ML12296A670

From kanterella
Revision as of 21:07, 11 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
SCCI Public Meeting - Slides, 10-16-12
ML12296A670
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/16/2012
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
krohn, pg
References
Download: ML12296A670 (10)


Text

Susquehanna Public Meeting to Discuss Substantive Cross-Cutting Issues Nuclear Regulatory Commission - Region I Berwick, PA October 16, 2012 1

Agenda g

  • Introduction
  • Review of Cross-Cutting Aspects, Themes, and d Substantive S b t ti Cross-Cutting C C tti IIssues (SCCI)
  • PPL Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC available to address public questions 2

Reactor Oversight g Process Strategic g

Performance Areas Every 6 months Safety Cornerstones the NRC looks Baseline Inspection Performance Indicator back over the Results Results previous 12 Significance Significance g

Threshold months to Threshold evaluate plant Action Matrix performance and issues an assessment Regulatory Response letter 3

Cross-Cutting Aspects, Themes, and Substantive Cross Cross-Cutting Cutting Issues NRC Finding Cross Cutting Aspect (CCA)

Cross-Cutting CCA CCA CCA CCA Cross-Cutting Theme Does the NRC have a concern No with the scope of the licensees Yes Open No SCCI efforts or progress in addressing SCCI the theme?

4

Substantive Cross-Cutting g Issues

  • PProblem bl Identification Id tifi ti and d Resolution-R l ti Evaluation [P.1 (c) - Evaluation/Extent off C Condition]

diti ]

- Theme identified during 2010 End of Cycle

- SCCI opened during the 2011 Mid Cycle

- Maintained open during the 2011 End of C l and Cycle d 2012 Mid C Cycle l bbasedd upon PPL not meeting established exit criteria 5

Substantive Cross-Cutting g Issues

  • HHuman P Performance f [H

H.2(c) 2( ) -

Documentation and Procedures]

- Theme identified during the 2011 Mid Cycle Assessment

- SCCI opened d during d i theth 2011 End E d off Cycle C l

- Maintained open during 2012 Mid Cycle based upon pon PPL not meeting established exit criteria 6

Susquehanna Substantive Cross-Cutting Cross Cutting Issue Summary

  • SCCI in P.1 (c) (Evaluation/Extent of Condition) remains open for a third consecutive ti assessmentt
  • SCCI in H.2(c) (Documentation and Procedures) remains open for a second consecutive assessment 7

Licensee Response and Remarks Timothy S. Rausch Sr Vice President & Chief Nuclear Sr.

Officer PPL Susquehanna Susquehanna, LLC 8

Contacting g the NRC

  • Report R t an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What What We Do Do for Public Affairs 9

Reference Sources

  • Reactor O Oversight ersight Process

- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html

  • Public Electronic Reading Room

- http://www.nrc.gov/reading-rm.html

  • Public Document Room 800-397-4209 800 397 4209 (Toll Free) 10