|
---|
Category:Letter type:SVPLTR
MONTHYEARSVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 SVPLTR 23-0004, Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities2023-02-10010 February 2023 Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities SVPLTR 22-0037, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2022-09-0707 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 22-0024, Registration of Use of Casks to Store Spent Fuel2022-06-16016 June 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 22-0016, Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds2022-06-0808 June 2022 Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds SVPLTR 22-0017, Registration of Use of Casks to Store Spent Fuel2022-05-25025 May 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0061, Core Operating Limits Report for Dresden Unit 2 Cycle 282021-11-19019 November 2021 Core Operating Limits Report for Dresden Unit 2 Cycle 28 SVPLTR 21-0057, Submittal of 10 CFR 72.48 Evaluation Summary Report2021-10-15015 October 2021 Submittal of 10 CFR 72.48 Evaluation Summary Report SVPLTR 21-0030, Registration of Use of Casks to Store Spent Fuel2021-06-0202 June 2021 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0028, 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report SVPLTR 21-0027, Radioactive Effluent Release Report and Offsite Dose Calculation Manual2021-04-22022 April 2021 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 21-0005, Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8)2021-01-29029 January 2021 Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8) SVPLTR 20-0053, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld2020-10-15015 October 2020 Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld SVPLTR 20-0045, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-09-0101 September 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 20-0037, Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-0532020-07-0202 July 2020 Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-053 SVPLTR 20-0027, Registration of Use of Casks to Store Spent Fuel2020-05-14014 May 2020 Registration of Use of Casks to Store Spent Fuel SVPLTR 20-0014, Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2020-04-21021 April 2020 Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 20-0010, Fifth 10-Year Interval 2019 Refueling Outage Activities2020-02-13013 February 2020 Fifth 10-Year Interval 2019 Refueling Outage Activities SVPLTR 19-0049, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-09-10010 September 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 19-0031, Registration of Use of Casks to Store Spent Fuel2019-06-14014 June 2019 Registration of Use of Casks to Store Spent Fuel SVPLTR 19-0020, Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2019-04-19019 April 2019 Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 19-0005, Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities2019-02-0808 February 2019 Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities SVPLTR 18-0025, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-08-15015 August 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 18-0020, Corrected 2017 Radioactive Effluent Release Report2018-06-28028 June 2018 Corrected 2017 Radioactive Effluent Release Report SVPLTR 18-0018, Registration of Use of Casks to Store Spent Fuel2018-06-14014 June 2018 Registration of Use of Casks to Store Spent Fuel SVPLTR 18-0012, Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2018-04-24024 April 2018 Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 18-0007, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 182018-03-0101 March 2018 Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 18 SVPLTR 17-0033, Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December2017-08-29029 August 2017 Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December SVPLTR 17-0026, Registration of Use of Casks to Store Spent Fuel2017-06-0606 June 2017 Registration of Use of Casks to Store Spent Fuel SVPLTR 17-0017, Submittal of 2016 Radioactive Effluent Release Report2017-04-26026 April 2017 Submittal of 2016 Radioactive Effluent Release Report SVPLTR 16-0027, 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC2016-12-0101 December 2016 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC SVPLTR 16-0061, Core Operating Limits Report for Unit 3 Cycle 252016-11-21021 November 2016 Core Operating Limits Report for Unit 3 Cycle 25 SVPLTR 16-0018, Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2016-04-25025 April 2016 Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 16-0017, Submittal of Post Accident Monitoring Report Instrumentation2016-04-0808 April 2016 Submittal of Post Accident Monitoring Report Instrumentation SVPLTR 16-0001, Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions2016-01-21021 January 2016 Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions