MONTHYEARLR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0075, 2022 Annual 10 CFR 50.46 Report2022-09-30030 September 2022 2022 Annual 10 CFR 50.46 Report LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0019, Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges2022-02-24024 February 2022 Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges LR-N22-0011, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink2022-02-0101 February 2022 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink LR-N22-0005, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-01-0707 January 2022 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0087, Corrected Hope Creek 10 CFR 50.46 Reports2021-12-0202 December 2021 Corrected Hope Creek 10 CFR 50.46 Reports LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0081, Submittal of Updated Final Safety Analysis Report, Revision 25, Summary of Revised Regulatory Commitments2021-11-15015 November 2021 Submittal of Updated Final Safety Analysis Report, Revision 25, Summary of Revised Regulatory Commitments LR-N21-0056, License Amendment Request to Amend the Technical Specifications to Revise Surveillance Requirements for Electric Power Monitor Channels for the Reactor Protection System (RPS) and Power Range Neutron Monitoring System2021-11-0303 November 2021 License Amendment Request to Amend the Technical Specifications to Revise Surveillance Requirements for Electric Power Monitor Channels for the Reactor Protection System (RPS) and Power Range Neutron Monitoring System LR-N21-0079, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2021-11-0303 November 2021 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N21-0071, 2021 Annual 10 CFR 50.46 Report2021-09-30030 September 2021 2021 Annual 10 CFR 50.46 Report LR-N21-0065, License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-09-29029 September 2021 License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0069, Emergency Plan Document Revisions Implemented August 10, 20212021-09-0909 September 2021 Emergency Plan Document Revisions Implemented August 10, 2021 LR-N21-0059, In-Service Inspection Activities - 90 Day Twenty-Third Refueling Outage2021-08-13013 August 2021 In-Service Inspection Activities - 90 Day Twenty-Third Refueling Outage LR-N21-0054, Correction to Prior Spent Fuel Cask Registration Letter2021-07-15015 July 2021 Correction to Prior Spent Fuel Cask Registration Letter LR-N21-0046, Submittal of Salem Generating Station Updated Final Safety Analysis Report, Revision 32, Summary of Revised Regulatory Commitments for Salem, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2021-06-17017 June 2021 Submittal of Salem Generating Station Updated Final Safety Analysis Report, Revision 32, Summary of Revised Regulatory Commitments for Salem, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N21-0040, Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication2021-05-27027 May 2021 Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication LR-N21-0042, Core Operating Limits Report, Reload 23, Cycle 24, Revision 212021-05-24024 May 2021 Core Operating Limits Report, Reload 23, Cycle 24, Revision 21 LR-N21-0025, License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink2021-05-0707 May 2021 License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink LR-N21-0039, Deviation from EPRI Document 33002012244 Inspection Requirements2021-04-30030 April 2021 Deviation from EPRI Document 33002012244 Inspection Requirements LR-N21-0018, Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication2021-04-29029 April 2021 Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication 2023-09-08
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARLR-N22-0011, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink2022-02-0101 February 2022 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink LR-N21-0040, Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication2021-05-27027 May 2021 Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication LR-N21-0018, Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication2021-04-29029 April 2021 Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication LR-N20-0069, Response to Final Request for Additional Information Regarding Revise Technical Specifications Requirements for High Pressure Coolant Injection System Inoperability2020-11-0404 November 2020 Response to Final Request for Additional Information Regarding Revise Technical Specifications Requirements for High Pressure Coolant Injection System Inoperability LR-N20-0043, PSEG Nuclear LLC - Response to Request for Additional Information, Adopt 10 CFR 50.69 LAR2020-06-25025 June 2020 PSEG Nuclear LLC - Response to Request for Additional Information, Adopt 10 CFR 50.69 LAR ML19308A5952019-11-0404 November 2019 Response to Request for Additional Information, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements ML19280A0002019-10-0303 October 2019 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) LR-N18-0109, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-17017 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0107, Response to Request for Additional Information, License Amendment Request Inverter Allowed Outage Time (AOT) Extension (Electrical Branch)2018-10-17017 October 2018 Response to Request for Additional Information, License Amendment Request Inverter Allowed Outage Time (AOT) Extension (Electrical Branch) LR-N18-0073, Supplement to License Amendment Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-07-19019 July 2018 Supplement to License Amendment Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. LR-N18-0061, Response to Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-06-27027 June 2018 Response to Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. LR-N17-0189, Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-22022 December 2017 Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate LR-N17-0187, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate LR-N17-0175, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate LR-N17-0186, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate