Category:Letter
MONTHYEARML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A1952024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance ML24121A0432024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 to Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds ML24081A1532024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves L-PI-24-009, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-09 Safety Injection System and Volume Control System Category C Check Valve Quarterly Testing2024-02-13013 February 2024 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-09 Safety Injection System and Volume Control System Category C Check Valve Quarterly Testing ML24040A1712024-02-0909 February 2024 Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software IR 05000282/20230042024-02-0101 February 2024 Integrated Inspection Report 05000282/2023004 and 05000306/2023004 ML23356A1232024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-23
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24185A0912024-07-0101 July 2024 Acceptance of LAR to Revise TS Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumptions in the Accident Analyses ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24088A1012024-03-29029 March 2024 Summary of March 6, 2024, Public Meeting with NSPM Regarding Planned LAR to Modify Technical Specifications Definitions and Incorporate Plant-Specific Methods for Response Time Testing for Prairie Island Nuclear Plant, Units 1 & 2 ML24059A4042024-03-0606 March 2024 March 6, 2023, Presubmittal Meeting for License Amendment Request to Modify Technical Specifications Definitions & Approve Plant-Specific Methods for Response Time Testing (EPID L-2024-LRM-0034) - Slides ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML23115A4072023-04-26026 April 2023 Correction of License Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML22357A1002023-03-31031 March 2023 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22300A2232022-11-0101 November 2022 Issuance of Amendments 241 and 229 TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML22181A0002022-08-17017 August 2022 Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels ML22188A0852022-07-15015 July 2022 Correction Letter for Amendments 238 and 226 to Renewed Facility Operating Licenses ML22061A2062022-04-0101 April 2022 Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 ML21312A0212021-11-23023 November 2021 Issuance of Amendment Nos. 237 and 225 Inoperable Cooling Water System Supply Header ML21008A0012021-03-19019 March 2021 Issuance of Amendment Nos. 236 and 224 Low Temperature Overpressure Protection ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20356A0022021-02-0505 February 2021 Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 ML20283A3422020-11-18018 November 2020 Issuance of Amendment Nos. 233 and 221 Adoption of Technical Specifications Task Force Traveler TSTF-547, Clarification of Rod Position Requirements ML20217L1852020-10-0202 October 2020 Issuance of Amendment Nos. 232 and 220 Increase the Integrated Leak Rate Test Program Type a and Type C Test Frequency ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML19276F6842019-11-12012 November 2019 Issuance of Amendments 230 and 218 Issuance of Amendments Adoption of 10 CFR 50.69 - Risk Informed Caterization and Treatment of Structure, Systems and Components of Nuclear Power Reactors ML19232A1512019-11-0707 November 2019 Issuance of Amendments Modifying the Design Basis for Quality Classification of Certain Fuel Handling Equipment ML19255H2012019-09-19019 September 2019 Correction Letter for Amendment Nos. 228 and 216 to Renewed Facility Operating License Nos. DPR-42 and DPR-60 ML19225D2172019-08-24024 August 2019 Correction Letter for Amendment Nos 228 and 216 to Renewed Facility Operating License Nos. DPR-42 and DPR-60 ML19140A4472019-07-30030 July 2019 Issuance of Amendments Revision to National Fire Protection Association (NFPA) Standard NFPA 805 Modifications ML19128A1332019-06-0606 June 2019 Issuance of Amendments TSTF-439 Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19045A4802019-04-16016 April 2019 Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19029A0942019-01-29029 January 2019 Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances) ML18100A7882018-05-0101 May 2018 Issuance of Amendment Special Heavy Lifting Device Nondestructive Examination Frequency (CAC Nos. MG0072 and MG0073; EPID L-2017-LLA-0280) ML17346A3612018-03-0606 March 2018 Issuance of Amendment Nos. 224 and 211 to Adopt Changes to the Emergency Plan ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) ML17334A1782017-11-30030 November 2017 Issuance of