power Imbalance

aONE

-70 Rev 27

  • age 13 of 33 Oconee 3 Cycle 24 Imbalance Setpoints for 4 Pump Operation, BOC to EOC 110.0

-35PS Trip - -n 2

100.0 I-ncore & Outcore Alarrr IRPS Trip Setpoiný 90.0 80.0 I

70.0 0

0. 60.0 U-0 E 50.0 ci,,

40.0 30.0 20.0 10.0 0.0 35 -30 20 -15 -10 -5 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

0 0 Oconee 3 Cycle 24 ONEI-0 0 0 Rev 27 Page 14 of 33 -

Imbalance Setpoints for 3 Pump Operation, BOC to EOC 110 100 90 80 70 w

0 0~ 60 n

U-0 C 50 0) 0 a,

0~

40 30 20 10 0

35 25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

ONEI-0400-70 Rev 27 Page 15 of 33 0 Oconee 3 Cycle 24 Operational Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No nop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 263.5 283.4 300 100.0 261.5 281.5 300 90.0 251.5 271.9 300 80.0 251.5 262.3 300 50.0 201.5 233.4 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 246.5 285.2 300 75.0 243.2 281.5 300 50.0 201.5 235.2 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

ONEI-0400-70 Rev 27 Page 16 of 33 Oconee 3 Cycle 24 Shutdown Margin Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 224.6 283.4 300 100.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 227.4 285.2 300 75.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

Oconee 3 Cycle 24 ONEI-0400-70 Rev 27 Rod Index Setpoints Page 17 of 33 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint , Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP7

.102 100 99.8 24.8 100 100 63.5 101 100 99.0 24.0 100 100 62.5 100 100 98.2 23.2 100 100 61.5 99 100 97.5 22.5 100 100 60.5 100 96.7 21.7 100 100 59.5 97 100 95.9 20.9 100 100 58.5 96 100 95.2 20.2 100 57.5


100 95 100 94.4 19.4 100 100 56.5 94 100 93.6 18.6 100 100 55.5 93 100 92.9 17.9 100 100 54.5 92 100 92.1 17.1 100 100 53.5 91 91.3 16.3 100 100 52.5 90 100 100 90.6 15.6 100 100 51.5 89 100 89.8 14.8 100 100 51.5 88 100 89.0 14.0 100 100 51.5 87 88.2 13.2 100 100 51.5 100 100~~~

86 87.5 12.5 100 51.5 100 85 100 86.7 11.7 100 100 51.5 84 85.9 10.9 1-ý00- 100 100 51.5 83 100 85.2 10.2 100 100 51.5 82 100 84.4 9.4 100 100 51.5 81 83:6 8.6 100 100 51.5 80 100 51.5 100 82.9 7.9 100 100 79 100 82.1 7.1 100 100 49.8 78 100 81.3 6.3 100 100 48.2 77 100 80.6 5.6 100 100 46.5 76 100 79.8 4.8 100 100 44.8 75 100 79.0 4.0 100 100 43.2 74 100 78.2 3.2 100 100 41.5 73 100 77.5 2.5 100 100 39.8 72 76.7 1.7 100 100 100 38.2 71 100 75.9 0.9 100 100 36.5 70 75.2 0.2 100 100 34.8 100 69.8 100 75.0 0 100 100 34.5 69 100 73.8 0 100 100 33.2 68 72.3 0 100 100 100 31.5 67 70.7 0 100 100 29.8 100 66 100 69.2 0 100 100 28.2 65 100 67.7 0 -- 100 100 26.5 64.1 66.3 0 100 100 25.0 63 100 64.6 100 24.1 99.1 62 100 63.0 0 98.2 23.2 61 100 61.5 0 100 97.4 22.4 60 100 60:0 0 100 96.6 21.6 59 58.4 0 100 95.8 20.8 58 100 56.9 0 100 94.9 19.9 57 100 55.3 0 100 94.1 19.1 56 100 53.8 0 100 93.2 18.2 55 100 52.3 0 100 100 92.4 17.4 54 100 50.7 0 100 91.6 16.6 53 100 49.2 0 90.8 15.8 52 100 47.7 0 100 89.9 14.9 51 100 46.1 0 100 89.1 14.1 50 100-- - 44.6 100 88.2 13.2