SVPLTR 15-0070, Core Operating Limits Report for Cycle 24A2015-12-15015 December 2015 Core Operating Limits Report for Cycle 24A SVPLTR 15-0065, Core Operating Limits Report for Cycle 252015-11-16016 November 2015 Core Operating Limits Report for Cycle 25 SVPLTR 15-0059, Core Operating Limits Report, Cycle 242015-10-25025 October 2015 Core Operating Limits Report, Cycle 24 SVPLTR 15-0056, 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2015-09-0404 September 2015 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 15-0055, Notification of Readiness for NRC 95001 Inspection2015-08-25025 August 2015 Notification of Readiness for NRC 95001 Inspection SVPLTR 15-0052, Response to Preliminary White Finding2015-08-14014 August 2015 Response to Preliminary White Finding SVPLTR 15-0046, ISFSI - Registration of Use of Casks to Store Spent Fuel2015-07-17017 July 2015 ISFSI - Registration of Use of Casks to Store Spent Fuel SVPLTR 15-0043, Registration of Use of Casks to Store Spent Fuel2015-06-12012 June 2015 Registration of Use of Casks to Store Spent Fuel SVPLTR 15-0034, 2014 Annual Radiological Environmental Operating Report2015-05-14014 May 2015 2014 Annual Radiological Environmental Operating Report SVPLTR 15-0020, Written Position on Preliminary White Finding Discussed in NRC Inspection Report 05000237/2014005; 05000249/20140052015-03-0202 March 2015 Written Position on Preliminary White Finding Discussed in NRC Inspection Report 05000237/2014005; 05000249/2014005 SVPLTR 15-0014, Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities2015-02-11011 February 2015 Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities 2023-06-20
[Table view] Category:License-Operator
MONTHYEARML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22215A1812021-05-14014 May 2021 April 2021 Administered JPMs ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 SVPLTR 21-0007, April 2021 Submittal Letter2021-05-14014 May 2021 April 2021 Submittal Letter ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22215A2462021-05-14014 May 2021 April 2021 Form ES-301-6 ML22215A2422021-05-14014 May 2021 April 2021 Form ES-301-4 ML22215A2382021-05-14014 May 2021 April 2021 Form ES-301-3 ML22215A1852021-05-14014 May 2021 April 2021 Administered Scenarios ML22236A0172021-05-14014 May 2021 Initial License Exam Forms ES-301-2 ML22236A0162021-05-14014 May 2021 Initial License Exam Forms ES-301-1 ML22216A1872021-05-14014 May 2021 April 2021 Proposed JPMs ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22216A1892021-05-14014 May 2021 April 2021 Proposed Scenarios ML22236A0182021-05-14014 May 2021 Initial License Exam Forms ES-401-1 and ES-401-3 rev1 ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam 2023-06-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22236A6382021-05-14014 May 2021 April 2021 Initial License Exam Form ES-401-4 ML22215A1812021-05-14014 May 2021 April 2021 Administered JPMs ML22215A1852021-05-14014 May 2021 April 2021 Administered Scenarios ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 SVPLTR 21-0007, April 2021 Submittal Letter2021-05-14014 May 2021 April 2021 Submittal Letter ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22215A2462021-05-14014 May 2021 April 2021 Form ES-301-6 ML22215A2422021-05-14014 May 2021 April 2021 Form ES-301-4 ML22215A2382021-05-14014 May 2021 April 2021 Form ES-301-3 ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam ML22236A6392021-05-14014 May 2021 April 2021 Initial License Exam Form ES-401-9 ML22236A0202021-05-14014 May 2021 Initial License Exam Forms ES-D1 ML22236A6372021-05-14014 May 2021 April 2021 Initial License Exam Form ES-301-7 ML22236A6402021-05-14014 May 2021 April 2021 Initial License Exam Operating Test Outline Comments 2023-06-09
[Table view] |
Text
2011 DRESDEN NUCLEAR POWER STATION INITIAL EXAMINATION OUTLINE SUBMITTAL
Exelon Generation Company, LLC Dresden Nuclear Power Station www.exeloncorp.com Nuclear 6500 North Dresden Road Morris. IL 60450-9765 September 23,2010 SVPLTR: #lo-0037 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road Lisle, IL 60532-4352 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Docket Nos. 50-237 and 50-249
Subject:
Submittal of Initial Operator Licensing Examination Outlines Enclosed are the examination outlines, supporting the initial license exam scheduled for the weeks of March 07,201 1 through March 18, 2011 at Dresden Nuclear Power Station.
This submittal includes all appropriate examination standard forms and outlines in accordance with NUREG-1021, Operator Licensing Examination Standards, revision 9 supplement 1.
In accordance with NUREG 1021, revision 9, supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are complete.
Should you have any questions concerning this letter, please contact Dennis Leggett, Regulatory Assurance Manager, at 815-416-2800. For questions concerning examination outlines, please contact Mr. Frank Ferrero at 815-416-2620.
