MONTHYEARSVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 SVPLTR 23-0004, Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities2023-02-10010 February 2023 Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities SVPLTR 22-0037, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2022-09-0707 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 22-0024, Registration of Use of Casks to Store Spent Fuel2022-06-16016 June 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 22-0016, Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds2022-06-0808 June 2022 Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds SVPLTR 22-0017, Registration of Use of Casks to Store Spent Fuel2022-05-25025 May 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0061, Core Operating Limits Report for Dresden Unit 2 Cycle 282021-11-19019 November 2021 Core Operating Limits Report for Dresden Unit 2 Cycle 28 SVPLTR 21-0057, Submittal of 10 CFR 72.48 Evaluation Summary Report2021-10-15015 October 2021 Submittal of 10 CFR 72.48 Evaluation Summary Report SVPLTR 21-0030, Registration of Use of Casks to Store Spent Fuel2021-06-0202 June 2021 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0028, 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report SVPLTR 21-0027, Radioactive Effluent Release Report and Offsite Dose Calculation Manual2021-04-22022 April 2021 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 21-0005, Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8)2021-01-29029 January 2021 Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8) SVPLTR 20-0053, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld2020-10-15015 October 2020 Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld SVPLTR 20-0045, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-09-0101 September 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 20-0037, Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-0532020-07-0202 July 2020 Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-053 SVPLTR 20-0027, Registration of Use of Casks to Store Spent Fuel2020-05-14014 May 2020 Registration of Use of Casks to Store Spent Fuel SVPLTR 20-0014, Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2020-04-21021 April 2020 Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 20-0010, Fifth 10-Year Interval 2019 Refueling Outage Activities2020-02-13013 February 2020 Fifth 10-Year Interval 2019 Refueling Outage Activities SVPLTR 19-0049, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-09-10010 September 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 19-0031, Registration of Use of Casks to Store Spent Fuel2019-06-14014 June 2019 Registration of Use of Casks to Store Spent Fuel SVPLTR 19-0020, Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2019-04-19019 April 2019 Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 19-0005, Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities2019-02-0808 February 2019 Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities SVPLTR 18-0025, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-08-15015 August 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 18-0020, Corrected 2017 Radioactive Effluent Release Report2018-06-28028 June 2018 Corrected 2017 Radioactive Effluent Release Report SVPLTR 18-0018, Registration of Use of Casks to Store Spent Fuel2018-06-14014 June 2018 Registration of Use of Casks to Store Spent Fuel SVPLTR 18-0012, Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2018-04-24024 April 2018 Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 18-0007, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 182018-03-0101 March 2018 Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 18 SVPLTR 17-0033, Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December2017-08-29029 August 2017 Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December SVPLTR 17-0026, Registration of Use of Casks to Store Spent Fuel2017-06-0606 June 2017 Registration of Use of Casks to Store Spent Fuel SVPLTR 17-0017, Submittal of 2016 Radioactive Effluent Release Report2017-04-26026 April 2017 Submittal of 2016 Radioactive Effluent Release Report SVPLTR 16-0027, 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC2016-12-0101 December 2016 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC SVPLTR 16-0061, Core Operating Limits Report for Unit 3 Cycle 252016-11-21021 November 2016 Core Operating Limits Report for Unit 3 Cycle 25 SVPLTR 16-0018, Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2016-04-25025 April 2016 Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 16-0017, Submittal of Post Accident Monitoring Report Instrumentation2016-04-0808 April 2016 Submittal of Post Accident Monitoring