Revised Monthly Operating Rept for Apr 1990 for Cooper Nuclear Station
ML20043G655
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/30/1990
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20043G639 List:
References
NUDOCS 9006200532
Download: ML20043G655 (2)


Text

_ _ _ . - - . .

y ,

OPERATING DATA REPORT

- DOCKET NO. __050 0298 UNIT CNS DATE June 15.1990 t OPERATING STATUS TELEPHONE (402) 825 5291

1. Unit Name: Coooer Nuclear Station Notes
2. Reporting Period: Antil 1990
3. Ucensed Thermal Power (MWL): 2381 4 Nameplate Rating (Gross MWe): 836
5. - Design Electrical Rating (Not MWe): 778
6. Maximum Dependable Capacity (Gross MWe): 787
7. Maximum Dependable Capacity (Not MWe): 764
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, if Any (Not MWe):
10. Reasons For Restriction,if Any:

This Month Yr.-to-Date Cumulative i t. Hours in Reporting Period 719.0 , 2.879.0 138.7 2

12. Number of Hours Reactor Was Critical 0.0 1.465.Q, 104.113.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Une . 0.0 1.465.0 102.496.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (Mw'Q 0.0 3.307.528.0 205.990.558.0
17. Gross Electrical Energy Generated (MWH, 0.0 1.108.739.0 66.444.612.0
18. Net Electrical Energy Generated (MWH) 0.0 1.069.620.0 64.084.815.0
19. Unit Service Factor 0.0 50.9 73.8

.20. Unit Availability Factor 0.0 50.9 73.8

21. Unit Capacity Factor (Using MDC Net) 0.0 48.8 60.4
22. Unit Capacity Factor (Using DER Net) .

00 47.8 59.3

23. Unit Forced Outage Rate QQ 0.0 '4.7

'24. Shutdown Scheduled Over Next 6 Months (Type, Date, and duratica of Each):

nefuelina and Maintenance Outtae 13. Scheduled for March 1990: 8 week duration.

9006200532 900615 PDR' ADOCK 05000298 R PDC

25. If Shut Down At End of Report Period, Estimated Date of Startup: May 6.1990
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY ,

COMMERCIAL OPERATION

{+ - '

4 s

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 050 0298 UNIT CNS DATE June 15. 1990 TELEPHONE (402) 825-5291 MONTH April 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0

-8 0 24 0 9 0 25 0 10 0 26 0

,11 0 27 _

0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 -

16 0

-INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt,

,_