MONTHYEARIR 05000220/20254032025-01-16016 January 2025 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000220/2025403 and 05000410/2025403 IR 05000220/20244022024-11-20020 November 2024 Material Control and Accounting Program Inspection Report 05000220/2024402 and 05000410/2024402 (Cover Letter Only) IR 05000410/20240032024-11-0808 November 2024 Integrated Inspection Report 05000220/1014003 and 05000410/2024003 IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 IR 05000220/20234202023-11-0101 November 2023 – Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 IR 05000220/20230012023-05-0505 May 2023 Integrated Inspection Report 05000220/2023001 and 05000410/2023001 IR 05000220/20233012023-03-29029 March 2023 Initial Operator Licensing Examination Report 05000220/2023301 IR 05000220/20220062023-03-0101 March 2023 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022006 and 05000410/2022006) IR 05000220/20220042023-01-23023 January 2023 Integrated Inspection Report 05000220/2022004 and 05000410/2022004 IR 05000220/20220102022-11-22022 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000220/2022010 and 05000410/2022010 IR 05000220/20220032022-11-0404 November 2022 Integrated Inspection Report 05000220/2022003 and 05000410/2022003 IR 05000220/20220052022-08-31031 August 2022 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022005 and 05000410/2022005) IR 05000220/20224012022-08-30030 August 2022 Security Baseline Inspection Report 05000220/2022401 and 05000410/2022401 IR 05000220/20220022022-08-0808 August 2022 Integrated Inspection Report 05000220/2022002 and 05000410/2022002 and Independent Spent Fuel Storage Installation Report 07201036/2022001 IR 05000220/20210042022-05-19019 May 2022 Reissued Integrated Inspection Report 05000220/2021004 and 05000410/2021004 IR 05000220/20220012022-04-29029 April 2022 Integrated Inspection Report 05000220/2022001 and 05000410/2022001 IR 05000220/20210062022-03-0202 March 2022 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021006 and 05000410/2021006) ML22026A3502022-01-26026 January 2022 Integrated Inspection Report 05000220/2021004 and 05000410/2021004 IR 05000220/20210122022-01-10010 January 2022 Biennial Problem Identification and Resolution Inspection Report 05000220/2021012 and 05000410/2021012 IR 05000220/20210032021-11-0909 November 2021 Integrated Inspection Report 05000220/2021003 and 05000410/2021003 and Independent Spent Fuel Storage Installation Report 07201036/2021001 IR 05000220/20215012021-10-14014 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2021501 and 05000410/2021501 IR 05000220/20210052021-09-0101 September 2021 Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021005 and 05000410/2021005) IR 05000220/20214012021-09-0101 September 2021 Material Control and Accounting Program Inspection Report 05000220/2021401 and 05000410/2021401 (Letter Only) IR 05000220/20210102021-08-24024 August 2021 Triennial Fire Protection Inspection Report 05000220/2021010 and 05000410/2021010 IR 05000220/20210022021-08-10010 August 2021 Integrated Inspection Report 05000220/2021002 and 05000410/2021002 and Independent Spent Fuel Storage Installation Report 07201036/2021002 IR 05000220/20214022021-06-22022 June 2021 Security Baseline Inspection Report 05000220/2021402 and 05000410/2021402 IR 05000410/20213022021-05-12012 May 2021 Initial Operator Licensing Examination Report 05000410/2021302 IR 05000220/20210012021-05-0505 May 2021 Integrated Inspection Report 05000220/2021001 and 05000410/2021001 IR 05000220/20210112021-05-0404 May 2021 Temporary Instruction 2515/194 Inspection Report 05000220/2021011 and 05000410/2021011 IR 05000220/20200062021-03-0303 March 2021 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020006 and 05000410/2020006) IR 05000220/20200042021-02-11011 February 2021 Integrated Inspection Report 05000220/2020004 and 05000410/2020004 and Independent Spent Fuel Storage Installation Report 07201036/202004 IR 05000220/20203012021-01-25025 January 2021 Initial Operator Licensing Examination Report 05000220/2020301 2025-01-16
[Table view] Category:Letter
MONTHYEARIR 05000220/20254032025-01-16016 January 2025 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000220/2025403 and 05000410/2025403 ML24358A1832025-01-0707 January 2025 Issuance of Relief Proposed Alternative Request Associated with Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24344A2742024-12-19019 December 2024 Alternative Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case OMN-32 ML24339B7292024-12-18018 December 2024 Amd - Constellation - Adoption of TSTF-591 ML24331A2592024-11-27027 November 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III 05000410/LER-2024-002, Automatic Reactor Scram on Turbine Trip Due to Failed Breaker2024-11-22022 November 2024 Automatic Reactor Scram on Turbine Trip Due to Failed Breaker NMP1L3614, Response to Request for Additional Information for License Amendment Request to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-11-22022 November 2024 Response to Request for Additional Information for License Amendment Request to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244022024-11-20020 November 2024 Material Control and Accounting Program Inspection Report 05000220/2024402 and 05000410/2024402 (Cover Letter Only) IR 05000410/20240032024-11-0808 November 2024 Integrated Inspection Report 05000220/1014003 and 05000410/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 2025-01-07
[Table view] |
Text
{{#Wiki_filter:UNITED STATES ber 13, 2013
SUBJECT:
NINE MILE POINT NUCLEAR STATION, LLC - NRC INTEGRATED INSPECTION REPORT 05000220/2013004 AND 05000410/2013004
Dear Mr. Costanzo:
On September 30, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Nine Mile Point Nuclear Station, LLC (NMPNS) Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on October 24, 2013, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Daniel L. Schroeder, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos: 50-220 and 50-410 License Nos: DPR-63 and NPF-69
Enclosure:
Inspection Report 05000220/2013004 and 05000410/2013004 w/ Attachment: Supplementary Information
REGION I==
Docket Nos: 50-220 and 50-410 License Nos: DPR-63 and NPF-69 Report Nos: 05000220/2013004 and 05000410/2013004 Licensee: Constellation Energy Nuclear Group, LLC (CENG)
Facility: Nine Mile Point Nuclear Station, LLC (NMPNS)
Units 1 and 2 Location: Oswego, NY Dates: July 1, 2013, through September 30, 2013 Inspectors: K. Kolaczyk, Senior Resident Inspector E. Miller, Resident Inspector J. Ambrosini, Senior Resident Inspector J. DeBoer, Project Engineer B. Dionne, Health Physicist S. Hammann, Senior Health Physicist P. Kaufman, Senior Reactor Inspector J. Krafty, Resident Inspector J. Laughlin, Emergency Preparedness Inspector Approved by: Daniel L. Schroeder, Chief Reactor Projects Branch 1 Division of Reactor Projects Enclosure
SUMMARY
IR 05000220/2013004, 05000410/2013004; 07/01/2013 - 09/30/2013; Nine Mile Point Nuclear
Station (NMPNS), Units 1 and 2; Routine Integrated Inspection Report.
