Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211K5171999-09-0202 September 1999 Expresses Appreciation for Support Provided for NRC Public Meeting on 990825 05000336/LER-1999-010, Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 11999-09-0202 September 1999 Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 1 ML20216H0591999-09-0202 September 1999 Responds to Re Issues Submitted by Cullen on Behalf of Several Petitioners Concerning Offsite Emergency Prepardeness for Millstone Nuclear Power Station ML20211N9241999-09-0101 September 1999 Forwards Document Classification Form for Insertion Into Emergency Planning Services Department Procedures ML20211H0741999-08-30030 August 1999 Discusses GL 92-01,Rev 1, Rv Structural Integrity, Issued by NRC on 950519 & NNECO Responses for Millstone Unit 2 & 980715.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 Based on Response Review 1999-09-30
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20245D9851989-06-22022 June 1989 Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also Prepared ML20247P9411989-05-17017 May 1989 FOIA Request for Final Open Item Transmittal Ltrs Per NRC Insp Procedure 94300B for Listed Plants ML20245C1421989-04-0303 April 1989 Forwards Endorsements 75,108,108,96 & 110 to Maelu Policies MF-56,MF-26,MF-58,MF-39 & MF-52,respectively & Endorsements 93,129,127,109 & 122 to Nelia Policies NF-186,NF-76,NF-188, NF-151 & NF-173,respectively ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20236S4291987-10-20020 October 1987 FOIA Request for Listed Documents,Including Encls from NRC Requesting Addl Info on Gpu Topical Repts TR-033 & TR-040 & Encl to NRC Meeting Summary Re SPDS ML20238E3011987-06-29029 June 1987 FOIA Request for All Documents Described in App,Including Listed LERs & Revs for Plants,W/Original Attachments & Encls ML18052B1911987-06-17017 June 1987 Forwards EGG-NTA-7720, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Calvert Cliffs-1 & -2,Millstone-2 & Palisades, Final Informal Rept. Plants Conform to Generic Ltr Item ML20234B6211987-05-12012 May 1987 Requests That Listed Plants Be Added to Encl 870508 FOIA Request Re 94300 Region Input on Plant Readiness ML20214R4051987-05-0808 May 1987 FOIA Request for Region Input to NRR Re Status of Listed Plants Readiness for Ol,Per IE Manual Chapter 94300 ML20234B6571987-05-0808 May 1987 FOIA Request for Placement,In Pdr,Region Input to NRC Headquarters,Nrr Re Status of Listed Plants in Terms of Plant Readiness for OL IE Manual,Chapter 94300 ML20214Q8801987-04-17017 April 1987 Forwards EGG-NTA-7591, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept.Plants Conform to Item ML20214R1861987-03-26026 March 1987 Forwards Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components,Haddam Neck & Millstone 1,2 & 3, Final Rept ML20207K0151986-12-19019 December 1986 FOIA Request That Encls to Insp Rept 50-247/86-26,Byron Semiannual Radioactive Effluent Rept & Millstone 1 & 2 SALP Rept Be Placed in PDR ML20210T4441986-03-27027 March 1986 FOIA Request for Initial (Cycle 1) Startup Test Repts & Suppls for Seven Plants & Original Monthly Operating Rept for June 1983 for Virgil C Summer Plant ML20141E9241985-12-0202 December 1985 Comments on Info Developed at ACRS Subcommittee on Millstone 1 851118-19 Meetings on Establishing How OLs Should Be Considered for Older Nuclear Power Stations ML20137Q6561985-11-21021 November 1985 FOIA Request for Reactor Operator/Senior Reactor Operator Exam Questions & Answer Keys for Exam Repts Listed in Encl ML20133H0871985-10-10010 October 1985 Requests Ltr Stating That Listed