Monthly Operating Rept for Oct 1989 for Fermi Unit 2.W/ 891115 Ltr
ML19332C955
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/1989
From: Anthony P, Orser W
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-89-0195, CON-NRC-89-195 NUDOCS 8911290221
Download: ML19332C955 (4)


Text

(~; 7, [T-

[ ,,

Y,

, C lileam S. Otler -

.- El$.".I5'e$,on. Reg Guide l'.16 .

, Ah

.s 7

[ '

Ferm12

['. ' 6400 North Daie Highway Nuclear f I O O E"% Newport Michigan 4816t' IOVI I cim 586 5201 Generation November 15. 1989 h

NRC-89-0105 e

U. S. Nuclear Regulatory Commission Attention
Document Control Desk j Washington, D.C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 l NRC Operating-License No. NPF-43

Subject:

Monthly Operating Status Report for October, 1989 i

Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report f or October.1989. This report includes the Operating Data Report. Average Daily Unit Power Level, and the Sum:sary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Patricia Anthony at (313) 586-1617.

Sincerely. ,

,/ .

'b k Enclosure I cc: A. B. Davis J. R. Eckert D. R. Hahn R. W. Defayette/W. L. Axelson T. R. Quay W. G. Rogers 312188th SWjbv  ?

-R

C OPLRATING DATL REPORT

,. - 4

  • DOCKET NO. - ~ 50-341 _

COMPLETED BY P. M. Anthony

.DATE November 15, 1989 _ TELEPHONE (313)586-1617 OPERATING STATUS

1. UNIT NAME: Fermi 2 INotes: I
2. REPORTING PERIOD: October, 1989 l l 3 LICENSED THERMAL POWER (MWt): 3292 l
  • To be determined I
4. NAMEPLATE RATING (GROSS MWe):- 1154 l l S. DESIGN ELECT RATING (Net MWe): 1093 I I
6. MAX DEPENDABLE CAP.(GROSS MWe):
  • l l i- 7 MAX DEPENDABLE CAP (Net MWE):
  • l l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9.- POWER LEVEL TO WHICH RESTRICTED, IF ANY (HWe Net): None
10. REASONS FOR RESTRICTION, IF ANY: None l

y l THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 741 7292 '5,538
12. HRS REACTOR WAS CRITICAL 0 5613 10,635.5 l.
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0
14. HOURS GENERATOR ON-LINE O 5290.2 10,011
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0
16. GROSS TdERMAL ENERGY GEN (MWH) 0 15,854,286 28,883,738
17. GROSS ELECT ENERGY GEN (MWH) 0 5,343,904 9,622,608 l- 18. NET ELECT ENERGY GEN (MWH) 0 5,117,826 9,199,960 1

l

19. UNIT SERVICE FACTOR 0 72.5 64.4
20. UNIT AVAILABILITY FACTOR 0 72.5 64.4
21. UNIT CAP FACTOR (USING MDC NET)
22. UNIT CAP FACTOR (USING DER NET) 0 64.2 54.2 )
23. UNIT FORCED OUTAGE RATE O 10.7 17.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

The first refueling outage began on September 5,1989 and is continuing.

The plant is expected to be returned to the grid on November 26, 1989 1

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/26/89 L 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

PORECAST ACHIEVED  !

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

1

f .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT FERMI 2 i

DATE November 15, 1989 COMPLETED BY P. M. Anthony ,

TELEPHONE (313) 586-1617 -

Month October, 1989 ,

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net) (MWe-Net) 1 0 17 0 18 0  ;

2 _0 3 0 19 0 4 0 ,

20 0 5 0 21 0 ,

6 0 22 0 7 0 23 0 8 0 24 0 -

9 0 25 0 to 0 26 0 11 0 27 0 12' O 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0

~~ ~'

- ~: Q. T ~ , ..

'~" _ -:Q~ ; ' '. 'l' _n,_ .., __

,_ _y, u ,.,  ; :. . ~~ ~

e: - ;.  : 5  ; -~; " < , ~

q c_; _

D" % ierg 4p (p 1 .

c; ,. y 3 :e

- -. UNIT SWITDOWNS'AND POWER REDUCTIONS-  ;, g- "jgQ.;/ -T M,.

,, ~7 -

q:

~DATE- - Novencer- 15. 1989 ~

DOCMET NO. 50-341 +-

' UNIT NAME' Fermt 2 COMPLETED GV P. M. Antnany .

-TELEPHONE' (313)586-1617-REPORT MONTH October, 1989' .,'.

n. :

i .

I i 1. l. l.

l METHOD OF l LER l Sv5 i COMP l CAUSE & CORRECTIVE I.

NO. DATE TYPE DUR I REASON SHUTTING DOWN-l~ NO. l COOE I' CODE l ACTIOta-TO PREVENT- .l' (1) (HPS)l (2) THE-REACTOR. l, l . (4) l . (S) '-l EECURRENCE  :

l l , f3) -1 l l

'l :

1 I .

I

I i 89-011 09/05/89 5 741 i C l 4- N/A ---

"l ---- Continued with refueling acttwitles e l including leek rate testing, I l l turnine inspection and repair and l l l fuel handling.'

g u ' lg .'. ~

g l (1) F: FORCED (2) REASON: (3) METHOD $ (4) EXHIBIT G- INSTRUCTIONS S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)' 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM .

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE' D - REGULATORY RESTRICTION 4 '- CONIINUED (NOREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION S - REDUCED LOAD F - ADMINISTRAT!vE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H- OTHER (EXPLAIN) (5) EXHIBIT 1'- SAME SOURCE g