|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04
[Table view] Category:Safety Evaluation
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation ML24145A1862024-05-30030 May 2024 Authorization and Safety Evaluation of Alternative Relief Request I5R-12 Concerning the Installation of a Full Structural Weld Overlay on RPV Recirculation Inlet Nozzle N2E ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 ML23156A6832023-06-22022 June 2023 Authorization and Safety Evaluation of Alternative Relief Request I5R-14 ML23156A6822023-06-22022 June 2023 Authorization and Safety Evaluation of Alternative Relief Request I5R-11 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23103A1912023-04-20020 April 2023 Request for Threshold Determination Under 10 CFR 50.80 ML23082A3502023-04-17017 April 2023 Issuance of Amendment No. 192, Revision of Surveillance Requirements Associated with Emergency Diesel Generator Testing ML23094A1422023-04-0505 April 2023 Approval of Alternative Request I5R-13 to Utilize Specific Provisions of Code Case N-716-3 ML23025A4122023-02-28028 February 2023 Issuance of Amendment No. 248 to Revise Alternative Source Term Calculation for Main Steam Isolation Valve Leakage and Non-MSIV Leakage ML22339A0582022-12-21021 December 2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML22061A0402022-03-11011 March 2022 Relief Request Associated with Excess Flow Check Valves ML22033A3102022-03-0404 March 2022 Issuance of Amendment No. 190, Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A7342021-11-15015 November 2021 Issuance of Amendment No. 187 Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21256A1792021-11-0202 November 2021 Issuance of Amendment No. 246 Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21140A1532021-06-0303 June 2021 Correction to April 22, 2021 Safety Evaluation for Requests for Alternative to the Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Program Interval ML21082A2212021-04-29029 April 2021 Issuance of Amendment No. 186, Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML21109A2162021-04-22022 April 2021 Proposed Alternative to Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Interval ML21105A3382021-04-22022 April 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Examination Coverage of Certain Class 1 and 2 Component Welds ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21049A0062021-03-16016 March 2021 Issuance of Amendment No. 245 for Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21049A0242021-02-23023 February 2021 Alternative Request to the Requirements of the ASME OM Code for the Testing Intervals for the Instrument-Line Flow Check Valves ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20332A1152021-01-29029 January 2021 Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21005A0612021-01-14014 January 2021 Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20241A1902020-10-20020 October 2020 Issuance of Amendment No. 182 to Change Allowable Main Steam Isolation Valve Leak Rates ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20141L0532020-06-0202 June 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts 2024-09-26
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23082A3502023-04-17017 April 2023 Issuance of Amendment No. 192, Revision of Surveillance Requirements Associated with Emergency Diesel Generator Testing ML23025A4122023-02-28028 February 2023 Issuance of Amendment No. 248 to Revise Alternative Source Term Calculation for Main Steam Isolation Valve Leakage and Non-MSIV Leakage ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22033A3102022-03-0404 March 2022 Issuance of Amendment No. 190, Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21295A7342021-11-15015 November 2021 Issuance of Amendment No. 187 Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21082A2212021-04-29029 April 2021 Issuance of Amendment No. 186, Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21083A1752021-03-24024 March 2021 Correction to License Page for Amendment No. 245 Related to Relaxation of Surveillance Frequency for Instrument Line Flow Check Valve ML21049A0062021-03-16016 March 2021 Issuance of Amendment No. 245 for Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21033A9432021-02-0202 February 2021 Correction to Acceptance of Requested License Amendment to Adopt Technical Specification Task Force Traveler 582 ML20332A1152021-01-29029 January 2021 Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML20241A1902020-10-20020 October 2020 Issuance of Amendment No. 182 to Change Allowable Main Steam Isolation Valve Leak Rates ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19301B0052019-11-25025 November 