MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 PSE:<i Nuclem*LLC 10 CFR 50.90 LR-N 17-0052 LAR H16-02 FEB 17' 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 HOPE CREEK GENERATING STATION RENEWED FACILITY OPERATING LICENSE NO. NPF-57 NRC DOCKET NO. 50-354
Subject:
Supplement to License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling
Reference:
LR-N16-0066, "License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling," dated June 17, 2016 On June 17, 2016, PSEG Nuclear LLC (PSEG) submitted a license amendment request (LAR) to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station to permit operability of low pressure coolant injection while aligned to shutdown cooling. Subsequent to this submittal, PSEG determined that the Technical Specification (TS) markup page in of the LAR was missing the word "manually" in the added note. A corrected TS markup page is included as Attachment 1 to this letter.
The corrected TS mark-up does not affect the Technical Analysis or No Significant Hazards Consideration conclusions contained in the LAR. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no regulatory commitments contained in this letter. i
. i If you have any questions or require additional information, please contact Mr. Lee Marabella at (856) 339-1208.
m 117 tm'i?l 10 CFR 50.90 Page 2 LR-N17-0052 I declare under penalty of perjury that the foregoing is true and correct.
Executed on __________
(Date)
R Eric Carr Site Vice President Hope Creek Generating Station Attachments:
- 1. Technical Specification LCO 3.5. 2 (marked-up page) cc: Administrator, Region I, NRC Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. MacEwen, Hope Creek Commitment Tracking Coordinator
LR-N17-0052 Attachment 1 Technical Specification LCO 3.5.2 (marked-up page)
J/4 5.2 ECCS
IM!TING CONO[T!ON FOR PERAT[QN
.,...._,...,.,.. r;l<;o,it!;Q>J.,1'1---""""'-"I ......._.
3,5,2 At lest wa of thQ following sna11 b OPERABLE:
- 2. An OPERABLE flow catn capable of taking suction from It east one of the followiflg watr sourcGs and trln$ferrfng ta ater thtogh thQ spray sorGr to th rQactor vsl:
a) From tM swpprJssion <::hll.mbflr, or D) lthn the suport:ssion cniHMbtr waur 1vt\ is \ass tMn t1e limit or is drainid, from the condnsat storaga tanK containfng at ',east l3S,OOO avt.i1hc1 gallons of wat.ar.
tl. Lo<R prssure coolant injecti01'1. (LPCI) syshm HIO$y:Hems uch with a subsystm eornprisQd of; L OrHt OP EAA8lE LPC! \jump , £\\d
- 2. An OPERABLE flaw pth capab1t of taking swction from tht supprls 'oM chambir and transfirr1ng th* w1tar to thl reacor V{l5\ili1,**
APPLICABtLlTY: OPERAiiOHAL CONDITION 4 and 5:11, ACTION:
a, WHh oM of tl'le il00¥'11 rqr.drtd &ubsy3tlliM inoperaol:, rutora .at
- 1 ust two S\JDSyHI'rl to OPERABLE tati,JS \Iii t.FI\n 4 ours or SWSPM all operations with pottntlal for draining thQ reactor v1sse1.
- b. With ootl'1 o1 thlll :bov11 rnquird s.ubsyst&Hni inoplllNb1e, su:pend CORE ALTERATtONS urd 11 operlioni with a pountial for dratn1ng tM rt&ctor vass01. Rastor at 1t$t onm subsysttru to OPERABLE status rt1thin d. r.ors or uutllieil SECONDARY CONTAIHMIH INTEGRITY within th@ nxt e hours.
Th1 ECCS s not rtQu1rd to b GPERABLE provitd that th rl&ctor vessel head is rmOvQd, thQ cvity Is floodtd, tno spnt fut1 pol gats &rt removed, nd lo'H<<r 14!ve1 is m<intalned within UH limit$ of SptC1fictioil 3.9.B and 3.9.9.
<*<one LPCI subsystem may be considered OPERABLE during alignment and operation for decay heal removal if capable of being manually realigned and not otherwise inoperable.