Facilities Do Not Have Fuel Element Transfer Tubes.Documentation Needed for IE Bulletin 78-08 Closeout Rept ML20087G9421984-03-0606 March 1984 Forwards Topical Rept 7703 on Missile Barrier Interaction. W/O Rept ML20084R6521984-02-24024 February 1984 FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl ML20023B4431983-04-20020 April 1983 Forwards Receipt Ack Form & Corrected Pages Inadvertently Omitted from FSAR Amend 2 Package ML20073Q3711983-04-20020 April 1983 Forwards Corrected Pages 6.3-1/2,6.3-5/6 & 10.4-1/2 for Replacement in Amend 2 to FSAR ML19339B6871980-09-11011 September 1980 Forwards Response Time Qualification of Resistance Thermometers in Nuclear Power Plant Safety Sys. No Proprietary Info Contained in Rept ML19242A1841979-06-14014 June 1979 Submits Slides to Be Inserted Into 790613 Transcript for ACRS Subcommittee on Reactor Operations Meeting Re Power Increase 1989-06-22
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests 05000336/LER-1999-010, Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 11999-09-0202 September 1999 Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 1 ML20216H0591999-09-0202 September 1999 Responds to Re Issues Submitted by Cullen on Behalf of Several Petitioners Concerning Offsite Emergency Prepardeness for Millstone Nuclear Power Station ML20211N9241999-09-0101 September 1999 Forwards Document Classification Form for Insertion Into Emergency Planning Services Department Procedures B17851, Forwards Semiannual fitness-for-duty Program Performance Data for 990101-990630 for Millstone Nuclear Power Station, Units 1,2 & 3,IAW 10CFR26.71(d)1999-08-27027 August 1999 Forwards Semiannual fitness-for-duty Program Performance Data for 990101-990630 for Millstone Nuclear Power Station, Units 1,2 & 3,IAW 10CFR26.71(d) B17855, Forwards NRC Forms 398 & 396 in Support of License Renewal for SRO TE Grilley,SOP-4053-04.Encl Withheld,Per 10CFR2.7901999-08-17017 August 1999 Forwards NRC Forms 398 & 396 in Support of License Renewal for SRO TE Grilley,SOP-4053-04.Encl Withheld,Per 10CFR2.790 B17849, Forwards Second Quarter Backlog Performance Rept for 1999, Which Represents Fourth Rept on Mnps Performance Since Restart of Unit 3 & First Status Update for Unit 2.No Regulatory Commitments Are Contained in Ltr1999-08-16016 August 1999 Forwards Second Quarter Backlog Performance Rept for 1999, Which Represents Fourth Rept on Mnps Performance Since Restart of Unit 3 & First Status Update for Unit 2.No Regulatory Commitments Are Contained in Ltr B17854, Forwards Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2,per TS 6.9.1.7.Revised Repts for May & June Also Encl Which Reflect Correct Faulty Printometer Readings1999-08-14014 August 1999 Forwards Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2,per TS 6.9.1.7.Revised Repts for May & June Also Encl Which Reflect Correct Faulty Printometer Readings B17850, Forwards First Lhc Quarterly Assessment Rept for Assessment Performed 990621 to 990701.NNECO Taking Appropriate Actions to Address Observations in Rept1999-08-11011 August 1999 Forwards First Lhc Quarterly Assessment Rept for Assessment Performed 990621 to 990701.NNECO Taking Appropriate Actions to Address Observations in Rept B17837, Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl1999-08-0707 August 1999 Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl B17657, Requests Schedular Exemption from Emergency Plan Exercise Requirements of 10CFR50,App E,Part Iv,Section F,Paragraph 2.c.Requests That Nrc/Fema Evaluated Exercise Be Conducted in Mar 2000 Rather than Sept 19991999-08-0303 August 1999 Requests