Letter Sequence Approval |
---|
|
|
MONTHYEARML18131A2912018-06-0808 June 2018 Issuance of Amendment No. 170 Removal of Note Associated with Surveillance Requirement 3.5.1.2 (CAC No. MGO148; EPID L-2017-LLA-0294) Project stage: Approval 2018-06-08
[Table View] |
|
---|
Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23082A3502023-04-17017 April 2023 Issuance of Amendment No. 192, Revision of Surveillance Requirements Associated with Emergency Diesel Generator Testing ML23025A4122023-02-28028 February 2023 Issuance of Amendment No. 248 to Revise Alternative Source Term Calculation for Main Steam Isolation Valve Leakage and Non-MSIV Leakage ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22033A3102022-03-0404 March 2022 Issuance of Amendment No. 190, Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21295A7342021-11-15015 November 2021 Issuance of Amendment No. 187 Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21082A2212021-04-29029 April 2021 Issuance of Amendment No. 186, Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21083A1752021-03-24024 March 2021 Correction to License Page for Amendment No. 245 Related to Relaxation of Surveillance Frequency for Instrument Line Flow Check Valve ML21049A0062021-03-16016 March 2021 Issuance of Amendment No. 245 for Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21033A9432021-02-0202 February 2021 Correction to Acceptance of Requested License Amendment to Adopt Technical Specification Task Force Traveler 582 ML20332A1152021-01-29029 January 2021 Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML20241A1902020-10-20020 October 2020 Issuance of Amendment No. 182 to Change Allowable Main Steam Isolation Valve Leak Rates ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19301B0052019-11-25025 November 2019 Issuance of Amendment No. 239 Administrative Edits to the Technical Specifications ML19204A0632019-09-13013 September 2019 Independent Spent Fuel Storage Installation, James A. FitzPatrick, and Nine Mile Point - Issuance of Amendments to Revise the Emergency Response Organization Staff ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19176A0862019-07-30030 July 2019 Issuance of Amendment No. 237 Changes to Containment Oxygen Concentration Requirements RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML19008A4542019-01-22022 January 2019 Issuance of Amendment No. 236 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18344A4522019-01-11011 January 2019 Issuance of Amendment No. 234 Change to Remove Boraflex Credit from Spent Fuel Racks ML18324A7232018-12-13013 December 2018 Issuance of Amendment No. 233 Relocation of Surveillance Requirement Frequencies to Inservice Testing Program ML18342A0152018-12-0909 December 2018 Issuance of Amendment No. 174 to Revise TS 3.5.1, ECCS-Operating, for One-Time Extension of High Pressure Core Spray Completion Time & Associated Surveillance Requirement (Emergency Circumstances) ML18309A3012018-11-15015 November 2018 R. E. Ginna - Issuance of Amendment Nos. 327, 305, 232, 173, and 133, Respectively, Eliminating the Nuclear Advisory Committee Requirements ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18137A6142018-06-26026 June 2018 Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station; and R. E. Ginna Nuclear Power Plant - Issuance of Amendments Revising Emergency Action Level Schemes ML18131A2912018-06-0808 June 2018 Issuance of Amendment No. 170 Removal of Note Associated with Surveillance Requirement 3.5.1.2 (CAC No. MGO148; EPID L-2017-LLA-0294) ML18113A0452018-05-29029 May 2018 Issuance of Amendments to Revise Technical Specification Requirements for Secondary Containment ML18073A3642018-03-28028 March 2018 Issuance of Amendment No. 168 to Revise Technical Specifications to Adopt TS Traveler Force 542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MF9357; EPID L-2017-LLA-0178) ML18060A0162018-03-16016 March 2018 Issuance of Amendment No. 167 to Revise Technical Specifications 2.1.1.2 Safety Limit Minimum Critical Power Ratio ML18032A1772018-03-0606 March 2018 Issuance of Amendment No. 166 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-522 (CAC No. MF9804; EPID L-2017-LLA-0232) ML17324B1782017-12-21021 December 2017 Issuance of Amendment to Allow Greater Flexibility in Performing Surveillance Testing in Modes 1, 2, or 3 of Emergency Diesel Generators(Cac No. MF9579; EPID L-2017-LLA-0203) ML17268A2632017-10-31031 October 2017 Issuance of Amendment to Reduce Steam Dome Pressure in Reactor Core Safety Limits (CAC No. MF8942; EPID L-2016-LLA-0038) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17152A3202017-06-30030 June 2017 Issuance of Amendments Emergency Plans Emergency Action Level HU1.5 ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) 2023-06-23