Respectfully, Tim Hanky Site Vice President Dresden Nuclear Power Station
Enclosures:
(Hand delivered to Chief Examiner Region 111)
Examination Security Agreements (Form ES-201-3)
Administrative Topics Outline (Form ES-301-1)
Control Room/ln-Plant Systems Outline (Form ES-301-2)
BWR Examination Outline (Forms ES-401-1)
Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)
Statement Detailing method of Written Exam Outline Generation Scenario Outlines (Form ES-D-1)
Record of Rejected WAS (Form ES-401-4)
Completed Checklists:
Examination Outline Quality Checklist (Form ES-201-2)
Transient and Event Checklist (Form ES-301-5) cc: (without enclosures)
Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Dresden Nuclear Power Station
ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Dresden Date of Examination: -
3 7-/
I Item I Task Description I Initials Tp 1.
... I a. Verify that the ouline(s) fit(@the appropriate model, in accordancewith ES-401.
RI T
~
- b. Assess whether the outline was systematically and randomlyprepared in accordancewith Section D.l of ES-401 and whether all WA categories are appropriately sampled. p-T E
- c. Assess whether the outline over-emphasizesany systems, evolutions, or generic topics. P-N d. Assess whether the justificationsfor deselected or rejected WA statementsare appropriate.
- a. Using Form ES-301-5,verify that the proposed scenario sets cover the requirednumber of normal evolutions, instrument and componentfailures, technical specifications, and major transients.
- b. Assess whether there are enough scenario sets (andspares) to test the projectednumber and mix of applicants in accordance with the expectedcrew composition and rotation schedule without compromisingexam integrity, and ensure that each applicant can be tested using at least one new or significantlymodifiedscenario, that no scenarios are duplicated from the applicants audit test@),and scenarios will not be repeated on subsequent days.
limits specifiedon the form
- a. Author
- b. Facility Reviewer c)
- c. NRC Chief Examiner (#)
NOTE: # IndependentNRC Reviewer initial items in Column c; chief examiner concurrence required.
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Dresden . Date of Examination: 3/7/11 Examination Level: RO SRO 0 Operating Test Number: 10-1 (2011-301)
Administrative Topic Type Describe activity to be performed (SeeNote) I Code*
Perform Calculated Drywell Leak Rate Conduct of Operations Generic.2.1.I8 Perform Off-Site Power Sources Available Conduct of Operations Generic.2.1.31 Verify Reversal Of EDG Cooling Water Flow Surveillance Equipment Control D, S Generic.2.2.12 Perform CCSW Activity Calculation Radiation Control Generic.2.3.11 Emergency Plan VOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
' Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (1.3 for ROs; f4 for SROs & RO retakes)
(N)ew or (M)odified from bank (11)
(P)revious 2 exams 1; randomly selected)
ES 301,Page 22 of 27
ES-301 Ad minist rat ive Topics 0utI i ne Form ES-301-1 Facility: Dresden Date of Examination: 3/7/11 Examination Level: RO 0 SRO Operating Test Number: 10-1 (2011-301)
Administrative Topic Type Describe activity to be performed (See Note) Code*
Reportability Determination Conduct of Operations N, S Generic.2.1.2 Review Off-Site Paperwork Sources Available Conduct of Operations Generic.2.1.31 Review Calculated Drywell Leakrate And Identify Tech Equipment Control Specs Generic.2.2.40 Perform CCSW Activity Calculation Radiation Control Generic.2.3.11 Authorize Use Of KI Emergency Plan Generic.2.4.40 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (I3 for ROs; 5 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (2 1)
(P)revious 2 exams (5 1; randomly selected)
ES 301,Page 22 of 27
ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 Facility: Dresden Date of Examination: 317111 Exam Level: RO SRO-I SRO-U 0 Operating Test Number: 10-1 (2011-3011 I Control Room Systems@(8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System I JPM Title Type 'Ode*
Function
- a. SBLC - Injection With RWCU Isolation Failure (211000.A4.08) A, M, s 1
- b. CORE SPRAY - Perform Pump Test, With Pump Trip (209001.A4.01) A, D, L, P, S 2 I c. DEHC - Establish RPV Cooldown With Bypass Valves (241000.A4.06) I D, L, S I 3.