Schedular Exemption from Emergency Plan Exercise Requirements of 10CFR50,App E,Part Iv,Section F,Paragraph 2.c.Requests That Nrc/Fema Evaluated Exercise Be Conducted in Mar 2000 Rather than Sept 1999 B17845, Forwards Revised Commitment for Surveillance Scheduling & Tracking.Options for Surveillance Scheduling & Tracking Methodologies to Be Incorporated in Standardized Station Surveillance Program Are Currently Being Reconsidered1999-08-0202 August 1999 Forwards Revised Commitment for Surveillance Scheduling & Tracking.Options for Surveillance Scheduling & Tracking Methodologies to Be Incorporated in Standardized Station Surveillance Program Are Currently Being Reconsidered B17831, Informs NRC Staff That Change 3 to Rev 25 of Mnps Emergency Plan Was Implemented on 990715.Change Removes Facility Organizational Charts from Emergency Plan & Identifies Relocation to Nuqap1999-07-26026 July 1999 Informs NRC Staff That Change 3 to Rev 25 of Mnps Emergency Plan Was Implemented on 990715.Change Removes Facility Organizational Charts from Emergency Plan & Identifies Relocation to Nuqap B17834, Forwards Proprietary Revised NRC Form 398,which Certifies That SL Doboe Has Completed Eligibility Requirements for Sro,Per 10CFR55.31.Proprietary Info Withheld1999-07-20020 July 1999 Forwards Proprietary Revised NRC Form 398,which Certifies That SL Doboe Has Completed Eligibility Requirements for Sro,Per 10CFR55.31.Proprietary Info Withheld B17836, Forwards Revised NRC Form 396 & Supporting Physician Rept for Licensed Operator Restricted from Licensed Duties, Effective 990628,due to Medical Condition.Without Encl1999-07-20020 July 1999 Forwards Revised NRC Form 396 & Supporting Physician Rept for Licensed Operator Restricted from Licensed Duties, Effective 990628,due to Medical Condition.Without Encl B17811, Submits Response to NRC AL 99-02,requesting That Licensees Provide Numerical Estimates of Licensing Actions to Be Expected to Be Submitted in Fy 2000 & 20011999-07-20020 July 1999 Submits Response to NRC AL 99-02,requesting That Licensees Provide Numerical Estimates of Licensing Actions to Be Expected to Be Submitted in Fy 2000 & 2001 ML20210S9911999-07-18018 July 1999 Requests NRC Intervene for All Shareholders of New England Electric System & to Help with Merger with National Grid Group & That NRC Petition Security & Exchange Commission to Investigate Matter Relative to No Shareholder Options B17835, Forwards Rev 33 to Millstone Station Physical Security Plan, Per 10CFR50.54(p)(2).Licensee Determined That Changes Do Not Decrease Effectiveness of Plan.Rev Withheld from Public Disclosure,Per 10CFR2.790(d)(1)1999-07-16016 July 1999 Forwards Rev 33 to Millstone Station Physical Security Plan, Per 10CFR50.54(p)(2).Licensee Determined That Changes Do Not Decrease Effectiveness of Plan.Rev Withheld from Public Disclosure,Per 10CFR2.790(d)(1) B17818, Provides NRC Staff with Change to TS Bases Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only.Change Was Reviewed & Approved by Unit 3 Plant Operations Review Committee IAW Provisions of 10CFR50.591999-07-16016 July 1999 Provides NRC Staff with Change to TS Bases Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only.Change Was Reviewed & Approved by Unit 3 Plant Operations Review Committee IAW Provisions of 10CFR50.59 B17824, Forwards Monthly Oeprating Rept for June 1999 & Revised Monthly Operating Rept for May 1999 for Millstone Unit 21999-07-13013 July 1999 Forwards Monthly Oeprating Rept for June 1999 & Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident B17816, Provides Certification That M Lettrich,Has