[Table view] Category:Safety Evaluation
MONTHYEARML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 ML23156A6832023-06-22022 June 2023 Authorization and Safety Evaluation of Alternative Relief Request I5R-14 ML23156A6822023-06-22022 June 2023 Authorization and Safety Evaluation of Alternative Relief Request I5R-11 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23103A1912023-04-20020 April 2023 Request for Threshold Determination Under 10 CFR 50.80 ML23082A3502023-04-17017 April 2023 Issuance of Amendment No. 192, Revision of Surveillance Requirements Associated with Emergency Diesel Generator Testing ML23094A1422023-04-0505 April 2023 Approval of Alternative Request I5R-13 to Utilize Specific Provisions of Code Case N-716-3 ML23025A4122023-02-28028 February 2023 Issuance of Amendment No. 248 to Revise Alternative Source Term Calculation for Main Steam Isolation Valve Leakage and Non-MSIV Leakage ML22339A0582022-12-21021 December 2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML22061A0402022-03-11011 March 2022 Relief Request Associated with Excess Flow Check Valves ML22033A3102022-03-0404 March 2022 Issuance of Amendment No. 190, Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A7342021-11-15015 November 2021 Issuance of Amendment No. 187 Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21256A1792021-11-0202 November 2021 Issuance of Amendment No. 246 Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21140A1532021-06-0303 June 2021 Correction to April 22, 2021 Safety Evaluation for Requests for Alternative to the Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Program Interval ML21082A2212021-04-29029 April 2021 Issuance of Amendment No. 186, Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML21109A2162021-04-22022 April 2021 Proposed Alternative to Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Interval ML21105A3382021-04-22022 April 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Examination Coverage of Certain Class 1 and 2 Component Welds ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21049A0062021-03-16016 March 2021 Issuance of Amendment No. 245 for Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21049A0242021-02-23023 February 2021 Alternative Request to the Requirements of the ASME OM Code for the Testing Intervals for the Instrument-Line Flow Check Valves ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20332A1152021-01-29029 January 2021 Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21005A0612021-01-14014 January 2021 Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20241A1902020-10-20020 October 2020 Issuance of Amendment No. 182 to Change Allowable Main Steam Isolation Valve Leak Rates ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20141L0532020-06-0202 June 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19301B0052019-11-25025 November 2019 Issuance of Amendment No. 239 Administrative Edits to the Technical Specifications ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques 2023-08-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 8, 2018 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 2 - ISSUANCE OF AMENDMENT NO. 170 RE: REMOVAL OF NOTE ASSOCIATED WITH SURVEILLANCE REQUIREMENT 3.5.1.2 (CAC NO. MG0148; EPID L-2017-LLA-0294)
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 170 to Renewed Facility Operating License No. NPF-69 for the Nine Mile Point Nuclear Station, Unit 2 (Nine Mile Point 2). The amendment consists of changes to the Nine Mile Point 2 Technical Specifications in response to your application dated August 22, 2017. A copy of your application is in the Agencywide Documents Access and Management System under Accession No. ML17234A025.
