Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated ML20092L6251995-09-22022 September 1995 Informs of Change to Pbaps,Units 2 & 3 TS Bases,Figure 1.1-1.Change Allows PBAPS Units 2 & 3 to Maximize Generation Throughout Entire Fuel Cycle ML20092A2071995-09-0101 September 1995 Application for Amend to License DPR-56,consisting of Change Request 95-07,deleting License Condition 2.C ML20092B9361995-08-28028 August 1995 Rev E to TS Change Request (Tscr) 93-16 to Licenses DPR-44 & DPR-56 Re Implementation of Improved Ts.Rev E to Tscr 93-16 Redesignates Change Control Mechanism from 10CFR50.59,as Indicated Previously,To 10CFR50.54(a) for Six Listed Items ML20086Q4271995-07-21021 July 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing Overall Conversion of Current PBAPS TS to Improved TS as Contained in NUREG-1433, Std Ts,Ge Plants,BWR/4 ML20083Q7341995-05-16016 May 1995 Rev a to Tscr 93-16 Re Conversion to Improved TSs as Contained in NUREG-1433 ML20083K8581995-05-0909 May 1995 Application for Amend to Licenses DPR-44 & DPR-56,consisting of Change Request 93-16 Re Conversion of Current PBAPS TS to Improved TS ML20082M3191995-04-12012 April 1995 Suppl 2 to License Change Request 94-08,supporting Mod P00068-3,which Upgrades Major Components of TIP Sys to Correct Typo.Revised TS Page 186 Encl ML20087H0411995-04-10010 April 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Requests 94-11,94-12 & 94-13,relocating Certain Review & Audit Requirements to Plant UFSAR ML20082B2121995-03-23023 March 1995 Revised Page 4 to TS Change Request 90-03 ML20082B0491995-03-22022 March 1995 License Change Request 95-04 to Licenses DPR-44 & DPR-56, Reducing Local Leak Rate Test Hold Time Duration from One H to 20 Minutes ML20081H1261995-03-16016 March 1995 Application for Amends to Licenses DPR-44 & DPR-56 Re Requirements for SRMs While in Refueling Condition ML20080H0401995-02-10010 February 1995 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Errors Made During Past TS Changes ML20078A0531995-01-17017 January 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing to Change Source Range Monitor to Range Neutron Monotors & Delete Intermediate Range Monitors ML20077S6191995-01-13013 January 1995 License Change Request 94-07 to Licenses DPR-44 & DPR-56, Revising Allowed Time Between Signal Calibrs of LPRM from Every 6 Wks (Approx 1,000 EFPH) to Every 2,000 Megawatt Days Per Std Ton ML20077S4691995-01-13013 January 1995 License Change Request 94-08 to Licenses DPR-44 & DPR-56, Revising TS Tables 3.7.1 & 3.7.4 to Reflect Reduction in Number of Primary Containment Power Operated Outboard Valves for TIP Probes,Per PBAPS Mod P00068 ML20078L7541994-11-21021 November 1994 TS Change Request 94-14 to License DPR-56,re One Time Schedular Exemption from 10CFR50,App J,Section III.D.1(a) Concerning 10CFR50,App J Type a Test Intervals ML20078K7601994-11-17017 November 1994 License Change Request 93-13 to Licenses DPR-44 & DPR-56, Revising TS to Support Mods 5384 & 5386,upgrading Main Stack & Vent Stack Radiation Monitoring Sys 1999-09-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K9761999-10-14014 October 1999 Amend 234 to License DPR-56,changing TS in Response to 990301 Application & Suppls ,1001 & 06,to Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Monitoring Sys ML20217B4261999-10-0505 October 1999 Amend 233 to License DPR-56,changing Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Repts ML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20216H6891999-09-24024 September 1999 Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively, Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by TSs SR 3.9.1.1 ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20211D5471999-08-23023 August 1999 Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Correct Typo & Editorial Errors Introduced in TSs by Previous Amends ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205K7371999-04-0707 April 1999 Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively, Consisting of Changes to TS SRs Re Secondary Containment Doors in Response to 980204 Application,As Revised by ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20155C6011998-10-26026 October 1998 Amend 226 to License DPR-44,revising TSs for Safety Limit MCPR from Current Value of 1.11 to 1.10 for Two Recirculation Loop Operation & from 1.13 to 1.12 for Single Recirculation Loop Operation ML20154H4691998-10-0505 October 1998 Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Permit