Completed Eligibility Requirements,Per 10CFR55.31 for Operator License.Util Requests That Licensing Action Be Taken for Named Individual1999-07-0101 July 1999 Provides Certification That M Lettrich,Has Completed Eligibility Requirements,Per 10CFR55.31 for Operator License.Util Requests That Licensing Action Be Taken for Named Individual B17801, Forwards 10CFR50.59 Annual Rept for Period Jan-Dec 1998. Various Changes That Were Initiated in Previous Yrs & Completed in 1998,also Incorporated Into Annual Rept1999-06-30030 June 1999 Forwards 10CFR50.59 Annual Rept for Period Jan-Dec 1998. Various Changes That Were Initiated in Previous Yrs & Completed in 1998,also Incorporated Into Annual Rept B17819, Forwards Rev 17 to FSAR & Addendum 6 to Annual Rept.Nneco Recently Completed Review of Unit 2 Design & Licensing Bases Which Resulted in Changes to FSAR Provided in Encl 1.Encl 2 Includes Info Covering Changes Not Included in1999-06-30030 June 1999 Forwards Rev 17 to FSAR & Addendum 6 to Annual Rept.Nneco Recently Completed Review of Unit 2 Design & Licensing Bases Which Resulted in Changes to FSAR Provided in Encl 1.Encl 2 Includes Info Covering Changes Not Included in B17780, Forwards Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) TR, IAW 10CFR50.54(a)(3).Changes to TR Are Shown as Text in Bold Italics1999-06-30030 June 1999 Forwards Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) TR, IAW 10CFR50.54(a)(3).Changes to TR Are Shown as Text in Bold Italics B17723, Responds to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for Units 2 & 3 Encl.Without Encl1999-06-29029 June 1999 Responds to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for Units 2 & 3 Encl.Without Encl B17767, Forwards Rev 12 to FSAR & Addendum 3 to Annual Rept, for Millstone Unit 3,per 10CFR50.71(e) & 10CFR50.4(b)(6). No New Regulatory Commitments Contained in Ltr1999-06-29029 June 1999 Forwards Rev 12 to FSAR & Addendum 3 to Annual Rept, for Millstone Unit 3,per 10CFR50.71(e) & 10CFR50.4(b)(6). No New Regulatory Commitments Contained in Ltr 1999-09-03
[Table view] |
Text
. -
STONE 6 WEBSTER ENGINEERING CORPORATION 245 SUMMER STREET, BOSTON. M ASSACHUSETTS ADDRESS ALL CORRESPONDENCE TO P.O. BOX 2325. BOSTON M ASS. 02107 W. U. TELEX 94-0001 oRK C NSTRUCTION
"E .""rio~.
%.^1o-u 1"'.YM'"*~.
z 0.".',Y~~A ~"" "
To All FSAR Copy Holders:
The attached Receipt Acknowledgement form was inadvertently omitted from the Amendment 2 packages. Please sign the form and return it to Carol Shaffer using the envelope provided with your Amendment 2 package.
Also included in this package are FSAR corrected pages. Please destroy pages 6.3-1/2, 6.3-5/6, and 10.4-1/2 included in your Amendment 2 FSAR package, which were incorrectly numbered.
Replace them with the corrected pages attached.*
- See attached corrected insertion instructions for changes.
NOTED APR 2 01983 Emna l
l l
4 l
l 0'0
,p B305050069 830420 PDR ADOCK 05000 K
General Offices
. co c,co, m wo o.t co. , P O BOX 270 aEs's= ==ssoustruscfac cowa a'e=a ria wa co."*"'
HARTFORD. CONNECTICUT 06141-0270 nacatetast viofE5 sE#wCE COnsemy (203) 666-6911 L
eu CSteeE48T aluCLleA EMaGv COtre.s*
Mail to: Carol 3. Shaffer Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, CT 06101
SUBJECT:
Millstone Nuclear Power Plant, Unit 3 Acknowledgement of Distribution of NRC Questions and Responses and Amendment 2 of ER/FSAR NRC Questions and Responses and Amendment 2 of the Millstone Nuclear Power Plant, Unit 3 Environmental Report / Final Safety Analysis Report to Copy No.
has been received.
Organization Name Copy Holder's Name Signature Date l
l i
+.