The amendment revises Nine Mile Point 2 Technical Specifications by removing a note associated with Surveillance Requirement 3.5.1.2 that allowed low pressure coolant injection subsystems to be considered operable in MODE 3 under certain conditions.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely, Michael L. Marshall, Jr., Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosures:
- 1. Amendment No. 170 to NPF-69
- 2. Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NINE MILE POINT NUCLEAR STATION, LLC LONG ISLAND LIGHTING COMPANY EXELON GENERATION COMPANY, LLC DOCKET NO. 50-410 NINE MILE POINT NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 170 Renewed License No. NPF-69
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated August 22, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-69 is hereby amended to read as follows:
Enclosure 1
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 170, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION
~
- l=~~
Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: June 8 , 2 o1 8
ATTACHMENT TO LICENSE AMENDMENT NO. 170 NINE MILE POINT NUCLEAR STATION, UNIT 2 RENEWED FACILITY OPERATING LICENSE NO. NPF-69 DOCKET NO. 50-410 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Page Insert Page 4 4 Replace the following page of Appendix A, Technical Specifications, with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Page Insert Page 3.5.1-4 3.5.1-4
(1) Maximum Power Level Exelon Generation is authorized to operate the facility at reactor core power levels not in excess of 3988 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 170, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Fuel Storage and Handling (Section 9.1.SSER 4)*
- a. Fuel assemblies, when stored in their shipping containers, shall be stacked no more than three containers high.
- b. When not in the reactor vessel, no more than three fuel assemblies shall be allowed outside of their shipping containers or storage racks in the New Fuel Vault or Spent Fuel Storage Facility.
- c. The above three fuel assemblies shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping container array and approved storage rack locations.
- d. The New Fuel Storage Vault shall have no more than ten fresh fuel assemblies uncovered at any one time.
(4) Turbine System Maintenance Program (Section 3.5.1.3.10 SER)
The operating licensee shall submit for NRC approval by October 31, 1989, a turbine system maintenance program based on the manufacturer's calculations of missile generation probabilities.
(Submitted by NMPC letter dated October 30, 1989 from C.D. Terry and approved by NRC letter dated March 16, 1990 from Robert Martin to Mr. Lawrence Burkhardt, Ill).
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report (SER) and/or its supplements wherein the license condition is discussed.
Renewed License No. NPF-69 Amendment 117through 140,141,143,144,145,146,147,150,151,152,154,156,157,158, 15Q, 160,161, 163,164,165,166,167,168,170
ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each ECCS injection/spray In accordance with subsystem, locations susceptible to the Surveillance gas accumulation are sufficiently filled Frequency Control with water. Program SR 3.5.1.2 -----------------------------NOTE------------------------------
Not required to be met for system vent paths opened under administrative control.
Verify each ECCS injection/spray subsystem In accordance with manual, power operated, and automatic valve the Surveillance in the flow path, that is not locked, Frequency Control sealed, or otherwise secured in position, Program is in the correct position.
SR 3.5.1.3 Verify: In accordance with the Surveillance
- a. For each ADS nitrogen receiver discharge Frequency Control header, the pressure is 2: 160 psig; and Program
- b. For each ADS nitrogen receiver tank, the pressure is 2: 334 psig.
(continued)
NMP2 3.5.1-4 Amendment Q1, 150,152,170
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 170 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-69 NINE MILE POINT NUCLEAR STATION, LLC LONG ISLAND LIGHTING COMPANY EXELON GENERATION COMPANY, LLC.
NINE MILE POINT NUCLEAR STATION, UNIT 2 DOCKET NO. 50-410
1.0 INTRODUCTION
By letter dated August 22, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17234A025), Exelon Generation Company, LLC (Exelon, the licensee) submitted a request for a change to the Nine Mile Point Nuclear Station, Unit 2, (Nine Mile Point 2) Technical Specifications (TSs). The requested change would remove a note associated with Surveillance Requirement (SR) 3.5.1.2 that allowed low pressure coolant injection (LPCI) subsystems to be considered operable in MODE 3 under certain conditions.
Currently, the Nine Mile Point 2 TS 3.5.1.2 contains a note that requires the residual heat removal (RHR) system be capable of manual realignment to the LPCI mode and not be otherwise inoperable. This note was added as a part of the Nine Mile Point 2 Improved Technical Specification campaign intended to provide clarity that LPCI may be considered operable during alignment and operation in the shutdown cooling (SDC) mode.
The RHR system is used in the SOC mode to remove residual heat from the nuclear system to maintain reactor water inventory below 212 degrees Fahrenheit (°F} so that refueling and nuclear system servicing can be performed.