%FP CRGP 5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint 11 Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 3 Cycle 24 ONEI-0400-70 Rev 27 Rod Index Setpoints Page 18 of 33 4 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin S Operational Alarm Setpoint

%FP CRGP 5 CRGP 6 CRGP 5 CRGP 6 CRGP 7 49 100 43.0 100 86.7 11.7 48 100 41.5 100 85.1 10.1 47 100 39.6 100 83.5 8.5 46 100 37.8 100 82.0 7.0 45 100 35.9 100 80.4 5.4 44 100 34.1 100 78.8 3.8 43 100 32.2 100 77.2 2.2 42 100 30.4 100 75.7 0.7 41.6 100 29.6 100 75.0 0 41 100 28.5 100 73.2 0 40 100 26.6 100 70.1 0 39.1 100 25.0 100 67.3 0 39 99.9 24.9 100 66.9 0 0

38 99.0 24.0 100 63.8 37 98.0 23.0 100 60.6 0 36 97.1 22.1 100 57.5 0 0

35 96.2 21.2 100 54.3 0 34 95.2 20.2 100 51.2 0 33 94.3 19.3 100 48.1 32 93.4 18.4 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0 100 32.4 0 27 88.8 13.8 0 100 29.2 0 26 87.8 12.8 0 100 26.1 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 15 77.6 2.6 0 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 13 75.8 0.8 0 75.8 0.8 1.2.8 75.0 0 0 75.0 0 0

12 69.0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 7 31.5 0 31.5 0 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5 0 0 4 9.0 0 0 9.0 0 3 1.5 0 0 1.5 0 00 2.8 0 0 0 0 0 0

2 0 0 0 0 00 0

0 0 0 0 0 0

0 0 -0 0 0 0 Shutdown Margin Setp int Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 24 ONEI-0400-70 Rev 27 Rod Index Setpoints Page 19 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

%FP CRGP5 I CRGP6 CRGP77 CRGP I5 CRGP6 CRGP7 77 100 100 27.4 100 100 46.5 100 76.2 100 25.0 100 100 45.2 76 100 99.7 24.7 100 100 44.9 75 100 98.2 23.2 100 100 43.2 74 100 96.8 21.8 100 100 41.5 73 100 95.3 20.3 100 39.9 93.8 =1:0:0F 72 100 18.8 100 100 38.2 71 100 92.3 17.3 100 100 36.5 70 100 90.8 15.8 100 100 34.9 69 100 89.4 14.4 100 100 33.2 68 100 87.9 12.9 100 100 31.5 67 100 86.4 11.4 100 100 29.9 66 100 84.9 9.9 100 100 28.2 65 100 83.4 8.4 100 100 26.5 64.1 100 82.1 7.1 100 100 25.0 63 100 80.5 5.5 100 99.1 24.1 62 100 79.0 4.0 100 98.3 23.3 61 100 77.5 2.5 100 97.4 22.4, 60 100 76.0 1.0 100 96.6 21.6 59.3 100 75.0 0.0 100 96.0 21.0 59 100 74.1 0 100 95.8 20.8 58 100 71.1 0 100 94.9 19.9 57 100 68.2 0 100 94.1 19.1 56 100 65.2 0 100 93.3 18.3 55 100 62.2 0 100 92.4 17.4 54 100 59.3 0 100 91.6 16.6 53 100 56.3 0 100 90.8 15.8 52 100 53.4 0 100 89.9 14,9 51 100 50.4 0 100 89.1 14.1 50 47.4 0 100 88.2 13.2 49 100 44.5 0 100 86.7 11.7 48 100 41.5 0 100 85.1 10.1 47 100 39.6 0 100 83.5 8.5 46 100 37.8 0 100 82.0 7.0 45 100 35.9 0 100 80.4 5.4 44 100 100 34.1 0 100 78.8 3.8 43 32.2 0 100 77.2 2.2 1~ -I- -- II-42 100 30.4 0 100 75.7 0.7 f-41.6 100 29.6 00 100 100 75.0 0.0 41 100 28.5 73.2 0 40 100 26.6 0 100 70.1 0 39.1 100 25,0 0 100 67.3 0 39 99.9 24.9 0 100 66.9 0 38 99.0 24.0 0 100 63.8 0 37 98.0 23.0 0 100 60.6 0 36 97.1 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0

