1986 Inservice Insp Summary Rept.
ML17219A217
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/31/1985
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17219A216 List:
References
NUDOCS 8611140119
Download: ML17219A217 (64)


Text

PR EPAR ED BY FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD JUNO BEACH'LORIDA 33408 ST LUCIE NUCLEAR POWER PLANT UNIT NO. 2 10 MILES SOUTH OF FT. PIERCE ON A1A FT. PIERCE, FLORIDA 33450 1986 INSERVICE INSPECTION

SUMMARY

REPORT COMMERCIAL SERVICE DATE: 8 AUGUST 1983 sosl i4oi ie alii so

,8...

PDR ADQCK 05QQQ389 PDR ) 1

~ .

I

'P IL

FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules page 1 of 18

l. Owner Florida Power and Li ht Co. 700 Universe Blvd Mia Fl (Name and address of Owner)

St. Lucie Nuclear Power Plant

2. Plant 10 MILES SOUTH OF FT. PIERCE ON AlA Ft. Pierce FL 33450 (Name and address of Plant)
3. Plant Unit 2
4. Owner Certificate of Authorization (if required) ~N A
5. Commercial service date 8 AUGUST 1983
6. National Board Number for Unit ~N A
7. Components Inspected Component or Manufacturer Manufacturer State or National Appurtenance or Installer or Installer Province Board Serial No. Number Number RPV VESSEL COMBUSTION ENG. 71172 N A N/A PRESSUR IZER COMBUSTION ENG 71372 N A N A STM. GEN. 2A COMBUSTION ENG 71272-1 N A 22227 2B 71272-2 N/A 22228 MAIN REACTOR COOLANT . EBASCO N/A N/A N/A REACTOR COOLANT FPL N/A N/A N/A SAFETY INJECTION EBASCO/FPL N/A N/A N/A CVCS FPL N/A N/A N/A MAIN STEAM FPL N A N A N A FEEDWATER FPL N/A N/A N/A SAFETY INJECT ION FPL N/A N A N A Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 in. x ll in., (2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

t l l

~n U

'4

'lF i

k 'k

page 2 of 18 NIS-1 REPORT CONTINUED S.Examination Dates 4-5-1986 to 6-1-1986

9. Inspection Period Identification from 0 YEARS to 3 1 3 YEARS 10.Inspection Interval Identification from 8-8-83 to 8-8-93 11.Applicable Edition of Section XI 1980 Addenda W-1980 12.Date/Revision of Inspection Plan ~5/10 85 Rev.l
13. Abstract of Examination. Include a list of examinations and a statement concerning status of work required for inspection program.

The Inservice Examinations (ISI) of selected Class I,II components of Florida Power and Light Company's (FPL) ST. LUCIE PLANT (PSL), UNIT NO. 2, was performed during the refueling outage which began on 5 APRIL 1986 . These examinations constitute the SECOND OUTAGE of the FIRST 40 MONTH PERIOD OF COMMERCIAL OPERATION.

The components were selected in accordance with ST. LUCIE LONG-TERM PLAN which was prepared to meet the requirements of SECTION XI of the AMERICAN SOCIETY of MECHANICAL ENGINEERS BOILER and PRESSURE VESSEL CODE " RULES FOR INSERVICE INSPECTION OF NUCLEAR POWER PLANT COMPONENTS," 1980 EDITION with ADDENDA through WINTER 1980.

Manual Ultrasonic, Liquid Penetrant, Magnetic Particle and Visual techniques were used in the performance of the Inservice Inspection Examinations. Mechanized Ultrasonic examination techniques were used in the RPV Nozzle examinations.

Eddy Current examination were conducted from to 3 May 1986 on steam generators 2A and 2B. These examinations ll April 1986 were performed by Combustion Engineering. 8,233 tubes were examined on S/G 2A and 8,276 tubes were examined on S/G 2b. See attached NIS-BB report for summary of examination results.

The snubber visual examinations and functional testing was conducted in accordance with the requirements of St. Lucie Plant Technical Specifications. These examinations were performed by Paul Munroe Energy Services.

The System Pressure test's were conducted in accordance with plant procedures.

NIS-1 REPORT CONTINUED page 3 of 18 Representative samples of the following components and areas were examined with nondestructive testing (NDE) techniques CLASS I REACTOR PRESSURE VESSEL CLOSUR E HEAD PRESSURIZER STEAM GENERATORS 2A AND 2B REACTOR COOLANT SAFETY INJECTION CHEMICAL 6 VOLUME 42"-RC-201 12"-SI-501 2"-CH-146 30"-RC-103 10"-SI-130 2"-CH-347 30"-RC-107 10"-SI-378 2"-CH-147 30"-RC-109 10"-SI-4205 2"-CH-145 30"-RC-112 6"-SI-151 30"-RC-115 6"-SI-518 30"-RC-1501 3"-SI-191 30"-RC-401 3"-SI-9 3"-RC-502 3"-RC-147 2"-RC-149 CLASS II MAIN STEAM FEEDWATER SAFETY INJECTION 36"-MS-52 18"-BF-51 24"-SI-504 34"-MS-28 18"-BF-52 24"-SI-2407 35.5"-MS-1 20"-BF-55 12"-SI-407 20"-BF-14 12"-SI-406 12 M-SI-459 CONTAINMENT SPRAY 12"-SI-4203 10"-SI-362 24"-CS-1-1 10"-SI-472 24"-CS-41 6"-SI-113 14"-CS-7-3. 6"-SI-146 14"-CS-6-1 6"-SI-110 12"-CS-14 14.Abstract of Results of Examinations:

This section of the report provides a summary of the NDE examinations performed.

NIS-1 REPORT CONTINUED page 4 of 18 A. EXAMINATION

SUMMARY

CLASS I ZONE 1 REACTOR VESSEL Mechanized Ultrasonic examination of the Reactor Pressure Vessel was performed by Nuclear Energy Services, Inc. The examinations conducted from the inside surface were as follows:

The outlet nozzles at 0 and 180 degrees, the inner radius sections at 0 and 180 degrees, the outlet nozzle to extension piece at 0 and 180 degrees, and the extension to pipe weld at 0 and 180 degrees. In addition to the Mechanized examinations FPL conducted manual examinations of the upper shell to flange weld, and the threads in the base material flange surface.

Results of the mechanized examinations can be found in Nuclear Energy Services Final Report, Document no. 83A2843.

ZONE 2 RPV CLOSURE HEAD All (4) four peel segments welds were examined by ultrasonic examination techniques. No Recordable indications were noted.

ZONE 3 STEAM GENERATOR 2A Twenty-one (21) examinations were conducted. Three (3) geometric reflectors were noted due to the inside inner radius section.

During the visual examination of studs some dents were noted.

ZONE 6 RCS LOOP A HOT LEG Six (6) examinations were conducted. No Recordable indications were noted.

ZONE 8 RCS LOOP A STEAM GENERATOR TO REACTOR COOLANT PUMP Five (5) examinations were conducted. No recordable indications were noted.