- d. LPCl - Mitigate High Suction Pressure While Lining Up To CST For A, D, L, S 4 Injection (203000.A4.02)
- e. CONTAINMENT -Vent The Torus With Level Less Than 30 Feet A, D, s 5 (295024.A1.14\
- f. AUX POWER - Transfer To TR-22 From TR-21, With Breaker Failure D, s 6 (262001.A4.04)
- g. RWM - Enter Substitute Rod Position (201006.A4.06) D, S 7
- h. OFF GAS - Align Charcoal Adsorber Filters In Series Mode N, L, S 9 (271000.A4.09)
In-Plant Systems@(3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. SBLC - Lineup SBLC Test Tank For Alternate Water Injection D, E, R 2 (295031.Al.O8)
- j. EDG - Manually Fill Unit 213 EDG Day Tank (264000.G.2.1.30) D, R 6
- k. HVAC - Valve In Control Room Emergency Breathing Air (600000.A2.10) D 8
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO I SRO-I I SRO-U '
(A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank -< 9 158 154 (E)mergency or abnormal in-plant ->1 1 2 1 1 2 1 (EN)gineered safety feature - I - I 2 1 (control room system)
(L)ow-Power I Shutdown -> I 1 2 1 1 2 1 (N)ew or (M)odified from bank including 1(A) -> 2 1 2 2 11.1 (P)revious 2 exams - 3 I 5 3 I 5 2 (randomly selected)
(WA -> I 1 2 1 1 2 1 (S)imulator ES-301, Page 23 of 27
ES-301 Control Room/ln-Plant Svstems Outline Form ES-301-2 Facility: Dresden Date of Examination: 317111 Exam Level: RO 0 SRO-I SRO-U Operating Test Number: 10-1 (201 1-3011 I Control Room Systems@(8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) I Safety System I JPM Title Type Ode* Function
- a. SBLC - Injection With RWCU Isolation Failure (21 1000.A4.08) A, M, S 1
- b. CORE SPRAY - Perform Pump Test, With Pump Trip (209001.A4.01) A, D, L, P, S 2 I c. DEHC - Establish RPV Cooldown With Bypass Valves (241000.A4.06) 1 D, L, S I 3 I
- h. OFF GAS - Align Charcoal Adsorber Filters In Series Mode N, L, S 9 (271000.A4.09)
- i. SBLC - Lineup SBLC Test Tank For Alternate Water Injection D, E, R 2 (295031.AI .08)
- j. EDG - Manually Fill Unit 213 EDG Day Tank (264000.G.2.1.30) D, R 6 I k. HVAC - Valve In Control Room Emergency Breathing Air (600000.A2.10) 1 D 1 8 I
- Type Codes Criteria for RO I SRO-I I SRO-U (A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank -< 9 158 154 (E)mergency or abnormal in-plant -> I 12.1 1 2 1
~ (EN)gineered safety feature - I - I 1. 1 (control room system)
(L)ow-Power I Shutdown -> I 121 / ? I 1 (N)ew or (M)odified from bank including 1(A) -> 2 122 I 1 1 (P)revious 2 exams -3 I 5 3 I 5 2 (randomlyselected)
(WCA -> I 12.1 12.1 (S)imulator ES-301, Page 23 of 27
tS-301 I ransient and tvent ChecklistForm tS-301-5
--
acility: Dresden Date of Exam: 3/7/11 Scenarios Operating Test Number: 10-1 (2011-301)
A E P V 1 M P E L N CREW I T POSITION POSITION POSITION T N C A I A T L M N Y R T O R T O U T P E
RX NOR
- RO-I I/C 11 MAJ TS RX NOR
- RO-I I/C
!2 MAJ TS Rx NOR 10 I/C
- I MAJ TS Rx NOR I/C MAJ
- -
TS nstruci Ins:
- 1. Check the a licant level and enter the operating test number and Form ES-D-1 event numbers for each event ty e; f8 are not ap licable for RO applicants. ROs must serve in both the at-the-controls (ATC) and baknce-of- lant(B8P) positions. Instant SROs must serve in both the SRO and. the ATC positions, including at leasrtwo instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionallyserves in the BOP position, one I/C malfunction can be credited oward the two I/C malfunctions required for the ATC position.