2019 Issuance of Amendment No. 239 Administrative Edits to the Technical Specifications ML19204A0632019-09-13013 September 2019 Independent Spent Fuel Storage Installation, James A. FitzPatrick, and Nine Mile Point - Issuance of Amendments to Revise the Emergency Response Organization Staff ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19176A0862019-07-30030 July 2019 Issuance of Amendment No. 237 Changes to Containment Oxygen Concentration Requirements RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML19008A4542019-01-22022 January 2019 Issuance of Amendment No. 236 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18344A4522019-01-11011 January 2019 Issuance of Amendment No. 234 Change to Remove Boraflex Credit from Spent Fuel Racks ML18324A7232018-12-13013 December 2018 Issuance of Amendment No. 233 Relocation of Surveillance Requirement Frequencies to Inservice Testing Program ML18342A0152018-12-0909 December 2018 Issuance of Amendment No. 174 to Revise TS 3.5.1, ECCS-Operating, for One-Time Extension of High Pressure Core Spray Completion Time & Associated Surveillance Requirement (Emergency Circumstances) ML18309A3012018-11-15015 November 2018 R. E. Ginna - Issuance of Amendment Nos. 327, 305, 232, 173, and 133, Respectively, Eliminating the Nuclear Advisory Committee Requirements ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18137A6142018-06-26026 June 2018 Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station; and R. E. Ginna Nuclear Power Plant - Issuance of Amendments Revising Emergency Action Level Schemes ML18131A2912018-06-0808 June 2018 Issuance of Amendment No. 170 Removal of Note Associated with Surveillance Requirement 3.5.1.2 (CAC No. MGO148; EPID L-2017-LLA-0294) ML18113A0452018-05-29029 May 2018 Issuance of Amendments to Revise Technical Specification Requirements for Secondary Containment ML18073A3642018-03-28028 March 2018 Issuance of Amendment No. 168 to Revise Technical Specifications to Adopt TS Traveler Force 542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MF9357; EPID L-2017-LLA-0178) ML18060A0162018-03-16016 March 2018 Issuance of Amendment No. 167 to Revise Technical Specifications 2.1.1.2 Safety Limit Minimum Critical Power Ratio ML18032A1772018-03-0606 March 2018 Issuance of Amendment No. 166 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-522 (CAC No. MF9804; EPID L-2017-LLA-0232) ML17324B1782017-12-21021 December 2017 Issuance of Amendment to Allow Greater Flexibility in Performing Surveillance Testing in Modes 1, 2, or 3 of Emergency Diesel Generators(Cac No. MF9579; EPID L-2017-LLA-0203) ML17268A2632017-10-31031 October 2017 Issuance of Amendment to Reduce Steam Dome Pressure in Reactor Core Safety Limits (CAC No. MF8942; EPID L-2016-LLA-0038) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) 2024-05-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 28, 2011 Mr. Thomas A. Lynch Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO.1-ISSUANCE OF AMENDMENT REGARDING CHANGES TO MODIFY SURVEILLANCE REQUIREMENTS FOR TESTING OF THE MAIN STEAM ELECTROMATIC RELIEF VALVES (TAC NO. ME4849)
Dear Mr. Lynch:
The Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 210 to Renewed Facility Operating License No. DPR-63 for the Nine Mile Point Nuclear Station, Unit No.1 (NMP1), in response to your application dated September 29,2010, (Agencywide Documents and Management System (ADAMS) Accession No. ML102800415).
This amendment revises the NMP1 Technical Specifications (TS) Sections 3/4.1.5, "Solenoid Actuated Pressure Relief Valves (Automatic Depressurization System)," and 3/4.2.9, "Pressure Relief Systems -Solenoid-Actuated Pressure Relief Valves (Overpressurization)," to provide for an alternative means of testing the main steam electromatic relief valves (ERVs). The proposed change allows demonstration of the capability of the valves to perform their safety function without requiring the ERVs to be cycled with reactor steam pressure while installed in the plant.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-220
Enclosures:
- 1. Amendment No. 210 to DPR-63
- 2. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NINE MILE POINT NUCLEAR STATION, LLC (NMPNS)
DOCKET NO. 50-220 NINE MILE POINT NUCLEAR STATION, UNIT NO.1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 210 Renewed License No. DPR-63
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Nine Mile Point Nuclear Station, LLC (the licensee) dated September 29,2010, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-63 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, which is attached hereto, as revised through Amendment No. 210, is hereby incorporated into this license.