ZONE 10 RCS LOOP B STEAM GENERATOR TO REACTOR COOLANT PUMP Three (3) examinations were conducted. No Recordable indications were noted.

NIS-1 REPORT CONTINUED page 5 of 18 ZONE 11 RCS LOOP B,REACTOR COOLANT PUMP TO REACTOR VESSEL Six (6) examinations were conducted. One (1) Recordable indication was noted, determined to be acceptable.

ZONE 12 RCS LOOP A STEAM GENERATOR TO REACTOR COOLANT PUMP Three (3) examinations were conducted. No Recordable indications were noted.

ZONE 17 REACTOR COOLANT PUMP FLYWHEEL The flywheel bore and keyway wa's examined as required by R.G. 1.14. No recordable indications noted.

ZONE 18 REACTOR COOLANT PUMP FLYWHEEL The flywheel bore and keyway was examined as required by R.G. 1.14. No recordable indications noted.

ZONE 19 REACTOR COOLANT PUMP FLYWHEEL The flywheel bore and keyway was examined as required by R.G. 1.14. No recordable indications noted.

ZONE 20 REACTOR COOLANT PUMP FLYWHEEL

\

THE FLYWHEEL BORE AND KEYWAY WAS EXAMINED AS REQUIRED BY R. G. 1. 14. NO RECORDABLE INDICATIONS NOTED.

ZONE 24 SAFETY INJECTION LOOP 2B2 Three (3) visual examinations were conducted on valve bolting in place. One (1) indication was noted and determined to be acceptable.

NIS-1 REPORT CONTINUED page 6 of 18 CLASS I CONTINUED ZONE 28 LOOP B SHUTDOWN COOLING Five (5) examinations were conducted. Three (3) rounded indications noted on the branch connection, determined to be acceptable.

ZONE 29 SHUTDOWN COOLING 8( HOT LEG INJECTION LOOP A Three (3) visual examinations were conducted. One (1) cap screw was noted as missing, and boric acid residue was noted.

ZONE 33 2A1 PRIMARY DRAIN One (1) examination was conducted. No Recordable indications we'e noted ZONE 34 2A2 PRIMARY DRAIN One (1) examination was conducted. Rust was noted on bolting.

ZONE 35 2Bl PRIMARY DRAIN One (1) examination was conducted. No recordable indications noted.

ZONE 36 2B2 PRIMARY DRAIN One (1) examination was conducted. Boric acid residue was noted.

ZONE 37 LETDOWN LINE Two (2) examinations were conducted. Boric acid residue was noted.

NIS-1 REPORT CONTINUED page 7 of 18 CLASS II STEAM GENERATOR 2A Four (4) examinations were conducted. Keyway Bracket I 0 degrees, Secondary extension ring to Lower shell, Secondary extension ring to Tube sheet and Clevis bracket 9 45 degrees. Two (2) rounded indications were noted and determined to be acceptable.

ZONE 43 LPSI 2A DISCHARGE SEVEN (7) examinations were conducted, Pipe to Valve, Pipe Long Seam, Reducer to pipe and shear lugs. No Recordable indications were noted.

ZONE 49 SHUTDOWN COOLING "A" Seven (7) examinations were conducted, Penetration to Pipe, Pipe Long Seam, Elbow Long Seam, Elbow to Pipe. No Recordable indications were noted.

ZONE 52 SHUTDOWN COOLING Six (6) examinations were conducted, Two (2) Pipe to Elbows and associated Long Seams. No Recordable examinations were noted.

ZONE 62 HIGH PRESSURE SAFETY INJECTION 2B Two (2) examinations were conducted on a Pipe to Valve Weld.

No Recordable indications were noted.

ZONE 63 MAIN STEAM 2A1, Eleven (ll were noted.

) examinations were conducted. No Recordable indications ZONE 64 MAIN STEAM 2Bl Five (5) examinations were conducted. No Recordable indications were noted.

0 t

\ ~

't V

Cl 0/

1

~

4 I

NIS-1 REPORT CONTINUED page 8 of 18 ZONE 65 MAIN STEAM PA Four (4) examinations were conducted. No Recordable indications were noted.

ZONE 67 MAIN FEEDWATER 2A1 Three (3) examinations were conducted and Augmented examinations were also conducted as a follow up of IGE Bulletin 79-13 "CRACKING IN FEEDWATER SYSTEM PIPING" . FP &L conducted 100 8 ultrasonic examination of base metal from the nozzle ramp out to a point one pipe diameter upstream of the pipe to elbow weld on the horizontal run.( applicable to Zones 67 & Zone 68) Two (2) geometric reflectors were noted, one from the counterbore and one from a redirected shear wave.

ZONE 68 MAIN FEEDWATER 2Bl Two (2) examinations were conducted and Augmented examinations as described in zone 67. No Recordable indications noted.

ZONE 78 SHUTDOWN COOLING 2B One (1) examinations were conducted. Radiographic examination performed on the CS pump 2B Flange to Reducer weld. No Reportable indications were noted.

ZONE 79 SHUTDOWN COOLING 2B Three (3) examinations were conducted. No Recordable indications were noted.

SNUBBER'S SNUBBER EXAMINATIONS AND TESTS The program for the visual examination and functional testing were conducted in accordance with Plant technical specifications.

The results of these examinations and tests are available at the site.

Twenty Eight (28) snubbers were replaced during this outage.

'0 ~ .

I 1

pl 1

p I C,

K

~ ~

NIS-1 REPORT CONTINUED page 9 of 18 CLASS Ii SYSTEM LEAKAGE TESTS la SYSTEM LEAKAGE TESTS The system leakage tests and visual (VT-2) examinations of class I systems prior to plant startup was performed by the plant. The system leakage was conducted during the Reactor Coolant (RCS) overpressure, and Instrumented Inspection Technique was conducted on the charging lines. The following are the results of those examinations:I 2-IPT-07 No leakage noted Reactor coolant discharge boundary 2-IPT-05 Packing Leakage Charging pump suction header 2-IPT-06 Check Valve Leaking Charging Pump discharge Header

15. Abstract of Corrective Measures All of the above conditions were dispositioned in accordance with plant procedures.

The following section of this report are presented for explanation of the summary of NDE examination tables (

SUMMARY

TABLES). The summary table, which are included in this report, provides information and results for the nondestructive examinations which were performed.

ZONE NUMBER Each specific system has been given a unique zone number, each zone number is identified in the upper left corner of the summary sheet tables.

SYSTEM Also identified in the upper left hand corner of the summary sheet tables is a brief description of the system.

PROGRAM ITEM NUMBER The program item number is an administrative number assigned to each weld or item for correlation purposes.

NIS-1 REPORT CONTINUED page 10 of 18 COMPONENT IDENTIFICATION AND COMPONENT DESCRIPTION I I Component identification and component description are listed in the second and th) rd column respectively. Each component examined is identified either by listing the name of the component or by a unique coded number.

ISOMETRIC NUMBER Each isometric number is listed on the top left corner of each page.