ý-34 95.2 20.2 0 100 51.2 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 00 28 89.7 14.7 0 100 32.4 ii I~ II 4

'Shutdown Margin Setpoint IL Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 3 Cycle 24 ONEI-0400-70 Rev 27 Rod Index Setpoints Page 20 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setpoint 11 Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 27 88.8 13.8 0 100 29.2 0 26 87.8 12.8 0 100 26.1 0 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 15 77.6 2.6 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 0 13 75.8 0.8 75.8 0.8 0 12.8 75.0 0 75.0 0 12 69.0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 1 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 0

7 31.5 0 0 31.5 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5 0 0 4 9.0 0 0 9.0 0 0 - 1.5 0 0 1.5 0 0 2.8 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 24 ONEI-0400-70 Rev 27 Rod Index Setpoints Page 21 of 33 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP7 CRGP 51 CRGP 6 CRGP 7 102 100 100 83.4 100 100 83.4 101 100 100 82.5 100 100 82.5 100 100 100 81.5 100 100 81.5 99 100 100 80.5 100 100 80.5 98 100 100 79.6 100 100 79.6 97 100 100 78.6 100 100 78.6 96 100 100 77.7 100 100 77.7 95 100 100 76.7 100 IO00 76.7 94 100 100 75.7 100 100 75.7 93 100 100 74.8 100 100 74.8 92 100 100 73.8 100 100 73.8 91 100 100 72.8 100 IO00 72.9 90 100 71.9 100 100 71.9 89 100 100 70.9 100 100 70.9 88 100 100 70.0. 100 100 70.0 87 100 100 69.0 100 100 69.0 86 100 100 68.0 100 100 68.1 85 100 100 67.1 100 100 67.1 84 100 100 66.1 100 100 66.1 83 100 100 65.2 100 100 65.2 82 100 100 64.2 100 100 64.2 81 100 100 63.2 100 100 63.3 80 100 100 62.3 100 100 62.3 79 100 61.3 100 100 61.3 78 100 100 60.3 100 100 60.4 77 100 100 59.4 100 100 59.4 76 100 100 58.4 100 100 58.4 75 100 100 57.5 100 O00 57.5 74 100 100 56.5 100 100 56.5 73 100 100 55.5 100 100 55.6 72 100 100 54.6 100 100 54.6 71 100 100 53.6 100 100 53.6 70 100 100 52.7 100 100 52.7 69 100 100 51.7 100 100 51.7 68 100 100 50.7 100 100 50.7 67 100 100 49.8 100 100 49.8 48.8 66 100 100 100 100 48.8 65 100 100 47.8 100 100 47.8 64 100 100 46.9 100 100 46.9 63 100 100 45.9 100 100 45.9 62 100 100 45.0 100 100 45.0 61 100 100 44.0 100 100 44.0 60 100 43.0 100 100 43.0 59 100 100 42.1 100 100 42.1 58 100 100 41.1 100 100 41.1 57 100 100 40.2 100 100 40.2 56 100 100 39.2 100 100 39.2 55 100 100 38.2 100 100 38.2 54 100 100 37.3 100 100 37.3 53 100 100 36.3 100 100 36.3 52 100 100 35.3 100 10 35.3 51 100 100 34.4 100 100 34.4 50 100 100 33.4 100 O00 33.4 49 100 100 100 32.5 100 100 32.5 48 100 31.5 100 100 31.5

-- -]I Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 3 Cycle 24 ONEI-0400-70 Rev 27 Rod Index Setpoints Page 22 of 33 4 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 1 CRGP 6 CRGP 7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 93.2 18.2 100 93.2 18.2 37 ~~*100 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 __100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2