LR-N17-0176, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate2017-12-14014 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate LR-N17-0170, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-27027 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate LR-N17-0161, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-0101 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate LR-N17-0126, Response to Request for Additional Information (Rai), P-T Limit Report License Amendment Application2017-09-0505 September 2017 Response to Request for Additional Information (Rai), P-T Limit Report License Amendment Application LR-N17-0125, Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2017-08-11011 August 2017 Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors LR-N17-0109, Response to Final Request for Additional Information (Rai), Permanently Extend Type a and Type C Leak Rate Test Frequencies2017-07-13013 July 2017 Response to Final Request for Additional Information (Rai), Permanently Extend Type a and Type C Leak Rate Test Frequencies LR-N17-0063, Response to Request for Additional Information, Permanently Extend Type a and Type C Leak Rate Test Frequencies2017-03-27027 March 2017 Response to Request for Additional Information, Permanently Extend Type a and Type C Leak Rate Test Frequencies LR-N16-0231, Response to Request for Additional Information, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling2016-12-27027 December 2016 Response to Request for Additional Information, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling LR-N16-0226, Response to Request for Additional Information, Regarding Removing Certain Training Requirements2016-12-19019 December 2016 Response to Request for Additional Information, Regarding Removing Certain Training Requirements LR-N16-0232, Response to Prelim White Finding in Integrated Inspection Report 05000354/20160032016-12-14014 December 2016 Response to Prelim White Finding in Integrated Inspection Report 05000354/2016003 LR-N16-0192, Response to Request for Additional Information Stuck Open Safety/Relief Valves2016-12-13013 December 2016 Response to Request for Additional Information Stuck Open Safety/Relief Valves ML16305A2382016-10-31031 October 2016 Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spend Fuel Pools LR-N16-0165, Transmittal of Response to Request for Additional Information Regarding Digital Power Range Neutron Monitoring (Prnm) System Upgrade2016-09-23023 September 2016 Transmittal of Response to Request for Additional Information Regarding Digital Power Range Neutron Monitoring (Prnm) System Upgrade LR-N16-0174, Response to Second Request for Additional Information Regarding Relief Request VR-02 Associated with the Fourth 10-Year Inservice Test Interval2016-09-23023 September 2016 Response to Second Request for Additional Information Regarding Relief Request VR-02 Associated with the Fourth 10-Year Inservice Test Interval LR-N16-0148, Supplemental Information Regarding Request for Relaxation from the Hardened Containment Vent Release Point Height Requirement of NRC Order EA-13-1092016-09-0707 September 2016 Supplemental Information Regarding Request for Relaxation from the Hardened Containment Vent Release Point Height Requirement of NRC Order EA-13-109 LR-N16-0137, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External2016-08-24024 August 2016 Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External LR-N16-0119, Response to Request for Additional Information Regarding Review of Post-Extended Power Uprate Steam Dryer Stress Calculation Acoustic Circuit Model Software Error2016-06-29029 June 2016 Response to Request for Additional Information Regarding Review of Post-Extended Power Uprate Steam Dryer Stress Calculation Acoustic Circuit Model Software Error LR-N16-0109, and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 172016-06-15015 June 2016 and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 17 LR-N16-0105, Request for Additional Information Regarding Relief Requests Associated with the Fourth 10-Year Lnservice Test Interval2016-06-10010 June 2016 Request for Additional Information Regarding Relief Requests Associated with the Fourth 10-Year Lnservice Test Interval LR-N15-0256, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-12-23023 December 2015 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident LR-N15-0092, Compliance with NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information2015-07-28028 July 2015 Compliance with NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information 2022-02-01
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 OPSEG Nuclear LLC 10 CFR 50.90 LR-N16-0231 December 27,2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354
Subject:
Response to Request for Additional Information, Re: License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling (CAC No. MF8012)
Reference:
NRC letter to PSEG, "Hope Creek Nuclear Generating Station - Request for Additional Information Regarding License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling (CAC NO. MF8012)," dated November 3,2016 (ADAMS Accession No. ML16277A514)
In the referenced letter, the Nuclear Regulatory Commission (NRC) requested PSEG Nuclear LLC (PSEG) to provide additional information in order to evaluate the proposed License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling. Attachment 1 provides a detailed response to the request for additional information. PSEG has determined that the information provided in this submittal does not alter the conclusions reached in the 10 CFR 50.92 no significant hazards determination previously submitted. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment. .
In a telephone call on December 8, 2016, PSEG proposed to extend the due date for this response to January 6, 2017, and the NRC staff indicated that was acceptable.
There are no regulatory commitments contained in this letter.
Should you have any questions regarding this submittal, please contact Mr. Lee Marabella at 856-339-1208.
Page 2 LR-N16-0231 I declare under penalty of perj ury that the foregoing is true and correct.