Amendment Request Related to Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121 and MF7122, EPID L-2015-LLA-0002) Non-Proprietary ML17310B2392017-11-28028 November 2017 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Unit Staff Qualifications (CAC Nos. MF9545, MF9546, and MF9547; EPID L-2017-LLA-0195) ML17163A0272017-08-0808 August 2017 Issuance of Amendments Transition to NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML17130A7162017-06-20020 June 2017 Issuance of Amendments Technical Specification 3.8.7 Inverters-Operating ML16256A5142016-10-13013 October 2016 Issuance of Amendment One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources - Operating ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) ML15264A2092015-11-30030 November 2015 Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating License ML15229A1762015-08-26026 August 2015 Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture ML15086A0462015-05-21021 May 2015 Issuance of Amendment Nos. 214 and 202 Regarding Revisions to Technical Specification 3.8.1, AC Sources - Operating ML15062A0132015-05-20020 May 2015 Issuance of Amendments 213 and 201 to Revise TS 3.5.3, ECCS - Shutdown ML14239A2572014-11-28028 November 2014 and Prairie Island Nuclear Generation Plant, Units 1 and 2 - Issuance of License Amendments Regarding Cyber Security Plan Implementation Schedule Milestones ML14296A6662014-11-19019 November 2014 Issuance of Amendments Regarding Nuclear Methodology References ML13270A2792014-01-25025 January 2014 Issuance of Amendments Emergency Plan Changes ML13175A2082013-09-11011 September 2013 Issuance of Amendment Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement ML13241A3832013-08-29029 August 2013 Issuance of Amendments Spent Fuel Pool Criticality Changes ML13113A4002013-07-0202 July 2013 License Amendments TSTF-510 ML13093A3442013-05-0909 May 2013 License Amendments for Fuel Oil System and TSTF-501 ML1129011152011-12-0101 December 2011 Issuance of Amendments Revision of Technical Specifications 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications. ML1122008562011-10-27027 October 2011 Operating Plant, Units 1 and 2 - Issuance of Amendments Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology ML1119904692011-08-16016 August 2011 Issuance of Amendments Changes to Security Plan ML11187A2312011-07-29029 July 2011 Issuance of Amendment Nos. 202 (for Unit 1) and 189 (for Unit 2) Regarding Cyber Security 2024-07-01
[Table view] Category:Safety Evaluation
MONTHYEARML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24060A1232024-03-27027 March 2024 to Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 ML23115A4072023-04-26026 April 2023 Correction of License Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML22357A1002023-03-31031 March 2023 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22300A2232022-11-0101 November 2022 Issuance of Amendments 241 and 229 TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML22270A3252022-09-30030 September 2022 (Prairie Island), Unit 2 - Authorization and Safety Evaluation for Alternative Request No. RR-08 ML22181A0002022-08-17017 August 2022 Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22061A2062022-04-0101 April 2022 Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 ML21312A0212021-11-23023 November 2021 Issuance of Amendment Nos. 237 and 225 Inoperable Cooling Water System Supply Header ML21008A0012021-03-19019 March 2021 Issuance of Amendment Nos. 236 and 224 Low Temperature Overpressure Protection ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20356A0022021-02-0505 February 2021 Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 ML20283A3422020-11-18018 November 2020 Issuance of Amendment Nos. 233 and 221 Adoption of Technical Specifications Task Force Traveler TSTF-547, Clarification of Rod Position Requirements ML20276A0032020-10-0202 October 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20217L1852020-10-0202 October 2020 Issuance of Amendment Nos. 232 and 220 Increase the Integrated Leak Rate Test Program Type a and Type C Test Frequency ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML20230A0512020-09-0303 September 2020 Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML20153A4012020-06-0101 June 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML20135G9922020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML20134H9582020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML19276F6842019-11-12012 November 2019 Issuance of Amendments 230 and 218 Issuance of Amendments Adoption of 10 CFR 50.69 - Risk Informed Caterization and Treatment of Structure, Systems and Components of Nuclear Power