Responds to IE Bulletin 79-03A Re Longitudinal Weld Defects in SA-312 Type 304 Pipe.Some Pipe Matl Has Been Used, However No Application Was Found to Exceed 85% of Allowable Stress
ML19296F074
Person / Time
Site: Beaver Valley
Issue date: 09/05/1980
From: Dunn C
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-03A, IEB-79-3A, NUDOCS 8010010823
Download: ML19296F074 (1)


Text

IO

'A@

(412) 456-6000 435 Sism Anna

$7'"" September 5, 1980 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Attn: Boyce H. Grier, Regional Director Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Response to IE Bulletin 79-03A Gentlemen:

We have reviewed IE Bulletin 79-03A, " Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe."

Our investigation has determined that for some pipe fittings, A-312 seam welded material had been used. However, no application of the A-312 material was found to exceed 85 percent of the allowable stress as identi-fled in the Bulletin. No further action is necessary at this time.

If you have any questions regarding this response, please contact my office.

Very truly yours,

/

L /l.:....,

C. N.'Dunn Vice President, Operations cc: United States Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.C. 20555 Mr. D. A. Beckman, Resident Inspector U.S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, Pennsylvania 15077 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 803()01USD