NDE PROCEDURE IDENTIPICATION COLUMN The column titled procedure number lists the NDE procedure that was used for each examination.

CODE EXAM METHOD This column describes the NDE examination to be performed.

INDICATION COLUMNS The four columns under the general heading of "INDICATIONS" are "NRI", "IN" "GEO" AND "OTHER" These columns were used as required, and their general description is provided below.

The results for the VT, MT and PT examinations are indicated by an "X" in the appropriate column to be either "NRI", or "OTHER".

The term "OTHER" is used when indications are observed that do not exceed the recording requirements of the applicable procedure.

The results of the UT examinations are indicated by recording a "X" in the appropriate column to be either "NRI" "IN" "GEO" or "OTHER" column.

In the performance of the UT examinations, the data recording level was established by the applicable NDE procedure.

10

0 1

NIS-1 REPORT CONTINUED page ll of 18 "NRI" The term "NRI" ( NO RECORDABLE INDICATIONS ) was applied when no indications were observed greater than the recording level.

"IN" The term "IN" ( INSIGNIFICANT ) was applied when (1) the amplitude of any indication observed was equal to or greater than the recording level, but less than 100% of the DAC curve, and was not resolved as being relevant or (2) non-relevant indications, such as reflections due to standing wave, trapped couplant, etc.

"GEO%

The term ( GEOMETRIC) was applied when (1) indications which have an amplitude equal to or greater than 100% of the DAC curve, and have been documented to be GEOMETRIC in nature, or (2) indications that are less than 1008 of the DAC curve but were suspected by the level II examiner to be other than geometric in nature, and were determined and documented to be geometric.

"OTHER" The term ( OTHER ) indications include those indications evaluated to be other than INSIGNIFICANT or GEOMETRIC indications.

The resolution of each GEOMETRIC and OTHER indication is either documented on the indication report form or on a sheet of paper that is attached with the weld data package.

REMARKS COLUMN The remarks column is used to provide additional information pertinent to the examination results.

1.When complete coverage of the examination was not possible, the remarks column was used to indicate the limitation.

0 0 e I

'j

>II

NIS-1 REPORT CONTINUED page 12 of 18

2. For VT,MT an/ PT results, reportable in the OTHER column, a brief description is given in the remarks column.
3. For UT results reported in the OTHER column, a brief description of the resolution of the indications is presented in the remarks column.
4. References is made in the remarks column to CORRECTIVE ACTION REQUESTS used in reporting the indications to the plant for action.
5. Augmented examinations that were performed are also identified in the remarks column.

We certify that the statements made in this report are correct and the examinations meet the Inspection Plan as required by the ASME Code,Section XI.

Date: 11-6-86 Signed FLORIDA POWER & LIGHT CO. By Owner Certificate of Authorization no.(if applicable) ~N A Expiration date N/A CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of OHIO and employed by ARKWRIGHT BOSTON MFGS MUTUAL INSURANCE COMPANY ofNORWOOD MASS have inspected the components described in this Owners'ata Report during the period04-05-1986 to 06-01-1986 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners'ata Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and

'corrective measures described in this Owners'ata Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date: 7 November 1986 FACTORY MUTUAL SYSTEM Commissions NB-7719 Inspector's Signature National Board, state, Province and No.

12

0 P

NIS-1 REPORT CONTINUED page 13 of 18 SUPPLEMENTAL SHEET NIS-1

l. Owner: Florida Power 6 Light Co.

700 Universe Blvd.

Juno Beach, Florida 33408

2. Plant: St. Lucie Nuclear Power Plant 10 Miles South of Ft. Pierce on AlA Ft. Pierce, Florida 33450
3. Plant Unit : 2
4. Owner Certificate of Authorization  : N/A
5. Commercial Service Date: 8 AUGUST 1983
6. National Board Number for Unit: N/A
10. REPORT NUMBER ORGANIZATION DESCRIPTION OF SERVICE MCI-PSL-RPT-86-002-2 FPL INSERVICE INSPECTION FINAL REPORT IR-ISI-096 CE EDDY CURRENT EXAMINATION OF STEAM GENERATORS 83A2843 NES REACTOR VESSEL MECHANIZED Ul trasoni C EXAMINATION FINAL R EPOR T 13

~ ~

C 1

t

~ l ~ ~

~

I FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As required by the provisions of the ASME CODE RULES PAGE 14 OF 18 EDDY CURRENT EXAMINATION RESULTS PLANT: ST LVCIE PLANT UNIT NO ~ 2 EXAMINATION DATES: PROM 4-11-1986 THRU 5-3-1986 STEAM TOTAL TOTAL TOTAL TOTAL TOTAL GENERATOR TUBES INDICATIONS INDICATION INDICATION TUBES NUMBER INSPECTED 20% OR = TO OR = TO PLUGGED 20% TO 39% 40% 100%

SG 2A 8233 48 30 18 SG 2B 8276 37 16 .12 LOCATION OF INDICATIONS STEAM APEX OF FULL PARTIAL TOP OF TUBE SHEET GENERATOR U-BENDS EGGCRATES EGGCRATES TO 1 DRILLED SUPPORT 1 THRU 7 8 AND 9 SG 2A 59 23 SG 2B 30 19 CERTIFICATION OF RECORD We certify that the statements in this record are correct and the tubes inspected were tested in accordance with the requirements of Section XI of the ASME Code.

FLORIDA POWER & LIGHT COMPANY

( Organization )

DATE 6 November 1986 BY OWNERsS DESIGNEE 14

~ ~

~

~

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the provisions of the ASME Code Section XI

l. Owner: Date 6 November 1986 name FLORIDA POWER 6 LIGHT CO.

address 700 UNIVERSE BLVD.

JUNO BEACH'LORIDA 33408 sheet 15 of 18

2. Plant: I ST. LUC E POWER PLANT Unit 2 name 10 MILES SOUTH OF FT. PIERCE address ON A1A PC/M NO. N/A FT. PIERCE, FLORIDA 33450 repair organization P.O. No.

job No., etc.

3. Work Performed by: Type Code Symbol Stamp N/A name PAUL MUNROE address 1701 W. SEQUOIA AVE. Authorization no. N/A P.O. BOX 5900 ORANGE, CALIFORNIA 92668 Expiration Date N/A
4. Identification of system:

SEE ATTACHED TABLES

5. (a) Applicable Construction Code N/A (b) Applicable Edition of Section XI utilized for repairs or replacements 1980 EDITION THROUGH THE WINTER 1980 ADDENDA
6. Identification of components repaired or replaced and replacement components Name of Name of Mfrs. Ser. Nat'1 Crn Other Year Repaired ASME Code Component Mfr. No. Bd. No. Ident- Built Replaced stamped No. ifica- or repl- (yes,no) tion acement MECH. SEE REPLACE-SNUBBERS PSA ATTACHED N/A N/A 0.25 N/A MENT YES MECH. SEE REPLACE-SNUBBER PSA ATTACHED N/A N/A 1.00 N/A MENT YES MECH. SEE REPLACE-SNUBBER PSA ATTACHED N/A N/A 0.50 N/A MENT YES MECH. SEE REPLACE-SNUBBER PSA ATTACHED N/A N/A 10. 0 N/A MENT YES 15

~

~ ~ I f

A

\ E 1 g ~

C1'C

~t lj .

A t.

NIS-2 REPORT CONTINUED PAGE 16 OF 18

7. Description of work:

Replace twenty-eight (28) mechanical snubbers during outage

8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure Other X Pressure psig Test Temp.
9. Remarks: Applicable Manufacturer's data Report's are attached NONE CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this REPLACEMENT conforms to Section XI of the ASME Code.

( Repair or Replacement )

Signed BY ~>'l~~~, 11-6-86

( wn r or Owner's Designee) (Title) (Date)

CERTIFICATE OF INSPECTION I, the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of OHIO employed by Arkwri ht Boston Mf 's Mutual Insurance Com an of NORWOOD MASS have inspected the REPLACEMENT described in this report on NOVEMBER 1986 and state that to the best of my knowledge and belief, this re lacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer takes any warranty. expressed or implied, concerning the repair or replacement described in this report. Furthermore neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date ll-7-1986 (Inspector Commissions FACTORY MUTUAL SYSTEM COMM. NO NB-7719 (State or Province, National Board) 16

~ ~

NIS-2 SUPPLEMENTAL SHEET PAGE 17 OF 18

1. OWNER: FLORIDA POWER & LIGHT DATE: 6 November 1986 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408

2. PLANT: ST. LUCIE POWER PLANT UNIT: 2 10 MILES SOUTH OF FT. PIERCE ON AIA, FT. PIERCEg FLA
3. WORK Paul Munroe JOB NO. N/A PERFORMED BY:

SUMMARY

OF REPLACED SNUBBERS TAG MARK SERIAL MANUFACTURER LINE/COMPONENT DESCRIPTION NO. NO. NO. CAPACXTY 2-021 RC58-22 24078 PSA-0.25 RCP 2Bl DIFFERENTIAL PRESS.

2-022 RC48-R8 26319 PSA-0.25 RCP 2B1 UPPER SEAL CAV. PRESS 2-024 RC44-R7 26329 PSA-0.25 RCP 2B1 MID SEAL CAV. PRESS 2-025 RC35-Rll 29186 PSA-0.25 RCP 2B2 MID. SEAL CAV. PRESS.

2-027 RC2-R5 29194 PSA-0.25 2B1 LETDOWN 2-029 RC5-R4 19071 PSA-0.25 SURGE LINE SAMPLE 2-030 RC59-R2 29190 PSA-0.25 RCP 2B2 DIFF. PRESS.

2-033 RC18-R9 26327 PSA-0.25 RCP 2A2 MID. SEAL CAV. PRESS.

2-034 RC26-R10A 24081 PSA-0.25 RCP 2A1 MID. SEAL CAV. PRESS.

2-045 CH108-R4 19100 PSA-0.25 CH TO LOOP 2B2 2-046 CH108-R8 26315 PSA-0.25 CH TO LOOP 2B2 2-051 SI4201-7368 12901 PSA-0.25 SI TO LOOP 2A1 2-059 SI4200-322B 29372 PSA-0.25 SI LOOP 2A2 2-061 SI4200-6307 19069 PSA-0.25 SI TO LOOP 2A2 2-071 SI4208-2668 12905 PSA-0.25 HPSI TO LOOP 2A 2-086 SI99-Rl 12910 PSA-0.25 SI TANKS TO RWT 2-088 SI4204-1270B 20361 PSA-1.00 SI TO LOOP 2Bl 2-091 BF4007-7012A 16442 PSA-10.00 FEEDWATER TO 2A S/G 2-117 SI4206-6271B 12050 PSA-0.25 HPSI TO LOOP 2B 2-162 RC4300-157 8947 PSA-10.00 PRESSURIZER RELIEF 2-214 CH2081-147A 14138 PSA-0.50 BAM PUMP SUCTION 2-215 CH2081-100A 14137 PSA-0.50 BAMT 2B OUTLET 2-224 CH2081-685B 14139 PSA-0.50 BAMT GRAVITY FEED 2-230 CH1-R5 19105 PSA-0.25 LETDOWN 2-232 CH1-R3 19104 PSA-0.25 LETDOWN 2-318 MS4102-2828 10168 PSA-10.00 S/G 2B OUTLET 2-321 MS50-R4 19111 PSA-0.25 AUX FSWTR. 2C TURB SUP. DRAIN 2-322 MS7-R2B 26318 PSA-0.25 2B MS DRAIN TO CATCH BASIN 17

II ~

OWNERS REPORT FOR PROGRAM "B" COMPLIANCE As referenced by the provisions of the ASME Code Rules page 18 of 18

l. Owner: Florida h

Power & Light Company Date: 6 November 1986 Name 700 Universe Blvd.

Address: Juno Beach, Florida 33408

2. Plant: St. Lucie Power Plant Unit No. 2 Name 10 Miles South of Ft. Pierce Address: on A1A Ft. Pierce, Florida 33450
3. Commercial Service Date: 8 August 1983
4. Inspection Period: from 0 years to 3 1/3 years
5. Inspection Interval Dates: 8-8-83 to 8-8-93
6. Applicable Edition of Section XI 1980, Addenda Winter 1980
7. OVERALL FIRST PERIOD PROGRAM COMPLIANCE TOTAL ITEMS FIRST PERIOD TOTAL ITEMS TOTAL CLASS SUBJECT TO 8 REQUIRED COMPLETE COMPLETE EXAMINATION FIRST FIR ST INTERVAL 16% 34% PERIOD PER IOD WELDS 1 1443 230 490 435 33%

454 72 154 113 40%

SUPPORTS 1 68 10 23 20 34%

120 19 40 33 36%

49 16 48 100%

TOTAL 2134 341 725 649 32%

18

ZONE 01 ST. LU IE NK:LEAR PLANT UNIT 2 N>n Oct 13 1986 SYSTEM REPCHR VESSEL 1986 SNARY REKRT TABLES PPQE 1 ISO NO. 501-014 CLASS 1 ITEM IDENTIFICATION ITEN EXAM EBOC CAL M)ICATICNS N). =

%MBA DERE IPTION MEIH NO BLK tBI IN GEO OIKB RB4ARKS 200 101-121 UPPER SHELL-FLANGE WKD 5.12 UP-8 X QONJ WI'IH NOZ EXAM 210 105-121-A OVPLEP NOZ"SHELL 6 0 DEG 83A2835 UP-10 X FROM THE ID SURFACE 240 105-121-B OVPLEP NOZ-SHELL 0 180 DEG 83A2835 UP-10 X 1 ACCP CCNJ. WITH NOZ. EXA 330 401-128-A OVPLEP NOZZLE EXT 9 0 DEB 83A2836

  • X *5CSCL-40 340 RC-114-1 QJILET NOZ EXT-PIPE 0 0 DEB 83A2836 UP-6R X 390 401-128-B T-01 TIBU T-54 OUPLEP NOZ. To EXT 6 180 83A2836 X GE) 5~40 480 'DREADS IN BASE MAT'L FLANGE NDE 5.12 UP-8 X 0,1.5,5.7,12.5 deg.

