ML20211M708

From kanterella
Jump to navigation Jump to search
Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2
ML20211M708
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/01/1999
From: Hutton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9909090183
Download: ML20211M708 (12)


Text

.. ..

A v

PECO NUCLEAR. ecco emerov ce<1 amv 965 Chesterbrook Boulevard A Unit of PECO Energy Wayne, PA 19087 5091 September 1,1999 l

I Docket Nos. 50-277  !

I 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission i Attention: Document Control Desk l Washington, D.C. 20555 i Re: Peach Bottom Atomic Power Station, Units 2 and 3 License Change Application ECR 99-01497 Ref.: Letter G. D. Edwards to U. S. Nuclear Regulatory Commission, Dated July 1,1999, License Change Application ECR 99-01497 Docket Nos. 50-277 & 50-278

Dear Sir / Madam:

I

)

PECO Energy Company (PECO Energy) hereby resubmits Attachment 2, in its entirety, to the above captioned letter, which transmitted License Change Application ECR 99-01497, requesting a change to the Peach Bottom Atomic Power Station ,

(PBAPS), Units 2 and 3 Facility Operating Licenses. The proposed change will revise j the Facility Operating Licenses to reflect a change in the corporate structure at Public  !

. Service Electric & Gas (PSE&G). During the review process a few minor  ;

discrepancies were discovered in the pages of Attachment 2. These discrepancies have now been corrected. ]

l If you have any questions, please feel free to contact me at 610-640-6722  ;

Very truly yours,

%4[ N

' James A. H on 1p\'

Director- Licensing i)80U41 Attachments; Affidavit cc H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS R. A. Janati, Commonwealth of Pennsylvania 9909090183 990901 PDR P

ADOCK 05000277 PDR

-4 c

COMMONWEALTH OF PENNSYLVANIA  :

SS.

COUNTY OF CHESTER  :

'J. J. Hagan, Being first duly sworn, deposes and says:

That he is Senior Vice President of PECO Energy Company; the Applicant herein; that he has read the updated Attachment 2 to License Change Application ECR 99-01497, for Peach Bottom Atomic Power Station Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, Information and belief.

w-ior Vi President Subscribed and Sw n to before me this /d dayof k1999 iV

0. 5

[ Notary 1/ublic Notarial sea!

!' Carol A.Walton, Notary Public l

Tredyffrin Typ., Chester County  !

My Commission Expires May 28,2002 l Member, Pennsylvene Associaton of Notaries  !

[.g4 '

l l < '

k i f ATTACHMENT 2 FACILITY OPERATING LICENSE CHANGES License Nos. DPR-44 DPR-56 Docket Nos. 50-277 50-278 Description of Changes page 2 Unit 2 Licenso Markups pages 3 -4 Unit 2 " Camera Ready" pages 5-6 Unite 3 License Markup pages 7-8 Unit 3 " Camera Ready" pages 9-10

' . ' License Nos. DPR-44 Docket N:s. 50-277 l DPR-56 50-278 I I

ATTACHMENT 2 l

Facility Operating License Changes l Peach Bottom Unit 2 Changes References to Public Service Electric and Gas Company or PSE&G are being changed as ,

follows: I License section, page number Action Description Heading, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 1.A, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 2, page 2 Change Public Service Electric and Gas Company to PSEG Nuclear LLC (PSEG l Nuclear) {

Paragraphs 2B(1) page 2 Change PSE&G to PSEG Nuclear '

Peach Bottom Unit 3 Changes References to Public Service Electric and Gas Company or PSE&G are being changed as follows:

1 i

License section, page number Action Description )

Heading, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 1.A, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 2, page 2 Change Public Service Electric and Gas Company to PSEG Nuclear LLC (PSEG Nuclear)

Paragraphs 2B(1) page 2 Change PSE&G to PSEG Nuclear i

1 of 3

r 1 4

UNITED STATES NUCLEAR REGULATORY COMMISSION Washington' DC 20555-0001 l

PECO ENERGY COMPANY j

[PSEG NUCLEAR LLC) > bueLC SERV!CE ELECT 9!C .* ND G.^S COi"^ NY l 1 DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 ,

PEACH BOTTOM ATOMIC POWER STATION. UNIT 2

, FACILITY OPERATING LICENSE i l

License No. DPR-44 Amendment No.1

1. The Atomic Energy Commission (the Commission) having found that:

! A. The application for license filed by PECO Energy Company, formerly l [ PSEC Nuclear LLCJ Philadelphia Electric Company,"

l Delmarva Power and Light Company, and Atlantic City Electnc Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and  !

l regulations set forth in 10 CFR Chapter I and all required notifications to I other agencies or bodies have been duly made; B. Construction of the Peach Bottom Atomic Power Station, Unit 2 (the facility) has been substantially completed in conformity with Construction Permit No.

