ML20095J697
| ML20095J697 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/19/1995 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20095J699 | List: |
| References | |
| NUDOCS 9512270270 | |
| Download: ML20095J697 (3) | |
Text
St: tion Sunset Ds54ttensnt A
-- y PECO ENERGY
=3l 3.L.
E'#Tsear-"
December 19,1995 Docket Nos. 50-277 50 278 Ucense Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission j.
l ATTN: Document Control Desk Washington, DC 20555 i
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 l
Technical Specifications Change Request No. 95-13
Dear Sir:
PECO Energy Company (PECO Energy) hereby submits Technical l
Specifications (TS) Change Request No. 9513, in accordance with 10CFR50.90, requesting changes to Appendix A of the Peach Bottom Facility Operating Ucenses. The proposed changes correct an administrative error in the improved Technical Specifications concerning the Ventilation Filter Testing l
Program (VFTP).
l l to this letter describes the proposed changes and provides justification for the changes including the basis for PECO Energy's l'
determination that the proposed changes do not involve a significant hazards consideration. Attachment 2 provides marked up TS Pages indicating the proposed changes.
PECO Energy requests exigent handling _of TS Change Request No. 95-13. On December 11,1995, it was determined that a change to the improved Technical Specifications issued by, Amendments 210 and 214 to Unit 2 and Unit 3, respectively,' was required. An administrative error in the VFTP would result in the Engineered Safety Feature (ESF) filter ventilation systems being declared inoperable upon implementation of improved Technical Specifications which is scheduled for January 11,1996. Because these ESF filter ventilation systems are common to both Units and because the ESF filter ventilation systems cannot be maintained operable in accordance with the administrative error in
-the VFTP, a shutdown of both Units would be required. Therefore, approval of PDk k
koSh277 e___eu e
December 19,1995 P,a g e 2
\\
i TS Change Request No. 95-13 in advance of the implementation of improved j
Technical Specifications would result in eliminating unnecessary hardship. If j
you have any questions concerning this matter, please do not hesitate to contact us.
Very truly yours,
. h.
fsh -
1 G. A. Hunger, Jr.,
Director Ucensing
Enclosures:
Affidavit, Attachment 1, Attachment 2 l
cc:
T. T. Martin, Administrator, Region I, USNRC l
W. L Schmidt, USNRC Senior Resident inspector, PBAPS R. R. Janati, Commonwealth of Pennsylvania i
i I
I I
COMMONWEALTH OF PENNSYLVANIA :
t ss.
COUNTY OF CHESTER D. B. Fetters, being first duly sworn, deposes and says:
That he is Vice President of PECO Energy; the Applicant herein; that he has read the enclosed Technical Specifications Change Request No. %13, " Administrative Change to Ventilation Filter Testing Program,' for Peach Bottom Atomic Power Station, Unit 2 and Unit 3, FacRy Operating License Nos. DPR44 and DPR 56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, 1
information and belief.
h1
/
Vice President Subscribed and sworn to before me this / 9 day of 7/cc ENdc41995.
lL llLru _
LtLJw U
U Notary Public Noted Seal wc yennT Chester%
red Member, Pennsywaru Assomam of Noranes
.