The report covered a 3-month period of inspection by resident inspectors and announced inspections performed by regional inspectors. The inspectors identified no findings during this period. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4.
No findings were identified.
REPORT DETAILS
Summary of Plant Status
Unit 1 began the inspection period at 100 percent power. On July 3, 2013, power was decreased to 90 percent to start recirculation pump 15. Power was returned to 100 percent later that day. On July 8, Unit 1 was shut down due to elevated unidentified leakage in the primary containment. Following identification of the source of the leakage and the completion of repairs to the reactor water cleanup vent valve 33-61, Unit 1 returned to 100 percent power on July 12. On July 13, power was reduced to 75 percent for a rod pattern adjustment and later that day returned to 100 percent power. On September 9, Unit 1 decreased power to 90 percent to perform turbine stop valve testing and remove recirculation pump 13 from service.
Reactor power was returned to 100 percent later that day. Unit 1 remained at full power for the remainder for the inspection period.
Unit 2 began the inspection period at 100 percent power. On July 19, 2013, reactor power was decreased to 98 percent due to high condensate pump discharge header temperature. Power was returned to 100 percent later that day. On September 7, Unit 2 reduced power to 85 percent to conduct turbine stop valve testing, returning to full power that same day. On September 21, Unit 2 reduced power to 70 percent to perform a control rod pattern adjustment and scram time testing. Unit 2 returned to full power on September 22 and operated at full power for the remainder of the inspection period.
REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
1R01 Adverse Weather Protection
Main article: IP 71111.01
Readiness for Seasonal Extreme Weather Conditions
a. Inspection Scope
The inspectors performed a review of the stations readiness for the onset of seasonal high temperatures. The review focused on Unit 1 batteries 11 and 12 and emergency diesel generators (EDGs) 102 and 103 on July 17, 2013. The inspectors reviewed the Updated Final Safety Analysis Report (UFSAR), technical specifications (TSs), and the corrective action program (CAP) to determine what temperatures or other seasonal weather could challenge these systems, and to ensure CENG personnel had adequately prepared for these challenges. The inspectors reviewed station procedures including CENGs seasonal weather readiness procedure and applicable operating procedures.
The inspectors performed walkdowns of the selected systems to ensure station personnel identified issues that could challenge the operability of the systems during hot weather conditions. Documents reviewed for each section of this inspection report are listed in the Attachment.
b. Findings
No findings were identified.
==1R04 Equipment Alignment
.1 Partial System Walkdowns
Main article: IP 71111.04Q ==
a. Inspection Scope
The inspectors performed partial walkdowns of the following systems:
Unit 2 Division I standby gas treatment system (SGTS) following functional testing on July 18, 2013 Unit 1 uninterruptible power supply (UPS) system for the reactor protection system bus 11 following the trip of the alternating current (AC) breaker for UPS 162A and B on July 22, 2013 Unit 1 offsite power systems following testing on EDG 102 on July 25, 2013 Unit 2 high-pressure core spray (HPCS) system while the reactor core isolation cooling (RCIC) system was out of service (OOS) for planned maintenance on August 6, 2013 The inspectors selected these systems based on their risk significance relative to the reactor safety cornerstones at the time they were inspected. The inspectors reviewed applicable operating procedures, system diagrams, the UFSAR, TSs, work orders (WOs), condition reports (CRs), and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have impacted system performance of their intended safety functions. The inspectors also performed field walkdowns of accessible portions of the systems to verify system components and support equipment were aligned correctly and were operable. The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no deficiencies. The inspectors also reviewed whether CENG staff had properly identified equipment issues and entered them into the CAP for resolution with the appropriate significance characterization.
b. Findings
No findings were identified.
.2 Full System Walkdown
Main article: IP 71111.04S
a. Inspection Scope
On September 17, 2013, the inspectors performed a complete system walkdown of accessible portions of the Unit 1 primary containment isolation valves to verify the existing equipment lineup was correct. The inspectors reviewed operating procedures, drawings, completed surveillances, and the UFSAR to verify the system was aligned to perform its required safety functions. The inspectors performed field walkdowns of accessible portions of the system to verify system components and support equipment were aligned correctly and operable. The inspectors examined the material condition of components and observed operating parameters of equipment to verify that there were no deficiencies. Additionally, the inspectors reviewed a sample of related CRs and WOs to ensure CENG personnel appropriately evaluated and resolved any deficiencies.
b. Findings
No findings were identified.
==1R05 Fire Protection
.1 Resident Inspector Quarterly Walkdowns
Main article: IP 71111.05Q