Request for Additional Information Regarding License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling
ML16277A514
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/03/2016
From: Carleen Parker
Plant Licensing Branch 1
To: Sena P
Public Service Enterprise Group
Parker C, NRR/DORL/LPLI-II, 415-1603
References
CAC MF8012
Download: ML16277A514 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2016 Mr. Peter P. Sena, Ill President PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION- REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO PERMIT OPERABILITY OF LOW PRESSURE COOLANT INJECTION WHILE ALIGNED TO SHUTDOWN COOLING (CAC NO. MF8012)

Dear Mr. Sena:

By letter dated June 17, 2016 (Agencywide Documents Access and Management System Accession No. ML16172A010), PSEG Nuclear LLC (PSEG or the licensee) submitted a license amendment request to permit operability of one low pressure coolant injection (LPCI) subsystem while the subsystem is aligned to shut down cooling for Hope Creek Generating Station. Specifically, this change would add a note to Technical Specification (TS) 3.5.2 allowing one LPCI subsystem of residual heat removal to be considered operable, while the subsystem is aligned and operating in the shutdown cooling mode during Operational Conditions 4 and 5.

The U.S. Nuclear Regulatory Commission staff has reviewed the licensee's application and, based upon this review, has determined that additional information is needed to complete our review. On October 3, 2016, a draft of these questions was sent to Mr. Paul Duke of your staff to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. On October 28, 2016, a teleconference was held to clarify the questions. On November 1, 2016, Mr. Duke indicated that PSEG will submit a response within 45 days of the date of this letter.

P.Sena If you have any questions, please contact me at (301) 415-1603 or by e-mail at Carleen.Parker@nrc.gov.

Sin&; r cJ-Carleen J. P r, Project Manager Plant Licens n Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosure:

Request for Additional Information cc w/enclosure: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO PERMIT OPERABILITY OF LOW PRESSURE COOLANT INJECTION WHILE ALIGNED TO SHUTDOWN COOLING PSEG NUCLEAR LLC HOPE CREEK GENERATING STATION DOCKET NO. 50-354 By letter dated June 17, 2016 (Agencywide Documents Access and Management System Accession No. ML16172A010), PSEG Nuclear LLC (PSEG or the licensee) submitted a license amendment request (LAR) to permit operability of one low pressure coolant injection (LPCI) subsystem while the subsystem is aligned to shutdown cooling for Hope Creek Generating Station (Hope Creek). Specifically, this change would add a note to Technical Specification (TS) 3.5.2 allowing one LPCI subsystem of residual heat removal to be considered operable while the subsystem is aligned and operating in the shutdown cooling mode during Operational Conditions (OPCONs) 4 and 5.

The requirements in Title 10 of the Code of Federal Regulations Section 50.36, "Technical specifications," identify the requirements for the TS categories for operating power plants. One of these categories, limiting conditions for operation (LCOs), is "the lowest functional capability or performance levels of equipment required for safe operation of the facility." The proposed change modifies an existing Hope Creek TS LCO regarding the LPCI subsystem in OPCONs 4 and 5.

The U.S. Nuclear Regulatory Commission staff has reviewed the application and, based upon this review, determined that the following additional information is needed to complete our review:

1. The technical analysis states that the remaining methods of inventory loss in OPCONs 4 and 5 are boiloff and draindown. Discuss the expected time of boiloff and draindown and confirm that these results do not adversely impact existing safety analyses.
2. The LPCI mode of operation can be manually aligned from the control room. In the LAR, it states that, "sufficient time will be available to manually align and initiate LPCI subsystem operation to provide core cooling prior to postulated fuel uncovery." Demonstrate that the time available to manually and remotely align and initiate LPCI operation is bounded by postulated fuel uncovery time.

Enclosure

P.Sena If you have any questions, please contact me at (301) 415-1603 or by e-mail at Carleen.Parker@nrc.gov.

Sincerely, IRA/

Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosure:

Request for Additional Information cc w/enclosure: Distribution via Listserv DISTRIBUTION:

PUBLICLPL 1-2 R/F RidsNrrDorllpl 1-2 Resource RidsNrrLALRonewicz Resource RidsNrrPMHopeCreek Resource RidsACRS_MailCTR Resource RidsRgn1 MailCenter Resource RidsNrrDssSrxb Resource DWoodyatt, NRR ADAMS A ccess1on No.: ML16277A514 t d

  • b 1 e-ma1*1 d ae OFFICE DORL/LPL 1-2/PM DORL/LPL 1-2/LA DSS/SRXB/BC* DORL/LPL 1- DORL/LPL 1-2/PM*

2/BC(A)

NAME CParker LRonewicz EOesterle SKoenick CParker DATE 11/02/2016 10/06/2016 09/28/2016 11/03/2016 11/03/2016 OFFICIAL RECORD COPY