The licensee's application dated August 22, 2017 (i.e., license amendment request (LAR)),
provided revised TS Bases pages to be implemented with the associated TS changes. These pages were provided for information only. Changes to the TS Bases should be made in accordance with the licensee's TS Bases Control Program.
Enclosure 2
2.0 REGULATORY EVALUATION
2.1 Description of System Design and Operation The safety function of the emergency core cooling system (ECCS) is to provide core cooling following a loss-of-coolant accident (LOCA). The ECCS consists of two high-pressure and two low-pressure systems. The high-pressure systems are the high-pressure core spray (HPCS) system and the automatic depressurization system. The low-pressure systems are the LPCI mode of RHR and the low-pressure core spray (LPCS) system.
The manner in which the ECCS operates to protect the core is a function of the rate at which reactor coolant inventory is lost from the break. The HPCS is designed to operate while the reactor coolant system is at high pressure. The LPCS and LPCI are designed for operation at low pressures. If the break in the nuclear system process barrier is of such a size that the loss-of-coolant exceeds the capability of the HPCS, reactor pressure decreases at a rate fast enough for the low pressure ECCSs to commence coolant injection into the reactor vessel in time to cool the core. Automatic depressurization is provided to reduce reactor pressure if a break has occurred and the HPCI system is inoperable.
The RHR system is a low pressure system that can be used for cooling and or inventory control.
The primary purposes (i.e., modes) of the RHR system are 1) the LPCI mode to automatically initiate and maintain reactor water level following a LOCA, and 2) the containment spray mode is employed following a LOCA to condense steam for primary containment pressure reduction and to reduce airborne activity in the primary containment following a LOCA. The RHR system consists of three independent closed loops, each containing a motor driven pump.
The SDC mode of the RHR system is operated during normal unit cooldown and shutdown to remove decay heat. The RHR system is placed in the SDC mode of operation when nuclear system temperature has decreased to where the steam supply pressure is not sufficient to maintain the turbine shaft gland seals and the vacuum in the main condenser cannot be maintained.
2.2 Description of Change The proposed change will delete the following Note associated with TS SR 3.5.1.2:
Low pressure coolant injection (LPCI) subsystems may be considered OPERABLE during alignment and operation for decay heat removal with reactor steam dome pressure less than the residual heat removal cut-in permissive pressure in MODE 3 (Hot Shutdown), if capable of being manually realigned and not otherwise inoperable.
2.3 Description of Applicable Regulatory Requirements The regulatory requirements that the U.S. Nuclear Regulatory Commission (NRC) staff considered in its review of the proposed amendment included the following:
Title 1O of the Code of Federal Regulations ( 10 CFR) 50, Appendix A, "General Design Criteria for Nuclear Power Plants," describe necessary design and performance requirements for structures, systems, and components important to safety. The applicable general design criteria are applicable to the proposed amendment:
- Criterion 34, "Residual Heat Removal," requires that a system to remove residual heat be provided with a safety function to transfer fission product decay heat and other residual heat from the reactor core at a rate such that specified acceptable fuel design limits and the design conditions of the reactor coolant pressure boundary are not exceeded.
- Criterion 35, "Emergency core cooling," requires that a system to provide abundant emergency core cooling be provided with a safety function to transfer heat from the reactor core following any loss of reactor coolant at a rate such that ( 1) fuel and clad damage that could interfere with continued effective core cooling is prevented and, (2) clad metal-water reaction is limited to negligible amounts.
- Criterion 37, "Testing of Emergency Core Cooling System," requires that the ECCS design provide the capability for periodic pressure and functional testing. This testing shall assure ( 1) structural and leak-tight integrity of components, (2) operability and performance of active components, (3) operability of the whole system under conditions as close to design as possible.
Section 50.36, "Technical Specifications," of 10 CFR details the content and information that must be included in a station's TS. In accordance with 10 CFR 50.36, TSs are required to include (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation (LCOs); (3) SRs; (4) design features; and (5) administrative controls.
As described in 10 CFR 50.36(c)(2), "Limiting conditions for operation," are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When an LCO is not met, the licensee shall shut down the reactor or follow any other actions permitted by TS.
