ML17319B243

From kanterella
Revision as of 07:39, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Public Version of Procedure Temporary Sheet 1 to Emergency Plan Plant Manager Procedure PMP 2080 EPP.007 Re Initial Release Assessment (Liquid).Procedure Index Encl
ML17319B243
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/04/1982
From: Vince S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17319B241 List:
References
PROC-820304-01, NUDOCS 8203220568
Download: ML17319B243 (4)


Text

lilfPAIIIA 5 kf/C'HIBItI EIECTEIC COMPANY DONALD G. GOOK NUCL'EAR PLANT Instruction or Procedure Temporary Sheet TEMPORARY This temporarjj sheet.applies-to,,Initial Re1ease Assessment (Liquid) SHEET NO.

fnstructlon or Procedure No. Pgp 2p8p Epp pp7 Revision No. 0 The following change ( X) new requirement ( ) shall be instituted effective (Date). 2 23 82 Change the Nate $n step 4.1.3 to read:

If the EAL's have been equalled or exceeded, implement PMP 2080 EPP .001; If Not, continue with step 4.1.4 Reason: Individual EPP's for the four classes of emergency conditions have all be included into PUP 2080 EPP ,001.

OCR This change shoulcLbeImade a.permanent revis on to the instruction or Procedure:

Ct YES aNQ a NOT KNOWN, addittonal review required

'xpiratIcrr Date: Standard. Dist. List No.:

Originator. Distribution:

Managerrent .Staff:

Senior Reactor Operators PNSRC Rant Manager 8203220568 8203i2 PDR ADOCK 05000315 Po, F PDR IIrHITE ORIG'L CANARY ORIGINATOR COPY

%OR NG COP

0 ~ ~

I 1

I C.

I

)

PMP EPP INDEX INDIANA Itc MICHIGAN POWER COMPANY DONALD C. COOK'UCLEAR PLANT PLANT MANAGER PROCEDURE Indev.

Identi fi cati on Title Revision No. Cottments Number And Date PMP2080 EPP.001 Emergency Plan Activation . Revision > TP 1,1-23-82* Exp N/A and Condition Classification '0-27-81 EPP.002 Unusual Event CANCELLED 10-29-81 EPP.003 Alert CANCELLED UL>29+83 J

EPP.004 Site Emergency CANCELLED

~

iQ;29.,~

EPP.005 General Emergency CANCELLED.

i&29.KL EPP.006 Initial Dose Assessments Revision 1 (Gaseous) 10-27,:81 EPP.007 Initial Release Assessments- Revision 0 TP-1,2-23-82 Exp N/A (Liquid) 4-1-81 EPP.008 Calling Off-Duty Plant Revision 0 Personnel 4-1.-81

.EPP.009 Fire Emergency Guidelines 'evision 0

4-1-81 EPP.010 oxic Gas Rel.ease Revision 0 uidelines 4-1-81 EPP.011 atural Emergency Guidelines Revision 0 4-1-81 EPP.012. nitial Off-Site Revision 0 TP-1,2-1-82 Exp N/A oti ficati on 4-1-81 EPP.013 uties of the Individual Who Revision 0 iscovers an Emergency 4-1-81 ondition