Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:Inspection Report
MONTHYEARIR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 IR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 IR 05000482/20234202023-07-12012 July 2023 Security Baseline Inspection Report 05000482/2023420 - Cover Letter IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23111A0662023-04-20020 April 2023 (Cover Letter Only) Wolf Creek Generating Station Special Inspection Reactive Report 05000482-20220502 IR 05000482/20230012023-04-19019 April 2023 Integrated Inspection Report 05000482/2023001 IR 05000482/20220062023-03-0101 March 2023 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2022006) IR 05000482/20234022023-02-0606 February 2023 Security Baseline Inspection Report 050004822023402 ML23017A2092023-01-18018 January 2023 Emergency Preparedness Biennial Exercise Inspection URI Closure Report IR 05000482/20220042023-01-17017 January 2023 Integrated Inspection Report 05000482/2022004 ML22333A7132022-12-0202 December 2022 License Renewal Phase 1 Report IR 05000482/20220032022-10-25025 October 2022 Integrated Inspection Report 05000482/2022003 IR 05000482/20224032022-08-31031 August 2022 NRC Security Baseline Inspection Report 05000482/2022403 IR 05000482/20220052022-08-23023 August 2022 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2022005) IR 07200079/20224042022-08-0404 August 2022 NRC Security Inspection Report 07200079/2022404 (Cover Letter) IR 05000482/20220022022-07-25025 July 2022 Integrated Inspection Report 05000482/2022002 IR 05000482/20224022022-06-29029 June 2022 Security Baseline Inspection Report 05000482/2022402 - Public IR 05000482/20220102022-05-0505 May 2022 Biennial Problem Identification and Resolution Inspection Report 05000482/2022010 IR 05000482/20224012022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 IR 05000482/20220012022-04-25025 April 2022 Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 IR 05000482/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000482/2021006) IR 05000482/20213012022-01-19019 January 2022 NRC Examination Report 05000482/2021301 IR 05000482/20210042022-01-19019 January 2022 Integrated Inspection Report 05000482/2021004 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021002 IR 05000482/20210112021-12-0101 December 2021 Temporary Instruction 2515/194 Report 05000482/2021011 IR 05000482/20214202021-11-15015 November 2021 Inspection Report Cover Letter FOF 05000482/2021420 IR 05000482/20210032021-11-0505 November 2021 Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch IR 05000482/20210102021-09-0909 September 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000482/2021010 IR 05000482/20210022021-08-0909 August 2021 Integrated Inspection Report 05000482/2021002 IR 05000482/20214022021-07-27027 July 2021 NRC Security Baseline Inspection Report 05000482/2021402 (Cover Letter Without Enclosure) IR 05000482/20210012021-05-0505 May 2021 Integrated Inspection Report 05000482/2021001 IR 05000482/20190062021-03-0303 March 2021 Annual Assessment Letter (Report 05000482/2019006) IR 05000482/20214012021-02-26026 February 2021 NRC Security Inspection Report 05000482/2021401 IR 05000482/20200042021-02-0909 February 2021 Integrated Inspection Report 05000482/2020004 IR 05000482/20200132020-12-0303 December 2020 Traditional Enforcement Follow-Up Inspection Report 05000482/2020013 IR 05000482/20200122020-11-19019 November 2020 Triennial Fire Protection Inspection Report 05000482/2020012 IR 05000482/20200032020-11-12012 November 2020 Integrated Inspection Report 05000482/2020003 IR 05000482/20204102020-09-29029 September 2020 Security Baseline Inspection Report 05000482/2020410 IR 05000482/20200022020-08-12012 August 2020 Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001 IR 05000482/20200102020-08-0303 August 2020 Biennial Problem Identification and Resolution Inspection Report 05000482/2020010 IR 05000482/20200112020-05-21021 May 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000482/2020011 IR 05000482/20200012020-05-0404 May 2020 Integrated Inspection Report 05000482/2020001 IR 05000482/20194132020-02-11011 February 2020 Security Baseline Inspection Report 05000482/2019413 IR 05000482/20190042020-02-0303 February 2020 Integrated Inspection Report 05000482/2019004 IR 05000482/20193012020-01-15015 January 2020 NRC Examination Report 05000482/2019301 IR 05000482/20190032019-10-25025 October 2019 Integrated Inspection Report 05000482/2019003 IR 05000482/20194102019-09-24024 September 2019 NRC Cyber Security Inspection Report 05000482/2019410 IR 05000482/20194122019-09-11011 September 2019 NRC Security Inspection Report 05000482/2019412 IR 05000482/20190052019-08-30030 August 2019 Updated Inspection Plan for Wolf Creek Generating Station, Report 05000482/2019005 2024-01-11