Incorporation of EOC-RPT Sys at Plant,Units 2 & 3 ML20154J2261998-10-0505 October 1998 Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20154G6551998-10-0101 October 1998 Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively, Revising Plant,Units 2 & 3 TSs to Exclude MSIV Leakage from Total Type B & Type C Local Leak Rate Test Results ML20153B9581998-09-14014 September 1998 Amend 9 to License DPR-12,adding Requirements for Control of Effluents & Annual Reporting Per 10CFR50.36a ML20238F2611998-08-24024 August 1998 Amend 222 to License DPR-44,revising Pbaps,Unit 2 TSs to Support Mod P00271,which Would Replace SRMs & IRMs W/Wrnms, During Forthcoming Outage 2R12,scheduled for Early Oct 1998 ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20212G8261997-10-24024 October 1997 Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively, Changing TSs to Eliminate Inconsistency Between ECCS Operability Requirements & Autostart & Protective Trip Bypass of EDGs on ECCS Initiation Signal ML20217J5571997-10-0909 October 1997 Amend 225 to License DPR-56,revising MCPR Safety Limit in Section 2.1 of TSs from 1.07 to 1.11 for Two Recirculation Loops in Operation ML20217D8101997-09-30030 September 1997 Amend 224 to License DPR-56,revises TS to Support PBAPS Mod P00271,which Would Replace Source Range & Intermediate Range Monitors W/Wide Range Neutron Monitoring System ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20216G5321997-09-0404 September 1997 Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively, Revising TS to Extend Replacement Frequency for Inflatable Seat Seals for Primary Containment Purge & Vent Valves to 96 Months ML20217M7961997-08-19019 August 1997 Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively, Extending APRM Flow Bias Instrumentation Surveillance Interval from 18 Months to 24 Months ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20135B3851997-02-19019 February 1997 Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively, Changing Min Allowable Charging Water Header Pressure from Value 955 Psig to Value of 940 Psig in TS 3.10.8 ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated 1999-09-27
[Table view] |
Text
- - - - _ _ - - _ . _ _ - . _ _ _ _ _ - - _ _ _ _ _ _ _ _ - - - - _ _ _ _ _ - _ - _ _ _ _ _ _ _ -
Ctation Support Department
' 4 10 CFR 50.91
'. PECO ENERGY 5.T;1g="L,
- ,?.7: ?; Mi~'"
September 1,1995 Docket No. 50-278 Ocense No. DPR-56 l
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Unit 3 Exigent Ucense Change Request No. 95-07
Dear Sir:
PECO Energy Company hereby submits Exigent Ucense Change Request No.
l 95-07, in accordance with 10 CFR 50.91, requesting a change to the Peach Bottom Atomic Power Station, Unit 3 Facility Operating Ucense. The proposed changes involves the deletion of Ucense Condition 2.C(G). This condition was also the subject of a request for Enforcement Discretion (ED) submitted to the NRC on August 30,1995.
As discussed in the August 30,1995 letter, PECO Energy identified on August 29,1995 that the PBAPS, Unit 3 was operating outside the FOL. Ucense Condition 2.C(5) restricts power levels to no less than 70% in the coastdown condition. At the time of discovery, PBAPS, Unit 3 was operating at approximately 62% in order to avoid an unnecessary plant shutdown, a request for ED was submitted to cover the period until such time that a followup license change request could be submitted. We request that the proposed change be made effective upon issuance.
Attachment 1 to this letter describes the proposed change, and provides justification for the change. Attachment 2 contains the revised Facility Operating Ucense page.
080015 95o9o9o262 95o9ol PDR A90CK o5ooo278 \l
_ e_ __ _eDR.
. .. . - - . ~ . - - . - - .
September 1,1995
- Page 2 i
i If you have any questions concerning this matter, please do not hesitate to contact us.
Very truly yours, G. A. Hunger, Jr.,
Director - Ucensing
Enclosures:
Affidavit, Attachment 1, Attachment 2 cc: T. T. Martin, Administrator, Region I, USNRC W. L. Schmidt, USNRC Senior Resident inspector, PBAPS i R. R. Janati, Commonwealth of Pennsylvania i
l l
1 COMMONWEALTH OF PENNSYLVANIA I
ss.
l COUNTY OF YORK :
G. R. Rainey, being first duly sworn, deposes and says:
That he is Vice President of PECO Energy Company; the t
Applicant herein; that he has read the attached License Change Roquest (Humber 95-07) for Peach Bottom Facility Operating License DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his ;
knowledge, information and belief.