Nine Mile Point Nuclear Station, LLC shall operate the facility in accordance with the Technical Specifications.
-2
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
- /
- /7l- C'/ ;;<., ~~j?~41 Nancy L. Salgado, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and Technical Specifications Date of Issuance: September 28, 2011
ATTACHMENT TO LICENSE AMENDMENT NO. 210 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-63 DOCKET NO. 50-220 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Page Insert Page 3 3 Replace the following pages of Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages 60 60 121 121
-3 (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components.
(5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30; Section 40.41 of Part 40; Section 50.54 and 50.59 of Part 50; and Section 70.32 of Part 70. This renewed license is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect and is also subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 1850 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, which is attached hereto, as revised through Amendment No. 210, is hereby incorporated into this license. Nine Mile Point Nuclear Station, LLC shall operate the facility in accordance with the Technical Specifications.
(3) Deleted Renewed License No. DPR 63 Amendment No. 191 to 209,210
LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENT 3.1.5 SOLENOID-ACTUATED PRESSURE RELIEF VALVES 4.1.5 SOLENOID-ACTUATED PRESSURE RELIEF VALVES (AUTOMATIC DEPRESSURIZATION SYSTEM) (AUTOMATIC DEPRESSURIZATION SYSTEM)
Applicability: Applicability:
Applies to the operational status of the solenoid Applies to the periodic testing requirements for the actuated relief valves. solenoid-actuated pressure relief valves.
Objective: Objective:
To assure the capability of the solenoid-actuated To assure the operability of the solenoid-actuated pressure relief valves to provide a means of pressure relief valves to perform their intended depressurizing the reactor in the event of a small line functions.
break to allow full flow of the core spray system.
Specification: Specification:
- a. During power operating condition whenever the The solenoid-actuated pressure relief valve reactor coolant pressure is greater than 110 psig surveillance shall be performed as indicated below.
and the reactor coolant temperature is greater than saturation temperature, all six solenoid a. At least once during each operating cycle, verify actuated pressure relief valves shall be operable. each valve actuator strokes when manually actuated.
- b. If specification 3.1.5a above is not met, the reactor coolant pressure and the reactor coolant b. At least once during each operating cycle, temperature shall be reduced to 110 psig or less automatic initiation shall be demonstrated.
and saturation temperature or less, respectively, within ten hours.
AMENDMENT NO. 442" 210 60
LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENT
- b. At least once during each operating cycle, verify each valve actuator strokes when manually actuated.
- c. At least once during each operating cycle, relief valve setpoints shall be verified.
AMENDMENTNO.~, 210 121
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 210 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-63 NINE MILE POINT NUCLEAR STATION, LLC NINE MILE POINT NUCLEAR STATION, UNIT NO.1 DOCKET NO. 50-220
1.0 INTRODUCTION
By letter dated September 29, 2010 (Agencywide Documents Access Management System (ADAMS) Accession No. ML102800415), Nine Mile Point Nuclear Station, LLC (NMPNS or the licensee) submitted a request for changes to the Nine Mile Point, Unit No.1 (NMP1) Technical Specifications (TSs).
The proposed change would modify NMP1 Technical Specifications (TS) Sections 3/4.1.5, "Solenoid-Actuated Pressure Relief Valves (Automatic Depressurization System)," and 3/4.2.9, "Pressure Relief Systems -Solenoid-Actuated Pressure Relief Valves (Overpressurization)," to provide for an alternative means of testing the electromatic relief valves (ERVs) located on the main steam system. These valves provide overpressure protection and automatic depressurization relief functions. The proposed change would allow demonstration of the capability of the valves to perform their safety function without requiring the ERVs to be cycled with reactor steam pressure while installed in the plant. Specifically, the proposed amendment would revise TS Surveillance Requirements (SRs) 4.1.5.a and 4.2.9.b to verify each ERV actuator strokes when manually actuated at least once each operating cycle.