400 RC-123-1 OVP NOZ EXT-PIPE 9 180 deg. 83A2836 IA'IR 'X 300 CN-IR-B INN. RAD NE 9 180 degrees 83A2836 UP-10 X IN OCNJ. WI'IH NOZ.

ZONE 02 Sr. LK.'IB NU LEAR PLANT UNIT 2 R>n Oct 13 1986 SYSTH4 CMSlRB HEAD 1986 SQUABBY REKRT TABLES PPQB 2 ISO NO. 501-102 CLASS" 1 ITEM IDENrIPICATION ITEH EXAM EROC CAL INDICATIONS NO. NRBZR DESCR IPTION MBIH NO BLK QtI IN GE) OIHER RBSRKS 20 101-104-A pEEL smmr 8 0 Dm Ur NDE 5.14 Ur-3A X R.G. 1.150 30 101-104-B PEEL SEGMENT 6 90 degrees Ur NDE 5.1 Ur-2 X 50 101-104-D PEEL SEREPP 9 270 degrees Ur 5.14 Ur-2 x 40  : 101-104M PEEL SKMENT WELD 9180 Ur M)E 5.14 Ur-2 X

ZCNE 03 ST. LU IE NU LEAR PLANT WIT 2 R>n Oct 13 1986 SYSTEM SIM. GEN. 2A 1986 SUKQRY REPCRT TABLES PPQE 3 ISO NO. 501-103 CLASS 1 ITEM IDnmlPICAPION PZEM INDICATIONS NO. NMBER DESCRIPTION tRI IN GEO OIHER REMARKS 150 101-244M EKT. RING IDNG WEXD 9 180 VP M)E 5.1 UP-27 160 101-244-D EXT. RING GONG WEXD 9 270 VP NDE 5.1 UP-27 260 EMN-B IRI. MANWAY NVIS 9112 D83 VP-1 NDE 4.1 N/A 70 101-254-E 9 324 30'ERIDIONAL VP 800-99 UP-27 170 IN-IR INLET NOZZLE INNER RADIUS UP NDE 5.13 UP-2 UZ 3A 90 201-246 IBI. EXT. RING IUBESHEEP UP 5.1 UP-27 190 CN-IR-B OUZLEP NOZ. 9 315 INNER RADIUS UP tSE 5.13 VP-2 110 102-251-A OVZLET NOZZLE HEAD 9 45 UZ 5.1 UP-27 80 202-271 PRIMARY EKT. RING HEAD UP 5.1 UZ 27 250 EMS-B ERI. MANWAY SIUDS 9112 DES VP-1 M)E 4.1 N/A 140 101-244-B RING IDNG WEXD 9 90 30'KT.

UZ NDE 5.1 UP-27 30 101-254-A MERIDIONAL 9 36 UP 800-99 UP-27 0 deg. only LIMITED 40 101-254-B MERIDIONAL 9 108 UP 5.1 UP-27 50 101-254M MERIDImL 9 180 UP 800-99 UP-27 180 CZI-IR-A OUZLET NOZZLE 945 INNER RADIUS UP NDE 5 '3 UP-2 100 104-251 INLEP NOZZLE IO HEAD UP 5.1 UP-27 GEO 120 102"251"B OUZLET NOZZLE 'IO HEAD 9 315 UP 5.1 UP-27 GEO 130 101-244-A EKT. RING IlNG WEXD 9 0 UP 5.1 UP-27 60 101-254-D MERIDI(MAL 9 252 UP 800-99 VP-27 0 deg. only LIMITED 240 EMN-A IRIMARY MANWAY 9 0 NUIS VP-1 NDE 4.1 N/A 230 EMS-A IRIMARY MANWAY 9 0 SIUDS VP-1 NDE 4.1 N/A X DENTS INPLACE,RM%ED

ZONE 04 SZ. LK.'IE NUCLEAR PLANT UNIT 2 Mon Oct 13 1986 SYSTEM SIN. GEN. 2B 1986 SRTQRY REKRT TABLES PAGE 4 ISO NO. 501-104 CLASS 1 ITEM IDEÃZIPICATION ITEM EXAM EBOC CAL INDICATIONS NO. NR93ER DESCRIFZION MEIR NO BLK NII IN GEO OILER 230 IMS-A IBIMARY MANHAY 6 0 DIG SDX8 VZ-1 NDE 4.1 N/A X DENNIS 260 PQl-B IBI MAHHAY NUIS 6112 DEC VZ-1 NDE 4.1 N/A X FROZE 250 WS-B MANHAY SIUDS 9 112 30'BIMARY VZ-1 NDE 4. 1 N/A X DELIS 240 ~ BW-A MANHAY 9 0 DHr NUIS 30'BIMARY VZ-1 NDE 4.1 N/A X

ZONE 06 ST. IlLIE NlCLEAR PLANT UNIT 2 Aw Oct 13 1986 SYSTEM RCS LOOP A HOP LEG 1986 S8%ARY RERRT TABLES PAGE 5 ISO NO. 501-106 CLASS 1 ITEM IDEÃZIPICATION ITEM EXAM tao CAL INDICATIONS NO. NEER DESCRIPTION MEIH NO BLK &I IN GEO OIIIER 31 42 "WC-101-722-B PIPE IONG SEAM NES UP-4A X 12" OP IONG SEAM 20 42 "WC-101-722-A PIPE - IlÃG SEAM UP'Pi NDE 2.2 N/A X 12" OF IDNG SEAM 10 42"WC-l14-1 RPV NOZ. EXT. PIPE HP NDE 2.2 N/A X FROM NOZ. KRE ZN.

30 42"WC-101-722-B PIPE IONG SEAM MP ~ NDE 2.2 N/A X 12" OP IDNG SEAM 100 3"WC-502-77l NOZZLE 'IO SAFE END UF. NDE S.ll UP-33 X COILS. ON ITEM 4 2l 21 42"WC-101-722"A PIPE KNG SEAM UP ~ NES UP-4A X 12" OP DOG SEAM

ZONE 08 ST. LK'.IE NU:LEAR PLANT WIT 2 Wn Oct 13 1986 SYSTEM RCS IDOP A S/&RCP 1986 SASSY REKRT TABLES PAGE 6 ISO NO. 501-108 CLASS 1 ITEM IDBIPIFICATION ITEM EXAM EROC CAL INDICATIONS NO. NQ93ER DEKRIP1'ION - MEIH NO BLK tRI IN GEO OIHER REEKS 40 30"-RC-107-742-B -

