ML19330C771

From kanterella
Revision as of 00:09, 6 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to OLs DPR-44 & DPR-56 Adding Seismic Monitoring Instrumentation Operability & Surveillance Requirements in Response to NRC 800701 Ltr. Certificate of Svc Encl
ML19330C771
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/07/1980
From: Bauer E, Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML17193A372 List:
References
NUDOCS 8008110465
Download: ML19330C771 (6)


Text

.

..

.

(

BEFORE Tile UNITED STATES NUCLEAR REGULATORY COMMISSION 1- In the Matter of  :

<

Docket Nos. 50-277 PHILADELPilIA ELECTRIC COMPANY  : 50-278

,

!

APPLICATION FOR AMENDMENT

..

OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 I

,.

f

Edward G. Bauer, Jr.

Eugene J. Bradley i

2301 Market Street Philadelphia, Pennsylvania 19101

! Attorneys for Philadelphia Electric Company i

l

!

<

4 8008110*#

. - - .

- .. . . -

.. .

. .. .-- .. . . .

. . . - - - . ._. -

.

.

. BEFORE Tile UNITED STATES NUCLEAR REGULATORY COMMISSION J

In the Matter of  :

Docket Nos. 50-277 Pl!ILADELPl!IA ELECTRIC COMPANY  : 50-278

'

.

APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56

.

Philadelphia Electric Campany. Licensee under Facility Operating Licenses DPR-44 and DPR-56 for Peach Bottom Units 2 and 3, hereby requests that the Technical Specifications contained in Appendix A of the Operating Licen.scs be amended by adding pages 240n, 240(o), 240p, and 240g; and by revising section 6.9.3c on page 257.

Correspondence from Mr. Thomas M. Novak, Assistant 1

Director for Operatitig Reactors, ;iRC , to Mr. E. G. Bauer, J r. ,

Philadelphia Electric Company, da:cd July 1, 1980, requested the submission of a license amendment application to conform with certain sections of the model Technical Specifications attached -

, - _ _ .

.

.

'

to his letter, by adding seismic monitoring instrumentation operability and surveillance requirements. The proposed amendment incorporates these provisions into the Peach Bottom Operating License.

The design of the present seismic instrumentation at Peach Bottom is not consistent with the guidelines presented in the Model Technical Specifications, transmitted with Mr. Novak's l e t. t e r , and with the requirements of itegulatory Guide 1.12,

" Instrumentation for Earthquakes". Design and procurement of a

!

new scismic monitoring system was initiated previously in the Spring of 1980. This new system will comply with the guidelines of the !!odel Technical Specifications, and Regulatory Guide 1.12.

Delivery of equipment is expected in September 1980, and the new system is expected to be operational by the Fall of 1980.

  • Accordingly, the Licensee requests approval of operability and surveillance requirements for the proposed seismic monitoring instrumentation that would take effect upon completion of the installation.

Pursuant to 10 CFR 170.22, " Schedule of Fees for Facility License Amendments", Philadelphia Electric Company proposes that this Application for Amendment be considered a Class II Amendment for Unit 2, and a Class 1 Amendment for Unit 3, since the proposed changes are deemod to be administrative in nature.

The Plant Operation Review Committee and the Operation and Safety tieview Committee have reviewed these proposed changes to the Technical Specifications, and have concluded that they do

.

.

not involve an unreviewed cafety question or a significant hazard consideration; and will not endanger the health and safety of the public.

Respectfully submitted,

,  !

_

\ 'b /

Vice P r e s i'd e n t

~

,

/ I

. .

9-

  • CO MtlON WE ALTil 0F PElelSYLVANIA  :

ss.

COUNTY OF Pl!ILADELPilIA  :

S. L. Daltroff, being ftrat duly sworn, deposes and says:

That he is Vice President of Philadelphia Electric Company, the Applicant herein; th.it he has read the foregoing Application for Amendment of Facility Operating Licenses and knows the contents thereof; and that the statements and matters act forth therein a re ,t rue .and correct to the best of his knowledge, information and belief. ,,

/ //

_l' -

kW} ~f, Subscribed and sworn to

'

before me this '1T

  • day o f no c o s t , 1980.

'. .hNl. \/ bo y /J.:

g,otary Public Notary Put&, PN!adst;hia, PN!aMphia Co.

Y, Cwmissbn Errives idy 28.19F3

..__. . .. .. _ .. .-

.

.

.

.

CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Board of Supervisors, Peach Bottom Township, York

.

County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Albert R. Steele, Chairman of the Board of Supervisors, R. D. No. 1, Deltn, Pennsylvania 17314; upon the Board of Supervisors, Fulton Township, Lancaster County, Pennsylvania, by

'

,

mailing a copy thereof, via first-class mail, to George K.

Brinton, Chairman of the Board of Supervisors, Peach Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore Township, Lancaster County, Pennsylvania, by mailing a-copy

'

thereof, via first-class mail, to Wilmer P. Bolton, Chairman of the Board of Supervisors, R. D.'No. 1, ll ol t w o o d , Pennsylvania *  :

17532: all this 8th day of August, 1980,

_

g t:n e C/b2,

. Bradley Attorney for -

Philadelphia. Electric Company

.

.r w+ r - -

  • - w , , . -.--r ,y w e 4-e , 3