ML20046B036

From kanterella
Revision as of 10:21, 11 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Proprietary Draft Scaling Analysis for Osu AP600 Integral Sys & Long Term Cooling Test Facility & Application for Withholding.Encl Withheld (Ref 10CFR2.790). Proprietary Portion of Document Sent to Westinghouse
ML20046B036
Person / Time
Site: 05200003
Issue date: 07/28/1993
From: Liparulo N
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Joshua Wilson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20046B037 List:
References
ET-NRC-93-3933, NUDOCS 9308030029
Download: ML20046B036 (2)


Text

-_____ - ___________ _ __ _

Westinghouse Energy Systems es 355 Pmsburgh PennsyNama 15230 0355 Eleetric Corporation ET-NRC-93-3933 NSRA-APSI 93-0274 Docket No.: STN-52-003 l

July 28,1993 Document Control Desk i

U.S. Nuclear Regulatory Commission I Washington, D.C. 20555 ATTENTION: MR. J. N. WILSON

SUBJECT:

DRAFT SCALING ANALYSIS FOR THE OSU AP600 INTEGRAL SYSTEM AND LONG TERM COOLING TEST FACILITY

Dear Mr. Wilson:

Enclosed please find a final draft of the scaling analysis report for the Oregon State University AP(40 long Term Cooling Test Facility (OSU-NE-9204). This report, prepared for Westinghouse by Dr.

Josd N. Reyes, Jr. of Oregon State University, was requested by NRC staff and ACRS Thermal i Hydraulic Phenomena Subcommittee members at the July 22-23,1993 ACRS subcommittee meeting.

The report is being provided for your information only. Westinghouse is currently performing an l'

internal technical review and proprietary information determination. The final scaling report is scheduled for submission in September 1993.

Enclosed with Mr. Hasselberg's copy of this letter are six copies of the draft report. Eight copics of the draft report are enclosed with Mr. Boehnert's copy of this letter. The Westinghouse Electric Corporation copyright notice, proprietary information notice, application for withholding and affidavit are also attached.

This submittal contains Westinghouse proprietary information consisting of trade secrets, commercial information or financial information which we consider privileged or confidential pursuant to 10CFR2.790. Therefore, it is requested that the Westinghouse proprietary information attached hereto be handled on a confidential basis and be withheld from public disclosures.

l 020042 g]d 1

!!)lA p

i 930B030029 930728 I PDR ADOCK 05200003 I ,

^ '

e i

l 1

I l

i i'

ET-NRC-93-3933 NSRA-APSI 93-0274 July 28,1993  ;

i This material is for your internal use only and may be used for the purpose for which it is submitted.  !

It should not be otherwise used, disclosed, duplicated, or disseminated, in whole or in part, to any l other person or organization outside the Commission, the Office of Nuclear Reactor Regulation, the j Office of Nuclear Regulatory Research or Idaho Nucicar Engineering Laboratory without the express i written approval of Westinghouse. l Correspondence with respect to the application for withholding should reference AW-93-499, and j should be addressed to N. J. Liparulo, Manager of Nuclear Safety And Regulatory Activities,  ;

Westinghouse Electric Corporation, P.O. Box 355. Pittsburgh, Pennsylvania, 15230-0355.

Please contact Brian A. McIntyre on (412) 374-4334 if you have any questions concerning this j transmittal. i I

i lL ' $1es~),h)j-v i

N. J. Liparulo, Manager  ?

Nuclear Safety & Regulatory Activities )

/nja )

Enclosure Attachments cc: T. Kenyon, NRC (w/o Enclosures / Attachments)

R. Hasselberg, NRC (6 copies of Enclosure, Attachments)

P. Bochnert, ACRS (8 copies of Enclosure, Attachments)

B. A. McIntyre, Westinghouse (w/o Enclosures / Attachments) i nu.  ;

.  ;