Text
.
p.s p-4 UNITED STATES g
,'t NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 8004H001 S....,*
PECO ENERGY COMPANY PUBLIC SERVICf. ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH E)TTOM ATOMIC POWER STATION. UNIT NO. 2 AMENDMENT TO FACILI1Y OPERATING LICENSI Amendment No. 221 1.icense No. DPR-44 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The ap)11 cation for amendment by PECO Energy Company, et al. Ctie licensee) dated June 4, 1997, complies with the standards and requnrements of the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) ion's regulations; that such activities will be conducted in compliance with the Comiss D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this ac.endment is in accordaace with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
~
9711070117 971024 PDR ADOCK 05000277 P
u
' 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:
(2) Technical Soecifications The Technical Specifications contained in Ap>endices A and 8, as ravised through Amendsent No. 221 are here)y incorporated in the license.
PECOEnergyCompanyshalloperatethefacilityinaccordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, to be implemented within 30 days.
FOR THE NUCLEAR REGillATORY COMMISSION t
h F. Stolz, Directo r ect Directorate I-vision of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: October 24, 1997 4
4 ATTACHMENT TO LICENSE AMENDNENT NO. 2?1 FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 Replace the following lages of the Appendix A Technical Specifications with the enclosed pages.
T1e revised areas are indicated by marginal lines.
Remove Insert 3.8-24 3.8-24 8 3.8-46 B 3.8-46 B 3.8-47 B 3.8-47 i
AC Sources-Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1
NOTE--------------------
The following SRs are not required to be performed: SR 3.8.1.3,>SR 3.8.1.9 through z
SR 3.8.1.11, SR 3.8.1.13 through SR 3.8.1.16, SR 3.8.1.18, and SR 3.8.1.19.
...................N0TE--------------------
The requirements of SR 3.8.1.12, SR 3.8.1.13 and SR 3.8.1.19 are not required to be met during periods that ECCS are not required.
For required Unit 2 AC sources the SRs of in accordance Specification 3.8.1, except SR 3.8.1.8, with applicable SR 3.8.1.17, and SR 3.8.1.20, are SRs applicable.
NOTE--------------------
l When Unit 3 is not in MODE 1, 2, or 3, the Note to Unit 3 SR 3.8.2.1 is applicable.
For required Unit 3 AC sources, the SRs of In accordance Unit 3 Specification 3.8.1, except with applicable SR 3.8.1.8 (when only one Unit 3 offsite SRs circuit is required), SR 3.8.1.12, SR 3.8.1.13, SR 3.8.1.17, SR 3.8.1.18 (ECCS load block requirement only)
SR 3.8.1.19, and SR 3.8.1.20, are applicable.
PBAPS UNIT 2 3.8-24 Amendment No.221 J
AC Sources-Shutdown 1
~
B 3.8.2 BASES SURVEILLAhCE SR 3.8.2.1 (continued)
UEQUIREMENTS required to be met since only one offsite circuit is required to be OPERABLE. SR 3.8.1.17 is not required to-be metbecausetherequiredOPERABLEDG(s)isnotrequiredto undergo periods of being synchronized to the offsite circuit. SR 3.8.1.20 is excepted because starting independence is not required with the DG(s) that is not required to be OPERABLE. Refer to the corresponding Bases
~for LCO 3.8.1 for a discussion of each SR.
This SP. is modified by a Note. The reason for the Note is to preclude reqeiring the OPERABLE DG(s)k or otherwise from being paralleled with the offsite power networ rendered inoperable during the performance of SRs, and to preclude de-energizing a required 4 kV emergency bus or-disconnecting a required offsite circuit during performance of SRs. Witi) limited AC sources available, a single event could compromise both the required circuit and the DG, It is the intent that these SRs must still be capable of being met, but actual performance is not required during periods when the DG and offsite circuit are required to be OPERABLE.
This SR is modified by a second Note.