CPPR-37 and the application, as amended, the provisions of the Act and the l rules and regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance: (1) that the activities authorized by this amended operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted l in compliance with the rules and regulations of the Commission; j E. PECO Energy Company is technically qualified and the licensees are 1 financially qualified to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,

" Financial Protection Requirements and Indemnity Agreements," of the j Commission's regulations; l G. The issuance of this amended operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1

H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available altamatives, the issuance of Amendment No.1 to Facility Operating License No. DPR-44 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I. The receipt, possession, and 'use of source, by-product and special nuclear material as authonzed by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.

PSEG Nuclear Lt.C (PSEG Nuclear) l

2. Amendment No.1 to Facility Operating License No. DPR-44 issued to the PECO Energy Company (PECO), formerly Philadelphia Electric Company,lPd:: S:C j

l E!rdMc :nd Gr- C=peny (PSE* G), Delmarva Power and Light Company (DP&LC),

and Atlantic City Electnc Company (ACEC), is hereby amended in its entirety to read as follows:

A. This amended license applies to the Peach Bottom Atomic Power Station, Unit 2, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

1 (1) PECO Energy Company, pursuant to Section 104b of the Act and 10 )

CFR Part 50, " Licensing of Production and Utilization Facilities," to l l PSEG Nuclearl possess, use, and operate the facility and TPSE&Gj, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; (2) PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to l receive, possess and use at any time special nuclear material as  ;

reactor fuel, in accordance with the limitations for storage and I amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use in amounts as required any byproduct, source, or specia! nuclear material without Page 2

UNITED STATES NUCLEAR REGULATORY COMMISSION

. Washington, DC 20555-0001 PECO ENERGY COMPANY -

l. PSEG NUCLEAR LLC DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT 2 FACILITY OPERATING LICENSE License No. DPR-44 Amendment No.1
1. The Atomic Energy Commission (the Commission) having found that:

A. The application for license filed by PECO Energy Company, formerly l Philadelphia Electric Company, PSEG Nuclear LLC, Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B. Construction of the Peach Bottom Atomic Power Station, Unit 2 (the facility) has been substantially completed in conformity with Construction Permit No.

CPPR-37 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance: (1) that the activities authorized by this amended operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E. PECO Energy Company is technically qualified and the licensees are financially quali3ed to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,

" Financial Protection Requirements and indemnity Agreements," of the Commission's regulations; G. The issuance of this amended operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1

H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available

- alternatives, the issuance of Amendment No.1 to Facility Operating License No. DPR-44 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I. The receipt, possession, and use of socree, by-product and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.

2. Amendment No.1 to Facility Operating License No. DPR-44 issued to the PECO Energy Company (PECO), formerly Philadelphia Electric Company, PSEG Nuclear LLC (PSEG Nuclear), Delmarva Power and Light Company (DP&LC), and Atlantic i City Electric Company (ACEC), is hereby amended in its antirety to read as follows:

A. This amended license applies to the Peach Bottom Atomic Power Station,

. Unit 2, a single cycle, forced circulation, boiling water nuclear reactor and ,

associated equipment (the facility), owned by the licensees and operated by l PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.