Executed on DEC 2 7 Z016 (Date)
Sincerely,
~~)
~~/ C~--~,-----
Eric S. Carr Site Vice President Hope Creek Generating Station Attachments:
- 1. Response to Request for Additional Information cc: Mr. D. Dorman, Administrator, Region I, NRC Ms. C. Parker, Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Chief, NJBNE Hope Creek Commitment Tracking Coordinator Corporate Commitment Tracking Coordinator
LR-N16-0231 Attachment 1 Response to Request for Additional Information
LR-N16-0231 Response to Request for Additional Information Regarding License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling Hope Creek Generating Station Docket No. 50-354 By letter dated June 17, 2016 (Agencywide Documents Access and Management System Accession No. ML16172A010), PSEG Nuclear LLC (PSEG or the licensee) submitted a license amendment request (LAR) to permit operability of one low pressure coolant injection (LPCI) subsystem while the subsystem is aligned to shutdown cooling for Hope Creek Generating Station (Hope Creek). Specifically, this change would add a note to Technical Specification (TS) 3.5.2 allowing one LPCI subsystem of residual heat removal to be considered operable, while the subsystem is aligned and operating in the shutdown cooling mode during Operational Conditions (OPCONs) 4 and 5.
The requirements in Title 10 of the Code of Federal Regulations Section 50.36, "Technical specifications," identify the requirements for the TS categories for operating power plants. One of these categories, limiting conditions for operation (LCOs), is "the lowest functional capability or performance levels of equipment required for safe operation of the facility." The proposed change modifies an existing Hope Creek TS LCO regarding the LPCI subsystem in OPCONs 4 and 5.
The U.S. Nuclear Regulatory Commission staff has reviewed the licensee's application and, based upon this review, determined that the following additional information is needed to complete their review.
Request for Additional Information
RAI-1
The technical analysis states that the remaining methods of inventory loss in OPCONs 4 and 5 are boiloff and draindown. Discuss the expected time of boiloff and draindown and confirm that these results do not adversely impact existing safety analyses.
PSEG Response to RAI-1 Draindown:
PSEG performed a technical evaluation to confirm potential draindown times do not adversely affect existing safety analyses. The evaluation included the following:
- The estimated time to realign the system in the control room is 5 minutes.
- The volume of water between the minimum vessel level with shutdown cooling in service (80") and LPCI injection signal Level 1 (-129") was calculated to be 39,779.39 gallons.
1
LR-N16-0231
- Using a conservative realignment time of 30 minutes, the leak rate that would be necessary to drain down the vessel to Level 1 was calculated to be approximately 1,326 gpm.
- The limiting draindown event, Control Rod Drive Mechanism Replacement with blade removed, results in a postulated leak rate of 1,290 gpm.
Given that the draindown to Level 1 is 32" above the top of active fuel (-161") and since the limiting postulated draindown event leak rate (1,290 gpm) is less than the calculated leak rate required to drain the vessel to Level 1 in 30 minutes (approximately 1,326 gpm), no postulated draindown event would result in Reactor Vessel water level decreasing to Level 1 during the time it takes to re-align the sub-system to LPCI mode.
Boil-off:
A technical evaluation was performed to determine the effects on reactor vessel level due to boiloff following the loss of shutdown cooling in OPCONs 4 and 5.
For all cases evaluated where the vessel head was in place (OPCONs 4 and 5), the vessel water level increased for the first 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> due to the increase in specific volume of the water as a result of an increase in temperature and pressure due to the very small vessel head vent piping area.
A case was run for the vessel head removed (OPCON 5) at a higher reactor vessel level. The results show that vessel water level increases for the first 1.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> until boiling begins. At time 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, vessel level is higher than the level at the start of the case due to thermal expansion.
A final MODE 5 case was run with conservative (bounding) initial conditions to maximize the water depletion rate. These conservative results show that vessel level drops 84 inches by the 1.5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> mark resulting in a level of -4 inches which is still 157 inches above the top of active fuel.
Therefore, the time to reach the top of active fuel due to boiloff is substantially greater than the estimated time to realign the subsystem to LPCI mode.
RAI-2
The LPCI mode of operation can be manually aligned from the control room. In the LAR, it states that, "sufficient time will be available to manually align and initiate LPCI subsystem operation to provide core cooling prior to postulated fuel uncovery." Demonstrate that the time available to manually and remotely align and initiate LPCI operation is bounded by postulated fuel uncovery time.
2
LR-N16-0231 PSEG Response to RAI-2 PSEG estimates it would take approximately 5 minutes to re-align the Residual Heat Removal (RHR) system from SOC to LPCI Injection mode from the control room. PSEG would not consider one LPCI subsystem of RHR to be operable while the subsystem is aligned and operating in the Shutdown Cooling Mode during Operational Conditions (OPCONs) 4 and 5 unless realignment of the subsystem could be accomplished from the control room. The bases will be worded accordingly.
Using a conservative value of 30 minutes, the technical evaluation for draindown calculated the limiting leak rate that would result in vessel level decreasing to Level 1 (LPCI injection). This leak rate was compared to the limiting draindown event and was found to be bounding.
In addition, the technical evaluation for boiloff calculated that even with conservative initial conditions, the loss of decay heat removal would not result in reducing vessel level to below the top of active fuel in the 30 minute time interval assumed for re-alignment.
3