/ s, -O President L
t Subscribed and sworn to before me this 31st day of August, 1995.
l l
NotertalSeal I ot1I . My 998 i
Notary Public l
l- - - - - _ . . _ - - _ . _ _ _ _ . - . . _ _ _
l i
ATTACHMENT 1 l 1
PEACH BOTTOM ATOMIC POWER STATION UNIT 3 Docket No. 50-278 '
Ucense No. DPR-56 EXIGENT LICENSE CHANGE REQUEST 95-07
" Deletion of Facility Operating Ucense Condition 2.C(5)"
Supporting information - 4 Pages l
J J
f J
4 4
}
6 4
I i i
Docket No. 50-278 l -
License No. DPR-56 j Introduction PECO Energy Company (PECO Energy), Ucensee under Facility Operating Ucense DPR 56 for the Peach Bottom Atomic Power Station (PBAPS), Unit 3, requests that the Facility Operating License No. DPR-56 be amended. The proposed change involves the deletion of License Condition 2.C(5) from the Facility Operating Ucense (FOL).
The proposed change is shown in Attachment 2 for the PBAPS, Unit 3 FOL. Due to the urgency of this issue, we request that this change be made effective upon issuance.
This license change request provides a discussion and description of the proposed FOL change, a safety discussion of the proposed FOL change, information supporting a finding of No Significant Hazards Consideration, and information supporting an Environmental Assessment.
Discussion The proposed change involves the deletion of Ucense Condition 2.C(5). License Condition 2.C(5) states: " Operation beyond the end-of-cycle (all rods out condition) thermal power is limited to seventy (70) percent minimum. Increasing core power level via reduced feedwater heating, onco operation in the coastdown mode has begun, is i not permitted unless the licensee has performed an analysis of this operating condition that confirms that this condition is bounded by the analysis for the particular cycle of operation."
l This condition was incorporated in the PBAPS, Unit 3 FOL as a part of License
- Amendment No 62, dated October 24,1979. The NRC stated in the NRC Safety Evaluation Report (SER) for Amendment No. 62, that the 70% coastdown core power i level was the limit of the NRC acceptance of the core reload safety analyses. This condition was included as a license condition to the PBAPS, Unit 3 FOL As also l
i discussed in Ucense Amendment No. 62, an additional requirement was added to License Condition 2.C(5) which restricts the increasing of core power by reducing feedwater heating in coastdown unless an analysis was performed that bounds the condition for the particular cycle of operation.
The 70% limit was revised as discussed in the Supplemental Reload Licensing Report for PBAPS, Unit 3 Reload 9 Cycle 10, Revision 0, GE Document No. 23A7215, dated ,
October 1993. This reload report allowed coastdown operation beyond full power j capability to as low as 40% power under conditions bounded by 110% core flow. The ;
reload licensing report was submitted to the NRC, by reference, in the Core Operating !
Limits Report (COLR) for PBAPS, Unit 3, Cycle 10 in a letter dated November 19,
- 1993. The basis for the methodology utilized in this reload is provided in " General 1 4
Electric Standard Application for Reactor Fuel," NEDE-24011-P-A-10, February 1991. !
l Although the 70% limit was initially included as a licensing condition in the FOL, it has
, been determined that this limit is more appropriately located in other licensing basis :
documents which include the NRC approved GESTAR ll analyses and the cycle 1 )
I
l Docknt No. 50-278
,' - License No. DPR-56
^
specific reload licensing reports, and should not be part of the FOL. This approach is j consistent with the guidance of Generic Letter 88-16, " Removal of Cycle-Specific Parameter Umits From Technical Specifications."
Also included in this license condition is the stipulation that increasing core power level via reduced feedwater heating, once operation in the coastdown mode has begun, is not permitted unless the licensee has performed an analysis of this operating condition that confirms that this condition is bounded by the analysis for the particular cycle of operation. The need to perform this analysis is more appropriately discussed in each cycle specific reload licensing report and is not needed as a license condition as originally incorporated. The analysis contained in the cycle specific reload report for this condition is also based on approved methodology as provided in GESTAR 11.
Descriotion of the Procosed Chanae This change will delete FOL License Condition 2.C(5).
Safety Discussion
~
Deletion of Ucense Condition 2.C(5) from the FOL is an administrative change that does not impact any UFSAR design basis accident or transient. This license condition is more appropriately controlled by other licensing bases documents, which include the NRC approved GESTAR ll analyses and the cycle specific reload licensing reports, and should not be part of the FOL. This approach is consistent with the guidance of Generic Letter 88-16, " Removal of Cycle-Specific Parameter Limits From Technical Specifications." The limits contained in the licensing condition were discussed in Supplemental Reload Licensing Report for PBAPS, Unit 3 Reload 9 Cycle 10, Revision 0, GE Document No. 23A7215, dated October 1993.
Deletion of the license condition will not involve any physical changes to plant structures, systems, or components (SSCs). Implementation of this proposed change will not effect the manner in which SSCs are tested. Additionally, this FOL change will not alter any safety limits which ensure the integrity of fuel barriers, and will not result l in any increase to onsite or offsite dose.
Information Suocorting a Finding of No Significant Hazards Consideration We have concluded that the proposed change to the PBAPS, Unit 3 FOL does not constitute a Significant Hazards Consideration. In support of this determination, an evaluation of each of the three (3) standards set forth in 10 CFR 50.92 is provided below.
l l
l 2
Docket No. 50-278
. License No. DPR-56
-1) The orocosed change does not involve a significant increase in the orobability or conseauences of any accident oreviously evaluated.
Deletion of Ucense Condition 2.C(5) is an administrative change that will not involve a significant increase in the probability or consequences of any accident previously evaluated. This license condition is more appropriately controlled by other licensing bases documents, which include the NRC approved GESTAR ll analyses and the cycie specific reload licensing reports, and should not be part of the FOL Additionally, this FOL change will not alter any safety limits which ensure the integrity of fuel barriers, and will not result in any increase to onsite or offsite dose.
No physical changes are being made to the plant, nor are there any changes being made in the operation of the plant as a result of this change which could involve a significant increase in the probability or consequences of any accident previously evaluated. Additionally, this change will not alter the operation of equipment assumed to be available for the mitigation of accidents or transients.
2)
The orocosed chanae does not create the oossibility of a new or different kind of accident from any oreviousiv evaluatri Deletion of License Condition 2.C(5) is art administrative change that will not create the possibility of a new or different Npe of accident from any previously evaluated. Deletion of License Condition 2.C(5) is an administrative change that will not involve any changes to plant systems, structures or components (SCCs) which could act as new accident initiators. This change will not impact the manner in which SSCs are tested such that a new or different type of accident from any previously evaluated could be created.
l
- 3) The orocosed change does not result in a sianificant reduction in the margin of safety.
No margins of safety are reduced as a result of the proposed deletion of License Condition 2.C(5). No safety limits will be changed as a result of this change. The proposed change does not involve a reduction in the margin of safety because this change is an administrative change which will not impact core limits or any other parameters that are used in the mitigation of a UFSAR design basis accident or transient. The change to the FOL does not introduce any hardware changes, and will not alter the intended operation of plant structures, systems or components utilized in the mitigation of UFSAR design basis accidents or transients. Additionally, this change will not introduce any new failure modes of plant equipment not previously evaluated.
Information Succorting an Environmental Assessment i
3
1 Docket No. 50-278 i
/ -
Ucens9 No. DPR 56 l
-An environmental assessment is not required for the proposed change since the proposed change conforms to the criteria for " actions eligible for categorical exclusion" ,
as specified in 10 CFR 51.22(c)(9). The proposed change will have no impact on the i environment. The proposed change does not involve a significant hazards consideration as discussed in the preceding section. The. proposed change does not involve a significant change in the types or significant increase in the amounts of any effluents that may be released offsite. In addition, the proposed change does not involve a significant increase in individual or cumulative occupational radiation exposure.
Donclusion The Plant Operations Review Committee and the Nuclear Review Board have reviewed the proposed change to the PBAPS, Unit 3 FOL and have concluded that the change does not involve an unreviewed safety question and will not endanger the health and safety of the public.
L i
I 4 l l
i
i -
i i
1 ATTACHMENT 2 i
. PEACH BOTTOM ATOMIC POWER STATION
- UNIT 3 i
Docket No. 50-278 Ucense No. DPR-56 FACILITY OPERATING LICENSE CHANGE Ust of Attached Pages Unit 3 Page 4