. 1 MNPS-3 FSAR INSERTION INSTRUCTIONS FOR AMENDMENT 2 (Cont)
Remove Insert Location 6.2-3/4 6.2-3/4 5 6.2 6.2-7/8 6.2-7/8 6.2-11/12 6.2-11/12 6.2-12a/ Blank 6.2-21/22 6.2-21/22 6.2-23/24 6.2-23/24 i
6.2-25/26 6.2-25/26 6.2-43/44 6.2-43/44 6.2-45/46 6.2-45/46 6.2-47/48 6.2-47/48 6.2-49/50 6.2-49/50 0 6.2-51/52 6.2-51/52 6.2-53/54 ~6.2-53/54 6.2-54a/ Blank
, . 6.2-55/56 ,6.2-55/56 i'
6.2-57/58 6.2-57/58
. 6.2-81/82, 6.2-81/82 T6.2-6E'(1 of 2/2 of 2) T6.2-69 (1 of 2/2 of 2) .-
l , .w 6.3-5/6 6.3-5/6 S 6.3
, 6.3-6a/ Blank 1 -
~
6.3 ,19/20 6.3-19/20 /
Notes to F6.3-1 (1 of 18/ Notes to F6.3-1 (1 of 18/
W - 2 of 18) J ,~ 2 of 18) f -
,~ , ,-
l ._ _L - -' ,
' ~
. Amendment 2 5 of-10 April 1983
_,n
. =,/ ' .
- w s , ,,
, , W ~
y .-
,. \
/#
%.,-.~/f__.._-~_.._._._,._.-__..._..
__- . . - - . . - . . - . _ . . . . . . .-_ . . - . _,_.,L..-_.___._.__.--_- , , - - - - . . -
s MNPS-3 FSAR i , _
l~ i INSERTION INSTRUCTIONS FOR AMENDMENT 2 (Cont)
I Remove Insert Location I 9.2-17/18 9.2-17/18 9.2-19/20 9.2-19/20 9.2-29/30 9.2-29/30 l 9.2-31/32 9.2-31/32 9.2-32a/ Blank 9.2-35/36 9.2-35/36 9.2-36a/ Blank 4
VOLUME 12 9.4-55/56 9.4-55/56 S 9.4 -
i EP10-1/ Blank EP10-1/ Blank After Ch. 10 Tab j 10.4-47/48 10.4-47/48 S 10.4 l ;
10.4-51/52 10.4-51/52
- 10.4-53/54 10.4-53/54 10.4-54a/ Blank i
! VOLUME 13 i
EP11-1/2 EP11-1/2 After Ch. 11 Tab
- 11-iii/iv 11-iii/iv T11.2-1/2 (1 of 7) T11.2-1/2 (1 of 7)
S 11.2 4
11.4-1/2 11.4-1/2 S 11.4 11.4-2a/ Blank j 11.4-7/8 11.4-7/8 11.4-8a/ Blank T11.5-1 (1 of 2/2 of 2) T11.5-1 (1 of 2/2 of 2) S 11.5 Amendment 2 8 of 10 April 1983 4
m-rw,v--w--w g yrum-o--,,y m , w s e -m m w .m e-ww , ,, , ww w w,ow..vw..m-w,w,__.-,,_ma m
MNPS-3 FSAR Accumulator gas pressure is monitored by indicators and alarms. The operator can take action as required to maintain plant operation within the requirements of the technical specification addressing accumulator operability.
6.3.2.2.2 Tanks Refueling Water Storage Tank (RWST)
The RWST is used to provide a sufficient supply of borated water to the safety injection, charging, residual heat removal, during the injection mode of ECCS operation. All valves.between the RWST and the safety injection system are normally aligned and open, or
-immediately receive an SIS to effect proper position and alignment to assure an immediate supply of water to the safeguards equipment when required. Redundant level indicators and alarms are provided with readouts on the main control board to:
- 1. Maintain the level within the minimum and maximum technical specification range
- 2. Allow the operator to complete'switchover from the injection to recirculation phase
- 3. Indicate when the tank is empty A further discussion of the RWST-level indications is provided in Section'6.3.5A.
