ML19344E330

From kanterella
Revision as of 06:32, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-058/01T-0
ML19344E330
Person / Time
Site: Beaver Valley
Issue date: 08/22/1980
From: Werling J
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19344E331 List:
References
BVPS:JAW:945, NUDOCS 8008280396
Download: ML19344E330 (2)


Text

!

j .

d %. .

31 S Duquesne Lifit , . , , , . _

43$ S.sen A.eeve

$ 7 "#' DUQUESNE LIGHT COMPANY Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 August 22, 1980 BVPS: JAW:945 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 LER 80-058/01T Mr. B. H. Crier, Director of Regulation United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406 ,

Dear Mr. Grier:

In accordance with Appendix A, Beaver Valley Technical Specifications, the following Licensee Event Report is submitted:

LER 80-058/OlT, Technical Specification 6.9.1.8.1, Administrative Controls.

l This occurrence was reported to Mr. D. A. Beckman, the Beaver Valley Resident l

Inspector, at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on August 21, 1980.

( Evaluation and reanalysis required by IE Bulletin 79-14 have shown that l the following piping and supports have less conservatism than assumed for the safety analysis and require remedial action.

This report is. written' to serve as both the immediate report and the fourteen (14) day followup. The information available should fulfill the requirements of both reports.

Very truly yours, A

l J. A. Werling l

[v Superintendent l

1 Attachment p l 80082 80896 s lI i

$ =

dr. B. H. Grier August 22, 1980 BVPS: JAW:945 Page 2 cc: Director Of Management & Program Analysis United States Nuclear Regulatory Commission Washington, D. C. 20555 -

W. J. Ross, BVPS Licensing Project Managers /'

United States Nuclear Regulatory Commission Washington, D. C. 20555 D. A. Beckman, Nuclear Regulatory Commission, BVPS Site Inspector P. Higgins, Secretary, Prime Movers Committee - EEI Nuclear Safety Analysis Center, Palo Alto, California Mr. John Alford, PA Public Utilities Commission, Harrisburg, PA O

I I

(

l l .

l l

. i - . - . _ _ - . _ _ _ _ , _ _ _ _ . _ . . _ _ _ _ _ _ _ _ _ , , , _ . . _ _ _ _ _