-32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 77.2 2.2 100 77.2 2.2 100 21 76.2 1.2 100 76.2 1.2 100-ioo 100 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 100 69.5 0 100 69.5 0 16 '100 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 63.5 0 100 63.5 0 13 -100 61.5 0 100 61.5 0 12 100 0 100 53.0 100 53.0 0 11 10.0 44.5 100 44.5 0 100 10-- 36.0 0 100 36.0 0 9 27.5 0 100 27.5 0 8.7 25.0 0 100 25.0 0 97.0 8 51.00 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 13.5 00 88.5 13.5 5 9.2 84.2 9.2 0 0

4 5.0 80.0 5.0 0 0

3 75,8 0.8 75.8 75.0 0 0.8 0" 2.8 68.0 0 0 75.0 0 0 2 0 0 68.0 0 0 1 59.5 0 59.5 0 0

0 0 0 _____ 51.0 0 0  % FP CRGP 5 1 CRGP 6 CRGP 7 Shutdown Margin Setpoint CRGP 5 CRGP6 J CRGP7 Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 24 ONEI-0400-70 Rev 27 Rod Index Setpoints Page 23 of 33 3 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint 11 Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 I

100 i 100 81.5 74 100 100 79.6 100 100 79.6 73 100 100 77.8 100 100 77.8 72 100 100 75.9 100 100 75.9 71 100 100 74.1 100 74.1 70 100 100 72.2 100 72.2 100 69 100 100 70.4 100 100 70.4 68 100 iyod 100 68.5 100 100 68.5

- 100 100 66.7 100 66.7 100 66 100 100-- 64.8 100 100 64.8 65 -- 100 100 63.0 100 100 100 63.0 64 100 61.1 100 61.1 100 100 63 100 100 59.3 100 100 59.3 62 100 100 57.4 100 57.4 61 100 100 55.6 100 100 55.6 60 100 53.7 100 100 53.7 100 100 59 100 51.9 100 51.9 100 58 100 100 50.0 100 100 50.0 57 100 100 48.2 100 100 48.2 56 100 100 46.3 100 -o-100 46.3 55 100 100 44.5 100 100 44.5 54 100 100 42.6 100 100 42.6 53 100 100 40.8 100 100 40.8 52 100 100 38.9 100 100 38.9 51 100 100 37.1 37.1 100 100 100 50 100 100 35.2 35.2 100 100 100 100 49 100 100 33.4 100 100 33.4 48 100 31.5 100 100 31.5 47 100 29.5 100 100 29.5 46 100 27.5 100 100 27.5 45 100 25.5 100 25.5

- f ff 100 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 95.2 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 II + 4 Shutdown Marain Setooint Ooerational Alarm Setnoint S .t .....

Shutdown Magi ...... n

.... O rato a Alarm..

RI = 300 is withdrawal limit at all power levels. .Continued on next page.

Oconee 3 Cycle 24 ONEI-0400-70 Rev 27 Rod Index Setpoints Page 24 of 33 3 Pump Operation, 1 Inoperable Rod, BOC to EOC Shutdown Margin Setpoint Operational Alarm Setpoint

% FP CRGP 5 1 CRGP6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100. 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71,5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 63.5 0 13 100 100 61.5 0 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 100 10 100 36.0 0 100 36.0 0 9 100- 27.5 0 100 27.5 0 8.7 100 25.0 0 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 88.5 13.5 U 0 5 84.2 9.2 0 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75.0 0 0 75.0 0 0 2 68.0 0 0 68:0 0 1 59.5 0 0 59.5 0 0 0 51.0 0 51.0 0 0 C24->The f(our "contingency" 2.0 wt% Mk-B1 1 feed ir in the applii:ation of the above limits to the contingei CY K -

% FP CRGP 5 CRGP 6 [ CRGP 7 CRGPS5 CRGP6 CRGPP7 Shutdown Margin Setpoint T Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

ONEI-0* Rev 27 Oconee 3 Cycle 24 Page 25 of 33 105 itililil iff10 5 M100l 100 95 INo InoDerable Control Rods. 4 PumD Rod Position Floi Setpoints Restricted 95 Operation I fil II lt1 H111 90 HIM. it- 90 85 85 80 a l

