Responds to IE Bulletin 79-19.Liquid Radwaste Generated Jan-June 1979 & Solidified Using Atcor in-line Solidification Sys.Packaging Requirements for Burial Maintained
ML19254E816
Person / Time
Site: Beaver Valley
Issue date: 09/28/1979
From: Dunn C
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7911020354
Download: ML19254E816 (3)


Text

-- . . . - . ._ - - . . .

( * , +w TA

'Af M u m 456-6000 e.,.....

It gM. Pt September 28, 1979 United States Nuclear Regulatory Coc: mission Attention: Boyce H. Grier, Director Regien ?

631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Beaver Valley Pover Station, Unit No. 1 Docket No. 50-334 License No. DPR-66 Response To IE Bulletin 79-19 Gentlemen:

NRC IE Bulletin 79-19 which concerns packaging of low-level radioactive waste for transport and burial has been reviewed. As requested in the subject Bulletin, the following information is provided.

Item 1 A current set of DOT regulations (49 CFR) is currently on order. The BVPS Station Office currently maintains a subscription copy of 10 CFR.

Item 2 A current set of the packaging requirements for transportation and burial at the Barnwell, South Carolina burial site is maintained by the Station. The Station has not made shipments to the other two burial sites.

Item 3 The Station personnel responsible for the proper packaging and transport of low-level radioactive material are identified in the BVPS Radeon Manual, Appendix 8, Part I, which will be issued and effective by October 31, 1979.

Item 4 BVPS Radeon procedures are presently being revised to include detailed instructions and procedures for the packaging and transport of low-level radioactive material. These procedures will be written, approved, and in effect by December 31, 1979.

1249 168

$ $t 7911020  %

*4 Beavet Valley Power Station, Unit No. 1 Docket No. 50-334 Response To IE Bulletin 79-19 Page 2 Item 5 Radiation Technician Retraining Module 6, dealing with the packaging and transport of radioactive material, is currently in progress. Completion of this module is scheduled by October 31, 1979. As shipping procedures are approved, they are reviewed by all Radeon personnel with an instructor or supervisor conductirg the review. In addition, a two-day technical seminar for supervisory, operations and technical personnel is being conducted at the site September 27 and 28, 1979 by an outside consultant.

Item 6 Operators are trained in the operation of the liquid and solid waste disposal systems. Station operating procedures are written to minimize excess waste. By these means, the operators are aware of the acceptable chemical and physiccl properties of waste for transfer, as well as the need to minimize gaste generation.

Item 7 T -

ging of low-level radioactive waste for transport and burial has beer, cporated into the Operations Quality Assurance program of the Ducaesi Li; bt Company. In addition, the Beaver Valley Power Station Radiati a Centrol Manual contains an appendix which provides an overall prograu f r solid radioactive weste management and the Beaver Valley Fc; . ion Operating Manual contains implementing procedures. A Process Contt. -rcgcim has been submitted to the Nuclear Regulatory Commission along with the proposed Appendix I Technical Specifications.

Routine audits by the Duquesne Light Company Quality Assurance Department check the implementation of the above. In addition, technical audits are performed at the direction of the Offsite Review Committee (ORC) to examine methodology and techniques used in the packaging and solidification of radioactive wastes.

Item 8 An ORC audit reviewing the technical aspects of the solidification program has been completed. A management-controlled audit utilizing the Quality Assurance Department will be conducted by October 10, 1979 to review activities associated with the packaging cr( transport of low-level radioactive waste.

1249 169

Beaver Valley Power itation, Unit No. 1 Docket No. 50-334 Response To NRC IE Btiletin 79-19 Page 3 Item 9 Beaver Valley Power Station reports the information requested in Questions 1 and 2 in accordance with the Technical Specifications.

Liquid waste was generated during the first-six months of 1979.

This waste was solidified using an ATCOR In-Line Solidification System, as described in Operating Manual Chapter 18.

If you have any questions regarding this response, please contact my office.

Very truly yours, B+/dL-C. N. Dunn Vice President, Operations cc: NRC Office Of Inspection And Enforcement Division of Fuel Facility And Materials Safety Inspection Washington, D. C. 20555 1249 170