Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Correct Typo & Editorial Errors Introduced in TSs by Previous Amends
ML20211D547
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/23/1999
From: Clifford J
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20211D546 List:
References
NUDOCS 9908270074
Download: ML20211D547 (10)


Text

? .

o g*O@ Qto %,%

pg -

UNITED STA~E '.

8 i B NUCLEAR REGULATORY COMMISSION (h i! WASHINGTON, D.C. 20555-0001 J

%...../

PECO ENERGY COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DEL MARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 228 i

License No. DPR-44

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by PECO Energy Company, et al. (the licensee) dated February 12,1999, as supplemented by letter dated July 8,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I.

B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; )

l C. Therc is reasonable assurance (i) that the activities authorized by this amendment W can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; j D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and j E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the i Commission's regulations and all applicable requirements have been satisfied. j

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility l Operating License No. DPR-44 is hereby amended to read as follows: ,

1 i

9908270074 990823 I PDR ADOCK 05000277  !

P PDR i a

l

, (2) TechnicalSpecifications

.The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 228 ,~ are hereby incorporated in the license. PECO Energy Company shall operate the facility in accordance with the Technical Specifications.

3.- This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/

mes W. Clifford, Chief, Section 2 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: August'23,1999 r

I a

E ATTACHMENT TO LICENSE AMENDMENT NO' 228 .

FACILITY OPERATING LICENSE NO. DPR 44 l DC CKET NO. 50-277 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. 'The revised page is identified by amendment number and contains marginal lines indicating the areas of change.

Remove Insert 4.0 4.0 3 s.

i

i Design Features 4.0

.,o O

o\$

  • {\fo

' Q

...... \ .

\ Og

+9 90 0 N CE BOTTOM D 4 ATOMIC POWER STATION 4 NN 1 tu:: s N o g,

p 2700r:

RAD-

\

gyr;; ;

'[ '

~,~~ \ 27007: ,

, ~ s

m. ,'

LL.

ln I I

~

l l STACK

[N

{

\

[% '

/ ,

UN:: 1/rurxzuc

\/ g N  !

N

'N EXCLUSION AREA BOUNDARY *

\ $

p

/ ~

s t SITE BOUNDARY

/ i t

{ s Figure 4.1-1 (page 1 of 1)

Site and Exclusion Area Boundaries  ;

PBAPS UNIT 2 4.0-3 Amendment No. 228

p-

f. ,
  • p aro

. . y t' }& tlNITED ST/Trs

~j NUCLEAR REGULATORY COMMISSION t WASHINGTON, D.C. 2055M001 i PECO ENERGY COMPANY b

PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY

' ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 231 License No. DPR-56

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. ' The application for amendment by PECO Energy Company, et al. (the licensee) dated February 12,1999, as supplemented by letter dated July 8,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter 1.

B. The facility will operate in conformity with the application, the provisions of the Act, and the rufes and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in 1ccordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:

I p..

2

[

(2) . Technical Soecifications 2The Technical Specifications contained in Appendices A and B, as revised through Amendment No.231, are hereby incorporated in the license. PECO shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented -

. within 30 days from the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

//

J mes W. Cliffor , Chief, Section 2 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance:. August 23, 1999 I

i l

l

>< .j

p 1

(. *-

1 ATTACHMENT TO LICENSE AMENDMENT NO.231

' FACILITY OPERATING LICENSE NO. DPR-56 l DOCKET NO. 50-2Ze l L Replace the following pages of the Appendix A Technical Specifications with the attached L revised pages. The revised pages are identified by amendment number and contain marginal l: . lines indicating the areas of change.

Remove Insert }

3.3-13 3.3-13 1'

3.8-30 3.8-30 4.0-3 4.0-3 1

'~

4 I

l 1 j j

l i

i

r

?; .

h4J WRNM instrumentation 3.3.1.2 REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

.4 ------------------NOTES------------------ -

1. Not required to be met with less than or equal to four fuel assemblies adjacent to the WRNM and no other fuel assemblies in the associated core quadrant. 3 q-
2. Not required to be met during spiral '"

unloading.

Verify count rate is: 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE

a. a 3.0 cps; or ALTERATIONS
b. Within the limits of MQ Figure 3.3.1.2-1.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.3.1.2.5 ------------------NOTE-------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after WRNMs indicate 125E-5 %

l power or below.

Perform CHANNEL FUNCTIONAL TEST and 31 days determination of signal to noise ratio.

-SR 3.3.1.2.6 ------------------NOTES------------------

1. Neutron detectors are excluded. ,

I

2. Not required to be performed until 12 j hours after WRNMs indicate 125E-5 % q power or below. l Perform CHANNEL CALIBRATION. 24 months {

PBAPS UNIT 3 3.3-13 Amendment No.231

(( .

DC Sources-Operating 3.8.4 1

o SURVEILLANCE REQUIREMENTS i


NOTE------------------------------------_

'SR 3.8.4.1 through SR 3.8.4.8 are applicat,le only to the Unit 3 DC electrical l power subsystems. SR 3.8.4.9 is applicable only to the Unit 2 DC electrical power subsystems.

SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is ------NOTE-----

2123.5 V on float charge. The 7 day Frequency is not applicable if the battery is on equalize charge or has been on equalize charge at any time during the previous I day.

7 days 8!!Q

< 14 days SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.

DE Verify battery connection resistance is s 40 E-6 ohms.

SR 3.8.4.3 Verify battery cells, cell plates, and 12 months racks show no visual indication of physical damage or abnormal deterioration that could potentially degrade battery performance.

(continued)

PBAPS UNIT 3 3.8-30 Amendment No. 231

f.

  • Design Features '

4.0 L

.,o'

  • u\t

- \.t

,....- , %, Q

\

\,  %

,o# PzACE soTTox 4

ATOMIC POWER STATION NN / \ a:: s

\ 2700n wr:

T- s'- N-M \ 27oon l

2,4'e'+k 1

q 2 no.

,'y T T) -

f I 4--ol- ' ,'

l l STACK

/ "

fs1

( j e s

\ '

\ ,

W: 1/nazurxc

)/ g WD

\,

l ExcwsION AREA BOUNDARY

} .

g4 \

\ ,

[ SITE BOUNDARY Figure 4.1-1 (page 1 of 1)

/r h \

i Site and Exclusion Area Boundaries PBAPS UNIT 3 4.0-3 Amendment No. 231 L