Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23305A140 | 13 December 2023 | Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan |
ML23291A464 | 7 December 2023 | Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants | Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Cyber Security Incorporated by reference FLEX Fukushima Dai-Ichi Large early release frequency Safeguards Contingency Plan Preemption Authority License Renewal |
ML23289A012 | 6 December 2023 | Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Cyber Security FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Safeguards Contingency Plan Tornado Missile Risk Evaluator Flooding Focused Evaluation Preemption Authority Maintenance Rule Program Power-Operated Valves |
ML23131A424 | 23 June 2023 | Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 | Cyber Security Preemption Authority |
ML23118A347 | 1 May 2023 | County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 | |
ML23081A038 | 25 April 2023 | County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Cyber Security Safeguards Contingency Plan |
ML23082A350 | 17 April 2023 | Issuance of Amendment No. 192, Revision of Surveillance Requirements Associated with Emergency Diesel Generator Testing | Safe Shutdown Reserve Station Service Transformer Surveillance Frequency Control Program |
ML23025A412 | 28 February 2023 | Issuance of Amendment No. 248 to Revise Alternative Source Term Calculation for Main Steam Isolation Valve Leakage and Non-MSIV Leakage | |
ML22090A086 | 29 April 2022 | Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position | Safe Shutdown Water Inventory Control Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Recently irradiated fuel Fire Protection Program |
ML22033A310 | 4 March 2022 | Issuance of Amendment No. 190, Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements | Water Inventory Control Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML22021B660 | 1 February 2022 | Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Aging Management Annual Radioactive Effluent Release Report Safeguards Contingency Plan Preemption Authority License Renewal Subsequent License Renewal Fuel cladding Liquid penetrant Fire Protection Program Scaffolding Unidentified leakage Power Uprate |
ML22021B659 | 1 February 2022 | Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) | |
ML22031A276 | 1 February 2022 | Issuance of Indemnity Agreement Amendments-Enclosure 2 | |
ML21347A038 | 13 January 2022 | Issuance of Amendments to Revise Reactor Coolant Leakage Requirements | Packing leak Cyber Security Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML21295A734 | 15 November 2021 | Issuance of Amendment No. 187 Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Surveillance Frequency Control Program |
ML21082A221 | 29 April 2021 | Issuance of Amendment No. 186, Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Hot Short Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Anticipated operational occurrence Tornado Missile Water Inventory Control Internal Flooding Probabilistic Risk Assessment Reserve Station Service Transformer Cyber Security Zebra Mussel FLEX Tornado-Generated Missile Aging Management Tornado Missile Protection Thermoset Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Frazil ice Flooding Focused Evaluation Preemption Authority Earthquake Maintenance Rule Program Offsite Circuit Fire Protection Program |
ML21033A530 | 1 April 2021 | Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML21083A175 | 24 March 2021 | Correction to License Page for Amendment No. 245 Related to Relaxation of Surveillance Frequency for Instrument Line Flow Check Valve | |
ML21049A006 | 16 March 2021 | Issuance of Amendment No. 245 for Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve | Surveillance Frequency Control Program |
ML21013A005 | 4 February 2021 | Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML21033A943 | 2 February 2021 | Correction to Acceptance of Requested License Amendment to Adopt Technical Specification Task Force Traveler 582 | Water Inventory Control |
ML20332A115 | 29 January 2021 | Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components | High winds Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency Flooding Focused Evaluation |
ML20241A190 | 20 October 2020 | Issuance of Amendment No. 182 to Change Allowable Main Steam Isolation Valve Leak Rates | Reactor Vessel Water Level Safe Shutdown Earthquake Probabilistic Risk Assessment Squib Earthquake |
ML20141L636 | 10 July 2020 | Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 | Time of Discovery High winds Fire Barrier Internal Flooding Probabilistic Risk Assessment Cyber Security Large early release frequency Safeguards Contingency Plan Turbine Missile Fire Protection Program |
ML20134H940 | 8 July 2020 | Issuance of Amendments Revising the High Radiation Area Administrative Controls | High Radiation Area Offsite Dose Calculation Manual Cyber Security Annual Radioactive Effluent Release Report Process Control Program Safeguards Contingency Plan Deep Dose Equivalent Fire Protection Program Scaffolding |
ML20021A070 | 6 April 2020 | Issuance of Amendments to Delete License Conditions for Decommissioning Trusts | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Cyber Security Preemption Authority Fire Protection Program |