2.0 REGULATORY EVALUATION
In Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36, the Commission established its regulatory requirements related to the content of TS. Pursuant to 10 CFR 50.36, TS are required to include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation (LCOs); (3) SRs; (4) design features; and (5) administrative controls. The rule does not specify the particular requirements to be included in a plant's TS.
As stated in 10 CFR 50.36(c)(2)(i), the "Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When an LCO of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any
-2 remedial action permitted by the technical specification ..." NMP1 TS Sections 3.0 and 4.0, on "LCO and SR Applicability," provide details or ground rules for complying with the LCOs.
Criterion 3 of 10 CFR 50.36(c)(2)(ii) requires an LCO to be established for a structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design-basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. Paragraph (c)(3) of 10 CFR 50.36 specifies that SRs should ensure that LCOs are met. The licensee states that Criterion 3 of 10 CFR 50.36(c)(2)(ii) will continue to be met since full functionality will be tested under the proposed methodology. The NRC staff's evaluation of the proposed TS change is provided below.
The Nuclear Regulatory Commission (NRC) has also previously approved similar TS changes at several boiling-water reactor facilities (e.g., the Oyster Creek, LaSalle, Clinton, Peach Bottom, Dresden, and Quad Cities nuclear power facilities) regarding alternatives to stroke testing the main steam safety/relief and ERVs while the plant is on-line with steam pressure.
3.0 TECHNICAL EVALUATION
3.1 Licensee's Basis for the Proposed TS Change As a basis for the proposed TS change, the licensee provides the following information.
There are six Dresser model 1525VX solenoid-actuated, pilot-operated ERVs installed at NMP1.
The ERVs are located between the main steam line flow restrictor and inboard isolation valve.
The ERVs have two TS-required functional modes of operation, i.e., the automatic depressurization system (ADS) mode and the overpressurization protection (OP) mode. The ADS and OP function of the ERVs are described respectively in Sections VII and V-A of the NMP1 Updated Final Safety Analysis Report.
The licensee's proposed revision to the SRs provides an alternative method of verifying ERV operability. Current SR 3/4.1.5 and SR 3/4.2.9 require that at least once during each operating cycle, each ERV shall be manually stroked open until the downstream acoustic monitors or thermocouples indicate that the valve has opened and steam is flowing from the valve. The proposed alternative would revise SR 3/4.1.5 and SR 3/4.2.9 to verify that each ERV actuator strokes when manually actuated at least once each refueling cycle, and the test would be performed with no reactor pressure. The functional testing of the ERV main valve would be in accordance with the Inservice Testing (1ST) program and controlled pursuant to TS 6.5.4, "Inservice Testing Program." The in-situ steam pressure testing of the ERVs would be retained as an optional test method.
The proposed changes require that the valve actuators stroke when manually actuated. The test will be performed with the pilot valve and solenoid actuator mounted in their normal installed positions inside the drywell, which allows the solenoid actuator to be actuated electrically from the control room. Position indication verification will be performed by locally witnessing solenoid plunger movement and by verifying that control room indicating lights accurately indicate solenoid actuator operation. An as-found solenoid actuator test will be performed prior to performing maintenance activities. A final solenoid stroke test is performed after maintenance
- 3 activities are completed and directly demonstrates operability of the solenoid actuator.
Degradation of the solenoid actuator is monitored through the preventive maintenance inspection that are performed each refueling outage for each of the six ERV solenoid actuators.
