Category:Inspection Report
MONTHYEARIR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 IR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 IR 05000298/20210032021-11-0404 November 2021 Integrated Inspection Report 05000298/2021003 IR 05000298/20210112021-10-19019 October 2021 CNS2021011 TI194 RPT Jfd, Cooper Nuclear Station - Temporary Instruction 2515/194 Report 05000298/2021011 IR 05000298/20214022021-10-12012 October 2021 Security Baseline Inspection Report 05000298/2021402 IR 05000298/20210052021-09-0101 September 2021 CNS Mid-Cycle Inspection Plan Transmittal Letter for Cooper Nuclear Station (Report 05000298/2021005) IR 05000298/20210022021-08-0909 August 2021 Integrated Inspection Report 05000298/2021002 IR 05000298/20213012021-07-29029 July 2021 NRC Retake Examination Report 05000298/2021301 IR 05000298/20210122021-07-27027 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000298/2021012 IR 05000298/20210102021-06-0707 June 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000298/2021010 IR 05000298/20210012021-05-0505 May 2021 CNS2021001-IR-AS, Cooper Nuclear Station - Integrated Inspection Report 05000298/2021001 IR 05000298/20214012021-05-0404 May 2021 Security Baseline Inspection Report 05000298/2021401 IR 05000298/20200062021-03-0303 March 2021 Annual Assessment Letter for Cooper (Report 05000298/2020006) IR 05000298/20200042021-02-0303 February 2021 Integrated Inspection Report 05000298/2020004 2024-08-22
[Table view] Category:Letter
MONTHYEARML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding IR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 2024-09-03
[Table view] |
Text
ber 2, 2018
SUBJECT:
COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2018404
Dear Mr. Dent:
On August 23, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Cooper Nuclear Station facility. The NRC inspectors discussed the results of this inspection with Mr. Dan Buman, Director of Nuclear Safety Assurance and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
David A. Holman, Chief Plant Support Branch 1 Division Reactor Safety Docket No. 50-298 License No. DPR-46
Enclosure:
NRC Inspection Report 05000298/2018404
Inspection Report
Docket Number: 05000298 License Number: DPR-46 Report Number(s): 05000298/2018404 Enterprise Identifier: I-2018-404-0001 Licensee: Nebraska Public Power District Facility: Cooper Nuclear Station Location: Brownville, Nebraska Inspection Dates: August 20, 2018 to August 23, 2018 Inspectors: J. Buchanan, Physical Security Inspector C. Jewett, Physical Security Inspector Approved By: David A. Holman Chief, Plant Support Branch 1 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at Cooper Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings were identified.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, "Security Inspection Program for Commercial Nuclear Power Reactors." The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.04 - Equipment Performance, Testing, and Maintenance
Main article: IP 71130.04
The inspectors evaluated the security testing and maintenance program. The following elements were evaluated:
Tier I: all requirements Tier II: all requirements Tier III: all requirements
71130.07 - Security Training
Main article: IP 71130.07
The inspectors evaluated the nuclear security training program. The following elements were evaluated:
Tier I: all requirements Tier II: all requirements Tier III: all requirements
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
On August 23, 2018, the inspectors presented the Baseline Security Inspection results to Mr. Dan Buman, Director of Nuclear Safety Assurance, and other members of the licensee staff.