Report Instrumentation SVPLTR 16-0001, Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions2016-01-21021 January 2016 Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions SVPLTR 15-0070, Core Operating Limits Report for Cycle 24A2015-12-15015 December 2015 Core Operating Limits Report for Cycle 24A SVPLTR 15-0065, Core Operating Limits Report for Cycle 252015-11-16016 November 2015 Core Operating Limits Report for Cycle 25 SVPLTR 15-0059, Core Operating Limits Report, Cycle 242015-10-25025 October 2015 Core Operating Limits Report, Cycle 24 SVPLTR 15-0056, 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2015-09-0404 September 2015 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 15-0055, Notification of Readiness for NRC 95001 Inspection2015-08-25025 August 2015 Notification of Readiness for NRC 95001 Inspection SVPLTR 15-0052, Response to Preliminary White Finding2015-08-14014 August 2015 Response to Preliminary White Finding SVPLTR 15-0046, ISFSI - Registration of Use of Casks to Store Spent Fuel2015-07-17017 July 2015 ISFSI - Registration of Use of Casks to Store Spent Fuel SVPLTR 15-0043, Registration of Use of Casks to Store Spent Fuel2015-06-12012 June 2015 Registration of Use of Casks to Store Spent Fuel SVPLTR 15-0034, 2014 Annual Radiological Environmental Operating Report2015-05-14014 May 2015 2014 Annual Radiological Environmental Operating Report SVPLTR 15-0020, Written Position on Preliminary White Finding Discussed in NRC Inspection Report 05000237/2014005; 05000249/20140052015-03-0202 March 2015 Written Position on Preliminary White Finding Discussed in NRC Inspection Report 05000237/2014005; 05000249/2014005 SVPLTR 15-0014, Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities2015-02-11011 February 2015 Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities 2023-06-20
[Table view] |
Text
Dresden Nuclear Power Station 6500 North D1esden Road Exelon Generation~ Moms, [L 60450 SVPLTR: # 20-0053 October 15 1 2020 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Unit 2 and Unit 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 Subject. Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline -
Inspection of Unit 3 Top Guide Rim Weld
Reference:
- 1) BWRVIP-26-A: BWR Vessel and Internals Project, BWR Top.Gu,ide Inspection and Flaw Evaluation Guidelines, EPRI, Palo Alto, CA: 2004. 1009946.
- 2) BWRVIP-94NP Revision 3: BWR Vessel and Internals Project, BWR Vessel and Internals Project, Program Implementation Guide. EPRI, Palo Alto, CA:
2018. 3002013101.
Exelon Generation Company, LLC (EGC) is a member of the BWR Vessel and Internals Project (BWRVIP) and has committed to implementing BWRVIP products and to providing timely notification to the NRC staff if an applicable aspect of a BWRVIP product will not be implemented.
- BWRVIP-26-A (Reference 1) requires an EVT-1 inspection every other cycle of the top guide rim weld locations accessible during normal refueling activities.
Due to the current plan to permanently shut down both Dresden Units in 2021 and staffing concerns associated with Covid-19, Exelon evaluated opportunities to reduce the work performed during the D3R26 refueling outage. D3R26 is scheduled to start October 2Et 2020.
The Unit 3 rim weld was last inspected in D3R24 and deferring the inspection until D3R27
- (2022) would exceed tlie BWRVIP-26-A (Reference 1) inspection frequency by one cycle.
A Deviation Disposition was prepared in accordance with BWRVIP-94NP, Revision 3 (Reference 2). The Deviation Disposition contains an evaluation documenting the acceptability of n'ot performing the "needed" Top Guide rim weld inspections. The deviation was found to be acceptable because previous evaluations and analysis of the rim weld proved it to be very flaw tolerant. An engineering evaluation has shown that.only.8.9 inches of weld (of a total 600 inches) are needed to ensure structural integrity. Recent inspections resulted in no relevant indications and the amount of weld inspected greatly exceeds the required ligament.
Since the weld is shown to be very flaw tolerant and there 1s no history of cracking, the risk impact. of performing a one-time change to the inspection frequency from two to three cycles is negligible.
- This letter is being transmitted for your information in accordance with Section 3.5 of BWRVIP-94NP Revision 3 {Reference 2). This letter is to notify the NRC of the deviation from "neededD BWRVIP guidance. No actions or approvals on the part of the NRC are required as a result of his letter.
There are no regulatory commitments contained in this letter. Should you have any questions, please contact Joshua Sarrafian 779-231-1376.
Peter J. Karaba Site Vice President Dresden Nuclear Power Station