?. Reactivit mani ulations may be conducted under normal or controlled abnormal conditions (refer to 3.
r Section A.5.d) {ut must be significant.per Section C.2.a of Appendix D. ) Reactivity and normal evolutions may be replaced with additional instrument or component mal unctions on a I-for-I basis.
Whenever practical, both. instrument and component malfunctions should be included; only those that require verifiable actions that provide insight.to the applicants com etence count toward the minimum requirements specified for the applicants license level in &e right-hand columns.
ES-301, Page 26 of 27 tS-301 Transient and tvent Checklistkorm tS-301-5
-
- acility: Dresden Date of Exam: 3/7/11 Scenarios Operating Test Number: 10-1 (2011-301)
A P V 1 2 3 P E M 0 I L
I N
T 1 CREW POSITION 1 CREW POSITION CREW POSITION T N J
I C
A T M N 0 0 U Y
T P E
-
- 1. Check the a licant level and enter the operating test number and Form ES-D-1 event numbers for each event ty e. f.8 are not ap licablefor RO applicants. ROs must seye in both the at-the-controls (ATC) and pafanhe-of- lantjB8P) positions. Instant SROs must serve in both the SRO and. the ATC positions, including at leasrtwo instrument or component ( K ) malfunctions and one major transient, in the ATC position. If an Instant SRO addifional!y serves in the BOP position, one I/C malfunction can be credited oward the two I/C malfunctions required for the ATC position.
- 2. Reactivit manipulations may be conducted under normal or controlled abnormal conditions (refer to 3.
r Section J.5.d) but must be significant.per Section C.2.a of Appendix D. ) Reactivity and normal evolutions may be replaced with additional instrument or component mal unctions on a I-for-I basis.
Whenever practical, both. instrument and component malfunctions should be included; only those that require verifiable actions that provide insight.to the applicants com etence count toward the minimum requirements specified for the applicants license level in t f e right-hand columns.
ES-301, Page 26 of 27 tS-301 lransient and tvent Checklist korm tS-301-5
-acility: Dresden Date of Exam: 3/7/11 Operating Test Number: 10-1 (2011-301)
A E Scenarios P v 1 2 3 P E L
I N
T CREW POSITION CREW POSITION I CREW POSITION I C
A T N Y T P E
Rx NOR SRO-l IIC
$5 MAJ TS Rx NOR SRO-l I/C Y6 MAJ TS Rx NOR 30 IIC P3 MAJ TS Rx NOR I/C MAJ
-- TS Instrucl Ins:
- 1. Check the a licant level and enter the operating test number and Form ES-D-1 event numbers for each event ty e; f8 are not ap licablefor RO applicants. ROs must serve in both the at-the-controls (ATC) and bagnce-of- lant(B8P) positions. Instant SROs must serve in both the SRO and. the ATC positions, including at leasrtwo instrument or component (VC) malfunctions and one major transient, in the ATC position. If an Instant SRO addifiona/!yserves in the BOP position, one I/C malfunction can be credited oward the two I/C malfunctions required for the ATC position.
- 2. Reactivit manipulations may be conducted under normal or controlled abnormal conditions (refer to f
Section J.5.d) but must be significant,per Section C.2.a of Appendix D. ) Reactivity and normal evolutions may be replaced with additional instrument or component mal unctions on a l-for-I basis.
- 3. Whenever practical, both. instrument and component malfunctions should be included: only those that require verifiable actions that.provide insight.to the applicants com etence count toward the minimum requirements specified for the applicants license level in &e right-hand columns.
ES-301, Page 26 of 27 kS-301 Transient and Event Checklist korm ES-301-5 Dresden Date of Exam: 3/7/11 Operating Test Number: 10-1 (2011-301)
E Scenarios V
E 1 2 I I
3 I I
I N CREW CREW CREW T POSITION POSITION POSITION T
Y P
E NOR I/C MAJ I/C MAJ rs w
VOR IC MAJ rs w
UOR VlAJ
-
rs ns:
- 1. Check the a licant level and enter the operating test number and Form ES-D-1 event numbers for each event ty e; f8 are not ap licablefor RO applicants. ROs must serve in both the at-the-controls (ATC) and baLnce-of- lant(B8P) positions. Instant SROs must serve in both the SRO and. the ATC positions, including at leasrtwo instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited oward the two I/C malfunctions required for the ATC position.