! The EWST supplies water to quench spray pumps (Section 6.2.2). l2 The RWST also provides borated water for filling the refueling cavity for refueling operations.
6.3.2.2.3 Pumps ECCS Pumps Pump characteristic curves are shown on Figures 6.3-3, 6.3-4, and l 6.3-5 with pump power requirements given in Table 6.3-1.
Available and required net positive suction head for ECCS pumps are shown in Table 6.3-1. The safety intent of Regulatory Guide 1.1 is met by the design of the ECCS such that adequate net positive suction j head (NPSH) is provided to system pumps. In addition to considering l the static head and suction line pressure drop, the calculation of available NPSH in the recirculation mode assumes that the vapor pressure of the liquid in the sump is equal to the containment
-pressure. This assures that the actual available net positive suction head is always greater than the calculated net positive suction head.
Residual Heat Removal Pumps Amendment 2 6.3-5 April 1983
f - .
MNPS-3 FSAR The (RHS) pumps are started automatically on receipt of an SIS signal. The pumps deliver water to the RCS from the RWST during the injection phase. Each pump i:: a single stage vertical position centrifugal pump.
A minimum flow bypass line is provided for the pumps to recirculate and return the pump discharge fluid to the pump suction downstream of the RHS heat exchangers should these pumps be started with their normal flow paths blocked. Once flow greater than 1,000 gpm is established to the RCS, the bypass line is automatically closed.
This line prevents deadheading of the pumps and permits pump testing during normal operation.
The limiting NPSH available when pumping from the RWST, occurs for pump runout flow.
The available NPSH values for this case are:
Q440.4 RHS Pump A: 38.0 ft 7
RHS Ptimp B: 40.5 ft Ihe required NPSH for normal and runout flow conditions are given in Tabla 5.4-3, The RHE pumps are discussed further in Section 5.4.7. A pump
- performance curve is given on Figure 6.3-3.
The pumps have a self-contained mechanical seal which is normally cooled by the comptr. ant cooling water system. However, after a LOCA, cooling water will not be supplied or required, because the pumps will be pumping water having a maximum temperature of 50"F. The RHS pumps are not utilized in the recirculation phase.
Centrifugal Charging Pumps In the event of an accident; the charging pumps are started automatically on receipt of an SIS and are automatically aligned to take suction from the RWST during injection. During recirculation, suction is provided from the containment recirculation pump discharge.
The charging pumps deliver flow to the RCS at the prevailing RCS pressure. Each centrifugal charging pump is a multistage centrifugal diffuser design (barrel-type casing) with vertical suction and discharge nozzles. The pump lubricating oil coolers are cooled by the charging pumps seal cooling subsystem (Section 9.2.2.4).
A minimum flow bypass line is provided on each pump discharge to recirculate flow to the pump suction after cooling via the seal water heat exchanger during normal plant operation. The minimum flow bypass line contains two valves in series which close on receipt of the SIS. This signal also closes the valves to isolate the normal charging line and volume control tank and opens the charging pump / refueling water storage tank suction valves to align the high Amendment 2 6.3-6 April 1983
MNPS-3 FSAR m
I i 1. Loss of power (LOP)
V
- 2. Safety injection signal (SIS)
- 3. Containment depressurization actuation signal (CDA) l2
- 4. Two of four Low-Low water level signals in any one steam generator The turbine-driven steam generator auxiliary feedwater pump starts automatically on loss of onwer or when there are two of four Low-Low water level signals in any two of four steam generators.
The steam generator auxiliary feedwater pumps start automatically or can be started manually from the main control board. In addition, the pumps can be started manually from the auxiliary shutdown panel (Section 7.4.3.1).