Reactors ML19232A1512019-11-0707 November 2019 Issuance of Amendments Modifying the Design Basis for Quality Classification of Certain Fuel Handling Equipment ML19140A4472019-07-30030 July 2019 Issuance of Amendments Revision to National Fire Protection Association (NFPA) Standard NFPA 805 Modifications ML19177A3802019-07-0303 July 2019 Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML19128A1332019-06-0606 June 2019 Issuance of Amendments TSTF-439 Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19045A4802019-04-16016 April 2019 Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19046A1662019-02-25025 February 2019 Relief from the Requirements of the ASME Code ML19029A0942019-01-29029 January 2019 Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances) ML18270A0152018-10-19019 October 2018 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME OM Code ML18100A7882018-05-0101 May 2018 Issuance of Amendment Special Heavy Lifting Device Nondestructive Examination Frequency (CAC Nos. MG0072 and MG0073; EPID L-2017-LLA-0280) ML17346A3612018-03-0606 March 2018 Issuance of Amendment Nos. 224 and 211 to Adopt Changes to the Emergency Plan ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) ML17334A1782017-11-30030 November 2017 Issuance of Amendment Request Related to Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121 and MF7122, EPID L-2015-LLA-0002) Non-Proprietary ML17310B2392017-11-28028 November 2017 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Unit Staff Qualifications (CAC Nos. MF9545, MF9546, and MF9547; EPID L-2017-LLA-0195) ML17163A0272017-08-0808 August 2017 Issuance of Amendments Transition to NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML17130A7162017-06-20020 June 2017 Issuance of Amendments Technical Specification 3.8.7 Inverters-Operating ML17110A2752017-05-0404 May 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16320A0212016-11-28028 November 2016 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Review of Changes to the Northern States Power Company Quality Assurance Topical Report ML16256A5142016-10-13013 October 2016 Issuance of Amendment One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources - Operating ML16246A2002016-10-0404 October 2016 Request for Relief 1RR-4-11 and 2-RR-4-11 Associated with Certain Inservice Inspection of Component Welds for the Fourth 10-Year Interval ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) ML15264A2092015-11-30030 November 2015 Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating License ML15229A1762015-08-26026 August 2015 Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture ML15196A2132015-08-17017 August 2015 Requests 1-RR-4-9 and 2-RR-4-9 Associated with the Fourth Ten-Year Interval for the Inservice Inspection Program ML15196A2412015-08-12012 August 2015 Requests 1-RR-5-6 and 2-RR-5-6 Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program ML15196A2272015-08-12012 August 2015 Requests 1-RR-5-3 and 2-RR-5-3 Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program 2024-05-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 13, 2016 Mr. Scott D. Northard Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 - ISSUANCE OF AMENDMENT RE: ONE-TIME EXTENSION OF TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.8.4.3. "DC SOURCES - OPERATING" (CAC NO. MF7572)
Dear Mr. Northard:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 218 to Renewed Facility Operating License No. DPR-42 for the Prairie Island Nuclear Generating Plant, Unit 1. The amendment consists of changes to the Technical Specifications in response to your application dated April 7, 2016.
The amendment revises Technical Specification (TS) Surveillance Requirement (SR) 3.8.4.3 to allow a one-time extension of the TS SR frequency to account for the effects of rescheduling the next refueling outage (1 R30).
A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely, Robert F. K , Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282
Enclosures:
- 1. Amendment No. 218 to DPR-42
- 2. Safety Evaluation cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NORTHERN STATES POWER COMPANY - MINNESOTA DOCKET NO. 50-282 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 218 License No. DPR-42
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Northern States Power Company, a Minnesota Corporation (NSPM, the licensee), dated April 7, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-42 is hereby amended to read as follows:
Enclosure 1
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 218, are hereby incorporated in the renewed operating license.
NSPM shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 7 days.
