ML20044D165

From kanterella
Revision as of 04:55, 12 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 93-003-00:on 930408,determined That Insufficient Instrument Error Considered When Operating Limits for Core Flood Tank Selected.Caused by Programmatic Deficiency.Alarm Bistables Reset & Allowed Margin expanded.W/930510 Ltr
ML20044D165
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/10/1993
From: Boldt G, Stephenson W
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0593-03, 3F593-3, LER-93-003, LER-93-3, NUDOCS 9305170312
Download: ML20044D165 (6)


Text