Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Repts 50-363/78-15.Corrective Actions:Equipment Was Recalibr & Validating Test Data Taken Following Expiration Date
ML19274D890
Person / Time
Site: 05000363
Issue date: 01/16/1979
From: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19274D887 List:
References
NUDOCS 7902270168
Download: ML19274D890 (2)


Text

.

....J Jersey Central Power & Ught Company 1,.;- 4"

( ) Madison Avenue at Punen Bowl Road Morristown, New Jersey 07960 (201)455-8200 File #2421.10 January 16, 1979 E&L-ll48 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

Forked River Nuclear Station License No. CPPR-96 Inspection No. 78-15 Docket No. 50-363

Dear Mr. Grier:

Thic letter responds to the infraction uncovered by Mr. L.

Narrow during his inspection of November 13-16, 1978.

Infraction 10 CFR 50 Appendix B Criterion V, states, in part, that

" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings. . . .

and shall be accomplished in accordance with these in-structions, drawings and procedures. . ."

The licensee's Quality Assurance Plan for Forked River Nuclear Station Unit I, states, in part, in Paragraph 12.0 that:

"GPUSC requires its contractors and subcontracters to establish, document and implement a QA program for identifi-;ation, calibration and control of measuring and test equipment in accordance with the applicable specifications, codes or referenced technical documents".

190227

Mr. Boyce H. Grier Page Two Morrison-Knudsen's Procedure GEN-ll states, in part, in Paragraphs 11.3.3 and 11.4.4 that:

"Only properly identified and calibrated tools are issued for quality controlled construction, inspec-tion and tests", and, "The calibration agency shall affix a label on each tool indicating date calibrated, due date, and facility name or logo".

Contrary to the above, on November 14, 1978, certain measuring and test equipment in use by M-K was found to be not properly identified or controlled.

Corrective Action Taken The equipment in question was re-calibrated and found to be in-calibration, thus validating the test data taken following the expiration of the date posted on the calibration-due label.

Corrective Steps to Avoid Further Infractions Copies of the Non-C' arc _;.9nce Report filed against this in-fraction were distributr.d to all f M-K's personnel involved with the use of test equipmeat and those involved with the logging and maintenance of " Calibration Due Logs" to preclude reoccurrence.

GPu-QA will conduct inspections, at scheduled intervals, of M-K's Calibration Due IJgs to insure that the status of test equip-ment in use by M-K is being monitored by M-K satisfactorily.

Very truly yours,

%.' ,q f, _ ; l, '

'I. R. Finfrock, Jr.

Vice President mf

.