B. Subject to the conditions and requirements incorporated herein, the 1 Commission hereby licenses:

(1) PECO Energy Company, pursuant to Section 104b of the Act and 10 CFR Part 50, " Licensing of Production and Utilization Facilities," to ,

l possess, use, and operate the facility and PSEG Nuclear, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; (2) PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)_ PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without Page 2

UNITED STATES NUCLEAR REGULATORY COMMISSION Washington, DC 20555-0001 PECO ENERGY COMPANY

( PSEG NUCLEAR LLC ) > IJD1"eICln'D24M4MPEDI:'3XML'M'4 DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT 3 FACILITY OPERATING LICENSE License No. DPR-56

1. The Atomic Energy Commission (the Commission) having found that:

A. The application for license filed by PECO Energy Company, formerly (P5EG Nuclear LLC] Philadelphia Electric Company,

  • Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other egencies or bodies have been duly made; B. Construction of the Peach Bottom Atomic Power Station, Unit 3 (the facility) has been substantially completed in conformity with Construction Permit No.

CPPR-38 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.- There is reasonable assurance: (1) that the activities authorized by this

?.

operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E. PECO Energy Company is technically qualified and the licensees are ,

financially qualified to engage in the activities authorized by this amended  !

operating license in accordance with the rules and regulations of the I Commission; I

F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,

" Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; l l

G. The issuance of this operating license will not be inimical to the common i defense and security or to the health and safety of the public; I Page1

9 H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available altematives,

., , the issuance of Facility Operating License No. DPR-56 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I. The receipt, possession, and use of source, by-product and special nuclear material as authonzed by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.

[PSEG Nuclear LLC (PSEG Nuclear)]

2. Facility Operating License No. DPR-56 is hereby issued to the PECO Enerry Company (PECO), formerly Philadelphia Electric Company,"'= O.-C 2:3t V

)

... _ _ _ . ... . ... _._ . . .. Delmarva Power and Light Company (DP&LC), and Atlantic City Electnc Company (ACEC), is hereby amended in its entirety to read as follows:

A. This license applies to the Peach Bottom Atomic Power Station, Unit 3, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented )

and amended.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1) PECO Energy Company, pursuant to Section 104b of the Act and 10 i CFR Part 50, " Licensing of Production and Utilization Facilities," to

( PSEG Nuclearj possess, use, and operate the facility and NASE &G)l DP&LC, and ACEC to possess the facility at the designated location in Peach  !

' Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; i

(2) PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to l receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts j required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; Page 2

p-

~

<- UNITED STATES

. NUCLEAR REGULATORY COMMISSION Washington, DC 20555-0001 i PECO ENERGY COMPANY l l PSEG NUCLEAR LLC DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT 3 -

FACILITY OPERATING LICENSE I License No. DPR-56

1. The Atomic Energy Commission (the Commission) having found that:

A. The application for license filed by PECO Energy Company, formerly l Philadelphia Electric Company, PSEG Nuclear LLC, Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies l

with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 <

CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B. Construction of the Peach Bottom Atomic Power Station, Unit 3 (the facility) has been substantially completed in conformity with Construction Permit No.

CPPR-38 and the application, as amended, the provisions of the Act and the l rules and regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance: (1) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E. PECO Energy Company is technically qualified and the licensees are financially qualified to engage in the activities authorized by this amended ,

operating license in accordance with the rules and regulations of the i Commission; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,

" Financial Protection Requirements and indemnity Agreements," of the Commission't regulations; G. The issuance of this operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1

H. After weighing the environmental, economic, technical, and other benefits of

.the facility against environmental costs and considering available altamatives,

, , the issuance of Facility Operating License No. DPR-56 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfed; and I. The receipt, possession, and use of source, by-product and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.

2. Facility Operating License No. DPR-56 is hereby issued to the PECO Energy Company (PECO), former1y Philadelphia Electnc Company, PSEG Nuclear LLC (PSEG Nuclear), Delmarva Power and Light Company (DP&LC), and Atlantic City Electric Company (ACEC), is hereby amended in its entirety to read as follows:

A. This license applies to the Peach Bottom Atomic Power Station, Unit 3, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1) PECO Energy Company, pursuant to Section 104b of the Act and 10 CFR Part 50," Licensing of Production and Utilization Facilities," to l possess, use, and operate the facility and PSEG Nuclear, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom York County, Pennsylania in accordance with the procedures and limitations set forth in this license; (2) PECO Energy Company, pursuant to the /.ct and 10 CFR Part 70, to receive, possess and use at any time specia! nuclear material as reactor fuel, in accordance with the limitations for storage and amounts l required for reactor operation, as described in the Final Safety Analysis )

Report, as supplemented and amended; (3) PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; Page 2 I