Preventive maintenance is currently, and will continue to be, performed on all six of the ERV solenoid actuators and their associated cutout switches each refueling outage. The preventive maintenance activities include inspection and cleaning of the cutout switch contacts, as necessary to assure that the contact surfaces are clean and free of oxidation, corrosion, and discoloration. The contact tin plating is verified to be intact and not worn off exposing the copper base material. Associated springs and mechanisms are inspected, and as-left contact resistances are verified. Resistance checks are performed on both actuator coils, and actuator operating currents during electrical actuation are verified to be within acceptance limits. These steps provide substantial indication that the solenoid actuator is capable of functioning as designed and producing its full output force.
Regarding the potential of a bent stem in the pilot valve assembly, the licensee states that as part of the preventive maintenance program, all six of the ERV pilot valve assemblies are removed and replaced with new or refurbished assemblies every refueling outage. The maintenance activities include inspections of pilot valve assembly parts and the pilot valve housing interior to identify any damage or wear that could impair free movement of the stem or proper valve seating. Parts are refurbished or replaced as necessary. Cleanliness of parts and components and absence of foreign material are verified prior to assembly. Prior to reinstalling the pilot valve assembly inside the pilot housing, pilot stem/disc leak testing and freedom of movement and reseat functionality are demonstrated. A complete cleanliness inspection must be performed prior to installing the pilot valve assembly back into the housing. The housing is thoroughly cleaned and vacuumed to remove moisture and debris to minimize the potential for debris blocking or hindering pilot valve performance. Following the installation of the pilot valve assembly inside the housing, the freedom of movement and clearance adjustments for the pilot valve operating lever and pilot valve assembly are confirmed, followed by stroking the solenoid actuator plunger by hand to the full extent of travel. This ensures that the solenoid actuator plunger, pilot valve operating lever, and pilot valve assembly function as a unit, while eliminating the risk of damage resulting from electrically stroking the pilot valve in the absence of steam pressure. Degradation of the pilot valve assemblies is monitored through the preventive maintenance inspections that are performed each refueling outage for each of the six ERV pilot valve assemblies.
The relief valves will be tested in accordance with the NMP1 1ST Program, fourth 10-year interval. The current 1ST program for relief valves is based on the 2004 Edition of American Society of Mechanical Engineers Boiler Pressure and Vessel Code (ASME Code) for Operation and Maintenance of Nuclear Power Plants. The 1ST program specifies that three of the six ERV main valves be removed and replaced with pre-tested spare main valves during each refueling outage, such that all six ERV main valves are replaced every two refueling outages. Main valve testing will be performed at an offsite steam test facility. The testing and refurbishment activities performed at the off-site test facility on the partial sample (three valves each refueling outage) will ensure that main valve degradation mechanisms are detected in a timely manner. A spare pilot valve assembly and a spare solenoid actuator, both representative of the components used at the plant, will be installed at the test facility to allow testing of the main valve. The valve will be installed on a test steam header in the same orientation as the plant installation. The test
-4 conditions at the test facility will be similar to those in the plant, including ambient temperature and steam conditions. The main valve will receive an initial seat leak test, a functional test to ensure it is capable of opening and closing, and a final seat leak test. A valve stroke time will be obtained during the exercise test. Valve seat tightness will be verified by a cold bar test, and if not free of fog, leakage will be measured and verified to be below the specified acceptance criteria. Monitoring of ERV discharge line temperatures during plant operation also provides an indication of degradation of installed main valves.
The licensee states that after initial testing, the main valves will be completely disassembled, inspected and refurbished, and then retested. The refurbished main valves will be stored at the offsite test facility and returned to the plant prior to the next scheduled use. Prior to installation at the plant, the spare main valves will be inspected for foreign material and damage. The steam line and ERV discharge line openings will also be inspected to verify cleanliness and absence of foreign material. Procedural requirements ensure that the proper ERV inlet flange gasket separating ring thickness is provided, so proper crush of the flexitallic gasket is achieved when the valve is installed. The valves are then installed and necessary connections completed.