ELKM IDNG SEAM NDE 5.3 X 12" OF IDNG SEAM 20 30"WC-1501-771-A SAFE M) TO EL83W N)E 5.11 UZ-59 X 21 30"WC-1501-771-A SAFE END TO ELBOH NDE 5. 3 UP-6CS X 10 30"WC-115-4 RCP 2A2 INLET '10 SAFE END NDE 5.3 UP-59 X EXCEEDS 2.4 S/M 30 30"WC-107-742-A ELB3W - IDNG SEAM NDE 5.3 UP-6 X 12" OF IDNG SEAM

ZONE 10 ST. LU:IE NlLLEAR PLANT UNIT 2 Wn Oct 13 1986 SYSTEM RC IDOP B S/&RCP 1986 $ 3%QRY REKRT TABLES PAGE 7 ISO NO. 501-110 CLASS 1 ITEN IDENTIFICATION AMBER re EXAM EROC CAL INDICATIONS tBI NO. DESCRIPTION NO BLK IN GEO OILER 170 10 171 30 "RC-121-1501-771-B ELBOW-2Bl RCP INLET SAFE END 30"WC-121-401-258-B S/G NOZZLE-EXT PIECE 30"RC-121-1501-771-B ELK%-2B1 RCP INLET SAFE END UT UT UT NDE NDE NDE 5.3 5.3 5.3

~

UT-59 UT-6CS X

X X

KNE 11 ST. LICIE NUCLEAR PLANT UNIT 2 Non Oct 13 1986 SYSTEM RC IMP B RC~PV 1986 SUhSARY REKRT TABLES PAGE 8 ISO NO. 501-111 CLASS 1 PPEM IDERPIFICATION ITEM EXAM ERCX: CAL INDICATIONS NO. NRBER DERE IPTION MEIH NO BLK <BI IN GEO OQiER ll 30"WC-121-5 RCP 2B2-SAFE M) 3.3

~

N/A X

~

PP USE 30 30"WC-103-722-A PIPE IlSG SEAM VP NDE 5.3 X 12" OF IlSG SEAN 40 30"WC-103-722-B PIPE - IONG SEAN UP NDE 5.3 UP-6 X 12" OF IONG SEAN 21 30"-RC-901-771 SAFE END 10 PIPE UP ~ NDE 5.3 X 10 30"-RC-121-5 RCP 2Bl-SAFE M) UP NDE 5.3 UP-59 20 30"WC-901-771 SAFE BB 'IO PIPE UP NDE 5.3 VP-59 X

SNE 12 ST. LU:IE NU LEAR PLANT UNIT 2 Wn Oct 13 1986 SYSTEM RCS ZOOP A S/~CP 1986 SUhi4RY RERRT TABLES PPQE 9 ISO NO. 501-112 CLASS 1 ITEM IDENTIFICATION ITEM EXAM PRO= CAL INDICATIONS NO. ARGUER DEKRIPTION MEIN NO BLK lRI IN GEO OTHER 150 30 "WC-107-742-A ELBOW IlSG SEAN UT NDE 5.3 UP-6 X 12" OF IlbQ SEAN 170 30 "WC-1501-771-C EUKW 'IO SAFE END UZ NDE 5. 11 UT-59 X 171 30 "WC-1501-771-C ELBOH 'IO SAFE BQ UT NDE 5.3 UT-6 X

ZONE 17 ST. LK,'IE NUCLEAR PLANT WIT 2 Ran Oct 13 1986 SYSTEM RCP 2A1 1986 SURGERY REKRT TABLES PAGE 10 ISO NO. 501-117 CLASS 1 ITEM IDENTIFICATION ITEM EXAM IBO" CAL INDICATI(NS NO. NtHBER DEKR IPTIOH MEIH NO BIZ kRI IN GEO GIBER REMARKS 80 02&1708 FLYNHEEL BCRE 6 KEYWAY UI')E 5.15 N/A R.G. 1.14

RNE 18 ST. LK',IE NU'LEAR PLANT UNIT 2 Ran Oct 13 1986 SYSTEM RCP 2A2 1986 SPTCRY REPCRT TABLES PAGE 11 ISO NO. 501-118 CLASS 1 ITEM IDEÃZIFICATION ITEM EXAM EROC CAL INDICATIONS NO. NtMBER DESCRIPTION MEIT NO BLK tBI IN GEO OIHER REKRKS 80 02-018-008 FLYNHEEL BCRE & KEYWAY UT NDE 5.15 N/A R.G. 1.14

ZONE 19 ST. LU.IE NK,'LEAR PLANT UNIT 2 Mon Oct 13 1986 SYSTEM RCP 2B1 1986 SURGERY RERRT TABLES PAGE 12 ISO NO. 501-119 CLASS 1 ITEM IDEÃZIFICATION ITEM EXAM EROC CAL INDICATIONS NO. NUMBER OESmlPrrON MEW NO BLK Qkf IN GEO OWER REMARKS 80 02-019-008 HYWHEEL KRE & KEMAY UI'.15-1 N/A R.G. 1.14

ZONE 20 ST. LU:IB NU:LEAR PLANT [NIT 2 Mn Oct 13 1986 SYSTEM RCP 2B2 1986 SOAPILY REKRT TABLES PAGE 13 ISO NO. 501-120 CLASS 1 ITEM IDEMIPICATION ITEM ERH &OC CAL M)ICATICNS NO. NEER DESCRIPTION MEIH NO BLK tRI IN GEO OMFR REMARKS 80 02-020-008 UZ NDE 5.15 N/A X R.G. 1.14

ZCNE 24 ST. LU IE NK,'LEAR PLANT UNIT 2 bk>n Oct 13 1986 SYSTEM SI IDOP 2B2 (IC) 1986 SR@PRY REKRT TABLES PAGE 14 ISO NO. 501-124 CLASS 1 ITEM IDENTIFICATION ITEM EXAM ERCC CAL INDICATIONS NO. NUMBER DESCRIPTION MEIH NO BLK FBI IN GEO OTHER REMARKS 221 V-3644 VALVE BOLTING VZ-1 NDE 4.1 N/A X ACICEPT 51 V-3247 VALVE BOLTING VP-1 NDE 4.1 N/A X 271 V-3261 VALVE BOLTING 16 SIUDS/NUIS VT-1 NDE 4.1 N/A X

W I

RSE 28 ST. LU:IE N(CLEAR PLANT UNIT 2 Mon Oct 13 1986 SYSTEM S.C. & HLI IDOP B 1986 SNARY REPCRT TABLES <ME 15 ISO NO. 501-128 CLASS 1 ITEM IDENPIPICATION ITEM EXAM EROC CAL INDICATIQ4S NO. NUMBER DESCRIPTION MEIH NO BLK lRI IN GEO OIHER 380 10"-130-EW-901 PIPE TO PIPE NDE 5.4 UP"37 X 390 10"-SI-130-PW-902 PIPE m TEE M)E 5.4 UP-37 X 381 10"-SI-130-EW-901 PIPE 'IO PIPE me 3.3 N/A X 310 10"-SI-130-1-SW-6 2" ERAN H C NNECTION NDE 3.3 N/A X ACCEPT (3) RCUM) IND 391 10"-SI-130-EW-902 PIPE 'IO 'IKE NDE 3.3 N/A X