FOR THE NUCLEAR REGULATORY COMMISSION 0Jq_ V __
David J. Wrona, Chief Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: CX:tober 13, 2016
ATTACHMENT TO LICENSE AMENDMENT NO. 218 RENEWED FACILITY OPERATING LICENSE NO. DPR-42 DOCKET NO. 50-282 Replace the following page of the Renewed Facility Operating License No. DPR-42 with the attached revised page. The changed area is identified by a marginal line.
REMOVE INSERT Page 3 Page 3 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 3.8.4-3 3.8.4-3
(3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NSPM to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, NSPM to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, NSPM to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility; (6) Pursuant to the Act and 10 CFR Parts 30 and 70, NSPM to transfer byproduct materials from other job sites owned by NSPM for the purpose of volume reduction and decontamination.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level NSPM is authorized to operate the facility at steady state reactor core power levels not in excess of 1677 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 218, are hereby incorporated in the renewed operating license. NSPM shall operate the facility in accordance with the Technical Specifications.
(3) Physical Protection NSPM shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Renewed Operating License No. DPR-42 Amendment No. 218
DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or 7 days equal to the minimum established float voltage.
SR 3.8.4.2 Verify each battery charger supplies::::_ 250 amps at 24 months greater than or equal to the minimum established float voltage for ::::_ 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
OR Verify each battery charger can recharge the battery to the fully charged state within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while supplying the demands of the various continuous steady state loads, after a battery discharge to the bounding design basis event discharge state.
SR 3 .8 .4.3 --------------------------NOTES----------------------------
- 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
- 2. This Surveillance shall not normally be performed in MODE 1, 2, 3, or 4. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify battery capacity is adequate to supply, and 24 months*
maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
- During Unit 1 Cycle 29 only, the maximum allowed surveillance test interval shall not exceed 25 months.
Prairie Island Unit 1 -Amendment No.4-§.8 218 Units 1 and 2 3.8.4-3 Unit 2-Amendment No. 149
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 218 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-42 NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 DOCKET NO. 50-282
1.0 INTRODUCTION
By application dated April 7, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16098A093), Northern States Power Company, a Minnesota Corporation (NSPM, the licensee), requested changes to the technical specifications (TSs) for Prairie Island Nuclear Generating Plant (PINGP), Unit 1.
The proposed changes would revise TS Surveillance Requirement (SR) 3.8.4.3 to allow a one-time extension of the TS SR frequency by one month to account for the effects of rescheduling the next refueling outage (1 R30).
2.0 REGULATORY EVALUATION
Title 10 of the Code of Federal Regulations (10 CFR) 50.36(b), requires that "[e]ach license authorizing operation of a production or utilization facility of a type described in § 50.21 or§ 50.22 will include technical specifications. The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to § 50.34. The Commission may include such additional technical specifications as the Commission finds appropriate."
10 CFR 50.36(c) requires that Technical specifications will include items in the following categories: ... (3) Surveillance requirements. Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met."
10 CFR 50.63, "Loss of all alternating current power," requires that each light-water-cooled nuclear power plant must be able to withstand for a specified duration and recover from a station blackout (SBO) as defined in Section 50.2.
As stated in the PINGP Updated Safety Analysis Report (USAR), Section 1.2, the licensing basis conforms to the Atomic Energy Commission's (AEC's) proposed general design criteria as Enclosure 2
published in the Federal Register July 11, 1967 (ADAMS Accession No. ML043310029).
Since the construction of the plant was significantly completed prior to the issuance of the February 20, 1971, 10 CFR Appendix A general design criteria, the plant was not reanalyzed and the Final Safety Analysis Report (FSAR) was not revised to reflect these later criteria. On September 28, 1972, the AEC issued a safety evaluation report entitled "Safety Evaluation of the Prairie Island Nuclear Generating Plant Units 1 & 2." Section 3.1 of the AEC safety evaluation report stated that the AEC staff assessed the plant as described in the FSAR against the 10 CFR Appendix A design criteria and noted that the plant design generally conforms to the intent of these criteria.
