ML19263C491

From kanterella
Revision as of 19:43, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Hartsville Nuclear Plants Special Const Effects Monitoring Study,Rept for Second Year of Const, Dtd Jan 1979 W/Encl 781222 EPA Ltr & Natl Pollutant Discharge Elimination Sys Permit No TN0027740
ML19263C491
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 02/02/1979
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: Boyd R
Office of Nuclear Reactor Regulation
References
NUDOCS 7902260332
Download: ML19263C491 (229)


Text

f L TENNESSEE VALLEY AUTHCRITY CH AT? ANCC S A. TENNE 35EE 37401 500C Chestnut Street Tower II February 2, 1979 Director of Nuclear Reactor Regulation Attention: Mr. Roger S. Boyd, Director Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Boyd:

In the Matter of the Application of ) Docket Nos. STN 50-518 Tennessee Valley Authority ) STN 50-519 STN 50-520 STN 50-521 In accordance with Part II.B.h, Special Monitoring Study Review, of to the Hartsville Nuclear Plants construction permits, Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153, we are enclosing five copies of the "Hartsville Nuclear Plants - Special Construction Effects Mcnitoring Study - Report for the Second Year of Construction."

The monitoring period for this report was May 1, 1977, through April 30, 1978. Since the results of this report relate directly to matters regulated under the Federal Water Pollution Control Act Amendments esf 1972, copies of the report are being forvarded by this letter to the Environmental Protection Agency (EPA), Region IV, and the Division of Water Quality Control, Tennessee Department of Public Health, for their information.

This completes the reporting requirements which were specified in the construction permits. The National Pollutant Discharge Elimination System (NPDES) permit (No. TH0027740) for the construction discharges of the Hartsville Nuclear Plants was issued by EPA and became effective on December 31, 1978. A copy of the permit is enclosed. The permit established appropriate effluent limitations along with corresponding monitoring and reporting provisions to ensure the continued protection of the aquatic environ =ent of the Cumberland River during construction of the Hartsville Nuclear Plants.

We have revised our construction effects monitoring progrsm in accordance with the provisions of the NPDES pe nit.

Very truly yours, J. E. G111 eland Assistant Manager of Power Enclosures ee: See pag a 7 9 0 2 2 6 0 3 %> (<,

\

.m m x

Mr. Roger S. Boyd, Director February 2, 1979 cc (Enclosures):

Mr. Phillip Gustafson (h)

Environnental Statement Projects Building 11A Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439 Mr. Joe Holland (Report only)

R. S. Gass State Office Building Ben Allen Road Nashville, Tennessee 37216 Mr. Charles Kaplan, Coordinator (2) (Report Only)

Thermal Analysis Unit Environmental Protection Agency Region IV 3h5 Courtland Street Atlanta, Georgia 30308 Mr. Elmo Lunn (Report Only) 621 Cordell Hull Building Nashville, Tennessee 37219 Mr. Don Sells (h)

Environnental Projects Branch Division of Site Safety and Environm;ntal Analysis U.S. Nuclear Regulatory Consission Washington, DC 20555 Mr. John C. White (3)

Administrator, Region IV Environmental Protection Agency 3h5 Courtland Street, NE Atlanta, Georgia 30308