ML17212B190

From kanterella
Revision as of 09:45, 29 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 0030141 Re Control Room inaccessibility,0120041 Re Steam Generator Tube Leak Failure & 0120042 Re Loss of Reactor Coolant
ML17212B190
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/20/1981
From: Wethy C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML17212B187 List:
References
NUDOCS 8112110098
Download: ML17212B190 (2)


Text

Pcs7 OFF/6 X I s, FT. r lE'RCC,F tCRIOA 33464 CHH/PSL Ltr. Bk. fk 1525 chloe'4 Pc A 5 8( < ++a 'c 3 Pr elY November 20, 1981 Chief, Nuclear Response Branch Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Chief, Nuclear Response Branch Gentlemen:

SUBJECT:

TRANSMITTAL OF PLANT PROCEDURES ST. LUCIE PLANT, LICENSE NUMBER DPR 67 The following plant procedures are forwarded as an enclosure with this letter for your information and files:

EKRGENCY OPERATING No. 0030141, Rev. 8 No. 0120041, Rev. 9 No. 0120042, Rev. 18 Should you have any questions regarding this transmittal, please direct them to my attention.

Very truly yours, FLORIDA POWER AND LIGHT COMPLY

. 7 ethy P nt Manager St. Lucie Plant

(/(

QR/dac Enc. 3 PSL Procedures 8112110098 811203 PDR ADOCK 05000335 F PDR

t 4

'Ad 4 4 <'lie.'ui