General design criterion (GDC) 17, "Electrical power systems," states, in part, that "[a]n onsite electric power system and an offsite electric power system shall be provided to permit functioning of structures, systems, and components important to safety. The safety function for each system (assuming the other system is not functioning) shall be to provide sufficient capacity and capability to assure that (1) specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and (2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents.
The onsite electric power supplies, including the batteries, and the onsite electric distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure."
GDC 18, "Inspection and testing of electric power systems," states that "[e]lectric power systems important to safety shall be designed to permit appropriate periodic inspection and testing of important areas and features, such as wiring, insulation, connections, and switchboards, to assess the continuity of the systems and the condition of their components. The systems shall be designed with a capability to test periodically (1) the operability and functional performance of the components of the systems, such as onsite power sources, relays, switches, and buses, and (2) the operability of the systems as a whole and, under conditions as close to design as practical, the full operation sequence that brings the systems into operation, including operation of applicable portions of the protection system, and the transfer of power among the nuclear power unit, the offsite power system, and the onsite power system."
3.0 TECHNICAL EVALUATION
3.1 System Description PINGP, Units 1 and 2, have four safeguards batteries, one per 125 volts direct current (VDC) subsystem. For PINGP Unit 1, the safeguard batteries are "11" and "12." The batteries are flooded/vented lead acid storage batteries. Each battery consists of 58 cells with a nominal rated capacity of 1800 amperes-hours at an 8-hour discharge rate. One battery charger is in service for each battery so that the batteries are always fully charged.
Each battery is sized to carry expected shutdown loads for a period of one hour following a plant trip and loss of alternating current (AC) battery charger. The minimum terminal voltage is required to operate all necessary components during a design basis event.
Per USAR Section 8.4.4, PINGP is classified as a four hour plant (four hour SBO duration) based on criteria contained in Nuclear Management and Resources Council (NUMARC)-8700 "Guidelines and Technical Bases for NUMARC Initiatives Addressing Station Blackout at Light Water Reactors," which is endorsed for use by the NRC staff in Regulatory Guide (RG) 1.155, "Station Blackout," dated August 1988 (ADAMS Accession No. ML003740034). The license amendment request (LAR) stated that PINGP has demonstrated that alternate alternating current (AAC) from the non-SBO unit's emergency diesel generator is available and the interconnecting bus ties can be manually closed within 10 minutes of the realization that an SBO condition exists to provide power to the required loads on the SBO unit. The LAR stated that the safeguard 125 VDC battery on the SBO unit will provide direct current (DC) power to support actions on the SBO unit for aligning the AAC source to the SBO unit during the 1O minute timeframe and will power the one division of safeguard battery chargers. Therefore, in accordance with RG 1.155 and NUMARC-8700, section 7.1.2, no coping assessment is required.
3.2 Description of Proposed Change SR 3.8.4.3 and the 24-month frequency were added as a new SR during the PINGP TS conversion to STS consistent with NUREG-1431. The amendment approving the conversion of the PINGP TSs to STS was issued July 26, 2002 (ADAMS Accession No. ML022070661 ). The proposed change would, for one time only, extend the surveillance test interval by 1 month. The plant configuration for performing the "11" and "12" battery capacity tests in accordance with TS SR 3.8.4.3 is Mode 5 due to the duration of the test relative to the Required Action with one battery inoperable in Modes 1, 2, 3, and 4.
Unit 1 experienced multiple shutdowns of varying duration during the current operating cycle.
Therefore, the next outage was rescheduled from mid-September 2016 to mid-October 2016.
Extension of the surveillance is proposed to be accomplished by adding an asterisk after the existing frequency and adding a footnote that reads: "During Unit 1 Cycle 29 only, the maximum allowed surveillance test interval shall not exceed 25 months." The NRC staff added a comma after "only" to clarify the note and the licensee confirmed via email on October 11, 2016 that the addition of the comma is consistent with the intent of the proposed change.
