ML19269E867

From kanterella
Revision as of 20:33, 25 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to IE Bulletin 79-10, Requalification Training Program Statistics. Forwards Util Requalification Training Program Statistics
ML19269E867
Person / Time
Site: Beaver Valley
Issue date: 05/23/1979
From: Dunn C
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7906290746
Download: ML19269E867 (3)


Text

. . .

a g

'h >S (412) 471-4300 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 May 23, 1979 United States Nuclear Regulatory Commission Attention: B. H. Grier, Director Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 License No. DPR-66 Response To IE Bulletin 79-10 Gentlemen:

The information requested in IE Bulletin 79-10, "Requalification Training Program Statistics" has been compiled and tabulated in the attached Table 1.

If you have any questions regarding this information, please contact my office.

Very truly yours, C. N. Dunn Vice President, Operations Attachment cc: United States Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Project Management Operator Licensing Branch Washington, D. C. 20555 2142 076 790629079'6 g

.. .

- '*

.- _..

IE Bulletin No. 79-10 Date: May 11, 1979

.

,

.

TABLE 1 f Utility: Duquesne Light Company Date: May 17,1979

,

Facility: Beaver valley Power Station

-

Operators Senior Operators Exam Exam Exam Eyam Exam Exam Exam Exam 1 2 3 -4 1 2 3 4

.

1. Action 1: Responses

.

A. Total number failed annual examination 0 o o 1 1 o o 1 B. Percent that failed annual examination o o 0 8.3 8.3 o o 5.2

,

2. Action 2: Responses A. Percent required to

~

attend additional o 37.5 44 58 o 38 61 63 lectures B. Number of operators 0/0 1/20 1/2 2/4 0/0 1/7 2/2 2/2 attending specified 1/23 2/6 1/5 1/11 2/5 2/3 number of lectures (no. 1/26 1/8 1/6 2/15 1/6 1/4 of operators /no. of 1/7 1/29 1/7 2/6 lectures) 1/8 2/13 3/8 1/10 1/15 1/9

3. Action 3: Responses 1/18 1/20

~

1/22 A. Total number attending accelerated training because < 70 percent on annual written examination o o o 1 -1 o o 1 B. Percent attending accelerated training lesson because < 70

, percent on annual written examination o o o 8.3 8.3 o o 5.2 2142 077

-- -

..

p l'

. . ..

. - .

.

IE Bulletin No. 79-10 Date: May 11, 1979 TABLE 1 (Continued) .

Utility: Duquesne Light Company Operators Senior Operators Facility: Beaver Valley Power Exam Exam Exam Exam Exam Exam Exam Exam station 1 2 3 4 1 2 3 4

'

C. Total number attending

- accelerated training because unsatisfactory o o o 0 0 o o o oral examination D. Percent attending accelerated training because unsatisfactory o o o o o 0 0 0 oral examination Date of Exam 1., April - May 1976

.

2. March - April 1977

, 3. April - May 1978 4 April - May 1979

.

.

~

.

-

2142 078

.