May 30, 2024 LICENSEE:
NextEra Energy Seabrook, LLC, et al.
FACILITY:
Seabrook Station Unit 1
SUBJECT:
SUMMARY
OF APRIL 30, 2024, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY SEABROOK, LLC, TO DISCUSS LICENSE AMENDMENT REQUEST RELATED TO SEABROOK'S PLANNED FALL 2024 OUTAGE (EPID L-2024-LRM-0065)
On April 30, 2024, an information public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Seabrook, LLC, et al. (the licensee) via teleconference, Microsoft Teams. The purpose of the meeting was for the NRC staff and the licensee representatives to discuss the proposed license amendment request (LAR) to allow Seabrook to exit a planned Fall 2024 refueling outage (RFO) and conduct MODE 2 low-power physics testing concurrent with ongoing main generator breaker repair that would render one offsite AC power source inoperable. Upon completion of the low power physics testing, the unit would re-enter MODE 3 until the main generator breaker repair is completed and the affected offsite AC power source is restored to operability. The meeting notice is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML24108A142. Enclosed is a list of attendees at the meeting.
During the meeting, the NRC and the licensee representatives discussed information related to the proposed change to Technical Specification (TS) 3.8.1.1.a, A.C. Sources - Operating, would provide a one-time allowance to change plant modes from Cold Shutdown (MODE 5) to Startup (MODE 2) while one independent circuit between the offsite transmission network and the onsite Class 1E Distribution System is out of service. The NRC asked questions to gain an understanding of the intent and substance of the submittal affecting the change in technical specifications, The licensee presented information (ML24121A151) discussing the planned LAR. The licensees presentation detailed the proposed change and summarized the necessary reasons for the requested change. This meeting mainly discussed the licensees plans to revise the Technical Specification (TS) One-time TS 3.8.1.1.a Completion Time (CT) Extension from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br />. This would allow completion of RFO activities up through low-power physics testing for the duration of main generator breaker replacement. After the meeting discussion, the licensee indicated they would like to perform additional risk assessment to assess the feasibility up to 480 hours0.00556 days <br />0.133 hours <br />7.936508e-4 weeks <br />1.8264e-4 months <br /> (20 days) action statement completion time. The licensee plans to submit the LAR by May 10, 2024, for NRC approval targeted for September 30, 2024. If approved, the actions will be implemented during the fall 2024 refueling outage. No decisions were made during the meeting. No Members of the public identified themselves on the teleconference. No Public Meeting Feedback forms were received.
Please direct any inquiries to me at 301-415-2597, or by email at V.Sreenivas@nrc.gov.
/RA/
V. Sreenivas, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES APRIL 30, 2024, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY SEABROOK, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST RELATED TO PLANNED FALL 2024 OUTAGE SEABROOK STATION, UNIT 1 U.S. Nuclear Regulatory Commission V Sreenivas NRR1/DORL2/LPL13/PM4 Hipo Gonzalez NRR/DORL/LPL1/Branch Chief Wendell Morton NRR/DEX/EEEB/Branch chief Adakou Foli NRR/DEX/EEEB/Tech. Reviewer Ed Kleeh NRR/DEX/EEEB/Tech. Reviewer Khadija West NRR/DSS/STSB/Tech. Reviewer Jay Robinson NRR/DRA/APLB/Tech. Reviewer Charley Peabody NRR/DSS/SNSB/Tech. Reviewer NextEra Energy Seabrook, LLC Jeff Sobotka Seabrook Engineering Director Brad Woodland Seabrook Engineering Manager Joe Varga Seabrook Senior Control Room Operator Josh Greene Seabrook Senior Licensing Engineer Craig Fortin Fleet Outage Lead Supervisor Ken Mack Fleet Licensing Manager Keith Vincent Fleet Probabilistic Risk Assessment Manager Jarret Mack Fleet Principal Licensing Engineer Kaitlyn Hanley Fleet Licensing Engineer Sheryl Sweet Fleet Licensing Engineer Public None 1Office of Nuclear Reactor Regulation (NRR) 2Division of Operating Reactor Licensing (DORL) 3Plant Licensing Branch I(LPL I) 4Project Manager (PM)
ML24127A228 (Package)
ML24108A142 (Meeting Notice)
ML24127A227 (Meeting Summary)
ML24121A151 (Meeting Slides)
- by email OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DEX/EEEB/BC NRR/DRA/APLB/BC NAME VSreenivas KZeleznock WMorton SMakor DATE 05/07/2024 05/07/2024 05/20/2024 05/07/2024 OFFICE NRR/DSS/STSB/BC NRR/DSS/SNSB/BC NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME SMehta PSahd HGonzález VSreenivas DATE 05/24/2024 05/29/2024 05/30/2024 05/30/2024