A potential reason for performing in-situ testing of the ERVs with steam is to verify that the discharge line to the suppression pool is not blocked. The Foreign Material Exclusion (FME) controls implemented at NMP1 serve to minimize the potential for debris blocking an ERV discharge line. The licensee states that considering: (1) the size of the ERV discharge pipe (expands to 14 inches downstream of the 8-inch discharge expansion bellows); (2) the energy associated with high pressure steam; and (3) the FME controls, the probability of blocking an ERV discharge line and preventing the valve function is considered to be extremely remote.
The licensee concludes that steam testing three ERV main valves at the offsite test facility each refueling outage, and the solenoid actuator and pilot valve assembly testing, inspections, and maintenance activities performed for all six ERVs each refueling outage, will provide a complete check of the capability of the valves to open and close. Therefore, the proposed changes will provide for the demonstration of full functionality of the ERVs without cycling the valves using reactor steam pressure with the valves installed. The licensee further states that this approach will reduce the potential for valve seat leakage and that the proposed alternative test for the ERVs reflects the recommendations of NUREG-0737. "Clarification ofTMI Action Plan Requirements," Item II.K.3.16, "Reduction of Challenges and Failures of Relief Valves," that the number of relief valve openings be reduced as much as possible and unnecessary challenges should be avoided.
3.2 Evaluation of TS Changes The NRC staff has reviewed the licensee's basis for the proposed TS change and finds that with the proposed testing, the functional capabilities of the ERVs are adequately verified. A manual actuation and vaive leakage test will be performed at a steam test facility using test conditions similar to those for the installed valves in the plant, including valve orientation, ambient temperature, and steam conditions. Following ERV installation, the licensee's proposed testing includes verifying proper electrical supply connections and actuator performance. It is noted that, although the tests of the ERVs at the steam test facility are not performed with the actual valve solenoids installed in the plant, the solenoids are adequately tested and verified by
-5 separate tests. The NRC staff finds that all of the components necessary to actuate the ERVs will continue to be tested as necessary to demonstrate the functional capability of the valves, without the need to stroke test the valves on-line under system steam pressure conditions. In addition, the NRC staff finds that the current testing requirements could result in undesired seat leakage of the ERVs during power operation. Excessive seat leakage could result in excessive suppression pool temperature and level or unidentified dryweilleakage.
The NRC staff also finds that the description of the licensee's FME program provides reasonable assurance that the ERV discharge lines will remain unblocked and that foreign material will not interfere with valve operation. Furthermore, the NRC staff finds that extending the ERV main valve exercising interval from every refueling cycle (approximately 2 years) to every 2 refueling cycles plus a 6-month grace period is acceptable since the licensee has had no failures of the valves to stroke open with no significant degradation noted in the past 10 years.
Based on the above, the NRC staff has determined that the licensee's proposed change to TS SR 3/4.1.5 and SR 3/4.2.9 for stroke testing the NMP1 ERVs is acceptable. The licensee also proposed changes to the TS Bases to reflect the changes to the SRs. The NRC staff has no objection to the proposed changes to the TS Bases.
3.3 Conclusion The licensee has proposed a change to the NMP1 TS SRs, which would provide for alternative testing of the ERVs to demonstrate proper functional operation, without the need to stroke test the valves on-line with system steam pressure conditions. Based on the above evaluation, the NRC staff has determined that the licensee has adequately justified the proposed changes to the TS for NIVIP1. Therefore, the proposed TS changes to SR 3/4.1.5 and SR 3/4.2.9 are acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New York State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONIVIENTAL CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (76 FR 9826, February 22,2011). The amendment also relates to changes in recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or
-6 environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: J. Huang Date: September 28,2011
ML112500067
- SE NRR-106 DCI/CPTB/BC OGC LPL 1-1/BC AMcMurtray' RElliott AJones 9/22/11 7/22/11 9/16/11 9/22/11