The auxiliary feedwater pump turbine drive receives steam from the main steam system (Section 10.3.2) piping through the steam generator auxiliary feedwater purap turbine steam supply header. The source of steam will not be interrupted by a loss of ac power (station blackout). When the turbine driven pump is started, it will initially be supplied with 990 psia steam. As the reactor cools and the steam pressure drops below 600 psia, the turbine drive speed
,s decreases. However, sufficient pump capacity will be available until (s~ /') the steam pressure drops to 125 psia (reactor coolant temperature 350*F), at which condition the residual heat removal system is placed into service (Section 5.4.7) and the auxiliary feedwater system is manually secured.
Each motor-driven steam generator auxiliary feedwater pump receives power from a separate redundant emergency electrical bus.
Each auxiliary feedwater pump when operating recirculates a specified flow back to the DWST. The pumps are sized to supply the required flow to the steam generator plus this minimum recirculation. The turbine-driven pump requires 90 gpm recirculation and each motor-driven pump requires 45 gpm recirculation. This recirculation is continuous, eliminating the need for redundant recirculation controls normally required to ensure reliability of pumps which operate intermittently. Cooling water, required for pump and turbine bearing oil cooling, is supplied from the first stage casing of each pump.
This provides a guaranteed source of cooling water under all conditions.
I Each auxiliary feedwater pump normally takes suction through a separate supply line directly from the DWST. The DWST, sized at 340,000 total usable gallons, has sufficient capacity to satisfy the design basis of the auxiliary feedwater system. Makeup is provided to the DWST from the water treating system (Section 9.2.3).
An additional source of water (200,000 gallons) is provided to each auxiliary feedwater pump suction by the condensate storage tank Amendment 2 10.4-47 April 1983
a UNPS-3 FSAR (Section 9.2.6). This source is not safety related and, therefore, is not considered available for safety related purposes. The normally closed air-operated valve connecting the condensate storage tank and each auxiliary feedwater pump suction is under administrative control.
The service water system is available as a long term safety grade source of auxiliary feedwater for the steam generators. Before the auxiliary feedwater pumps can take suction from the service water system, spool pieces must be added to connect the service water system to the auxiliary feedwater system. These spool pieces are provided, in lieu of pe rmanent piping, to preclude inadvertant discharging of service water to the steam generators.
A connection from the domestic water cystem to the DWST fill line is provided to satisfy the requirement that auxiliary feedwater be available to support 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of hot standby followed by a subsequent cooldown in the event of damaging fires. A removable spool piece must be placed in line prior to use of tne domestic water system.
During this activity water is available in the DWST and the condensate storage tank.
Feedwater from the steam generator auxiliary f'eedwater pumps is pumped to each steam generator through normally open control valves.
Flow is monitored in each line connectir.g to the feedwater system (Section 10.4.2). Each control valve is manually adjusted from the control room as dictated by the steam generator water level and auxiliary feedwater flow rate. The control valves can also be manually adjusted from the auxiliary shutdown panel. In the event of a loss of power, these valves will remain open. The control valves will be equipped with handwheels and may be adjusted by hand.
Auxiliary feedwater flow to the steam generators is limited by flow venturis located in each auxiliary feedwater line. These venturis are sized to cavitate in order to maintain the minimum required flows to the intact steam generators and to prevent runout flow to a depressurized steam generator.
The auxiliary feedwater is discharged to the steam generators through a connection in each main feedwater line inside the containment structure and downstream of the main feedwater stop-check valves.
This will prevent loss of auxiliary feedwater, should a main feedwater line rupture upstream of the main feedwater stop-check valve.
The design parameters for the auxiliary feedwater pumps are listed in Table 10.4-4.
10.4.9.3 Safety Evaluation Each motor-driven steam generator auxiliary feedwater pump receives power from one of the emergency ac buses. One pump is available at all times in the event of the loss of one emergency bus. The turbine-driven pump is sufficiently sized to be used for residual 10.4-48