ML20034G546 | 12 March 2020 | Issuance of Amendments Revising Instrument Testing and Calibration Definitions | Shutdown Margin Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML19301B005 | 25 November 2019 | Issuance of Amendment No. 239 Administrative Edits to the Technical Specifications | Shutdown Margin Water Inventory Control Squib Surveillance Frequency Control Program |
ML19204A063 | 13 September 2019 | Independent Spent Fuel Storage Installation, James A. FitzPatrick, and Nine Mile Point - Issuance of Amendments to Revise the Emergency Response Organization Staff | Health Physics Network Minimum staff Fire Protection Program |
ML19176A033 | 28 August 2019 | Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR | Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Cyber Security Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Fire Protection Program |
ML19176A086 | 30 July 2019 | Issuance of Amendment No. 237 Changes to Containment Oxygen Concentration Requirements | |
RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control | 14 June 2019 | Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control | Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Scram Discharge Volume Process Control Program |
ML19008A454 | 22 January 2019 | Issuance of Amendment No. 236 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control | Reactor Vessel Water Level Water Inventory Control Probabilistic Risk Assessment Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel |
ML18304A365 | 16 January 2019 | 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fuel cladding Fire Protection Program Power change |
ML18344A452 | 11 January 2019 | Issuance of Amendment No. 234 Change to Remove Boraflex Credit from Spent Fuel Racks | License Renewal Control of Heavy Loads Fuel cladding |
ML18324A723 | 13 December 2018 | Issuance of Amendment No. 233 Relocation of Surveillance Requirement Frequencies to Inservice Testing Program | Incorporated by reference |
ML18342A015 | 9 December 2018 | Issuance of Amendment No. 174 to Revise TS 3.5.1, ECCS-Operating, for One-Time Extension of High Pressure Core Spray Completion Time & Associated Surveillance Requirement (Emergency Circumstances) | Anticipated operational occurrence Water Inventory Control Surveillance Frequency Control Program Feedwater Controller Failure Fuel cladding |
ML18309A301 | 15 November 2018 | R. E. Ginna - Issuance of Amendment Nos. 327, 305, 232, 173, and 133, Respectively, Eliminating the Nuclear Advisory Committee Requirements | Cyber Security Preemption Authority |
ML18206A282 | 2 August 2018 | Issuance of Amendments to Relocate the Staff Qualification Requirements | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML18137A614 | 26 June 2018 | Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station; and R. E. Ginna Nuclear Power Plant - Issuance of Amendments Revising Emergency Action Level Schemes | High winds Ultimate heat sink Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding |
ML18131A291 | 8 June 2018 | Issuance of Amendment No. 170 Removal of Note Associated with Surveillance Requirement 3.5.1.2 (CAC No. MGO148; EPID L-2017-LLA-0294) | |
ML18113A045 | 29 May 2018 | Issuance of Amendments to Revise Technical Specification Requirements for Secondary Containment | Shutdown Margin Surveillance Frequency Control Program Recently irradiated fuel |
ML18073A364 | 28 March 2018 | Issuance of Amendment No. 168 to Revise Technical Specifications to Adopt TS Traveler Force 542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MF9357; EPID L-2017-LLA-0178) | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Aging Management Surveillance Frequency Control Program Scram Discharge Volume Fuel cladding Pressure Boundary Leakage Recently irradiated fuel |
ML18060A016 | 16 March 2018 | Issuance of Amendment No. 167 to Revise Technical Specifications 2.1.1.2 Safety Limit Minimum Critical Power Ratio | Reactor Vessel Water Level Anticipated operational occurrence Abnormal operational transient Minimum Critical Power Ratio Fuel cladding |
ML18032A177 | 6 March 2018 | Issuance of Amendment No. 166 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-522 (CAC No. MF9804; EPID L-2017-LLA-0232) | Surveillance Frequency Control Program Recently irradiated fuel |
ML17324B178 | 21 December 2017 | Issuance of Amendment to Allow Greater Flexibility in Performing Surveillance Testing in Modes 1, 2, or 3 of Emergency Diesel Generators(Cac No. MF9579; EPID L-2017-LLA-0203) | Surveillance Frequency Control Program |
ML17268A263 | 31 October 2017 | Issuance of Amendment to Reduce Steam Dome Pressure in Reactor Core Safety Limits (CAC No. MF8942; EPID L-2016-LLA-0038) | Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
ML17163A355 | 31 August 2017 | Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) | Safe Shutdown Time of Discovery Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML17152A320 | 30 June 2017 | Issuance of Amendments Emergency Plans Emergency Action Level HU1.5 | |
ML17073A067 | 26 May 2017 | Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) | Safe Shutdown Shutdown Margin Packing leak High Radiation Area Squib Cyber Security Incorporated by reference Missed surveillance Surveillance Frequency Control Program Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |