ML20137P751

From kanterella
Jump to navigation Jump to search
License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months
ML20137P751
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/31/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137P755 List:
References
NUDOCS 9704090312
Download: ML20137P751 (2)


Text

.

Ctation Support Department -

t 10CFR50.90 y

s PECO NUCLEAR ncm. c-Q%*'Q.g'*v8'd A Unit of PECO Energy March 31,1997 Docket Nos. 50-277 50-278 License Nos. DPR-44

~

DPR-56 U. S. Nuclear Regulatory Commission 4

ATTN: Document Control Desk

. Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 j

License Change Request ECR 96-00627

Dear Sir:

PECO Energy Company hereby submits License Change Request ECR 96-00627 in accordance with 10CFR50.90 requesting changes to Appendix A of the Peach Bottom Facility Operating Licenses. The proposed changes extend the surveillance interval for calibration of Average Power Range Monitor flow bias instrumentation from 18 months to 24 months.

l

! to this letter describes the proposed changes and provides justification for the changes. Attachment 2 provides marked-up Technical Specifications pages indicating the proposed changes. If you have any i

questions concerning this matter, please do not hesitate to contact us.

Very truly yours,

. N.

k 96f,4 G. A. Hunger, JW, Director - Licensing cc:

H. J. Miller, Administrator, Region I, USNRC W. L. Schmidt, Senior Resident inspector, PBAPS, USNRC f

R. R. Janati, Commonwealth of Pennsylvania

,f 980N g

D 0

o 277 P.

PDR Ipppupppuppa

4-

- COMMONWEALTH OF PENNSYLVANIA l

gg.

COUNTY OF CHESTER i

l D. B. Fetters, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy, the applicant herein; that he has read the attached License Change Request (ECR 96-00627) for Peach Bottom Atomic

Power Station, Unit 2 and Unit 3, Facility Operating Licnese Nos. DPR-44 and DPR-56,.

i and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

q Vice President 5-Subscribed and swom to before me this 3/

day of M 1997.

L

%1LA t

l Notary Public Notans boel 1%

p May 800 -

i

+

l 4