ZONE 29 SF. LU IE NU LEAR PLANT UNIT 2 Mn Oct 13 1986 SYSTEM S.C. & HLI IDOP A 1986 SRlQRY REKRT TABLES PAGE 16 ISO NO. 501-129 CLASS 1 ITEM IDENTIFICATION ITEM INDICATIONS NO. NUMBER DERE IPTION i@I IN GEO OIHER 331 V-3480 VALVE BOLTING VZ 1 NDE 4.1 N/A X KREWS MISSING CAP SCREE 511 V-3545 VALVE BOLTING VT-1 NDE 4.1 N/A X 441 . V-3481 VALVE BOLTING VP-1 NDE 4. 1 N/A X KRIC PCID LIGHT

ZONE 33 SYSTEM IRIMARY IRAIN ISO NO. 501-133 2Al 1986 SR%PRY REPCRT CLASS 1

~

ST. LK:IE NU:LEAR PLANT WIT 2 Non PAGE Oct 13 17 1986 ITEM IDEVPIFICATION ITEM &OC CAL INDICATI(SS NO. NRBER DEKRIPTION NO BLK tRI IN GEO OILER 80 2"-RC-113-FB HINGE BOLTING 8 SIU)S 16 NVIS VT-1 NDE 4.1 N/A X

O. Jp 1

( ~ r

ZQK 34 SF. LK'.IE NU LEAR PLANT UNIT 2 Wn Oct 13 1986 SYSTEM IRI. IRAIN IDOP 2A2 1986 SORRY REKRT TABLES PAGE 18 ISO 83. 501-134 CLASS 1 ITEM IDENPIPICATION ITEM IBOC CAL INDICATIONS NO. NUMBER DBKRIPTION NO BLK WI IN GEO OIHER 80 2 "WC-116-FB FLANGE BOLTING 8 SIU)S 16 NUTS VP-1 NDE 4.1 N/A X RUST

ZONE 35 ST. IlCIE NU:LEAR PLANT UNIT 2 Mon Oct 13 1986 SYSTEM IRI. CRAIN LOOP 281 1986 SRRQRY REPCRT TABLES PAGE 19 ISO NO. 501-135 CLASS 1 ITEM IDENPIPICATION ITEM ERCC CAL INDICATIONS Q3. %NKB I DESCR PTION NO BLK tRI IN GEO OIHER 80 2"-RC-122-FB HANGE BOLTING 8 SIUDS 16 NUIS VZ-1 NDE 4.1 N/A

ZONE 36 SP. LU IE NUCLEAR PLANT UNIT 2 Mon Oct 13 1986 SYSTEM IRI. IRAIN IDOP 2B2 1986 SQT4$ Y REPCRT TABLES PAGE 20 ISO NO. 501-136 CLASS 1 ITEM IDBfrIFICATION ITEM IHDICATICHS NO. NOHBER OESCRrerION WI IH GEO OIHER 80 2"-RC-125-FB PL!Q4E BOLTING 8 SGDS 16 NVIS VZ-1 HDE 4.1 N/A X KROH

KNE 37 SP. ULIE NELS@ PLANT UNIT 2 Wn Oct U l986 SYSTEM LEHXWM LINE 1986 SRSPRY REKRT TABLES PAGE 21 ISO NO. 501-137 CLASS 1 ITEM IDENTIFICATION ITEM INDICATICNS NO. NUMBER DEKRIPTION tRI IN GEO OIHER 420 V"2516 VALVE BOLTING (12) VP-1 'DE 4.1 N/A X KRIC ERIC ACID 230 2"-CH-145-SRÃ-3 ELEOW 'Io PIPE PT NDE 3.1 N/A

ZONE 41 ST. LU IE NU LER PLANT DNIT 2 Hen Oct 13 1986 SYSTEM SIM. GEM. 1986 SCARY REPORT TABLES PAGE 22 ISO NO. 501-241 CLASS 2 ITEM ID EDIFICATION ITEM EXAM IBOC CAL INDICATIONS NO. RNBER DESCRIPTION MEIH NO BLK tRI IN GEO OZHER 120 103-221-A KE%AY WACKEIS 9 0 DEC MZ NDE 3.3 N/A X 20 101-241 SHXNDARY EXT RING-QNER SHELL UP NDE 5.1 UZ 25 X 10 , 203-246 SEXNDARY EXT. RING-'IUBESHEET UP NDE 5. 1 UP-25 X 140 i 104"221-A CLEGS &ACKE1' 45 DEB MP NDE 3.3 N/A X ACCEPT (2) RCUH)H)

~ ~

I 5

ZCNE 43 SF. LU IE NU:LEAR PLANT DNIT 2 . bk>n Oct 13 1986 SYSTEM LPSI 2A DISCHARGE 1986

SUMMARY

REKRT TABLES PAGE 23 ISO NO. 501-243 CLASS 2 IDENTIFICATION ITEM INDICATIONS NOMBER DEKR IPTION tRI IN GEO OIHER 40 10"-SI"417-FH-1 PIPE lQ VALVE V-3106 NDE 3.3 N/A X 30 10"-SI-417-1-SW"1 ls PIPE IlÃG SEAM NDE 3.3 N/A X 2.5t 'IQ BE EXAMINED 20 10""SI-417-1-SN-I 10"x8" RED 10" PIPE NDE 3.3 N/A X 140 10"-SI-2406-660 SHEAR AS t= 1 1/2" NDE 3.3 N/A X 4 LOGS 150 10"-SI-417-PH-3 PIPE m VALVE V-3206 NDE 3.3 N/A X 160 NO I.D. PIPE KNG SEAM 9 EW-3 NDE 3.3 N/A X 50 10"-SI-417-PN-1 ls PIPE GSG SEAM NDE 3.3 N/A X 2.5t 'IQ BE EXAMINED

ZONE 49 ST. LV IE NV LEAR PLANT UNIT 2 Ran Oct 13 1986 SYSTEM SHVIDOWN COOLING A 1986 S(MARY REPCRT TABLES PAGE 24 ISO M). 501-249 CLASS 2 ITEM ~ IDENI'IFICATION rIEM INDICATIONS NO. NUMBER DESCR IPI'ION Wl IN GEO OIHER REMARKS 10 10"-SI-363-EW-12 PENEIRATICN N 64 'IO PIPE NDE 3.3 N/A ~ X 40 10"-SI-363-PW-904 ls PIPE IlSG SEAM NDE 3.3 N/A X 2.5t OF LONG SEAM 50 10""SI-363-ll-SW-lA ELBOW-Ills SEAM NDE 3.3 N/A X 2.5t OF KNG SEAM 20 10"-SI-363-FW-12 ls PIPE LONG SEAM NDE 3.3 N/A X 2.5t OF LCNG SEAM 30 10"-SI-363-EW-904 PIPE 'IO ELBOW NDE 3.3 N/A X 60 10"-SI-363-ll-SW-lA ELBOW-KNG SEAM M)E 3.3 N/A X 2.5t OF GING SEAM 70 10"-SI-363-EW-13 ELBOW 'IO PIPE M)E 3.3 N/A X