.... . 80 75 70 65 0- Acceptable - 5 U-60 55 0

50 3A0 10 45 -20 a) I fi Il N1 11 il 40 15 35 10 30 75 l85 95 tfll Ifl 0 il 10 20 30I 40 50 607i8l0l0 25 Hill I I I GrIoup7 20 15 10 5

0 Control Rod Position, % WD

Oconee 3 Cycle 24 I.O ONEI-000 Rev 27 Page 26 of 33 105 . .... .. . .I 105 100 Control Rod Position Setpoints ibo0 NoIoerable Rods, 3 Pump Floi ---

95 95 90 85 ....

T IT]

90 80 75 1 85 80 75 N

LLLH

[

70 .... 70 65 Unacceptable .... 65 CL Operation [II 60 60 rL 55 55

~Th aI) 50 50 Restricted 45 Operation 45 TF 40 40 35 H+tH Li  ! .. 35 30 25 Acceptable Operation H 25 20 20 4t 15 15 10 10 5

Ii I5 15 5 25 35 Group 6 45 55 65 75 85 95 qI4 5

0 0 10 20 30 40 50 60 70 80 90 100 0 10 20 30 40 50 60 70 80 90 1001 Group 51 1 Group 7 Control Rod Position, % WD

Oconee 3 Cycle 24 ID ONEI-000 Rev 27 Page 27 of 33 105 ii p i I

105 Control Rod Position Setpoints 100 1Inoperable Rod, 4 Pump Flow 95 95 90 90 85 H444 85 IT It 80 80 75 75 70 65 Unacceptable 1 70 65 LL 60 Operation 60 R

55 55 0

50 L) Acceptable 45 Operation 40 40 35 35 30 30 25 II 25 II 20 H 20 1

TIIIq [I 15 15 10 10 5

0 Jo30 10 40II115 20 I0 10 20 30 40 50 60 70 80 90 100I 15 25 35 Group 6 45

!HI'l 55 H!,1111 65 llllllllll~ll t0 75 85 10

>l~lll 95 20 30 40 50 60 I 70 80 90 0

1001 Group 5 Group77 Control Rod Position, % WD

O NEI- C 0 Rev 27 Oconee 3 Cycle 24 Page 28 of 33 105 1 I 105 100 95 90 85 Control Rod Position Setpoints

+

Inoperable Rod, 3 Pump Flow lili

+ ......

1 w E Hi ill 100 85 80 H !t H+Ht 75

¢I411 H"ll4 H+H-H It Hil t71 TI IA 70 Unacceptable 70 65 H Operation J i I IL ....... L w

14

+

CL 60 w-55 55 0

(0_

50 ii II HilT H+H-0 ~50 r-) 45 Acceptable 40 Hil Operation 40 H4I~ H[W 4 35 30 1 _4 35 30 I-I 25 25 H+f nTm 20 H 20 15 11! I4~

~Ii44 11 15

! 1  !+ 1 10 10 5  !!!!!

! 6 "Group 55 65 75 85

! 95 i

,I It II 0

0 10 20 30 40 50 60 70 80 90 10 0 10 20 30 40 50 60 70 80 90 100 Group5 I Group 7 Control Rod Position, % WD

ONEI-0400-70 Rev 27 Page 29 of 33 Oconee 3 Cycle 24 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.

References provided in section 1 of this COLR identify the sources for the data which follows.

Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State Transient Maximum Core Power Level, %FP 3(0-100 0-30 30-10 0 0-30 0 - 100 Quadrant Power Ti it, % 5.40 10.00 9.44 12.00 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 Core Outlet Pressure Reactor Coolant Outlet Temperature, OF psia 3 RCS Pumps 4 RCS Pumps 1 800 581.0 578.3 900 590.0 587.3 2¢ I )00 598.9 596.3 21100 607.9 605.2 22?00 616.9 614.2 23300 625.9 623.2 S

ONEI-0400-70 Rev 27 Page 30 of 33 Oconee 3 Cycle 24 Axial Power Imbalance Protective Limits Referred to by TS 2.1.1

