ML20155C601

From kanterella
Jump to navigation Jump to search
Amend 226 to License DPR-44,revising TSs for Safety Limit MCPR from Current Value of 1.11 to 1.10 for Two Recirculation Loop Operation & from 1.13 to 1.12 for Single Recirculation Loop Operation
ML20155C601
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/26/1998
From: Capra R
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20155C593 List:
References
NUDOCS 9811020284
Download: ML20155C601 (4)


Text

.. _ .- - - . - . ~ . - - - . . - . - - _ - . . - . . . _ . - - - - - . - . . - . - .- . - - _ _ . - -

pausuq p UNITED STATES g j NUCLEAR REGULATORY COMMISSION o, ,$ WASHINGTON, D.C. 20086 0001 PECO ENERGY COMPANY PUBLIC SERVICE FI FCTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY J

ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.226 License No. DPR-44 l

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by PECO Energy Company, et al. (the licensee) dated July 10,1998, as supplemented by two letters dated September 11,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended )

(the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1. )

B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Spscifications as indicated in the attachment to this license amendment, and paragraph 2 C(2) of Facility Operating Ucense No. DPR-44 is hereby amended to read as follows:

~

9811020284 981026 PDR ADOCK 05000277 P PDR i

)

_ _. - - - . . --~

i i

i .

2 (2) Iechnical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No226 . are hereby incorporated in the ,icense. PECO Energy Company shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date ofissuance, and is to be implemented prior to stattup for Cycle 13 operations, scheduled for October 1998.

FOR THE NUCLEAR REGULATORY COMMISSION

+<N Q- (W Robert A. Capra, Director Project Directorate 1-2 Division of Reactor Projects .1/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: October 26, 1998 l

l

l l

ATTACHMENT TO LICENSE AMENDMENT NO. ??6

- FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 l

l Replace the following page of the Appendix A Technical Specifications with the enclosed page.

l .The revised areas are indicated by marginal lines.

Remove Insert 2.0 1 2.0-1 l

l l

l t

I l

i l i

t e

4 4

4

SLs 2.0 l 2.0 SAFETY LIMITS (SLs)

! 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:

THERMAL POWER shall be s 25% RTP.

  • 2.1.1.2 With the reactor steam dome pressure 2 785 psig and core flow 210% rated core flow:

MCPR shall be 21.10 for two recirculation loop operation or 21.12 for single recirculation loop operation.

i 2.1.1.3 Reactor vessel water level shall be greater than the top i of active irradiated fuel.

1 2.1.2 Reactor Coolant System Pressure SL l Reactor steam dome pressure shall be s 1325 psig.

2.2 SL Violations With any SL violation, the following actions shall be completed:

2.2.1 Within I hour, notify the NRC Operations Center, in accordance with 10 CFR 50.72.

2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

2.2.2.1 Restore compliance with all SLs; and 2.2.2.2 Insert all insertable control rods.

2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the Plant Manager and the Vice President-Peach Bottom Atomic Power Station.

(continued) l

  • MCPR values in TS 2.1.1.2 are applicable only for Cycle 13 operation 2

PBAPS UNIT 2 2.0-1 Amendment No.210,277, 226 l

l

,