The reason for the Note is to preclude requiring the automatic functions of the DG s whe(n)ECCSarenotrequired.on an ECCS initiation to be functional du Periods in which ECCS are not required are specified in LCO 3.5.2, "ECCS - Shutdown".
SR 3.8.2.2 This Surveillance is provided to direct that the appropriate Surveillances for the required Unit 3 AC sources are governed by the Unit 3 Technical Specifications.
Performance of the applicable Unit 3 Surveillances will satisfy Unit 3 requirements, as well as-satisfying this.
Unit ? Surveillance Requirement.
Seven exceptions are noted to the Unis 3 $Rr, of LC0 3.8.1.
SR 3.8.1.8 is excepted when only one Unit 3 offsite circuit is required by the Unit 2 Specification, since there is not a second circuit to transfer to. SR 3.8.1.12, SR 3.8.1.13. SR 3.8.1.17,-
SR 3.8.1.18 (ECCS load block requirements only), and SR 3.8.1.19 are excepted since these SRs test the Unit 3 ECCS initiation signal, which is not needed for the AC sources to be OPERABLE on Unit 2.
SR 3.8.1.20 is excepted since starting independence is not re that is not required to be OPERABLE. quired with the DG(s)
(continued)
PBAPS UNIT 2 B 3.8-46 Revision No.
' Amendment No. 221 m
AC Sources-Shutdown B 3.8.2 BASES SURVEILLANCE SR 3.8.2.2 (continued)
REQUIREMENTS The frequency required by the applicable Unit 3 SR also governs performance of that SR for Unit 2.
As Noted, if Unit 3 is not in MODE 1, 2, or 3, the Note to Unit 3 SR 3.8.2.1 is applicable. This ensures that a Unit 2 SR will not require a Unit 3 SR to be performed, when the Unit 3 Technicti Specifications exempts performance of a Unit 3 SR or when Unit 3 is defueled.
in the Unit 3 SR 3.8.2.1 Note, while per(However, as stated formance of an SR is exempted, the SR still must be met).
REFERENCES None.
1 Amendment No. 221 PBAPS UNIf 2 B 3.8-47 Revision No.
@ ' tov y*
t UNITED STATES
}
NUCLEAR REGULATORY COMMISSION
\\..... /,e WASHINGTON, D.C. 306 # 4 001 PECO ENERGY COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-2ZA PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 226 License No. DPR-56 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The ap)11 cation for amendment by PECO Energy Company, et al. (tie licensee) dated June 4,1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (I) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C amended to read as(2) of Facility Operating License No. DPR-56 is hereby follows:
(2) Technical Snecifications The Technical Specificatio s contained in A>pendices A and B, as revised through Amendment No.226, are here)y incorporated in the license.
PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMISSION J nF.Stolz,Directogj o ect Directorate I-Y i ision of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 24, 1997
4 ATTACHMENT TO LICENSE AMENDMENT NO.996 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following sages of the Appendix A Technical Specifications with the enclosed pages. Tie revised areas are indicated by marginal lines.
Remove Insert 3.8-24 3,8-24 B 3.8-46 8 3.8-46 B 3.8-47 B 3.8-47 i
)
a
AC Sources-Shutdown-3.8.2 SURVEILLANCE REQUIREMEhiS SURVEILLANCE FREQUENCY SR-3.8.2.1
NOTE--------------------
The followin SRs are not required to be performed: S 3.8.1.3,'SR 3.8.1.9 through SR 3.8.1.11, SR 3.8.1.13 through SR 3.8.1.16, SR 3.8.1.18, and SR 3.8.1.19.
NOTE--------------------
The requirements of SR 3.8.1.12 SR 3.8.1.13, and SR 3.8.1.19 are not required to be met during periods that ECCS are not required.
For required Unit 3 AC sources the SRs of In accordance Specification 3.8.1. except SR 3.8.1.8 with applicable SR 3.8.1.17, and SR 3.8.1.20, are SRs applicable.