%FP RPS Operational 4 Pumps 0.0 -35.0 -39.5 80.0 -39.5 87.1 -35.0 90.0 -37.0 100.0 -11.4 -24.7 109.4 109.4 14.4 100.0 28.4 90.0 35.0 39.5 80.0 39.5 0.0 35.0 39.5 3 Pumps 0.0 -35.0 -39.5 59.4 -35.0 77.0 -39.5 81.7 -11.4 81.7 14.4 77.0 39.5 62.3 35.0 0.0 35.0 39.5

ONEI-0400-70 Rev 27 Page 31 of 33 Oconee 3 Cycle 24 Rod Index Limits Referred to by TS 3.2.1 Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal

%FP Insertion Limit No Inop Rod 1 Inop Rod Limit 4 Pumps 102 262 220 280 300 100 260 300 90 250 300 80 250 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300 3 Pumps 77 245 220 280 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300

ONEI-0400-70 Rev 27 Page 32 of 33 Oconee 3 Cycle 24 LOCA Limits Core Elevation Feet LOCA LHR kw/ft Limit Versus Burnup Mk-B11 Fuel* 0 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 16.6 16.6 12.2 2.506 17.5 17.5 12.2 4.264 17.6 17.6 12.2 6.021 17.7 17.7 12.2 7.779 17.6 17.6 12.2 9.536 17.5 17.5 12.2 12.00 16.6 16.6 12.2 WH-177 Fuel 0 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 14.9 14.9 11.0 2.506 15.7 15.7 11.0 4.264 15.8 15.8 11.0 6.021 15.9 15.9 11.0 7.779 15.8 15.8 11.0 9.536 15.7 15.7 11.0 12.00 14.9 14.9 11.0

  • Note for 03C24-->The four "contingency" 2.0 wt% Mk-B1 1 feed assemblies used in this cycle have penalized LOCA limits. The penalties are accounted for in the application of the above limits to the contingency assemblies, as described in the MA.

ONEI-0400-70 Rev 27 Page 33 of 33 Oconee 3 Cycle 24 4 RCP Operation - Loop Average Temp., 'F 3 RCP Operation - Loop Average Temp., 'F ATcold, TF Tavg (Analytical) Tavg (Analytical) 0., <581:0 <581.0 0.1 <581.0 <581.0 0.2 <581.1 <581.0 0.3 <581.1 <581.1 0.4 <581.2 <581.1 0.5 <581.2 <581.1 0.6 <581.2 <581.1 0.7 <581:3 <581.2 0.8 <581.3 <581.2 0.9 <581.3 <581.2 1.0 <581.4 <581.2 1.1 <581.4 <581.2 1.2 <581.5 <581.3 1.3 <581.5 <581.3 1.4 <581.5 <581.3 1.5 <581.6 <581.3 1.6 <581.6 <581.4 1.7 <581.6 <581.4 1.8 <581.7 <581.4 1.9 <581.7 <581.4 2.0 <581.8 <581.4 2.1 <581.8 <581.5 2.2 <581.8 <581.5 2.3 <581.9 <581.5 2.4 <58129 <581.5 2.5 <582.0 <581.6 2.6 <582.0 <581.6 2.7 <582.0 <581.6 2.8 <582.1 <581.6 2.9 <582.1 <581.6 3.0 <582.1 <581.7 3.1 <582.2 <581.7 3.2 <582.2 <581.7 3.3 <582.3 <581.7 3.4 <582.3 <581.7 3.5 <582.3 <581.8 3.6 <582.4 <581.8 3.7 <582.4 <581.8 3.8 <582.4 <581.8 3.9 <582.5 <581.9 4.0 <582.5 <581.9 4.1 <582.6 <581.9 4.2 <582.6 <581.9 4.3 <582.6 <581.9 4.4 <582.7 <582.0 4.5 <582.7 <582.0 4.6 <582.7 <582.0 4.7 <582.8 <582.0 4.8 <582.8 <582.1 4.9 5.0 <582.9

<529<582.1 <582.1