ZONE 52 SF. LK:IE NlLLEAR PLANT UNIT 2 Mon Oct 13 1986 SYSTEM SHUIDCWN OQOLING B 1986 SPIRY REHRT TABLES PAGE 25 ISO NO. 501-252 CLASS 2 ITEM IDENTIFICATION ITEM IHDICATI(SS NO. NDMBER DESCRIPTION (BI IN I

GEO OILER 360 10"-362-4-SW-1 PIPE ELKIW 3.3 N/A X I

NDE 370 NO I.D. PIPE IlÃG SEAM 9 SW-1 HDE 3.3 N/A X 400 10"-362-4-SW-2 ELBOW PIPE HDE 3.3 N/A X 410 NO I.D. PIPE IZING SEAM QSW-2 HDE 3.3 N/A X 380 10-362-4-S&lA ELBOW rOWS SEAM 9 SW-1 HDE 3.3 N/A X 390 NO I.D. ELBOW KNG SEAM 9SW-2 NDE 3.3 H/A X

ZONE 62 ST. LK'.IE NK'.LES PLANT UNIT 2 Ron Oct 13 1986 SYSTEM HPSI 2B 1986 SWARY REKRT TABLES PAGE 26 ISO N). 501-261 CLASS 2 nm IDENTIPICATax arm EXAM EROC CAL INDICATIONS NO. %NER DESCRIPTION MEIH  %) BLK FBI IN GEO OIHER 50 6"-SI-213-PW-1 PIPE 10 VALVE V-3654 VZ NDE 5. 4 UP-54 X REPAIR WEU) 1 1/2"d 51 6"-SI-213-PH-1 PIPE '10 VALVE V-3654 PT NDE 3.3 N/A X REAPIR WEID 1 1/2"d

ZONE 63 ST. LU IE NU LEAR PLANT UNIT 2 )4m Oct 13 1986 SYSTEM HAIN STEAM 2Al 1986 SRRPRY REKRT TABLES PPQE 27 ISO NO. 501-263 CLASS 2 ITEM IDENPIFICATI(Ã CPEM EXAM EROC CAL INDICATI(NS NO. NWBER DESCRIPPION MEIN NO BLK tRI IN GEO O'ER 10 36"-MS-52-FW-1 NOZZLE m ELBOW 5.2 ll 36"-MS-52-FW-1 NOZZLE 'IO ELBOW NDE NDE 2.1 UP-45 N/A INACCESSIBLE 31 36"-MS-52-FW-lA ~IONG SEAM NDE 2.2 N/A 2.5t OF IXI'EAM 50 36"-HS-52-FW-lB ELK%-IONG SEAM NDE 5.2 UP-45 2.5t OF IONG SEAM 150 34"-MS-28"1-SW-3 PIPE 'IO EL83W NDE 5.2 UP-45 51 36"-MS-52-FW-1B 34"-MS-28"1"SW-3 ls EL' IONG SEAM NDE 2.2 N/A 2.5t OF IONG SEAN 140 PIPE- IONG SEAM NDE 5.2 UP"45 2.5t OF IONG SEAN 141 34"-MS-28-1-SW-3 ls PIPE HSG SEAM NDE 2.2 N/A 2.5t OF KNG SEAM 180 34"-MS-28"1-SW-3B ELBOW IlSG SEAM NDE 5.2 UP-45 2.5t OF IlXG SEAM 160 34"-MS-28-1-SW-3A ELK%- KNG SEAM NDE 5.2 UP-45 181 34"-MS-28"1-SW-3B ELBOW IONG SEAM NDE 2,2 N/A 2.5t OF IONG SEAN

ZONE 64 SF. LU IE NU"LlAR PIANO UNIT 2 hhn Oct 13 1986 SYSTEM MAIN STEAM 2B1 1986 SVKQSY RERRT TABLES PAGE 28 ISO N). 501-264 CLASS 2 ITEM IDEPPIPICATION ITEM CAL INDICATIONS HO. NUMBER DESCRIPTION BIZ Qtl IN GEO OIHER 350 34"-MS-4101-315 SHEAR uzi (4) t=l 1/4" NDE 2.2 N/A X 310 34"-MS-29-3-SW-1A ELBOW UmG SEAM 9SW-1 NDE 5.2 UP-45 X 360 34"-MS-29"FW-4

"- ELBOW m PIPE HDE 5.2 UP-45 X 361 3 ELBOW 10 PIPE HDE 2.2 N/A X 311 34 "-MS-29-3-SW-lA ELBOW IONG SEAM 6SW-1 HDE 2.2 N/A X

ZONE 65 ST. LU:IE NK:LEAR PLANT UNIT 2 Wn Oct 13 1986 SYSTEM MAIN STEAM 2A (OC) 1986 SENARY REKRT TABLES P&E 29 ISO NO. 501-265 CLASS 2 ITEM IDEÃPIFICATION ITEM EXAM EROC CAL INDICATES NO. NUMBER DESCR IPPION METH NO BLK tB I IN GEO OPHER REMARKS 231 35.5"-MS-1-1-SW-1 ls PIPE IDNG SEAM HP NDE 2.2 N/A X ERP 6.6 40 35.5"-MS-1-Bf-1 ls PIPE IlÃG SEAM UP NDE 5.2 UP-44 X &P 6.6 230 35.5"-MS-1-1-&/-1 ls PIPE KNG SEAM UP NDE 5. 2 UP-44 X &P 6.6 241  : 35"~"1-FH-2 PIPE 'IO VALVE (MSIV) MT NDE 2.1 N/A X

ZCNE 78 SYSTEH SHUIIOWN COOLING 2B ST. QLIE NU l EAR PSYCH UNIT 2 1986 SRTCSY REKRT TABLES

~ Oct PAGE 13 30 1986 ISO NO. 501-278 CLASS 2 ITEM IDEÃZIP ICATION I%AM PR(C CAL INDICATIONS N). NlNBER PCS'ESCRIPTION MEIT NO BLK hRI IN GEO ONE RBQRKS 10 12 "~-14 "1-SW-I CS PUMP 2B FLANGEWH)UCER RT FPL N/A X @KEPT PERKRHED BY BACKPI

ZONE 82 SZ. LU IE NU LSR PLANT UNIT 2 Hon Oct 13 1986 SYSTEM LPSI PUMP 2B 1986 STRIPY REPCRT TABLES PPQE 31 ISO NO. 501-282 CLASS 2 ITEN IDmrre ICATION Pr04 INDICATuXS HO. NUMBER OamrPI ION /RI IN GEO OIHER 10 2B-l-l WEU)ED SUPPCRT PT NDE 3.3 N/A X 20 2B-1-2 WELDED SUP KRT PZ NDE 3.3 N/A X 40 2B-1-4 HAP 1Q HdQGE WELD PP NDE 3.3 N/A X