Section 50.46(a)(1 )(i) of 10 CFR requires that each boiling or pressurized light-water nuclear power reactor fueled with uranium oxide pellets within cylindrical zircaloy or ZIRLO cladding be provided with an ECCS designed with a calculated cooling performance in accordance with an acceptable evaluation model following a postulated LOCA.
3.0 TECHNICAL EVALUATION
Industry operating experience has demonstrated that manually realigning a RHR SDC subsystem from SDC to LPCI could result in water flashing to steam in the RHR piping, water hammer, or pressure locking or thermal binding of valves unless the RHR SDC piping is first allowed to cool. In the LAR the licensee stated that this operating experience is applicable to Nine Mile Point 2, in that the design of the RHR system could be susceptible to this same phenomenon and that removal of the TS 3.5.1.2 Note is conservative and would prevent water flashing, and water hammer in the RHR piping.
An NRC Information Notice (IN) 2010-11 (ADAMS Accession No. ML100640465) describes an issue during operation in MODE 3, the potential exists for the water in the RHR pump suction piping aligned for SDC to flash/boil when realigned to the LPCI mode. This phenomenon is due to the physical arrangement (i.e., common interface) of the SDC and LPCI suction lines for the RHR pumps. The realignment from SDC mode to LPCI mode transfers the suction source for the RHR pump; thereby exposing the high temperature SDC water to the low pressure LPCI suction piping from the Suppression Pool. The resultant flashing or boiling of the high pressure,
high temperature water when introduced to the low pressure piping could result in voiding in the suction piping, RHR pump cavitation, water hammer and associated RHR system damage.
This threat is greatest during the early stages of MODE 3 operation when the SDC water temperature is highest. Nine Mile Point has implemented procedure changes/restrictions preventing the realignment of an RHR subsystem from SDC to LPCI mode as a result of NRC IN 2010-11.
Licensee's review of the potential for valve thermal binding found that the LPCI injection valves and the RHR pump min flow valves could be susceptible to thermal binding. The licensee's evaluation has shown that this condition exists at Nine Mile Point 2 when the differential temperature across the valve exceeds 60°F, as it may be when the valve is closed to support SDC mode of operation. This temperature differential results from the high temperature SDC water on one side of the valve and cool suppression pool water on the other side. The flashing or boiling in the RHR suction piping and the RHR valve thermal binding are the result of the RHR system design that supports several different operating modes using common equipment.
This design feature, and the associated temperature phenomenon, prevents timely realignment of the RHR subsystem from SDC mode to LPCI mode.
Based on the above, the NRC staff finds that the current Note in TS 3.5.1.2 could potentially allow operating conditions to exist that could adversely impact the function of the RHR system.
Specifically, high pressure, high temperature water when introduced to the low pressure piping could result in voiding in the suction piping, RHR pump cavitation, water hammer and associated RHR system damage. Therefore, the staff finds that removal of the Note is acceptable and the applicable regulatory requirements will continue to be met.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New York State official was notified of the proposed issuance of the amendment on May 10, 2018. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20, and changes surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (82 FR 60227). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the
amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: FForsaty, NRR D~e: June 8, 2018
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 2 - ISSUANCE OF AMENDMENT NO. 170 RE: REMOVAL OF NOTE ASSOCIATED WITH SURVEILLANCE REQUIREMENT 3.5.1.2 (CAC NO. MG0148; EPID L-2017-LLA-0294) DATED JUNE 8, 2018 DISTRIBUTION:
PUBLIC PM File Copy RidsNrrDorlLpl1 RidsRgn1 MailCenter RidsACRS_MailCTR RidsNrrLAI Betts RidsNrrPMNineMilePoint RidsNrrDssSrxb FForsaty, NRR ADAMS Access1on No.: ML18131A291 *b1y memo OFFICE DORL/LPL 1/PM DORL/LPL 1/LA OGC DSS/SRXB/BC DORL/LPL 1/BC NAME MMarshall IBetts JGillespie JWhitman* Joanna DATE 5/17/18 5/16/18 5/29/18 4/27/18 6/7/18 OFFICE DORL/LPL 1/PM NAME MMarshall DATE 6/8/18 OFFICIAL RECORD COPY