[Table view] |
See also: IR 05000482/2009005
Text
UNITED STATES
NUC LE AR RE G UL AT O RY C O M M I S S I O N
R E GI ON I V
612 EAST LAMAR BLVD , SU I TE 400
AR LI N GTON , TEXAS 76011-4125
March 2, 2010
Matthew W. Sunseri, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION
REPORT 05000482/2009005 ERRATA
Dear Mr. Sunseri:
Please replace page 18 of the Report Details and insert page A-4A into the Supplemental
Information in NRC Inspection Report 05000482/2009005, dated February 11, 2010, using the
enclosed revised pages. These changes are needed to properly document a flood protection
inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records component of NRCs document
system (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Geoffrey B. Miller, Chief
Project Branch B
Division of Reactor Projects
Docket: 50-482
License: NPF-42
Enclosure: As stated
cc w/Enclosure:
Vice President Operations/Plant Manager
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP
2300 N Street, NW
Washington, DC 20037
Supervisor Licensing
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Chief Engineer
Utilities Division
Kansas Corporation Commission
1500 SW Arrowhead Road
Topeka, KS 66604-4027
Office of the Governor
State of Kansas
Topeka, KS 66612-1590
Attorney General
120 S.W. 10th Avenue, 2nd Floor
Topeka, KS 66612-1597
County Clerk
Coffey County Courthouse
110 South 6th Street
Burlington, KS 66839
Chief, Radiation and Asbestos
Control Section
Kansas Department of Health and
Environment
Bureau of Air and Radiation
1000 SW Jackson, Suite 310
Topeka, KS 66612-1366
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Chris.Long@nrc.gov)
Site Secretary (Shirley.Allen@nrc.gov)
Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Senior Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Only inspection reports to the following:
DRS/TSB STA (Dale.Powers@nrc.gov)
L. Trocine, OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
ROPreports
SUNSI Review Completed: __CML__ ADAMS: ; Yes No Initials: __CML__
- Publicly Available Non-Publicly Available Sensitive ; Non-Sensitive
ML 100610613
SRI:DRP/B PE:DRP/B BC:DRP/B
CMLong GPTutak GBMiller
/RA by E/ /RA/ /RA/
3/2/10 3/2/10 3/2/10
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
for bunkers/manholes; verified that operator actions for coping with flooding can
reasonably achieve the desired outcomes; and walked down the area listed below to
verify the adequacy of equipment seals located below the flood line, floor and wall
penetration seals, watertight door seals, common drain lines and sumps, sump pumps,
level alarms, and control circuits, and temporary or removable flood barriers. Specific
documents reviewed during this inspection are listed in the attachment.
leakage
These activities constitute completion of two flood protection measures inspection
samples as defined by Inspection Procedure IP 71111.06-05.
b. Findings
No findings of significance were identified.
1R07 Heat Sink Performance (71111.07)
.1 Annual Inspection
a. Inspection Scope
The inspectors reviewed licensee programs, verified performance against industry
standards, and reviewed critical operating parameters and maintenance records.
- January 14, 2009, STN PE-38 on containment cooler SGN01D
The inspectors verified that performance tests were satisfactorily conducted for heat
exchangers/heat sinks and reviewed for problems or errors; the licensee utilized the
periodic maintenance method outlined in Electric Power Research Institute
Report NP 7552, "Heat Exchanger Performance Monitoring Guidelines;" the licensee
properly utilized biofouling controls; the licensees heat exchanger inspections
adequately assessed the state of cleanliness of their tubes; and the heat exchanger was
correctly categorized under 10 CFR 50.65, Requirements for Monitoring the
Effectiveness of Maintenance at Nuclear Power Plants. Specific documents reviewed
during this inspection are listed in the attachment.
These activities constitute completion of one heat sink inspection sample as defined by
Inspection Procedure IP 71111.07-05.
b. Findings
No findings of significance were identified.
- 18 -
MISCELLANEOUS
Condition Report 21764
Floor Drain Tank Logs 11/12/09 - 11/14/09
WORK ORDERS
09-322276-000
09-322259-002
DRAWINGS
NUMBER TITLE Revision
10466-A-1301 Architectural Auxiliary & Reactor Bldg. Floor Plan El. 8
1974 0
C-1C1112 Auxiliary Building - Area 1 Concrete Neat Lines Plan 2
- Base Slab El. 1974 0
C-1C1122 Auxiliary Building - Area 2 Concrete Neat Lines Plan 2
- Base Slab El. 1974 0
10466 C-0026 Civil Structural Standard Details Stainless Steel 11
Sumps
A-4a