The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision
Procedure
71130.04 Procedures 0.9.1 Administrative Procedure Lockout 12
1.6 Security Procedure Firearms and 42
Personnel Equipment Issuance,
Control, Testing and Maintenance
2.8 Access Control Devices 51
2.11 Security Procedure Equipment 37
Testing General
2.11.1 Security Procedure Equipment 23
Testing - CCTV
2.11.2 Security Procedure Access 30
Equipment Testing
2.11.4 Security Procedure Equipment 17
Testing Doors
7.3.29.3 UPS1 Security Battery 1
Maintenance
7.3.31.1 CAS Battery Intercell Connection 12
Testing and Maintenance
7.3.31.5 CAS, PMIS, and 24V Battery Cell 1
and Rack Examination
14.10.5 Security System Mux Unit Annual 18
Examination and Maintenance
14.10.6 Security System Intrusion 39
Detection Device Performance
Testing
14.10.11 Security System Uninterruptible 15
Power Supply (UPS2)
Performance Testing, Examination
and Data Collection
14.10.12 Security System Uninterruptible 7
Power Supply (UPS2 and UPS3)
Examination and Data Collection
14.10.14 Digital Imaging Security System 7
Camera Maintenance
14.10.15 Security System Intrepid 6
Maintenance
14.10.16 Microwave Zone Intrusion and 0
Power Supply Failure Testing
Audits and QAD 2017- Quality Assurance Audit 03/13/2017
Assessments 005
Self Assessment Security Equipment, Security 04/2018
Training, Access Control, Performance Indicator
Verification
MISC Badge Card Reader Transaction History 12/24/2017 -
01/23/2018
Daily Accountability Report, Issued Rifles and 08/21/2018
Duty Ammunition Accountability
Daily Security Log 12/24/2017 -
01/23/2018
Daily Security Log 08/16/2018
Email, Garrett Metal Detectors, Subject: Daily 08/21/2018
Testing of the Garrett 6500i Metal Detectors
Monthly Gas Mask Inspection 08/13/2018
Semi-Annual Vest Inspection 07/2018
VC/AVSS Site Acceptance Test 01/10/2018
Vital Area Portal Patrol Tracking 12/24/2017 -
01/23/2018
Weapons Maintenance Schedule 03/2016 -
2018
Zone Alarm History Report 08/22/2018
Work Orders 5066822 5121877 5149425
5164241 5170075 5208201
209969 5261429
Work Tasks WT 2018-0001-067 WT 2018-0001-200 WT 2018-0001-264
Condition CR-2017-03240 CR-2017-07372 CR-2018-00242
Reports CR-2018-01551 CR-2018-02322 CR-2018-04734
CR-2018-04942 CR-2018-04944 CR-2018-04963
71130.07 Procedures 0-CNS-LI-102 Corrective Action Process 08
SP1.4 Administration of Security 22
Training and Qualifications
SP 1.4.1 On-the-Job Training and Task 05
Performance Evaluation
SP 2.13 Security Team Training and 31
Exercises
SEC-125 Systematic Approach to (SAT) 03
Training
Audits and QAD 2017- QA Audit 17-01, Nuclear 03/13/2017
Assessments 005 Security
Self- Access Control, PIV, Security 04/2017
Assessment Equipment, Security Training
Program
Self- Access Control, PIV, Security 04/2018
Assessment Equipment, Security Training
Program
MISC Form Exhaustive List of Assignments In Use
Lesson Plan Semi-Automatic Handgun Day 07
Qualification
Lesson Plan Semi-Automatic Handgun Night 06
Qualification
Lesson Plan Semi-Automatic Rifle Day 07
Qualification
Lesson Plan Semi-Automatic Rifle Night 05
Qualification
Lesson Plan Semi-Automatic Handgun, Rifle 15
Tactical Qualification
Lesson Plan Perform Critical Administrative 12
Exams
Lesson Plan Perform Visitor Access Control 08
Lesson Plan Conduct Personnel Searches 10
Lesson Plan Conduct Security Patrols/Alarm 08
Response
Lesson Plan Determine Amount of Force 01
Required to Prevent an
Unauthorized Act
Exam Annual Written Exam 03
Plan Cooper Nuclear Station Physical March 30,
Security Plan 2017
Condition CR-2018-04934 CR-2018-04966 CR-2018-04967
Reports CR-2018-04972
ML18275A414
Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: ADM Yes No Publicly Available Sensitive ______ NRC-002
OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:PBC C:PSB1
NAME JBuchanan C Jewett DHolman JKozal DHolman
SIGNATURE /RA/ /RA/ /RA/ /RA by /RA/
DProulx
Acting For/
DATE 09/19/18 09/25/18 10/02/18 10/02/18 10/02/18