HOTE--------------------
naen Unit 2 is not in MODE 1, 2, or 3, the Note to Unit 2 SR 3.8.2.1 is applicable.
For required Unit 2 AC sources, the SRs of In accordance Unit 2 Specification 3.8.1, except with applicable SR 3.8.1.8 (when only one Unit _2 offsite SRs circuitisree! ired),SR3.8.1.12, SR 3.8.1.13, SR 3.8.1.17, SR 3.8.1.18 (ECCS load block requirement only), SR 3.8.1.19, and SR 3.8.1.20, are applicable.
m Amendment No. 226 PBAPS UNIT 3-3.8-24 Amendment No, i
p-(
AC Sources-Sh 4
L s
BASES I
i SURVEILLANCE SR 3.8.2.1 (continued)
REQUIREMENTS required to be met since only one offsite circuit is required to be OPERABLE. SR 3.8.1.17 is not required to be met because the required UPERABLE DG(s) is not required to undergo periods of being synchronized to the offsite circuit.
SR 3.8.1.20 is excepted because starting independence is not required with the DG(s) that is not required to be OPERABLE.
Refer to the corresponding Bases for LCO 3.8.1 for a discussion of each SR.
This SR is modified by a Note.
The reason for the Note is to preclude requiring the OPERABLE DG(s) from being paralleled with the offsite power network or otherwise rendered inoperable during the performance of SRs, and to preclude de-energizing a required 4 kV emergency bus or disunnecting a required offsite circuit during performance of SRs. With limited AC sources available, a single event could compromise both the required circuit and the DG.
It is the intent that these SRs must still be capable of being met, but actual performance is not required during periods when the DG and offsite circuit are required to be OPERABLE.
This SR is modified by a second Note. The reason for the Note is to preclude requiring the automatic functions of the DG(s) on an ECCS initiation to be functional during periods when ECCS are not required.
Periods in which ECCS are not required are specified in LCO 3.5.2, "ECCS - Shutdown".
SR 3.8.2.2 This Surveillance is provided to direct that the appropriate Surveillances for the required Unit 2 AC sources are governed by the Unit 2 Technical Specifications.
Performance of the applicable Unit 2 Surveillances will satisfy Unit 2 requirements, as well as satisfying this Unit 3 Surveillance Requirement.
Seven exceptions are noted to the Unit 2 SRs of LCO 3.8.1.
SR 3.8.1.8 is excepted when only one Unit 2 offsite circuit is required by the Unit 3 Specification, since there is not a second circuit to transfer to. SR 3.8.1.12, SR 3.8.1.13, SR 3.8.1.17, SR 3.8.1.18 (ECCS load block requirements only), and SR 3.8.1.19 are excepted since these SRs test the Unit 2 ECCS initiation signal, which is not needed for the AC sources to be OPERABLE on Unit 3.
SR 3.8.1.20 is excepted since starting independence is not required with the DG(s) that is not required to be OPERABLE.
(continued)
PBAPS UNIT 3 B 3.8-46 Revision No.
Amendment No. 226
AC Sources-Shutdown 8 3.8.2 BASES SURVEILLANCE SR 3.8.2.2 (continued)
REQUIREMENTS The Frequency required by the applicable Unit 2 SR also governs performance of that SR for Unit 3.
As Noted, if Unit 2 is not in MODE 1, 2, or 3, the Note to Unit 2 SR 3.8.2.1 is applicable. This ensures that a Unit 3 SR will not require a Unit 2 SR to be performed, when the Unit 2 Technical Specift:ations exempts performance of a Unit 2 SR or when Unit 2 is defueled.
in the Unit 2 SR 3.8.2.1 Note, while per(However, as stated formance of an SR is exempted, the SR still must be met).
REFERENCES
- None, PBAPS UNIT 3 B 3.8-47 Revision No.
Amendment No. 226
______