ML102170227

From kanterella
Revision as of 17:48, 6 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss the Perry Nuclear Power Plant, Unit 1, End-of-Cycle Plant Performance Assessment
ML102170227
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/05/2010
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To:
References
Download: ML102170227 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 5, 2010 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE JULY 28, 2010, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On July 28, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Perry Township Community Building in Perry, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Perry Nuclear Power Plant, Unit 1, for the period from January 1 through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML101930379 and ML102150069, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Perry Nuclear Power Plant, Unit 1, in calendar year 2009, which was documented in the March 4, 2009, end-of-cycle assessment letter, as ML100610281. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. The FirstEnergy presentation can be found in ADAMS as ML102150085. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-440 License Nos. NPF-58

Enclosure:

As Stated cc w/encl: Distribution via ListServ

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 5, 2010 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE JULY 28, 2010 PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On July 28, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Perry Township Community Building in Perry, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Perry Nuclear Power Plant, Unit 1, for the period from January 1 through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML101930379 and ML102150069, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Perry Nuclear Power Plant, Unit 1, in calendar year 2009, which was documented in the March 4, 2009, end-of-cycle assessment letter, as ML100610281. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. The FirstEnergy presentation can be found in ADAMS as ML102150085. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-440 License Nos. NPF-58

Enclosure:

As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2009\EOC letters\EOC Meeting Summaries\Perry 2009 EOC Public Meeting Summary.docx G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME AGarmoe:dtp JCameron DATE 08/04/10 08/05/10 OFFICIAL RECORD COPY

Letter to FirstEnergy Nuclear Operating Company from J. Cameron dated August 5, 2010.

SUBJECT:

SUMMARY

OF THE JULY 28, 2010, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

Susan Bagley RidsNrrPMPerry RidsNrrDorlLpI3-2 RidsNrrDirsIrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

Enclosure Meeting Participants NRC G. Shear, Deputy Director, Division of Reactor Projects, Region III J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III M. Marshfield, Senior Resident Inspector, Perry T. Hartman, Resident Inspector, Perry V. Mitlyng, Senior Public Affairs Officer, Region III FirstEnergy Nuclear Operating Company D. Pace, Sr. Vice President, Fleet Engineering and Services, FirstEnergy D. Maul, Vice President, Nuclear Support, FirstEnergy M. Bezilla, Site Vice President, Perry K. Krueger, Director of Site Operations M. Stevens, Director of Maintenance H. Hanson, Director of Performance Improvement