Summary of Annual Assessment Meeting with FPL Energy Seabrook, LLC
ML071010040
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/10/2007
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Krohn P, RI/DRP/PB6/610-337-5120
References
Download: ML071010040 (2)


Text

April 10, 2007 MEETING

SUMMARY

LICENSEE: FPL ENERGY SEABROOK, LLC FACILITY: SEABROOK STATION

SUBJECT:

SUMMARY

OF MARCH 29, 2007 ANNUAL ASSESSMENT MEETING WITH FPL ENERGY SEABROOK On March 29, 2007, at 6:30 p.m., an Annual Assessment Meeting was conducted at the Inn of Hampton, Hampton, NH, between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC (Seabrook). The NRC requested the meeting with Seabrook management to discuss the NRCs assessment of the safety performance of the Seabrook nuclear power plant for calendar year 2006.

The NRC presented and discussed its assessment of the safety performance of Seabrook Unit 1 for the period between January 1 through December 31, 2006. The NRC presentation included a discussion of the Reactor Oversight Process, general background on the plant, 2006 performance assessment results, and an overview of calendar year 2007 planned inspections.

As part of this annual assessment meeting, Seabrook presented an overview of their initiatives in the areas of human performance and engineering.

The public observed this meeting and was offered the opportunity to communicate with the NRC regarding Seabrooks performance and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and Seabrook, the NRC answered questions from the public which included the status of dissimilar metal pressurizer weld inspections, security issues that occurred during 2005, use and distribution of potassium iodide tablets, and some additional detail on selected 2006 NRC findings. The meeting notice with attaches meeting agenda can be located in ADAMS Accession No. ML070720415. The slides can be found at ADAMS Accession No. ML071000208.

Sincerely,

/RA Barry Norris for/

Paul Krohn, Chief Projects Branch 6 Division of Reactor Projects

2 Distribution:

P. Krohn, DRP B. Norris, DRP G. Dentel, DRP S. Shaffer, DRP S. Nelson, DRP E. Huang. DRP E. Miller, DRP A. Burritt, DRP V. Nevses, NRR SUNSI Review Complete: __PGK_____

DOCUMENT NAME: G:\DRP\BRANCH 6\Meeting Notice and Summary\ROP5 Seabrook Meeting Summary.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME A. Burritt/AB P. Krohn/BN for DATE 04/10/07 04/10/07 OFFICIAL RECORD COPY