- 2. Reactivit manipulations may be conducted under normal or controlled abnormal conditions (refer to 3.
r Sectiqn J.5.d) but must be siqnificant.per Section C.2.a of Appendix D. ) Reactivity and normal evolutions may be replaced with additional instrument or component mal unctions on a I-for-I basis.
Whenever practical, both. instrument and component malfunctions should be included; only those that require verifiable actions that.provide insight. to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27 ES-401 2 Form ES-401-1 95024 High Drywell Pressure / 5 Emergency generators Suppression pool level Protectionof the general public
TQ-AA-151-F10 Revision 0 Paqe 1 of 1 Scenario Outline I Station: Dresden Generating Station Scenario No.: ILT-N-1 Class ID: 10-01 (2011-301)
I Evaluators Operators I crew position I ATC I BOP I CRS Initial Conditions: Initial Power = 75%
Turnover:
Malf. Event Event No. -
le* DescriDtion RDFAILF5 I ATC CRD - RPlS failure for rod F-05.
Q22 C BOP SERV WATER - Pump Trip.
ICSPDFT I BOP IS0 COND - Inadvertent Initiation.
NONE C ATC RFP - 2B RFP Develops an Oil Leak / Must Swap.
Manual Scram - Earthquake Causes Plant Damage and CSBRKSEV M TEAM Subsequent Torus Leak.
_ _ _ ~
EMERGENCY DEPRESSURIZE - Torus ECCS Suction CSBRKSEV M TEAM Line Break / ED due to Lowering Torus Level.
- (N)orrr , (R)eactivity, (1)i trument it, (M)ajor, (T)ech Spec SRRS: 3D.105
TQ-AA-151-F10 Revision 0 Paqe 1 of 1 Scenario Outline Station: Dresden Generating Station Scenario No.: ILT-N-2 Class ID: 10-01 (2011-301; Evaluators Operators / crew position I ATC I BOP I CRS Initial Conditions: Initial Power = 80%
Turnover: Lower Reactor Power with Recirc Event No.
1 2
3 Malf.
No.
NONE HPlNlT RRMBBIAS
- Event Event Descrbtion RECIRC - Lower Reactor Power using Recirculation Flow.
HPCl - Spurious HPCl Initiation.
RECIRC - Individual Pump Controller Signal Fails Downscale.
4 NONE N 1 BOP HVAC - Swap Reactor Building Supply Fans.
5 RLLMLS I 1 ATC FW - FWLC Controller Drifts High.
6 121 M 1 TEAM Manual Scram - Steam Leak in the Drywell.
121 EMERGENCY DEPRESSURIZE - Steam Leak inside the 7 K23 M TEAM Drywell / Loss of Bus 23-1 & 28 / ED due to Exceeding K40 Primary Containment Pressure.
-
- (N)orrr , (R)eactivity, (I) trument, (C)omponent, (M)ajor, (T)ech Spec SRRS: 3D.105
TQ-AA-151-F10 Revision 0 Paae 1 of 1 Scenario Outline I Station: Dresden Generatinq Station Scenario No.: ILT-N-3 Class ID: 10-01 (201 1-301)
I EvaIuato rs Operators I crew position
/ BOP I CRS Initial Conditions: Initial Power = 5%
Turnover: Shutdown the U2 EDG per DOS 6600-01 Malf. Event Event No.
-
)e* Description EDG - Shutdown the U2 EDG Following Surveillance NONE N BOP Testing.
ADS3CBN C BOP ERV - Spurious ERV Opening.
ADS3CSD
~~
RDFCFHI C ATC CRD - Indicated Flow to CRD Flow Controller Fails High.
B15 NBI - B Med Range Level lnst Fails Low with Partial Half I ATC NVMl OOBP Scram.
RDPPATRP C ATC CRD - CRD Pump 2A Trip.
43 1 M TEAM Manual Scram - Loss of all Service Water.
AT5 NVMl OOBP FLOODING - Loss of RPV Level Indication Due to Loss of NVML29AP M TEAM NVML29BP Instrument Power And Transmitter Failures NVMLI 12P
- (N)orm , (R)eactivity, (I)r irumeni :C)omponent, (M)ajor, (T)ech Spec SRRS: 30.105