3.3 U.S. Nuclear Regulatory Commission (NRC or Commission) Staff Evaluation In the April 7, 2016, LAR, the licensee stated that the "11" battery surveillance test was last completed on October 14, 2014, and would therefore be required to be performed again by October 14, 2016. The licensee also stated that an extension to the TS SR 3.8.4.3 frequency is necessary due to the rescheduling of the 1R30 refueling outage, because the surveillance cannot be performed when the plant is online and will be required before the plant reaches Mode 5 during the scheduled 1R30 refueling outage.
The LAR also stated that each battery has been sized to carry expected shutdown loads following a plant trip and a loss of AC battery charging power for a period of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> without battery terminal voltage falling below the required minimum.
The "11" battery capacity test is performed during each refueling outage under Surveillance Procedure (SP) 1098, "11 Battery Refueling Outage Discharge Test." The purpose of this SP is to isolate, test, restore and recharge the "11" battery. Per the LAR, the battery discharge results were evaluated by the licensee in accordance with IEEE Std. 450-1995. The NRC staff reviewed IEEE Std. 450-1995, Section 6, "Procedure for Battery Tests," and determined that the test procedure for determining the battery capacity is the same as IEEE Std. 450-2010, which was endorsed by RG 1.129, "Maintenance, Testing, and Replacement of Vented Lead-Acid Storage Batteries for Nuclear Power Plants," Revision 3, dated March 2013 (ADAMS Accession No. ML 131?0A112). Therefore, the NRC staff finds licensee's method of determining the battery capacity by evaluating the battery discharge results is acceptable. The licensee stated that the "11" battery was replaced in 2012 and SR 3.8.4.3 battery capacity test performed in 2012 and 2014 indicated a battery capacity of 105.2 percent and 99.5 percent, respectively.
Therefore, the staff determined that if the one month extension request is approved, battery "11" is not expected to drop below its minimum capacity required per SR 3.8.6.6 of 80 percent, before the discharge test is completed.
In addition, the LAR stated that the weekly testing shows no degradation or trend of degradation of "11" battery terminal voltage and is greater than or equal to the minimum established float voltage (SR 3.8.4.1). The most recent system health report for the PINGP, Unit 1, DC distribution system shows no items that are degrading the health or capacity of the "11" battery.
The NRC staff has concluded that the change proposed to the TS SR is for a short duration, and it will not affect the ability of the "11" battery to perform its required function as described in GDCs 17 and 18. Therefore, independence, redundancy, capacity and testability of the PINGP, Unit 1, DC power sources will be maintained during the 1 month extension.
The NRC staff concludes that the proposed change to SR 3.8.4.3 will have minimal impact on the battery capacity. Because the proposed change is for a short duration, the one-time extension of the surveillance frequency will not affect the ability of the "11" battery to perform its required function. The NRC staff determined that battery "11" will not drop below the required minimum capacity before the discharge test is completed in accordance with a one month extension. Also, the proposed addition of the footnote to SR 3.8.4.2 will assure that requirements of 10 CFR 50.36(c)(3) are met. Therefore, the NRC staff finds the proposed change acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Minnesota State official was notified on September 8, 2016, of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes the surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration
and there has been no public comment on such finding (81 FR 40360; dated June 21, 2016).
Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Hari Kodali, NRR Date of issuance: CX:tober 13, 2016
'*
ML16256A514 *-via email OFFICE LPL3-1/PM LPL3-1/LA DE/EE EB/BC DSS/STSB/BC OGC NLO LPL3-1/BC LPL3-1/PM NAME RKuntz SRohrer JZimmerman* AKlein* MYoung DWrona RKuntz DATE 9/13/16 9/13/16 9/16/16 9/27/16 10/11/16 10/13/16 10/13/16