ML17320A308

From kanterella
Revision as of 07:32, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Public Version of Temporary Sheet 1 to Rev 3 to Emergency Plan Implementing Procedure PMP 2080 EPP.006, Initial Dose Assessments. Procedure Temporary Sheet Encl
ML17320A308
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/05/1983
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320A306 List:
References
PMP-2080-EPP., PMP-2080-EPP.00, NUDOCS 8301190162
Download: ML17320A308 (5)


Text

or Proc" 'Jre emporary Sheet

+)~)+8m~~

l'nstruct)on I

This temporary sheet applies to /<<<z~~~~ ~ S TEMPORARY acB a. ~P> <>~. c.d C A~Vr7 r ('0 wo This change should be made a permanent revision to the Instruction or Procedure:

ggES a NO 0 NOT KNOWN, additional review required Explfaticn Date:

Originator.

Management

'r'tandard tafF:

~ter: )

Dist. List No.:

Distribution:

Senior React PNSRC .:

Plant Managerf

' 'ce Form No. 4330 REVISED 7/78 ORIGINAL WHITE CANARY ORIGINATOR COPY WORKING COPY 830ii3 830ii90ib2 050003i5', PINK ~

PDR ADOCK

I e

PHP 2080 EPP.006 4.1.1.2 Zf R-15 or R-33 is off-scale high, obtain a radiation reading at 6" from the GSLO or SJAE exhaust line.

4.1.2 Appropriate vent flow rate (Unit Vent, GSLO, or SJAE) .

4.1.3 Wind velocity and direction from the 50 foot elevation.

lI 4.1.4 Determine PASCALL Category as per the table below:

DT=(T9180ft. - T930Ft.) C PASCALL CATEGORY

.9 A

.9

.8 to to-.8

.7 B

C 7 to - .2 D

~ 2 to + .7 E

+ 7 to +1.8 F

+1.8 G 4.2 Xf ~meteorological instrumentation is inoperable use Exhibit G to estimate wind speed and PASCALL Category.

Obtain wind direction from the Visitors Center or State Police.

4.3 Select appropriate graph(s) to use and blanks.

fill in data 4.3.1 R-26 On-Scale; Exhibit A 4.3.2 R-26 Off-Scale; Exhibit B 4.3.3 R-33 On-Scale; Exhibit C 4.3.4 R-15 On-Scale; Exhibit D

4. 3.'5 R-15, R-33 Off-Scale; Exhibit E 4.3.6 Waste Gas Decay Tank Release; Exhibit F NOTE: R-15 On-Scale will always result in less than 1 mR/hr off-site. With steam generator tube ruptures, readings would be expected also on R-33. The dose associated with the release from a steam generator tube rupture will be the sum of the doses calculated from R-15 and R-33.

Page 2 of 17 Rev. 3

'l 1

~

t~ PMP EPP INDEX v

i I

~ 4 ~

INDIANA 5 MICHIGAN POMER COMPANY DONALD C. COOK iVUCLEAR PLANT P ANT MANAG R P Indev Identification Title Revision iVo.

Comments Number And Date PMP 2080 EPP.001 Emergency Plan Activation Revision 3 and Condition Classification 10-12-82 EPP.002 Unusual Event CAiNCELLED 10-.29-81

.EPP.003 Alert CANCELLED 10-29-81 fPP.004 Site Emergency CANCELLED 10-29-81 EPP:00 General Emergency CANCELLED 10-29-81 EPP.OO Initial Dose Assessment Revihion 3 TP-1, "-4-83 EXP (Gaseous) 8-27-82 Procedure Revision fPP.007 Initial Release Assessments Revision 0 TP-1,2-23-82 Exp NA (Liquid) 4-1-81 EPP.008 Initiating Manning of Emer- Revision,3 gency Response Facilities 10-12-82 8 Calling Off-Duty Personnel EPP.009 Fire Emergency Guidelines Revision 1 6-15-82 EPP.010 Toxic Gas Release Guidelines Revision 1 6-'2-82 fPP. 011 Natural Emergency Guidelines Revisiorl 1 11-15-82 fPP.012 Initial Off-Site Notificatio Revision 2 18-19-82 Pca~

Rev. Data  !-F-83