ML20216G532
| ML20216G532 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/04/1997 |
| From: | Stolz J NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20216G528 | List: |
| References | |
| NUDOCS 9709150223 | |
| Download: ML20216G532 (10) | |
Text
- _ _ _ _ _ _ _ _ - _ - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _
,l M%
Jt UNITED STATES gj g
[
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20046 4 001 49.....,o PECO ENERGY COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING ll[fNSI Amendment No.220 License No. DPR-44 l
1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by PECO Energy Company, et al. (the licensee) dated May 9, 1997, as supplemented by letter dated July 14, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that sLch activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will riot be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:
'2 h 0
a/)D9 b 9709150223 970904 PDR ADOCK 05000277 P
PDR f
', l
. (2) Technical Soecifications The Technical Specifications contained in Ap)endices A and B, as revised through Amendment No. 220, are here)y incorporated in the license.
PECO Energy Company shall-operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION 9
l J hr F. Stolz, Direct r
,ect Directorate
-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications j
Date of Issuance: September 4, 1997
ll ATTACiMENT TO LICENSE AMENDMENT NO. 220 fAC11ITY OPERATING LICENSE NO. DPR-44 j
DOCKET NO. 50-277
-Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The-tevised areas are indicated by marginal lines.
Remove Insert 3.6-16 3.6-16 B 3.6-30 B 3.6-30 L
-PCIVs 4
3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.1.3.14 Verify leakage rate through each MSIV is In accordance s 11.5 scfh when tested at a 25 psig.
with the Primary Containment Leakage Rate Testing Program SR 3.6.1.3.15 Verify each 6 inch and 18 inch primary 24 months containment purge valve and each 18 inch 3rimary containment exhaust valve is alocked to restrict opening greater than the required maximum opening angle.
l SR 3.6.1.3.16 Replace the inflatable seal of each 96 months 6 inch and 18 inch primary containment purge valve and each 18 inch primary containment exhaust valve.
PBAPS UNIT 2 3.6-16 Amendment No. 220
PCIVs B 3.6.1.3 BASES SURVEILLANCE SR 3.6.1.3.16 REQUIREMENTS (continued)
The inflatable seal of each 6 inch and 18 inch primary containment purge valve and each 18 inch primary containment l
exhaust valve must be replaced every 96 months.
This will allow the opportunity for replacement before gross leakage l
failure occurs.
REFERENCES 1.
UFSAR, Chapter 14.
2.
UFSAR, Table 7.3.1.
3.
10 CFR 50, Appendix J, Option B.
4.
UFSAR, Table 7.3.1, Note 17.
5.
UFSAR, Table 5.2.2.
l PBAPS UNIT 2 B 3.5-30 Revision No.
Amendment No. 220
p as:
gj t
UNITED STATES s
}
NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 30M60001
\\...../
EECO ENERGY COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 223 License No. OPR-56 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by PECO Energy Company, et al. (the licensee) dated May 9,1997, as supplemented by letter dated July 14, i
1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the commun defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's. regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:
. 4 (2) Technical Soecifications The Technical Specifications contained in A)pendices A and B, as revised through Amendment No. 223, are heresy incorporated in the license.
PECO shall-operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION l
/
J F. Stolz, Direc P: ject Directorate T-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: September 4, 1997
ATTACHMENT TO LICENSE AMENDMENT NO. 991 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised areas are indicated by marginal lines.
Remove Insert 3.6-16 3.6-16 B 3.6-30 B 3.6-30 l
m
PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.1.3.14 Verify leakage rate through each MSIV is In accordance s 11.5 scfh when tested at a 25 psig, with the Primary Containment Leakage Rate Testing Program SR 3.6.1.3.15 Verify each 6 inch and 18 inch primary 24 months containment purge valve and each 18 inch primary containment exhaust valve is blocked to restrict opening greater than the required maximum opening angle.
l l
SR 3.6.1.3.16 Replace the inflatable seal of each 96 months 6 inch and 18 inch primary containment purge valve and each 18 inch primary containment exhaust valve.
PBAPS UNIT 3 3.6-16 Amendment No. 223 N.
PCIVs B 3.6.1.3 BASES 1
SURVEILLANCE SR 3.6.1.3.l_1 REQUIREMENTS (continued)
The inflatable seal of each 6 inch and 18 inch primary containment purge valve and each 18 inch primary containment l
exhaust valve must be replaced every 96 months.
This will allow the opportunity for replacement before gross leakage l
failure occurs.
REFERENCES 1.
UFSAR, Chapter 14.
2.
UFSAR, Table 7.3.1.
3.
10 CFR 50, Appendix J, Option B.
4.
Ui:SAR, Table 7.3.1, Note 17.
l 5.
UFSAR, Table 5.2.2.
PBAPS UNIT 3 B 3.6-30 Revision No.
Anendment No. 223